UFGS_01_11_00_Summary_of_Work.pdf

PDF 41 KB Posted

Attached to
Hill AFB Basewide Fencing IDIQ Federal contract opportunity
Solicitation number
FA8201-14-R-0009
Issued by
Department of the Air Force Materiel Command Ogden Air Logistics Complex

About this file

UFGS - Summary of Work

View the file

Other files for this federal contract opportunity

Other files attached to Hill AFB Basewide Fencing IDIQ, newest first.
File Type Posted
Amendment_0005.pdf PDF
Fencing_Solicitation_-_FA8201-14-R-0009.doc.pdf PDF
Revised_Copy_of_Schedule_B_FY14-FY18.xlsx XLSX spreadsheet
Questions_and_Answers_-_10_Jun_2014.pdf PDF
FA8201-14-R-0009-02.doc DOC document
Schedule_B.xls XLS spreadsheet
FA8201-14-R-0009-0001.doc DOC document
SOW_Seed_Task.docx DOCX document
Schedule_B.xls XLS spreadsheet
UFGS_31_00_00_Earthwork.pdf PDF
UFGS_31_10_00_Clearing_for_Civil_Works.pdf PDF
UFGS_01_20_00.00_20_Price_and_Payment_Procedures.pdf PDF
UFGS_32_31_13.53_High-Security_Chain_Link_Fences_and_Gates.pdf PDF
UFGS_32-12-16HMA.pdf PDF
UFGS_12_93_00_Site_Furnishings_-_Bollards _Wood_Fence.pdf PDF
Basic_SOW_23_Jul.pdf PDF
BASE_FACILITY_DESIGN_STANDARD.pdf PDF
ufc_1_300_02.pdf PDF
UFGS_32_16_13_Concrete_Sidewalks _Curb _Gutter.pdf PDF
UFGS_28_20_01.00_10_Electronic_Security_System_-_Vindicator.pdf PDF
UFGS_32-13-13.06PCC.pdf PDF
UFGS_02_41_00_Demolition_and_Deconstruction.pdf PDF
Fencing_Solicitation_-_FA8201-14-R-0009.pdf PDF
MIL_HDBK_1013_10.pdf PDF
UFGS_01_62_35_Recycled_-_Recovered_Materials.pdf PDF
UFGS_32_31_13_Chain_Link_Fences_and_Gates.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 11 00 Page 1

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 00

SUMMARY OF WORK

08/11

PART 1 GENERAL

1.1 REFERENCES

1.2 DEFINITIONS

1.3 SUBMITTALS

1.4 WORK COVERED BY CONTRACT DOCUMENTS

1.4.1 Project Description

1.4.2 Location

1.5 CONTRACT DRAWINGS

1.6 WORK RESCHEDULING

1.7 PROJECT ENVIRONMENTAL GOALS

1.8 OCCUPANCY OF PREMISES

1.9 EXISTING WORK

1.10 ON-SITE PERMITS

1.10.1 Utility Outage Requests and Utility Connection Requests

1.10.2 Borrow, Excavation, Welding, and Burning Permits

1.11 LOCATION OF UNDERGROUND UTILITIES

1.12 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT

1.13 SALVAGE MATERIAL AND EQUIPMENT

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 11 00 Page 2

SECTION 01 11 00

SUMMARY OF WORK

08/11

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM E2114 (2008) Standard Terminology for

Sustainability Relative to the Performance of Buildings

GREEN BUILDING INITIATIVE (GBI)

Green Globes (2004) Green Globes(tm) US Green Building

Rating System

U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)

Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System

U.S. GREEN BUILDING COUNCIL (USGBC)

LEED NC (2009) Leadership in Energy and

Environmental Design(tm) New Construction Rating System

1.2 DEFINITIONS

Definitions pertaining to sustainable development are as defined in ASTM E2114, Section 01 35 40.00 20 ENVIRONMENTAL MANAGEMENT, Section 01 57 20.00 10 ENVIRONMENTAL PROTECTION, and as specified.

a. "Environmentally preferable products" have a lesser or reduced effect on the environment in comparison to conventional products and services.

This comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, or disposal of the product.

b. "Indoor environmental quality" is the physical characteristics of the building interior that impact occupants, including air quality, illumination, acoustics, occupant control, thermal comfort, daylighting, and views.

c. "Operational performance" is the functional behavior of the building as a whole or of the building components.

d. "Sustainability" is the balance of environmental, economic, and societal considerations.

1.3 SUBMITTALS

SECTION 01 11 00 Page 3

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Upon receipt of Government Furnished Equipment, the Contractor shall submit records in accordance with paragraph entitled, "Government Furnished Property," of this section.

Submit the following items to the Contracting Officer:

Utility Outage Requests Utility Connection Requests Borrow Permits Excavation Permits

1.4 WORK COVERED BY CONTRACT DOCUMENTS

1.4.1 Project Description

The work includes installing all fence types and sizes, all gate types and sizes, barb wire, razor wire, privacy slats, bollards, vindicator, signage, painting, locks, electrical, grounding, VPL gates, and incidental related work.

1.4.2 Location

The work shall be located at the Hill AFB, UT, Little Mountain Test Annex, and Utah Test and Training Range, approximately as indicated. The exact location will be shown by the Contracting Officer.

1.5 CONTRACT DRAWINGS (Not Used)

1.6 WORK RESCHEDULING

Contractor shall allow for a maximum of 90 calendar days where construction activity is prohibitive. Further allowance for 90 calendar days of excavation and subsurface activity abeyance shall be imposed where other construction activities are permitted. Government will provide 24 hour notification each time the restrictions are invoked.

Normal duty hours for work shall be from 0730 a.m. to 1600 p.m., Monday through Friday at Hill AFB, 0730 a.m. to 1600 p.m., Monday through Thursday at Little Mountain, and 0700 a.m. to 1700 p.m., Monday through Thursday at UTTR. Requests for additional work hours shall require written approval from the Contracting Officer 7 days in advance of the proposed work period.

1.7 PROJECT ENVIRONMENTAL GOALS

Contractor shall distribute copies of the Environmental Goals to each subcontractor and the Contracting Officer. The overall goal for design, construction, and operation is to produce a building that meets the functional program needs and incorporates the principles of sustainability.

Specifically:

a. Preserve and restore the site ecosystem and biodiversity; avoid site

SECTION 01 11 00 Page 4 degradation and erosion. Minimize offsite environmental impact.

b. Use the minimum amount of energy, water, and materials feasible to meet the design intent. Select energy and water efficient equipment and strategies.

c. Use environmentally preferable products and decrease toxicity level of materials used.

d. Use renewable energy and material resources.

e. Optimize operational performance (through commissioning efforts) in order to ensure energy efficient equipment operates as intended.

Consider the durability, maintainability, and flexibility of building systems.

f. Manage construction site and storage of materials to ensure no negative impact on the indoor environmental quality of the building.

g. Reduce construction waste through reuse, recycling, and supplier take-back.

1.8 OCCUPANCY OF PREMISES

Building(s) will be occupied during performance of work under this Contract.

Before work is started, the Contractor shall arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

1.9 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.

1.10 ON-SITE PERMITS

1.10.1 Utility Outage Requests and Utility Connection Requests

Notify the Contracting Officer at least 48 hours prior to starting excavation work. Contractor is responsible for marking and verifying all utilities not marked.

The Contractor shall verify the elevations of existing piping, utilities, and any type of underground obstruction not indicated or specified to be removed. But indicated in locations to be transversed by piping, ducts, and other work to be installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

SECTION 01 11 00 Page 5

Work shall be scheduled to hold outages to a minimum.

Utility outages and connections required during the prosecution of work that affect existing systems shall be arranged for at the convenience of the Government and shall be scheduled outside the regular working hours or on weekends.

Contracting Officer may permit utility outages at his discretion.

Contractor shall not be entitled to additional payment for utility outages and connections required to be performed outside the regular work hours.

Requests for utility outages and connections shall be made in writing to the Contracting Officer at least 21 calendar days in advance of the time required. Each request shall state the system involved, area involved, approximate duration of outage, and the nature of work involved.

1.10.2 Borrow, Excavation, Welding, and Burning Permits

ACTIVITY SUBMISSION DATE SUBMISSION FORM

[Borrow Permits] [[ ] calendar days prior to work]

Excavation Permits 14 calendar days prior to work

75 CEG/CEOSLU

Form 12

Permits shall be posted at a conspicuous location in the construction area.

Burning of trash or rubbish is not permitted.

1.11 LOCATION OF UNDERGROUND UTILITIES (Not Used)

1.12 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT (Not Used)

1.13 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged shall remain the property of the Government.

The salvaged property shall be segregated, itemized, delivered, and off-loaded at the Government designated storage area located within 5 miles of the construction site.

Contractor shall maintain property control records for material or equipment designated as salvage. Contractor's system of property control may be used if approved by the Contracting Officer. Contractor shall be responsible for storage and protection of salvaged materials and equipment until disposition by the Contracting Officer.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --