Amendment 01 - FA812621Q00520001.pdf

PDF 209 KB Posted

Attached to
CM-ATS Power Supplies Federal contract opportunity
Solicitation number
FA8126-21-Q-0052
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This document is an amendment to a federal solicitation for CM-ATS power supplies. The amendment extends the response due date from July 12, 2021 to August 5, 2021. It also corrects the part number for one CLIN from 551082-01 to 5551082-01 and modifies the delivery date for all CLINs to be before October 29, 2021. The solicitation is for the Department of the Air Force Materiel Command Air Force Sustainment Center and seeks forty programmable DC power supplies, certificates of calibration, rack slides, input covers, modular DC power supplies, and various screws from respondents.

View the file

Other files for this federal contract opportunity

Other files attached to CM-ATS Power Supplies, newest first.
File Type Posted
BNJ for Power Supplies_Redacted.pdf PDF
FA812621Q0052.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Solicitation/Contract Form

The following changes have been made:

INFORMATION FROM TO

Response Due Date 12 Jul 2021 05 Aug 2021

Supplies or Services & Prices or Costs

The following CLIN(s) / SLIN(s) / ELIN(s) were modified:

INFORMATION FROM TO

Description

AC Input Cover with Strain Relief (for 4kW - 15kW, 3U models only) P/N: 551082-01

AC Input Cover with Strain Relief (for 4kW - 15kW, 3U models only) P/N: 5551082-01

Specification/SOW/SOO/ORD

The Requirements text has been modified to:

(40) Forty - Programmable DC Power Supply 3kW, Output: 0-60 Vdc, 0-50 Adc; Input: 190-250 VAC, three phase, 47-63 Hz. Includes IEEE-488 and RS232C, Input terminal block.

P/N: DCS60-50EM9CM33

(280) Two Hundred and Eighty - Screw

8-32 X .375,PPH,CS

P/N: 110EA04-06

(280) Two Hundred and Eighty - Screw

10-32 X 3/8L,PPH,RND,SS

P/N: FS1056

(40) Forty - AC Input Cover with Strain Relief (for 4kW - 15kW, 3U models only) P/N: 5551082-01

(40) Forty - 3U Rack Slides (pair) (for 5kW, 10kW and 15kW, 3U models only) P/N: K550212-01

(40) Forty - High Power Modular DC Power Supply 15kW, 3U high, Output: 0-40 Vdc, 0-375 Adc

FA812621Q00520001

Input:187-242 VAC, 47-63 Hz, three phase, Combined Options 1A + 1D (IEEE-488.2 + RS232C and Isolated Analog Control), Certificate of Calibration (includes Test Data) to ANSI / NCSL Z540-1, Passive PFC @ 0.9 at full load,Passive PFC @ 0.9 at full load (Standard on 10V, 15V, 20V, 30V, 50V and 1000V models)

P/N: SGA40X375C-2AABPF

(40) Forty - Certificate of Calabration ANSI Z540

P/N: DCS-Z540

Deliveries or Performance

The delivery information for the following CLIN(s) / SLIN(s) / ELIN(s) were modified:

Place of Performance - F3YCEB - OC ALC OBC

INFORMATION FROM TO

Delivery 60 Calendar Days, From Date of Award to delivery Delivery Before 29 Oct 2021.

Place of Performance - F3YCEB - OC ALC OBC

INFORMATION FROM TO

Delivery 60 Calendar Days, From Date of Award to delivery Delivery Before 29 Oct 2021.

Place of Performance - F3YCEB - OC ALC OBC

INFORMATION FROM TO

Delivery 60 Calendar Days, From Date of Award to delivery Delivery Before 29 Oct 2021.

Place of Performance - F3YCEB - OC ALC OBC

INFORMATION FROM TO

Delivery 60 Calendar Days, From Date of Award to delivery Delivery Before 29 Oct 2021.

Place of Performance - F3YCEB - OC ALC OBC

INFORMATION FROM TO

Delivery 60 Calendar Days, From Date of Award to delivery Delivery Before 29 Oct 2021.

Place of Performance - F3YCEB - OC ALC OBC

INFORMATION FROM TO

Delivery 60 Calendar Days, From Date of Award to delivery Delivery Before 29 Oct 2021.

Place of Performance - F3YCEB - OC ALC OBC

INFORMATION FROM TO

Delivery 60 Calendar Days, From Date of Award to delivery Delivery Before 29 Oct 2021.

List of Attachments

The following attachments were added:

Item Description

DEPARTMENT OF THE AIR FORCE

OKLAHOMA CITY AIR LOGISTICS COMPLEX (OC-ALC)

TINKER AIR FORCE BASE OKLAHOMA

Item Description

S21-040 CM-ATS Power Supplies

• (40) Forty - Programmable DC Power Supply

3kW, Output: 0-60 Vdc, 0-50 Adc; Input: 190-250 VAC, three phase, 47-63 Hz.

Includes IEEE-488 and RS232C, Input terminal block.

P/N: DCS60-50EM9CM33

• (40) Forty – Certificate of Calabration ANSI Z540

P/N: DCS-Z540

• (40) Forty – High Power Modular DC Power Supply

15kW, 3U high, Output: 0-40 Vdc, 0-375 Adc Input:187-242 VAC, 47-63 Hz, three phase, Combined Options 1A + 1D (IEEE-

488.2 + RS232C and Isolated Analog Control), Certificate of Calibration (includes Test Data) to ANSI / NCSL Z540-1, Passive PFC @ 0.9 at full load,Passive PFC @ 0.9 at full load (Standard on 10V, 15V, 20V, 30V, 50V and 1000V models)

P/N: SGA40X375C-2AABPF

• (40) Forty – 3U Rack Slides (pair) (for 5kW, 10kW and 15kW, 3U models only) P/N: K550212-01

• (40) Forty – AC Input Cover with Strain Relief

(for 4kW – 15kW, 3U models only) P/N: 5551082-01

• (280) Two Hundred and Eighty – Screw

10-32 X 3/8L,PPH,RND,SS

P/N: FS1056

• (280) Two Hundred and Eighty – Screw

8-32 X .375,PPH,CS

P/N: 110EA04-06

S21-040 Power Supply Item Description

IDCode:
Page: 1
Pages: 4
AmendNo: 0001
EffDate: 29 Jul 2021
ReqNo:
ProjNo:
IssCode: FA8126
AdmCode:
IssuedBy: FA8126 AFSC PZIMB

3001 STAFF DR STE 2S76

CP 405 739 5329

TINKER AFB, OK 73145-3305

UNITED STATES

Alaina Hill, Email: alaina.hill@us.af.mil Telephone: 339-3320

AdminBy:
ContractorNameAdd:
SolNo: FA812621Q0052
SolChg: 1
SolDate: 09 Jun 2021
AwardChg: Off
AwardNo:
Code:
FacCode:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: See Section G
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: The purpose of this amendment is to:

1) Extend the due date for quotes to 05 Aug 2021 at 12:00 PM, and

2) Attach the updated item description, which corrects the part number on CLIN 0004 from 551082-01 to 5551082-01.

ContNameTitle:
CoNameTitle: John Byrne

Email: john.byrne.4@us.af.mil Telephone: 312-339-2510

ContDate:
CODate:

File details come from the government source that posted it. Updated .