RC-26_RFP_Questions_and_Responses21June16.pdf

PDF 108 KB Posted

Attached to
C-26 Contractor Logistics Support (CLS) Federal contract opportunity
Solicitation number
FA8131-16-R-0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

Responses to Questions dated 21 June 2016

View the file

Other files for this federal contract opportunity

Other files attached to C-26 Contractor Logistics Support (CLS), newest first.
File Type Posted
RC-26_RFP_Questions_and_Responses1July16.pdf PDF
FA813116R0002_______0004_RC-26_52_212-1_ITO_21June16.docx DOCX document
FA813116R0002_______0004.RTF RTF text file
RC-26_RFP_Questions_and_Responses_15June16.pdf PDF
RC-26_RFP_Questions_and_Responses_10June16.pdf PDF
FA813116R0002_______0003_RC-26_52_212-1_ITO_9June16.docx DOCX document
FA813116R0002_______0003_C-26_PWS_8Jun16.docx DOCX document
FA813116R0002_______0003.RTF RTF text file
RC-26_RFP_Questions_and_Responses3June2016.pdf PDF
FA813116R0002_______0002.RTF RTF text file
FA813116R0002_______0002_WageDeterm27May2016.doc DOC document
FA813116R0002_______0002_SBIncentive27May2016.docx DOCX document
FA813116R0002_______0002_RC-26_52_212-1ITO_31May16.docx DOCX document
FA813116R0002_______0002_IncentiveOptions_26May16.doc DOC document
FA813116R0002_______0002_C-26_PWS_15Apr16v3.docx DOCX document
RC-26_RFP_Questions_and_Responses_23May16.pdf PDF
FA813116R0002_______0001_RC-26_PriceMatrix-18May16.docx DOCX document
FA813116R0002_______0001.RTF RTF text file
FA813116R0002_______0001_C26SourceSelectionQASP_v2May2016.docx DOCX document
ppi_tool.accdb —
DRAFT_C-26_RFP_Questions_and_Responses_28_March_16.docx DOCX document
FA813116R0002_GovernmentBaseSupportMatrix.pdf PDF
FA813116R0002_WageDeterm.doc DOC document
FA813116R0002_C26_QASP.docx DOCX document
FA813116R0002_DD254.pdf PDF
FA813116R0002_IncentiveOptions7Apr16.doc DOC document
FA813116R0002_RC-26_PriceMatrix-20Apr16.docx DOCX document
FA813116R0002_RC-26_52_212-2-Eval_Factors18Apr16.docx DOCX document
FA813116R0002_C-26_PWS_15Apr16.docx DOCX document
FA813116R0002_RC-26_52_212-1_ITO_18_Apr16.docx DOCX document
FA813116R0002.RTF RTF text file
FA813116R0002_SBIncentive.docx DOCX document
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Response to RFP Question

June 21, 2016

FA8131-16-R-0002

For the procurement of the spares in support of the

ISR Mission Equipment, (PWS 1.14) will the

Government authorize contractor to utilize GSA pricing to purchase spares as a cost savings measure?

The RFP contains FAR clause

52.251-1. This allows the authorization to use Government supply sources in the performance of this contract.

2 In Reviewing the prior parts usage reports released with the bidders library there are various components that are not compatible with Mission Equipment configuration relative to the released Mission

Equipment document released in the Bidders Library.

Please confirm that Bidders Library "Mission

Equipment" contains all Mission Management

Equipment incorporated through RC-26B Block 20, RC-26B Block 25 and RC-26B Block 25R. If not please provide detailed configuration management for each Block revision, and schedule for ongoing/future

Block conversions as this will have a material effect on pricing and will create an unfair advantage for the incumbent.

No, the "mission equipment" file in the tech library contains only a draft block 25R mission equipment parts listing.

Block 20 and Block 25 Mission

Equipment are listed in their applicable T.O.'s.

The -2 T.O. is for BLK 20 (5 aircraft), the -3 T.O. is for the

BLK 25 (6 aircraft), and -4 T.O.

(in work now) will be for Block

25R and replace the -3 T.O. for the

6 Block 25 aircraft.

Block 25R reconfiguration is currently in work with an ECD of early CY 2017 (-4 T.O. ECD Oct

16). As stated in previous industry

Q&A: To access T.O.'s offerors are required to submit the following to:

AFLCMC.LZPTP.PublicTOReque ts@us.af.mil;

1. Request access to specific T.O.'s via company letterhead with signature block and mailto:AFLCMC.LZPTP.PublicTORequets@us.af.mil mailto:AFLCMC.LZPTP.PublicTORequets@us.af.mil

2. Attach approved DD FORM

2345 (with request). Future block conversions will be negotiated separately when requirements are received from the operational user.

3 The Proposal Organization Table lays it out as follows:

7.1.1 Solicitation/Contract Form (SF 1449)

7.1 Model Contract

7.1.2 Pricing Matrix (Solicitation, Attachment 5)

7.1.4 Representations and Certifications

7.3.1-7.3.3 Contact Information

7.3.5 Attachments to the Model Contract

7.3.7 Small Business Subcontracting Plan

However, RFP, Section L, lays it out as follows:

7.1 Model Contract

7.1.1 Solicitation/Contract Form (Standard Form 1449)

7.1.2 Pricing Matrix (Solicitation, Attachment 5)

7.1.3 Contract Clauses

7.1.4 Representations, Certifications, and other

Statements of Offerors (Solicitation Provision)

7.2 Exceptions to Solicitation Requirements

7.3 Contract Information

7.3.1 Ombudsman

7.3.2 Authorized Offeror Personnel

7.3.3 Government Offices

7.3.4 Company/Division Address, Identifying Codes, and

Applicable Designations

7.3.5 Attachments to the Model Contract

7.3.6 Base Support Requirements

7.3.7 Small Business Subcontracting Plan

7.3.8 Government Furnished Property

The table as shown above skips Section 7.1.3, 7.2, 7.3.4, and 7.3.6. We have followed Section L so as to include all necessary information in the order it is requested, but we want to ensure we are compliant. Can you please confirm that we are okay if following Section L as listed?

The Proposal organization table has been updated to match Section

L.