Solicitation Amendment FA812522Q00590002 SF 30.pdf

PDF 573 KB Posted

Attached to
Composite Processing Ovens Federal contract opportunity
Solicitation number
FA8125-22-Q-0059
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This amendment to a solicitation and the related solicitation seek composite processing ovens. The amendment extends the response due date from May 13th to April 20th, adds and removes attachments, and answers seventeen questions from industry regarding technical requirements. The solicitation seeks two electric composite processing ovens capable of temperatures up to 500 degrees Fahrenheit and heating and cooling rates of 10 degrees per minute. The ovens must accommodate twenty source-probe vacuum pairs that can be controlled in groups or individually. Additional requirements include barcode scanners, one PC per oven to control all functions, and a five-year after-sale support package. The site visit was on April 5th and responses are due May 18th. The Department of the Air Force Materiel Command Air Force Sustainment Center issued this solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Composite Processing Ovens, newest first.
File Type Posted
Site Visit Questions and Answers.pdf PDF
Revision 3 - SOW for Composite Processing Ovens.pdf PDF
Solicitation Amendment FA812522Q00590001 SF 30.pdf PDF
Site Visit.pdf PDF
Statement of Work for Composite Processing Ovens.pdf PDF
Solicitation - FA812522Q0059.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Solicitation/Contract Form

The following changes have been made:

INFORMATION FROM TO

Number of Sealed Copies 1 Response Due Date 13 May 2022 20 Apr 2022

List of Attachments

The following attachments were added:

Statement of Work for Composite Processing Ovens

The following attachments were deleted:

Revision 3 - Statement of Work for Composite Processing Ovens

Instructions, Conditions, & Notices to Offerors or Quoters

Miscellaneous text in this section has been modified to:

The questions and answers are as follows:

1. Please confirm the smallest door or passage that the oven sections will need to pass through to reach the installation site.

Answer: The door near the first location in the southwest corner is 15ft wide by 11ft high. The door near the other location on the north side is 13ft wide and 12 feet high. Other farther overhead doors in the facility are of similar sizes.

2. Please confirm the ceiling height at the installation location.

Answer: The clearance height at the locations for the ovens are 25ft.

3. Are there any other notable physical restrictions your team would like to note?

Answer: There are a couple barriers but everything will be cleared when the ovens arrive.

4. What is the lowest temperature the oven will need to control at?

Answer: Our lowest cure temperature is 150F

5. With twenty (20) source/probe vacuum pairs, is it desired that these are evenly distributed through the chamber so there are five (5) pairs in each corner of the oven? Or would you prefer ten (10) pairs on each side of the oven chamber, located towards one end of the chamber?

FA812522Q00590002

Answer: Split the probes 10 per side evenly distributed.

6. Are all twenty (20) source vacuum lines controlled together at one (1) vacuum setting always? If not, are they to be set up in groups (if so how many) or do you require per port control of all twenty (20) ports?

Answer: The lines can be controlled by one vacuum system

7. What is the maximum number of steps/segments required per recipe?

Answer: The maximum I have seen so far is 6 steps.

8. Are the heating and cooling rates specified within the updated SOW to be achieve with an empty oven chamber or calculated with a load?

Answer: Calculate the temperature of the air with the load.

9. Will the 10 F/minute and cooling rate be required to and from the maximum operating temperature of 500 F?

If so, this process appears to require roughly 900 kW, which would put the full system FLA around 1,200 Amps.

Is this what is expected from the base?

Answer: The oven specs will be kept the same, we can prep the area for the 12000 amp as long as it can meet the heating requirements initially laid out. The oven will be electric.

10. There is a statement in 3.1.18 that notes External Services and Shipping and Training/Sale Support (5 Year).

Could we get a clarification on what is being requested with each of these items?

Answer: Please refer to section 4 for clarification. Contractor shall be responsible for providing transportation to 9001 as well as any personnel, equipment, tools, etc. needed to complete installation. Contractor shall offer 5 year after-sale support package. Including but limited to, telephone support, annual software upgrades, Annual preventative maintenance checks

11. For barcodes, will you require a 1D, 2D, or other scanner?

Answer: 2D scanners

12. Location of ovens in building?

Answer: First location is on the SW corner of 9001 and the second is on the north side of 9001.

13. Will the exhaust stacks be routed through the roof or wall? If through the roof how high is the building?

What is the roof type on the building?

Answer: The exhaust will be routed through the roof.

14. How high is the building (Inside and Outside)?

Answer: The height of the building is around 25ft inside and 28ft outside.

15. Paragraph 3.1.17 o the specs require Add-ons: 1 PC for vent and vacuum. Does it mean PC (computer) to control vacuum and vents only? What are you referring as vents? Is the PC and Controller PLC required per oven or one PC and Controller PLC for both ovens?

Answer: There should only be one PC per oven controlling all aspects of the oven

16. Are there any vacuum control in the oven controls such as vacuum transmitters?

Answer: Yes there should be vacuum controls, whatever controls that are recommended.

17. Please explain 5 year customer support

Answer: Customer support should include phone support. Preventative Maintenance/Remedial Maintenance will be sought out on another contract.

IDCode:
Page: 1
Pages: 4
AmendNo: 0002
EffDate: 06 May 2022
ReqNo:
ProjNo:
IssCode: FA8125
AdmCode:
IssuedBy: FA8125 AFSC PZIMA

3001 STAFF DR STE 2S76

CP 405 734 9107

TINKER AFB, OK 73145-3303

UNITED STATES

Sheridan Robison, Email: sheridan.robison@us.af.mil Telephone: 405-582-5686

AdminBy:
ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA812522Q0059
SolDate: 15 Mar 2022
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: See Section G - Contract Administration Data
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: The purpose of this amendment is to answer questions from industry and extend quote due date to 18 May 2022 at 3:00 PM CST.
ContNameTitle:
CoNameTitle: Sheridan Robison
ContDate:
CODate: 06 May 2022