UFGS_31_10_00_Clearing_for_Civil_Works.pdf

PDF 36 KB Posted

Attached to
Hill AFB Basewide Fencing IDIQ Federal contract opportunity
Solicitation number
FA8201-14-R-0009
Issued by
Department of the Air Force Materiel Command Ogden Air Logistics Complex

About this file

UFGS - Clearing for Civil Works

View the file

Other files for this federal contract opportunity

Other files attached to Hill AFB Basewide Fencing IDIQ, newest first.
File Type Posted
Amendment_0005.pdf PDF
Fencing_Solicitation_-_FA8201-14-R-0009.doc.pdf PDF
Revised_Copy_of_Schedule_B_FY14-FY18.xlsx XLSX spreadsheet
Questions_and_Answers_-_10_Jun_2014.pdf PDF
FA8201-14-R-0009-02.doc DOC document
Schedule_B.xls XLS spreadsheet
FA8201-14-R-0009-0001.doc DOC document
Schedule_B.xls XLS spreadsheet
SOW_Seed_Task.docx DOCX document
UFGS_32-12-16HMA.pdf PDF
UFGS_12_93_00_Site_Furnishings_-_Bollards _Wood_Fence.pdf PDF
UFGS_01_11_00_Summary_of_Work.pdf PDF
Basic_SOW_23_Jul.pdf PDF
BASE_FACILITY_DESIGN_STANDARD.pdf PDF
ufc_1_300_02.pdf PDF
UFGS_01_62_35_Recycled_-_Recovered_Materials.pdf PDF
UFGS_32_31_13_Chain_Link_Fences_and_Gates.pdf PDF
UFGS_31_00_00_Earthwork.pdf PDF
UFGS_01_20_00.00_20_Price_and_Payment_Procedures.pdf PDF
UFGS_32_31_13.53_High-Security_Chain_Link_Fences_and_Gates.pdf PDF
UFGS_32_16_13_Concrete_Sidewalks _Curb _Gutter.pdf PDF
UFGS_28_20_01.00_10_Electronic_Security_System_-_Vindicator.pdf PDF
UFGS_32-13-13.06PCC.pdf PDF
UFGS_02_41_00_Demolition_and_Deconstruction.pdf PDF
Fencing_Solicitation_-_FA8201-14-R-0009.pdf PDF
MIL_HDBK_1013_10.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 31 10 00 Page 1

SECTION TABLE OF CONTENTS

DIVISION 31 - EARTHWORK

SECTION 31 10 00

CLEARING FOR CIVIL WORKS

08/08

PART 1 GENERAL

1.1 UNIT PRICES

1.1.1 Clearing Brush

1.1.1.1 Payment

1.1.1.2 Unit of Measure

1.2 DEFINITIONS

1.2.1 Brush

1.3 PROJECT/SITE CONDITIONS

1.3.1 Aesthetics and Pollution Control

1.3.1.1 Ground Areas

1.3.1.2 Construction Roads

1.3.2 Existing Conditions

1.3.2.1 Boundaries

1.3.2.2 Markings of Zones

1.3.2.3 Zones

1.3.2.4 Fences

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 CLEARING REQUIREMENTS

3.1.1 Brush

3.1.2 Equipment

3.2 DISPOSAL OF MATERIAL

3.2.1 General

3.2.2 Burning

3.2.3 Burial

3.2.4 Removal from Site

3.3 DEBRIS

3.4 MARKETABLE MATERIALS

3.5 LOCATIONS

-- End of Section Table of Contents --

SECTION 31 10 00 Page 2

SECTION 31 10 00

CLEARING FOR CIVIL WORKS

08/08

PART 1 GENERAL

1.1 UNIT PRICES

1.1.1 Clearing Brush

1.1.1.1 Payment

Payment will be made for costs associated with furnishing plant, labor, materials and equipment, and performing all operations necessary for clearing brush as specified.

1.1.1.2 Unit of Measure

Unit of measure: lump sum.

1.2 DEFINITIONS

1.2.1 Brush

Brush is that growth which is less than 2 inches in diameter measured 6 inches from the ground on the uphill side and is less than 6 feet in height measured from the ground on the uphill side.

1.3 PROJECT/SITE CONDITIONS

1.3.1 Aesthetics and Pollution Control

1.3.1.1 Ground Areas

All ground areas in the zone of normal pool level fluctuations which are disturbed by clearing operations and which would become subject to erosion will be protected or restored.

1.3.1.2 Construction Roads

All construction roads proposed for use by the Contractor for access to the work area shall be approved, as to location and alignment, prior to construction. Where such roads are determined to be of no value to project operation or will not serve recreational access needs after project construction, the areas occupied by these roads will be restored as nearly as possible to pre-construction conditions by reasonable grading and seeding as directed along with the planting of seedling trees if in a tree cover area.

1.3.2 Existing Conditions

1.3.2.1 Boundaries

The area to be cleared under this section is the zone having the general limits as indicated on the aerial photographs, which form a part of each individual task order Statement of Work under this contract.

1.3.2.2 Markings of Zones

SECTION 31 10 00 Page 3

The contour lines have been established in the field by the Government.

The property lines or contour lines may be requested to be identified by stakes on the lines. Other boundaries are marked by identifiable topographical features or by section or fractional section lines.

1.3.2.3 Zones

The boundaries of the zone are as described in paragraph BOUNDARIES.

1.3.2.4 Fences

All fences shall be cleared as shown in each individual task order Statement of Work.

PART 2 PRODUCTS

Not used

PART 3 EXECUTION

3.1 CLEARING REQUIREMENTS

3.1.1 Brush

The cutting of brush may be required.

3.1.2 Equipment

Necessary equipment to clear brush may be used at the option of the Contractor in all brush clearing operations.

3.2 DISPOSAL OF MATERIAL

3.2.1 General

The material cleared from the areas shall be completely removed by transporting from the Government property as approved by the Contracting Officer. In no case shall cleared material be thrown into or left in any creeks or rivers. The cutting of brush and debris remaining after clean-up, in order to avoid removal, will not be permitted.

3.2.2 Burning

Burning will not be permitted.

3.2.3 Burial

Burial of debris will not be permitted.

3.2.4 Removal from Site

Haul concrete debris to the Class IV base landfill as shown in Basic Contract Statement of Work, unless otherwise stated in task Statement of Work. Haul asphalt debris to the Class IV base landfill as shown in Basic Contract Statement of Work, unless otherwise stated in each individual task order Statement of Work. Haul other debris to Class I, II, III, V, or VI landfill off base.

3.3 DEBRIS

SECTION 31 10 00 Page 4

Debris shall include trash of all kinds.

3.4 MARKETABLE MATERIALS

Any of the cleared materials which the Contractor considers marketable shall become its property and shall be removed from the project area.

3.5 LOCATIONS

The locations of brush and debris to be cleared are along the fence lines as shown in the task specific Statement of Work.

-- End of Section --