Solicitation Amendment FA813426RB0010006 SF 30.pdf

PDF 746 KB Posted

Attached to
Engineering Support Services - Commercial Derivative Aircraft
Solicitation number
FA813426RB001
Issued by

About this file

This is Amendment 0006 to a U.S. Air Force solicitation (FA813426RB001) issued by the Air Force Life Cycle Management Center (AFLCMC) at Tinker Air Force Base, effective March 17, 2026. The amendment modifies an Engineering Support Services (ESS) contract by revising the Performance Work Statement (PWS), removing all NT-43A Contract Line Items (CLINs), increasing the Engineering Task threshold from 10 direct labor hours to 25 direct labor hours, and updating standard timelines for Engineering Assignment Proposal submission. The contract procures non-recurring engineering tasks, engineering projects, and recurring engineering services supporting air vehicle development and sustainment. Engineering Tasks are limited to 25 direct labor hours with no travel or material authorization, priced on a Cost Plus Fixed Fee Level of Effort basis. Engineering Projects are referenced in the PWS with up to 3,500 direct labor hours permitted. Engineering Assignments are categorized by complexity: "Low" assignments (estimated value less than $2M with minimal single-tiered suppliers) have a standard 45-calendar-day proposal submission timeline; "Medium" assignments ($2M to less than $500M with multiple single-tiered suppliers) have 120 calendar days; "High" assignments ($500M or greater with multi-tiered suppliers) have 180 calendar days. Recurring engineering services are structured under a Fixed Price Incentive arrangement with 50/50 government and contractor share ratios for cost overruns and underruns.

The amendment deletes recurring engineering CLINs (0108, 1108, 2108, 3108, 4108, 5108, 6108, 7108, 8108, 9108), travel CLINs (0308, 1308, 2308, 3308, 4308, 5308, 6308, 7308, 8308, 9308), and engineering project material CLINs (0408, 1408, 2408, 3408, 4408, 5408, 6408, 7408, 8408, 9408) across the base and nine option periods. All inspection and acceptance locations designated as DoDAAC FA8134 are deleted. The Performance Work Statement is updated to Revision 3, dated March 16, 2026, which adds Section 2.1.9 and revises Appendix K to reflect the new proposal timeline standards. The contracting activity is FA8134, with points of contact Connie Cole (405-539-3513) and Cameron Burton (312-884-6817).

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

L

2. AMENDMENT/MODIFICATION NUMBER

3. EFFECTIVE DATE

17 Mar 2026

4. REQUISITION/PURCHASE

REQUISITION NUMBER

5. PROJECT NUMBER (if applicable)

6. ISSUED BY CODE FA8134

FA8134 AFLCMC WLK

CP 405 739 4177, 3001 STAFF DR BLDG 3001

TINKER AFB, OK 73145-3303

UNITED STATES

Connie Cole, Email: connie.cole.1@us.af.mil Telephone: 4053393513 CAMERON BURTON, Email: cameron.burton@us.af.mil Telephone: 312-884-6817

7. ADMINISTERED BY (if other than Item 6)

CODE

SCD: PAS:

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code)

CODE: FACILITY CODE:

9A. AMENDMENT OF SOLICITATION NUMBER

FA813426RB001

9B. DATED (SEE ITEM 11)

30 Oct 2025

10A. MODIFICATION OF CONTRACT/ORDER

NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; 1 or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required) See Section G - Contract Administration Data

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK

ONE

A.THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.)

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to incorporate the following changes: (1) Revised Performance Work Statement, that adds Section 2.1.9 and a revised Appendix K; (2) Removal of all NT-43A CLINs; (3) Revise Engineering Task threshold from 10 direct labor hours to 25 direct labor hours; (4) Updated standard timelines for Engineering Assignment Proposal Submission.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Computer generated. Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA-FAR (48 CFR) 53.243

Created On:

18 Mar 2026, 10:00 AM Central Daylight Time

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section B - Supplies or Services & Prices or Costs

Line Item 0108

The following Line Item(s) were deleted:

Item Supplies / Services Estimated Quantity Unit Unit Price Amount

NT-43A Recurring Engineering

Product Service Code: K016 Defense Priorities Allocation System (DPAS) Priority Rating: DO-A1 Surveillance Criticality Designator: C Pricing Arrangement: Fixed Price Incentive - Firm Target

12 Months

Additional Descriptive Data:

Recurring Engineering Services in accordance with ESS Performance Work Statement (PWS) Section 2.0 and Appendix L, LOE/FP Matrix.

Miscellaneous Text (Deleted):

Recurring Engineering Services in accordance with ESS Performance Work Statement (PWS) Section 2.0 and Appendix L, LOE/FP Matrix.

The following Share Ratio(s) were deleted:

Information Value

Government Share Description: Over Share Percentage Percentage: 50% Description: Under Share Percentage Percentage: 50%

Contractor Share Description: Over Share Percentage Percentage: 50% Description: Under Share Percentage Percentage: 50%

Line Item 0308

The following Line Item(s) were deleted:

Item Supplies / Services Estimated Quantity Unit Unit Price Amount

NT-43A Travel

Product Service Code: K016 Defense Priorities Allocation System (DPAS) Priority Rating: DO-A1 Surveillance Criticality Designator: C Pricing Arrangement: Cost No Fee

1 Lot Estimated

Additional Descriptive Data:

Travel in support of Non-Recurring Engineering Projects and Engineering Assignments.

NOTE: Approval from the PCO is required before travel is accomplished. The contractor shall submit all travel requests at least 3 days prior to the travel start date. All contractor travel shall be in accordance with Federal Joint Travel Regulations (JTR), located at https://www.travel.dod.mil/Policy- Regulations/Joint-Travel-Regulations/.

FA813426RB0010006

Miscellaneous Text (Deleted):

Travel in support of Non-Recurring Engineering Projects and Engineering Assignments.

NOTE: Approval from the PCO is required before travel is accomplished. The contractor shall submit all travel requests at least 3 days prior to the travel start date. All contractor travel shall be in accordance with Federal Joint Travel Regulations (JTR), located at https://www.travel.dod.mil/Policy-Regulations/Joint-Travel-Regulations/.

Line Item 0408

The following Line Item(s) were deleted:

Item Supplies / Services Estimated Quantity Unit Unit Price Amount

NT-43A Engineering Project Material

Product Service Code: K016 Defense Priorities Allocation System (DPAS) Priority Rating: DO-A1 Surveillance Criticality Designator: C Pricing Arrangement: Cost No Fee

1 Lot Estimated

Additional Descriptive Data:

Procurement of material in support of Non-Recurring Engineering Projects, as specified in the Performance Work Statement and Appendix L, LOE/FP Matrix.

NOTE: Engineering Projects that include estimated material costs in excess of $2M shall be procured using the Engineering Assignment process established in the Performance Work Statement. The Government and the contractor can mutually agree to issue Engineering Projects (CR-NF) with estimated material costs in excess of $2M on a case-by-case basis.

Miscellaneous Text (Deleted):

Procurement of material in support of Non-Recurring Engineering Projects, as specified in the Performance Work Statement and Appendix L, LOE/FP Matrix.

NOTE: Engineering Projects that include estimated material costs in excess of $2M shall be procured using the Engineering Assignment process established in the Performance Work Statement. The Government and the contractor can mutually agree to issue Engineering Projects (CR-NF) with estimated material costs in excess of $2M on a case-by-case basis.

Line Item 0501

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Line Item 0502

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Line Item 0503

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Line Item 0504

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Line Item 0505

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Line Item 0506

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Line Item 0507

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Line Item 0508

The following Line Item(s) were deleted:

Item Supplies / Services Estimated Quantity Unit Unit Price Amount

NT-43A Engineering Tasks (Level of Effort)

Product Service Code: K016 Defense Priorities Allocation System (DPAS) Priority Rating: DO-A1 Surveillance Criticality Designator: C Pricing Arrangement: Cost Plus Fixed Fee

10 Hours

Additional Descriptive Data:

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to ten (10) hours. direct labor The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Miscellaneous Text (Deleted):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF

LOE) Term Instructions. Each Engineering Task shall be limited to ten (10) hours. direct labor The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Line Item 0608

The following Line Item(s) were deleted:

Item Supplies / Services Estimated Quantity Unit Unit Price Amount

NT-43A Engineering Projects (Level of Effort)

Product Service Code: K016 Defense Priorities Allocation System (DPAS) Priority Rating: DO-A1 Surveillance Criticality Designator: C Pricing Arrangement: Cost Plus Fixed Fee

10 Hours

Additional Descriptive Data:

Non-Recurring Engineering Projects in accordance with ESS Performance Work State (PWS) paragraph 3.2 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Project shall be limited to 3,500 hours. The contractor shall comply direct labor with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

Miscellaneous Text (Deleted):

Non-Recurring Engineering Projects in accordance with ESS Performance Work State (PWS) paragraph 3.2 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF

LOE) Term Instructions. Each Engineering Project shall be limited to 3,500 hours. The contractor shall comply with special clause FA8134.52.216-9Z01, direct labor Cost Plus Fixed-Fee--Level of Effort.

Line Item 0701

Miscellaneous Text (Modified):

Proposal preparation in accordance with Performance Work Statement (PWS) paragraph 3.6 and Appendix K. Engineering Assignments with an estimated value less than $2M and/or minimal single-tiered suppliers are assigned to the 'Low' Proposal Preparation category. The standard proposal submission timeline for 'Low' Proposal Preparation is 45 calendar days. Incentives for early and on-time submissions are detailed in Appendix K of the PWS. Proposal complexity will be jointly determined through discussions with the contractor at the Boeing Advanced Communication Initiative (BACIn) meeting. The USAF Contracting Officer shall be the approval authority for determination of proposal complexity.

Line Item 0702

Miscellaneous Text (Modified):

Proposal preparation in accordance with Performance Work Statement (PWS) paragraph 3.6 and Appendix K. Engineering Assignments with an estimated value equal to $2M and less than $500M and/or multiple single-tiered suppliers are assigned to the 'Medium' Proposal Preparation category. The standard proposal submission timeline for 'Medium' Proposal Preparation is 120 calendar days. Incentives for early and on-time submission are detailed in Appendix K of the PWS. Proposal complexity will be jointly determined through discussions with the contractor at the Boeing Advanced Communication Initiative (BACIn) meeting. The USAF Contracting Officer shall be the approval authority for determination of proposal complexity.

Line Item 0703

Miscellaneous Text (Modified):

Proposal preparation in accordance with Performance Work Statement (PWS) paragraph 3.6 and Appendix K. Engineering Assignments with an estimated value equal to or greater than $500M and/or multi-tiered suppliers are assigned to the 'High' Proposal Preparation category. The standard proposal submission timeline for 'High' Proposal Preparation is 180 calendar days. Incentives for early and on-time submission are detailed in Appendix K of the PWS. Proposal complexity will be jointly determined through discussions with the contractor at the Boeing Advanced Communication Initiative (BACIn) meeting. The USAF Contracting Officer shall be the approval authority for determination of proposal complexity.

Option Line Item 1108

The following Line Item(s) were deleted:

Item Supplies / Services Estimated Quantity Unit Unit Price Amount

Option Line Item

Option Period 1 NT-43A Recurring Engineering

Product Service Code: K016 Defense Priorities Allocation System (DPAS) Priority Rating: DO-A1 Surveillance Criticality Designator: C Pricing Arrangement: Fixed Price Incentive - Firm Target

12 Months

Additional Descriptive Data:

Recurring Engineering Services in accordance with ESS Performance Work Statement (PWS) Section 2.0 and Appendix L, LOE/FP Matrix.

Recurring Engineering Services in accordance with ESS Performance Work Statement (PWS) Section 2.0 and Appendix L, LOE/FP Matrix.

The following Share Ratio(s) were deleted:

Information Value

Government Share Description: Over Share Percentage Percentage: 50% Description: Under Share Percentage Percentage: 50%

Contractor Share Description: Over Share Percentage Percentage: 50% Description: Under Share Percentage Percentage: 50%

Option Line Item 1308

The following Line Item(s) were deleted:

Item Supplies / Services Estimated Quantity Unit Unit Price Amount

Option Line Item

NT-43A Travel

Product Service Code: K016 Defense Priorities Allocation System (DPAS) Priority Rating: DO-A1 Surveillance Criticality Designator: C Pricing Arrangement: Cost No Fee

1 Lot Estimated

Additional Descriptive Data:

Travel in support of Non-Recurring Engineering Projects and Engineering Assignments.

NOTE: Approval from the PCO is required before travel is accomplished. The contractor shall submit all travel requests at least 3 days prior to the travel start date. All contractor travel shall be in accordance with Federal Joint Travel Regulations (JTR), located at https://www.travel.dod.mil/Policy- Regulations/Joint-Travel-Regulations/.

Miscellaneous Text (Deleted):

Travel in support of Non-Recurring Engineering Projects and Engineering Assignments.

NOTE: Approval from the PCO is required before travel is accomplished. The contractor shall submit all travel requests at least 3 days prior to the travel start date. All contractor travel shall be in accordance with Federal Joint Travel Regulations (JTR), located at https://www.travel.dod.mil/Policy-Regulations/Joint-Travel-Regulations/.

Option Line Item 1408

The following Line Item(s) were deleted:

Item Supplies / Services Estimated Quantity Unit Unit Price Amount

Option Line Item

Option Period 1 NT-43A Engineering Project Material

Product Service Code: K016 Defense Priorities Allocation System (DPAS) Priority Rating: DO-A1 Surveillance Criticality Designator: C Pricing Arrangement: Cost No Fee

1 Lot Estimated

Additional Descriptive Data:

1408 Procurement of material in support of Non-Recurring Engineering Projects, as specified in the Performance Work Statement and Appendix L, LOE/FP Matrix.

NOTE: Engineering Projects that include estimated material costs in excess of $2M shall be procured using the Engineering Assignment process established in the Performance Work Statement. The Government and the contractor can mutually agree to issue Engineering Projects (CR-NF) with estimated material costs in excess of $2M on a case-by-case basis.

Miscellaneous Text (Deleted):

Procurement of material in support of Non-Recurring Engineering Projects, as specified in the Performance Work Statement and Appendix L, LOE/FP Matrix.

NOTE: Engineering Projects that include estimated material costs in excess of $2M shall be procured using the Engineering Assignment process established in the Performance Work Statement. The Government and the contractor can mutually agree to issue Engineering Projects (CR-NF) with estimated material costs in excess of $2M on a case-by-case basis.

Option Line Item 1501

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Option Line Item 1502

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Option Line Item 1503

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Option Line Item 1504

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Option Line Item 1505

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Option Line Item 1506

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Option Line Item 1507

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Option Line Item 1508

The following Line Item(s) were deleted:

Item Supplies / Services Estimated Quantity Unit Unit Price Amount

Option Line Item

Option Period 1 NT-43A Engineering Tasks (Level of Effort)

Product Service Code: K016 Defense Priorities Allocation System (DPAS) Priority Rating: DO-A1 Surveillance Criticality Designator: C Pricing Arrangement: Cost Plus Fixed Fee

10 Hours

Additional Descriptive Data:

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to ten (10) business hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to ten (10) business hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Option Line Item 1608

The following Line Item(s) were deleted:

Item Supplies / Services Estimated Quantity Unit Unit Price Amount

Option Line Item

NT-43A Engineering Projects (Level of Effort)

Product Service Code: K016 Defense Priorities Allocation System (DPAS) Priority Rating: DO-A1 Surveillance Criticality Designator: C Pricing Arrangement: Cost Plus Fixed Fee

10 Hours

Additional Descriptive Data:

Non-Recurring Engineering Projects in accordance with ESS Performance Work State (PWS) paragraph 3.2 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Project shall be limited to 3,500 business hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

Miscellaneous Text (Deleted):

Non-Recurring Engineering Projects in accordance with ESS Performance Work State (PWS) paragraph 3.2 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Project shall be limited to 3,500 business hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

Option Line Item 1701

Miscellaneous Text (Modified):

Proposal preparation in accordance with Performance Work Statement (PWS) paragraph 3.6 and Appendix K. Engineering Assignments with an estimated value less than $2M and/or minimal single-tiered suppliers are assigned to the 'Low' Proposal Preparation category. The standard proposal submission timeline for 'Low' Proposal Preparation is 45 calendar days. Incentives for early and on-time submissions are detailed in Appendix K of the PWS. Proposal complexity will be jointly determined through discussions with the contractor at the Boeing Advanced Communication Initiative (BACIn) meeting. The USAF Contracting Officer shall be the approval authority for determination of proposal complexity.

Option Line Item 1702

Miscellaneous Text (Modified):

Proposal preparation in accordance with Performance Work Statement (PWS) paragraph 3.6 and Appendix K. Engineering Assignments with an estimated value equal to $2M and less than $500M and/or multiple single-tiered suppliers are assigned to the 'Medium' Proposal Preparation category. The standard proposal submission timeline for 'Medium' Proposal Preparation is 120 calendar days. Incentives for early and on-time submission are detailed in Appendix K of the PWS. Proposal complexity will be jointly determined through discussions with the contractor at the Boeing Advanced Communication Initiative (BACIn) meeting. The USAF Contracting Officer shall be the approval authority for determination of proposal complexity.

Option Line Item 1703

Miscellaneous Text (Modified):

Proposal preparation in accordance with Performance Work Statement (PWS) paragraph 3.6 and Appendix K. Engineering Assignments with an estimated value equal to or greater than $500M and/or multi-tiered suppliers are assigned to the 'High' Proposal Preparation category. The standard proposal submission timeline for 'High' Proposal Preparation is 180 calendar days. Incentives for early and on-time submission are detailed in Appendix K of the PWS. Proposal complexity will be jointly determined through discussions with the contractor at the Boeing Advanced Communication Initiative (BACIn) meeting. The USAF Contracting Officer shall be the approval authority for determination of proposal complexity.

Option Line Item 2108

The following Line Item(s) were deleted:

Item Supplies / Services Estimated Quantity Unit Unit Price Amount

Option Line Item

Option Period 2 NT-43A Recurring Engineering

Product Service Code: K016 Defense Priorities Allocation System (DPAS) Priority Rating: DO-A1 Surveillance Criticality Designator: C Pricing Arrangement: Fixed Price Incentive - Firm Target

Additional Descriptive Data:

Recurring Engineering Services in accordance with ESS Performance Work Statement (PWS) Section 2.0 and Appendix L, LOE/FP Matrix.

Miscellaneous Text (Deleted):

Recurring Engineering Services in accordance with ESS Performance Work Statement (PWS) Section 2.0 and Appendix L, LOE/FP Matrix.

The following Share Ratio(s) were deleted:

Information Value

Government Share Description: Over Share Percentage Percentage: 50% Description: Under Share Percentage Percentage: 50%

Contractor Share Description: Over Share Percentage Percentage: 50% Description: Under Share Percentage Percentage: 50%

Option Line Item 2308

The following Line Item(s) were deleted:

Item Supplies / Services Estimated Quantity Unit Unit Price Amount

Option Period 2 NT-43A Travel

Product Service Code: K016 Defense Priorities Allocation System (DPAS) Priority Rating: DO-A1 Surveillance Criticality Designator: C Pricing Arrangement: Cost No Fee

To Be Negotiated

Option Line Item

Additional Descriptive Data:

Travel in support of Non-Recurring Engineering Projects and Engineering Assignments.

NOTE: Approval from the PCO is required before travel is accomplished. The contractor shall submit all travel requests at least 3 days prior to the travel start date. All contractor travel shall be in accordance with Federal Joint Travel Regulations (JTR), located at https://www.travel.dod.mil/Policy- Regulations/Joint-Travel-Regulations/.

Miscellaneous Text (Deleted):

Travel in support of Non-Recurring Engineering Projects and Engineering Assignments.

NOTE: Approval from the PCO is required before travel is accomplished. The contractor shall submit all travel requests at least 3 days prior to the travel start date. All contractor travel shall be in accordance with Federal Joint Travel Regulations (JTR), located at https://www.travel.dod.mil/Policy-Regulations/Joint-Travel-Regulations/.

Option Line Item 2408

The following Line Item(s) were deleted:

Item Supplies / Services Estimated Quantity Unit Unit Price Amount

Option Line Item

Option Period 2 NT-43A Engineering Project Material

Product Service Code: K016 Defense Priorities Allocation System (DPAS) Priority Rating: DO-A1 Surveillance Criticality Designator: C Pricing Arrangement: Cost No Fee

To Be Negotiated

Additional Descriptive Data:

Procurement of material in support of Non-Recurring Engineering Projects, as specified in the Performance Work Statement and Appendix L, LOE/FP Matrix.

NOTE: Engineering Projects that include estimated material costs in excess of $2M shall be procured using the Engineering Assignment process established in the Performance Work Statement. The Government and the contractor can mutually agree to issue Engineering Projects (CR-NF) with estimated material costs in excess of $2M on a case-by-case basis.

Miscellaneous Text (Deleted):

Procurement of material in support of Non-Recurring Engineering Projects, as specified in the Performance Work Statement and Appendix L, LOE/FP Matrix.

NOTE: Engineering Projects that include estimated material costs in excess of $2M shall be procured using the Engineering Assignment process established in the Performance Work Statement. The Government and the contractor can mutually agree to issue Engineering Projects (CR-NF) with estimated material costs in excess of $2M on a case-by-case basis.

Option Line Item 2501

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

Option Line Item 2502

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Option Line Item 2503

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Option Line Item 2504

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Option Line Item 2505

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Option Line Item 2506

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Option Line Item 2507

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Option Line Item 2508

The following Line Item(s) were deleted:

Item Supplies / Services Estimated Quantity Unit Unit Price Amount

Option Line Item

Option Period 2 NT-43A Engineering Tasks (Level of Effort)

Product Service Code: K016 Defense Priorities Allocation System (DPAS) Priority Rating: DO-A1 Surveillance Criticality Designator: C Pricing Arrangement: Cost Plus Fixed Fee

To Be Negotiated

Additional Descriptive Data:

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to ten (10) business hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Miscellaneous Text (Deleted):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to ten (10) business hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Option Line Item 2608

The following Line Item(s) were deleted:

Item Supplies / Services Estimated Quantity Unit Unit Price Amount

Option Line Item

Option Period 2 NT-43A Engineering Projects (Level of Effort)

Product Service Code: K016 Defense Priorities Allocation System (DPAS) Priority Rating: DO-A1 Surveillance Criticality Designator: C Pricing Arrangement: Cost Plus Fixed Fee

To Be Negotiated

Additional Descriptive Data:

Non-Recurring Engineering Projects in accordance with ESS Performance Work State (PWS) paragraph 3.2 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Project shall be limited to 3,500 business hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

Miscellaneous Text (Deleted):

Non-Recurring Engineering Projects in accordance with ESS Performance Work State (PWS) paragraph 3.2 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Project shall be limited to 3,500 business hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

Option Line Item 2701

Miscellaneous Text (Modified):

Proposal preparation in accordance with Performance Work Statement (PWS) paragraph 3.6 and Appendix K. Engineering Assignments with an estimated value less than $2M and/or minimal single-tiered suppliers are assigned to the 'Low' Proposal Preparation category. The standard proposal submission timeline for 'Low' Proposal Preparation is 45 calendar days. Incentives for early and on-time submissions are detailed in Appendix K of the PWS. Proposal complexity will be jointly determined through discussions with the contractor at the Boeing Advanced Communication Initiative (BACIn) meeting. The USAF Contracting Officer shall be the approval authority for determination of proposal complexity.

Option Line Item 2702

Miscellaneous Text (Modified):

Proposal preparation in accordance with Performance Work Statement (PWS) paragraph 3.6 and Appendix K. Engineering Assignments with an estimated value equal to $2M and less than $500M and/or multiple single-tiered suppliers are assigned to the 'Medium' Proposal Preparation category. The standard proposal submission timeline for 'Medium' Proposal Preparation is 120 calendar days. Incentives for early and on-time submission are detailed in Appendix K of the PWS. Proposal complexity will be jointly determined through discussions with the contractor at the Boeing Advanced Communication Initiative (BACIn) meeting. The USAF Contracting Officer shall be the approval authority for determination of proposal complexity.

Option Line Item 2703

Miscellaneous Text (Modified):

Proposal preparation in accordance with Performance Work Statement (PWS) paragraph 3.6 and Appendix K. Engineering Assignments with an estimated value equal to or greater than $500M and/or multi-tiered suppliers are assigned to the 'High' Proposal Preparation category. The standard proposal submission timeline for 'High' Proposal Preparation is 180 calendar days. Incentives for early and on-time submission are detailed in Appendix K of the PWS. Proposal complexity will be jointly determined through discussions with the contractor at the Boeing Advanced Communication Initiative (BACIn) meeting. The USAF Contracting Officer shall be the approval authority for determination of proposal complexity.

Option Line Item 3108

The following Line Item(s) were deleted:

Item Supplies / Services Estimated Quantity Unit Unit Price Amount

Option Line Item

Option Period 3 NT-43A Recurring Engineering

Product Service Code: K016 Defense Priorities Allocation System (DPAS) Priority Rating: DO-A1 Surveillance Criticality Designator: C Pricing Arrangement: Fixed Price Incentive - Firm Target

To Be Negotiated

3108 Additional Descriptive Data:

Recurring Engineering Services in accordance with ESS Performance Work Statement (PWS) Section 2.0 and Appendix L, LOE/FP Matrix.

Miscellaneous Text (Deleted):

Recurring Engineering Services in accordance with ESS Performance Work Statement (PWS) Section 2.0 and Appendix L, LOE/FP Matrix.

The following Share Ratio(s) were deleted:

Information Value

Government Share Description: Over Share Percentage Percentage: 50% Description: Under Share Percentage Percentage: 50%

Contractor Share Description: Over Share Percentage Percentage: 50% Description: Under Share Percentage Percentage: 50%

Option Line Item 3308

The following Line Item(s) were deleted:

Item Supplies / Services Estimated Quantity Unit Unit Price Amount

Option Line Item

Option Period 3 NT-43A Travel

Product Service Code: K016 Defense Priorities Allocation System (DPAS) Priority Rating: DO-A1 Surveillance Criticality Designator: C Pricing Arrangement: Cost No Fee

To Be Negotiated

Additional Descriptive Data:

Travel in support of Non-Recurring Engineering Projects and Engineering Assignments.

NOTE: Approval from the PCO is required before travel is accomplished. The contractor shall submit all travel requests at least 3 days prior to the travel start date. All contractor travel shall be in accordance with Federal Joint Travel Regulations (JTR), located at https://www.travel.dod.mil/Policy- Regulations/Joint-Travel-Regulations/.

Miscellaneous Text (Deleted):

Travel in support of Non-Recurring Engineering Projects and Engineering Assignments.

NOTE: Approval from the PCO is required before travel is accomplished. The contractor shall submit all travel requests at least 3 days prior to the travel start date. All contractor travel shall be in accordance with Federal Joint Travel Regulations (JTR), located at https://www.travel.dod.mil/Policy-Regulations/Joint-Travel-Regulations/.

Option Line Item 3408

The following Line Item(s) were deleted:

Item Supplies / Services Estimated Quantity Unit Unit Price Amount

Option Period 3 NT-43A Engineering Project Material

Product Service Code: K016 Defense Priorities Allocation System (DPAS) Priority Rating: DO-A1 Surveillance Criticality Designator: C Pricing Arrangement: Cost No Fee

To Be Negotiated

Additional Descriptive Data:

Procurement of material in support of Non-Recurring Engineering Projects, as specified in the Performance Work Statement and Appendix L, LOE/FP Matrix.

NOTE: Engineering Projects that include estimated material costs in excess of $2M shall be procured using the Engineering Assignment process established in the Performance Work Statement. The Government and the contractor can mutually agree to issue Engineering Projects (CR-NF) with estimated material costs in excess of $2M on a case-by-case basis.

Miscellaneous Text (Deleted):

Procurement of material in support of Non-Recurring Engineering Projects, as specified in the Performance Work Statement and Appendix L, LOE/FP Matrix.

NOTE: Engineering Projects that include estimated material costs in excess of $2M shall be procured using the Engineering Assignment process established in the Performance Work Statement. The Government and the contractor can mutually agree to issue Engineering Projects (CR-NF) with estimated material costs in excess of $2M on a case-by-case basis.

Option Line Item 3501

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Option Line Item 3502

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Option Line Item 3503

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Option Line Item 3504

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Option Line Item 3505

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Option Line Item 3506

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Option Line Item 3507

Miscellaneous Text (Modified):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to 25 direct labor hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Option Line Item 3508

The following Line Item(s) were deleted:

Item Supplies / Services Estimated Quantity Unit Unit Price Amount

Option Line Item

Option Period 3 NT-43A Engineering Tasks (Level of Effort)

Product Service Code: K016 Defense Priorities Allocation System (DPAS) Priority Rating: DO-A1 Surveillance Criticality Designator: C Pricing Arrangement: Cost Plus Fixed Fee

To Be Negotiated

Additional Descriptive Data:

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to ten (10) business hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Miscellaneous Text (Deleted):

Non-Recurring Engineering Tasks in accordance with ESS Performance Work State (PWS) paragraph 3.1 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Task shall be limited to ten (10) business hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

NOTE: No travel or material is authorized under Engineering Tasks.

Option Line Item 3608

The following Line Item(s) were deleted:

Item Supplies / Services Estimated Quantity Unit Unit Price Amount

Option Line Item

Option Period 3 NT-43A Engineering Projects (Level of Effort)

Product Service Code: K016 Defense Priorities Allocation System (DPAS) Priority Rating: DO-A1 Surveillance Criticality Designator: C Pricing Arrangement: Cost Plus Fixed Fee

To Be Negotiated

Additional Descriptive Data:

Non-Recurring Engineering Projects in accordance with ESS Performance Work State (PWS) paragraph 3.2 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Project shall be limited to 3,500 business hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

Miscellaneous Text (Deleted):

Non-Recurring Engineering Projects in accordance with ESS Performance Work State (PWS) paragraph 3.2 and Appendix M, Cost Plus Fixed Fee Level of Effort (CPFF LOE) Term Instructions. Each Engineering Project shall be limited to 3,500 business hours. The contractor shall comply with special clause FA8134.52.216-9Z01, Cost Plus Fixed-Fee--Level of Effort.

Option Line Item 3701

Miscellaneous Text (Modified):

Proposal preparation in accordance with Performance Work Statement (PWS) paragraph 3.6 and Appendix K. Engineering Assignments with an estimated value less than $2M and/or minimal single-tiered suppliers are assigned to the 'Low' Proposal Preparation category. The standard proposal submission timeline for 'Low' Proposal Preparation is 45 calendar days. Incentives for early and on-time submissions are detailed in Appendix K of the PWS. Proposal complexity will be jointly determined through discussions with the contractor at the Boeing Advanced Communication Initiative (BACIn) meeting. The USAF Contracting Officer shall be the approval authority for determination of proposal complexity.

Option Line Item 3702

Miscellaneous Text (Modified):

Proposal preparation in accordance with Performance Work Statement (PWS) paragraph 3.6 and Appendix K. Engineering Assignments with an estimated value equal to $2M and less than $500M and/or multiple single-tiered suppliers are assigned to the 'Medium' Proposal Preparation category. The standard proposal submission timeline for 'Medium' Proposal Preparation is 120 calendar days. Incentives for early and on-time submission are detailed in Appendix K of the PWS. Proposal complexity will be jointly determined through discussions with the contractor at the Boeing Advanced Communication Initiative (BACIn) meeting. The USAF Contracting Officer shall be the approval authority for determination of proposal complexity.

Option Line Item 3703

Miscellaneous Text (Modified):

Proposal preparation in accordance with Performance Work Statement (PWS) paragraph 3.6 and Appendix K. Engineering Assignments with an estimated value equal to or greater than $500M and/or multi-tiered suppliers are assigned to the 'High' Proposal Preparation category. The standard proposal submission timeline for 'High' Proposal Preparation is 180 calendar days. Incentives for early and on-time submission are detailed in Appendix K of the PWS. Proposal complexity will be jointly determined through discussions with the contractor at the Boeing Advanced Communication Initiative (BACIn) meeting.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .