South_B2280_Drawings.docx
DOCX document 8 MB Posted
- Attached to
- Aerial Work Platforms Federal contract opportunity
- Solicitation number
- FA8125-18-R-0018
About this file
Updated Drawings B2280
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Question_and_Answers_2_-_AWP_South_Dock.pdf | ||
| Solicitation_Amendment-2-AWP.pdf | ||
| South_B2280_Drawings.docx | DOCX document | |
| Question_and_Answers_for_AWP_South_Dock.pdf | ||
| Site_Visit_Details.pdf | ||
| Solicitation_Amendment-1-AWP.pdf | ||
| SOW_08.07.18.pdf | ||
| Solicitation-AWP.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FILE:
DATE:
5/11/2018 1:41:50 PM
1 2 3 4
GENERAL NOTES:
1. GENERAL:
5 6 7 8 9
A. THESE NOTES, AND OTHER DRAWING NOTES CONTAINED WITHIN, ARE PROVIDED TO MEET SPECIFIC REQUIREMENTS AND TO SUPPLEMENT THE CONTRACT SPECIFICATIONS. THESE NOTES NEITHER REPLACE NOR OVERRIDE THE PROVISIONS AND REQUIREMENTS OF THE CONTRACT SPECIFICATIONS.
B. CONTRACTOR SHALL COORDINATE ALL STRUCTURAL WORK WITH WORK SHOWN ON ALL OTHER DRAWINGS.
F C. CONTRACTOR SHALL VERIFY ALL DIMENSIONS OF EXISTING CONSTRUCTION AND
REPORT ANY DISCREPANCIES FROM THE CONTRACT OR REFERENCE DRAWINGS TO THE CONTRACTING OFFICER'S REPRESENTATIVE PRIOR TO COMMENCING WITH WORK. SCALING OF WORKING DIMENSIONS FROM THE STRUCTURAL DRAWINGS IS PROHIBITED.
D. CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MEANS AND METHODS OF CONSTRUCTION INCLUDING, BUT NOT LIMITED TO, SHORING AND TEMPORARY BRACING. CONTRACTOR SHALL UNDERTAKE ALL NECESSARY MEASURES TO ENSURE SAFETY OF ALL PERSONS AND STRUCTURES AT THE SITE AND ADJACENT TO THE SITE. VISITS TO THE SITE BY THE CONTRACTING OFFICER'S REPRESENTATIVE SHALL NOT RELIEVE THE CONTRACTOR OF SUCH RESPONSIBILITY.
E. IF CERTAIN FEATURES ARE NOT FULLY SHOWN OR CALLED FOR ON THE CONTRACT DRAWINGS OR SPECIFICATIONS, THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE SHOWN OR CALLED FOR, WITH THE APPROVAL OF THE CONTRACTING OFFICER'S REPRESENTATIVE.
WHERE SECTIONS VARY, CONTRACTOR SHALL PROVIDE FOR SMOOTH TRANSITIONS
E BETWEEN THEM, UNLESS NOTED OTHERWISE.
F. ALL PRODUCTS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS' WRITTEN INSTRUCTIONS AND RECOMMENDATIONS, UNLESS NOTED OTHERWISE.
G. COMPLY WITH ALL OSHA REQUIREMENTS.
2. DESIGN STANDARDS
A. PRINCIPAL CODE OF RECORD: INTERNATIONAL EXISTING BUILDING CODE 2015 AS MODIFIED BY UFC 1-200-01.
B. ASCE 7, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES, 2010.
C. AISC 325, STEEL CONSTRUCTION MANUAL, 14th EDITION, 2011.
3. BOLT/WELD INSPECTION
A. SEE SHEET S-002 FOR BOLT/WELD INSPECTION.
4. MATERIALS:
A. STRUCTURAL STEEL:
1. STRUCTURAL STEEL SHALL BE FABRICATED AND ERECTED IN ACCORDANCE WITH AISC STEEL CONSTRUCTION MANUAL, 14th EDITION.
2. TEMPORARY ERECTION BRACING SHALL BE DESIGNED AND PROVIDED BY THE CONTRACTOR
D AS REQUIRED AND SHALL NOT BE REMOVED UNTIL ALL PERMANENT LATERAL-LOAD-RESISTING ELEMENTS AND CONNECTIONS ARE COMPLETELY INSTALLED.
3. WIDE FLANGE SHAPES AND TEES: ASTM A992, Fy = 50 KSI.
4. OTHER SHAPES AND PLATES:
a. ASTM A36, Fy = 36 KSI, UNLESS NOTED OTHERWISE.
b. PLATE: ASTM A572 GRADE 50, Fy = 50 KSI.
5. BOLTS:
a. 3/4" DIAMETER ASTM A490, UNLESS NOTED OTHERWISE.
b. FRAMING CONNECTIONS: PRETENSIONED JOINTS WITH STANDARD HOLES, UNLESS NOTED OTHERWISE.
c. COMPRESSIBLE WASHER TYPE DIRECT TENSION INDICATORS CONFORMING TO RCSC SPECIFICATION FOR STRUCTURAL JOINTS USING HIGH STRENGTH BOLTS SHALL BE PROVIDED AT ALL BOLTED CONNECTIONS.
6. WELDING: IN ACCORDANCE WITH AWS D1.1.
7. BOLTING/DRILLING/WELDING SAFETY: PROTECT EXISTING CONSTRUCTION FROM HEAT, SPARK, SLAG, ETC. PROVIDE FIRE WATCH WHEN WELDING OR DRILLING/CUTTING IS PERFORMED. AT MINIMUM, COMPLY WITH OSHA REQUIREMENTS/ANSI Z49.1.
C 8. PRIMER: SSPC PAINT 20 OR SSPC PAINT 29 (ZINC RICH PRIMER)
4. SUBMITTALS:
A. STRUCTURAL STEEL:
1. STEEL SHOP DRAWINGS
2. WELDING CERTIFICATES
3. NONDESTRUCTIVE TESTING REPORT (SEE SHEET S-110)
4. CORROSION REMOVAL METHOD
5. PRIMER
6. BOLTING/DRILLING/WELDING SAFETY PROCEDURE
7. BOLTING/WELDING INSPECTOR CERTIFICATION
| CY | CUBIC YARD |
| DBL | DOUBLE |
HEF
POUNDS OR NUMBER PERCENT
AND
EXT FAB FD
EXTERIOR FABRICATE FLOOR DRAIN
OSHA
OZ
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
OUNCE
FIELD VERIFY/COORDINATE
FDN
FOUNDATION
PCF
POUNDS PER CUBIC FOOT
AT
FF
FAR FACE
PED
PEDESTAL
AA
ALUMINUM ASSOCIATION
FL
FLOOR
PEMP
PRE-ENGINEERED METAL BUILDING
AB
ANCHOR BOLT
FLG
FLANGE
PEN
PENETRATE
ABT
ABOUT
FNSH
FINISH
PERIM
PERIMETER
ACI
AMERICAN CONCRETE INSTITUTE
FS
FAR SIDE
PERP
PERPENDICULAR
ADH
ADHESIVE
FT
FEET
PJNT
PROJECTION
AGGR
AGGREGATE
FUT
FUTURE
PL
PLATE
AHR
ANCHOR
GA
GAGE
PLC
PLACES
AISI
AMERICAN IRON AND STEEL INSTITUTE
GALV
GALVANIZE
PREFAB
PREFABRICATED
AL
ALUMINUM
GB
GRADE BEAM
PS
PIPE SUPPORT
ALTN
ALTERNATE
GHSE
GREENHOUSE
PSF
POUNDS PER SQUARE FOOT
ANSI
APPROX
AMERICAN NATIONAL STANDARDS INSTITUTE
APPROXIMATE
GND GR GRTG
GROUND GRADE GRATING
PSI PT PVC
POUNDS PER SQUARE INCH PRETENSIONED
POLYVINYL CHLORIDE
ARCH
ARCHITECT
H
SLAB THICKNESS
R
RISER
ASTM
AMERICAN SOCIETY FOR TESTING OF
HDHSE
HEADHOUSE
RAD
RADIUS
MATERIALS
HORIZONTAL EACH FACE
RD
ROOF DRAIN
AWS
AMERICAN
WELDING SOCIETY
HEX
HEXAGON
REF
REFERENCE
B/P
BASE OF PIER
HG
HIGH
REINF
REINFORCE
BC
BOLT CIRCLE
HH
HEADHOUSE
REQD
REQUIRED
BETW
BETWEEN
HK
HOOK
REV
REVISION
BLDG
BUILDING
HORIZ
HORIZONTAL
RM
ROOM
BM
BEAM
HIGH POINT
S
SOUTH
BO
BOTTOM
OF
HR
HAND RAIL
SB
SHEAR BAR
BOS
BOTTOM OF
STEEL
HS
HIGH STRENGTH
SC
SLIP-CRITICAL
BOT
BOTTOM
IBC
INTERNATIONAL BUILDING CODE
SCHED
SCHEDULE
BRG
BEARING
ID
INSIDE DIAMETER
SE
SOUTHEAST
BRKT
BRACKET
IF
INSIDE FACE
SECT
SECTION
C/C
CENTER TO
CENTER
ISOLATION JOINT
SF
SWAY FRAME
CAP
CAPACITY
IN
INCHES
SH
SHEET
CF
CUBIC FEET
INTR
INTERIOR
SIM
SIMILAR
CHKR
CHECKER
INVT
INVERT
SLO
SHORT LEG OUTSTANDING
CIR
CIRCLE
INSIDE RADIUS
SLP
SLOPE
CJ
CONSTRUCTION
JOINT
JT
JOINT
SLV
SLEEVE
CL
CENTER
LINE
KB
KNEE BRACE
SP
SPACE
CLJ
CONTROL JOINT
KPL
KICK PLATE
SPEC
SPECIFICATION
CLR
CLEAR
KSI
KIPS PER SQUARE INCH
SQ
SQUARE
CMU
CONCRETE MASONRY
UNIT
ANGLE
SST
STAINLESS STEEL
CO
CONCRETE OPENING
LAD
LADDER
ST
SNUG-TIGHTENED
COL
COLUMN
LB
POUND
STD
STANDARD
COMP
COMPRESSION
LD
DEVELOPMENT LENGTH
STIF
STIFFENER
CONC
CONCRETE
LONG
STIR
STIRRUP
CONN
CONNECTION
LL
LIVE LOAD
STL
STEEL
CONT
CONTINUOUS
LLH
LONG LEG HORIZONTAL
STR
STRAIGHT
CONTR
CONTRACT
LLO
LONG LEG OUTSTANDING
STRL
STRUCTURAL
COORD
COORDINATE
LLV
COR
CORNER
LONG LEG VERTICAL
STRUC
STRUCTURAL
LNTL
LINTEL
SW
SOUTHWEST
COTR
CONTRACTING
OFFICER
LONG
LONGITUDINAL
SYMM
SYMMETRICAL
CRSI
CONCRETE
REINFORCING
STEEL
LPT
LOW POINT
T
TON
INSTITUTE
LS
CTR
CENTER
LAP SPLICE
T&B
TOP AND BOTTOM
CTRD
CENTERED
LVL
LEVEL
T/
TOP OF
MATL
MATERIAL
T/C OR
TOP OF CONCRETE
)HPT
IJ
IR
L
LG
| MAX | MAXIMUM |
| MC | MOMENT CONNECTION |
TOC
T/P TOP OF PIER
US ARMY CORPS OF ENGINEERS ®
TULSA DISTRICT
APPR.
DATE
| REVISIONS |
| DESCRIPTION |
SYMBOL
CO
P Y R I G H T
B
URN
S
A N D
M
CDONN
E L L
E
NG
I N
EE
R I N G
CO
M P A N Y
I
NC
| )DET | DETAIL |
| DIA | DIAMETER |
| MECH | MECHANICAL |
| MEZZ | MEZZANINE |
T/STL OR TOP OF STEEL TOS
B
SIM
S-001 SIM
A
| DIAG | DIAGONAL |
| DIM | DIMENSION |
| DK | DECKING |
| DL | DEAD LOAD |
| DN | DOWN |
| DWG | DRAWING |
| MFR | MANUFACTURER |
| MH | MANHOLE |
| MIN | MINIMUM |
| MISC | MISCELLANEOUS |
| MK | MARK |
TEMP TEMPORARY
T
IN
KE
R
A
IR
F
OR
C E
BA
S E
O K L A H O M A
C I
TY
O K L H O M A I
SS
U E
DA
T E
/07/ S C A L E As
I n d ic ate d
DRA
W I
NG
C O D E:
P M A N I S
PRO
J
ECT
EN
G I
NEER
AR
C H I T
ECT
D
ES
I G N
ED
B Y
P M A N I S
DRA
W N
B Y
C M
CGEE
C H E C
KED
B Y
K N I E L
SEN-S
H E
FF
I
EL
D D E P A R T M
ENT
O F
T
HE
AR
M Y U S.
AR
M Y
CORPS
O F
ENG
I
NEERS
T U L
SA
D I S T R I
CT
OK
L
AHO
M A B
URNS
M cD O N N
EL
L
W
ARD
P
AR
K W
AY
K
AN
S
AS
C I T Y
M O
)THD THREAD
B
H
AN
G A R
A L
TE
R
AT
ION
GENER
A L
NO
T E S
A
ND
A
BBR
E
VI
A T
IONS
| )THK | THICK |
| THRU | THROUGH |
| TOB | TOP OF BOLT |
| TOG | TOP OF GRATING |
S-001
S001
| DWL | DOWEL |
| E | EAST |
| MO | MASONRY OPENING |
| N | NORTH |
TOS OR
T/S
TOP OF STEEL
SECTION CALLOUT EXAMPLE
DETAIL CALLOUT EXAMPLE
ELEVATION CALLOUT EXAMPLE
EA EACH
NA NOT APPLICABLE
TRD TREAD
ONE OR TWO CHARACTER DISCIPLINE DESIGNATOR (MAY NOT BE PRESENT IF CALLOUT AND TITLE ARE
ON DRAWINGS WITHIN
THE SAME DISCIPLINE)
A
S001
LETTER OR NUMBER DESIGNATO R
DRAWING SEQUENCE NUMBER INDICATES WHERE TITLE IS LOCATED (MAY NOT BE PRESENT IF CALLOUT AND TITLE ARE ON THE SAME DRAWING)
THE WORD "SECTION" MAY BE REPLACED WITH "ELEVATION" OR "DETAIL"
SECTION, DETAIL, OR ELEVATION TITLE EXAMPLE
| ED | EQUIPMENT DRAIN | ||
| EF | EACH FACE | ||
| EJ | EXPANSION JOINT | ||
| EL | ELEVATION | ||
| ELEC | ELECTRICAL | ||
| ELEV | ELEVATOR EMBED | EMBEDMENT EQ | EQUAL |
| EQ SP | EQUALLY SPACED EQUIP | EQUIPMENT | |
| EQUIV | EQUIVALENT |
| NE | NORTHEAST |
| NF | NEAR FACE |
| NIC | NOT IN CONTRACT |
| NO | NUMBER |
| NOM | NOMINAL |
| NS | NEAR SIDE |
| NTS | NOT TO SCALE |
| NW | NORTHWEST |
| OC | ON CENTER |
| OD | OUTSIDE DIAMETER |
| OF | OUTSIDE FACE |
| TYP | TYPICAL | |
| UNO | UNLESS NOTED OTHERWISE VAR | VARIES |
| VEF | VERTICAL EACH FACE | |
| VERT | VERTICAL | |
| W | WEST | |
| W/ | WITH | |
| W/O | WITHOUT | |
| WD | WIDE | |
| WDT | WIDTH | |
| WP | WORK POINT |
SHEET REFERENCE
SECTION, DETAIL, AND ELEVATION SYMBOL IDENTIFIERS
SECTION, DETAIL, AND ELEVATION IDENTIFICATION SYSTEM
| EW | EACH WAY |
| EXIST | EXISTING |
| EXP | EXPANSION |
| OPNG | OPENING |
| OPP | OPPOSITE |
| WS | WATERSTOP |
| WT | WEIGHT |
| WWF | WELDED WIRE FABRIC |
NUMBER:
S-001
1 2 3 4 5 6 7 8 9
AISC 360-10 INSPECTIONS FOR WELDING
TABLE N5.4-1 INSPECTION TASKS PRIOR TO WELDING
QC
QA
WELDING PROCEDURE SPECIFICATION (WPSs) AVAILABLE P P
MANUFACTURER CERTIFICATIONS FOR WELDING CONSUMABLES AVAILABLE
P P
MATERIAL IDENTIFICATION (TYPE/GRADE)
O O
WELDER IDENTIFICATION SYSTEM (1)
O O
FIT-UP OF GROOVE WELDS (INCLUDING JOINT GEOMETRY)
JOINT
PREPARATION
DIMENSIONS (ALIGNMENT, ROOT OPENING, ROOT FACE, BEVEL)
CLEANLINESS (CONDITION OF STEEL
SURFACES)
TACKING (TACK WELD QUALITY AND
LOCATION)
BACKING TYPE AND FIT (IF APPLICABLE)
O O
CONFIGURATION AND FINISH OF ACCESS HOLES
O O
FIT-UP OF FILLET WELDS
DIMENSIONS (ALIGNMENT, GAPS AT
ROOT)
CLEANLINESS (CONDITION OF STEEL
SURFACES)
TACKING (TACK WELD QUALITY AND
LOCATION)
O O
CHECK WELDING EQUIPMENT
O
TABLE N5.4-2 INSPECTION TASKS DURING WELDING
USE OF QUALIFIED WELDERS
O O
CONTROL AND HANDLING OF WELDING CONSUMABLES
PACKAGING
EXPOSURE
CONTROL
O O
NO WELDING OVER CRACKED TACK WELDS
O O
ENVIRONMENTAL CONDITIONS
WIND SPEED WITHIN
LIMITS
PRECIPITATION AND
TEMPERATURE
O O
WPS FOLLOWED
SETTINGS ON WELDING
EQUIPMENT
TRAVEL
SPEED
SELECTED WELDING
MATERIALS
SHIELDING GAS TYPE/FLOW
RATE
PREHEAT
APPLIED
INTERPASS TEMPERATURE MAINTAINED
(MIN./MAX.)
PROPER POSITION (F, V, H,
OH)
O O
WELDING TECHNIQUES
INTERPASS AND FINAL
CLEANING
EACH PASS WITHIN PROFILE
LIMITATIONS
EACH PASS MEETS QUALITY REQUIREMENTS
O O
TABLE N5.4-3 INSPECTION TASKS AFTER WELDING
WELDS CLEANED
O O
SIZE, LENGTH AND LOCATION OF WELDS
P P
WELDS MEET VISUAL ACCEPTANCE CRITERIA
CRACK
PROHIBITION
WELD/BASE-METAL
FUSION
CRATER CROSS
SECTION
WELD
PROFILES
WELD
SIZE
UNDERCUT
POROSITY
P P
ARC STRIKES
P P
K-AREA (2)
P P
BACKING REMOVED AND WELD TABS REMOVED (IF REQUIRED)
P P
REPAIR ACTIVITIES
P P
DOCUMENT ACCEPTANCE OR REJECTION OF WELDED JOINT OR MEMBER
P P THE FABRICATOR OR ERECTOR, AS APPLICABLE, SHALL MAINTAIN A SYSTEM BY WHICH A WELDER WHO HAS WELDED A JOINT OR MEMBER CAN BE IDENTIFIED. STAMPS, IF USED, SHALL BE THE LOW-STRESS
TYP.
WHEN WELDING OF DOUBLER PLATES, CONTINUITY PLATES OR STIFFENERS HAS BEEN PERFORMED IN THE K-AREA, VISUALLY INSPECT THE WEB K-AREA FOR CRACKS WITHIN 3 IN. (75 MM) OF THE
WELD.
AISC 360-10 INSPECTIONS FOR BOLTING
TABLE N5.6-1 INSPECTION TASKS PRIOR TO BOLTING
QC
QA
MANUFACTURER'S CERTIFICATIONS AVAILABLE FOR FASTENER MATERIALS
O P
FASTENERS MARKED IN ACCORDANCE WITH ASTM REQUIREMENTS
O O PROPER FASTENERS SELECTED FOR THE JOINT DETAIL (GRADE, TYPE, BOLT LENGTH IF THREADS ARE TO BE EXCLUDED FROM SHEAR PLANE) O O
PROPER BOLTING PROCEDURE SELECTED FOR JOINT DETAIL
O O CONNECTING ELEMENTS, INCLUDING THE APPROPRIATE FAYING SURFACE CONDITION AND HOLE PREPARATION, IF SPECIFIED, MEET APPLICABLE REQUIREMENTS O O PRE-INSTALLATION VERIFICATION TESTING BY INSTALLATION PERSONNEL OBSERVED AND DOCUMENTED FOR FASTENER ASSEMBLIES AND METHODS USED P O
PROPER STORAGE PROVIDED FOR BOLTS, NUTS, WASHERS AND OTHER FASTENER COMPONENTS
O O
TABLE N5.6-2 INSPECTION TASKS DURING BOLTING
FASTENER ASSEMBLIES, OF SUITABLE CONDITION, PLACED IN ALL HOLES AND WASHERS (IF REQUIRED) ARE POSITIONED AS REQUIRED O O
JOINT BROUGHT TO THE SNUG-TIGHT CONDITION PRIOR TO THE PRETENSIONING OPERATION
O O
FASTENER COMPONENT NOT TURNED BY THE WRENCH PREVENTED FROM ROTATING
O O FASTENERS ARE PRETENSIONED IN ACCORDANCE WITH THE RCSC SPECIFICATION, PROGRESSING SYSTEMATICALLY FROM THE MOST RIGID POINT TOWARD THE FREE EDGES O O
TABLE N5.6-3 INSPECTION TASKS AFTER BOLTING
DOCUMENT ACCEPTANCE OR REJECTION OF BOLTED CONNECTIONS
P P
)US ARMY CORPS OF ENGINEERS ®
TULSA DISTRICT
AP
PR
DA
T E R
EV
I S I O N S D
ES
CR
I
PT
I O N S Y M B O
)F
E
I
SS
U E
DA
T E
/07/
SCA
L E As
I n d ic ate d D
RA
W I N G
CO
D E:
P M A N I S P R O J E C T
E
NG
I N
EE
R A R C H I T E C T D
ES
I G N
ED
B Y
P M A N I S D
RA
W N
B Y
C
MC
GEE
C H E C
KED
B Y
K N I E L
SE
N -S H E
FF
I E L D D E P A R T M
ENT
O F
T
HE
AR
M Y U S.
AR
M Y
CORPS
O F
ENG
I
NEERS
T U L
SA
D I S T R I
CT
OK
L
AHO
M A
BURNS
M cD O N
NE
L L K
AN
S
AS
C I T Y
AISC 360-10
FABRICATOR AND ERECTOR QUALITY CONTROL PROGRAM
FABRICATOR INSPECTION TASKS
QC
QA
DETAILS IN ACCORDANCE WITH SECTION N5
P
SHOP CUT AND FINISHED SURFACES IN ACCORDANCE WITH SECTION M2
P SHOP HEATING FOR STRAIGHTENING, CAMBERING AND CURVING IN ACCORDANCE WITH SECTION M2.1 P
TOLERANCES FOR SHOP FABRICATION IN ACCORDANCE WITH SECTION 6 OF THE
CODE OF STANDARD PRACTICE
P INSPECT THE FABRICATED STEEL TO VERIFY COMPLIANCE WITH DETAILS SHOWN ON SHOP DRAWINGS, SUCH AS PROPER APPLICATION OF JOINT DETAILS AT EACH CONNECTION P
ERECTOR INSPECTION TASKS
DETAILS IN ACCORDANCE WITH SECTION N5
P STEEL DECK HEADED STEEL STUD ANCHOR PLACEMENT AND ATTACHMENT IN ACCORDANCE WITH SECTION N6 P
FIELD CUT SURFACES IN ACCORDANCE WITH SECTION M2.2
P
FIELD HEATING FOR STRAIGHTENING IN ACCORDANCE WITH SECTION M2.1
P
TOLERANCES FOR FIELD ERECTION IN ACCORDANCE WITH SECTION 7.13 OF THE
CODE OF STANDARD PRACTICE
P INSPECT THE ERECTED STEEL FRAME TO VERIFY COMPLIANCE WITH THE DETAILS SHOWN ON THE ERECTION DRAWINGS, SUCH AS BRACES, STIFFENERS, MEMBER LOCATIONS AND PROPE
R APPLICATION OF JOINT DETAILS AT EACH CONNECTION
P INSPECT PLACEMENT OF ANCHOR RODS AND OTHER EMBEDMENTS SUPPORTING STRUCTURAL STEEL FOR COMPLIANCE WITH CONSTRUCTION DOCUMENTS. AS A MINIMUM, THE DIAMETER, GRADE, TYPE AND LENGTH OF THE ANCHOR ROD OR EMBEDDED ITEM, AND THE EXTENT OR DEPTH OF EMBEDMENT INTO C
ONCRETE, SHALL BE VERIFIED PRIOR TO PLACEMENT OF CONCRETE
P INSPECT THE FABRICATED STEEL OR ERECTED STEEL FRAME, AS APPROPRIATE, TO VERIFY COMPLIANCE WITH THE DETAILS SHOWN ON CONSTRUCTION DOCUMENTS, SUCH AS BRACES, STIFFENERS, MEMBER LOCATIONS AND PROPER APPLICATION OF JOINT DETAILS AT EACH CONNECTION O REVIEW THE MATERIAL TEST REPORTS AND CERTIFICATIONS FOR COMPLIANCE WITH THE CONSTRUCTION DOCUMENTS P )D
W
ARD
P
ARK
W
AY
)C
P Y R I G
B
URN
S
A N D
M
CDONN
E L L
E
NG
I N
EE
R I N G
CO
M P A N Y
I
NC
T
IN
KE
R
A
IR
F
OR
C E
BA
S E
O K L A H O M A
C I
TY
O K L H O M A B
H
AN
G A R
A L
TE
R
AT
ION
B O L T
AND
W E L D
IN
S P E C T I O N )B
SHEET REFERENCE NUMBER:
S-002
1 2 3 4 5 6 7 8 9
DATE:
5/11/2018 1:41:
PM
F
13A
C D.1 E G
TRUSS RIDGE
J K L
DEMOLITION NOTES:
1. CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND DIMENSIONS.
2. BASE BID: SUCCESSFUL CONTRACTOR TO DEMOLISH EXISTING TELEPLATFORM/COMPONENTS, RUNWAY BEAMS, AND RUNWAY BEAM HANGER COMPONENTS.
3. OPTION: SUCCESSFUL CONTRACTOR TO DEMOLISH EXISTING TELEPLATFORM/COMPONENTS ONLY, AND STEEL CONTRACTOR TO DEMOLISH RUNWAY BEAMS AND RUNWAY BEAM HANGER COMPONENTS.
4. OPTION: STEEL CONTRACTOR TO DEMOLISH ABANDONED RUNWAY BEAMS AS ILLUSTRATED ON THIS SHEET.
5. GOVERNMENT SHALL DETERMINE WHAT COMPONENTS TO BE TURNED OVER TO DRMO, AND WHAT COMPONENTS THE SUCCESSFUL CONTRACTOR CAN SALVAGE.
6. DOCK SHALL BE IN SHUTDOWN DURING ALL WORK.
7. STEEL CONTRACTOR RESPONSIBLE FOR DEMOLISHING/GRINDING OF EXISTING RUNWAY BEAM CONNECTIONS AND PREPARATION OF NEW STRUCTURAL STEEL SCOPE OF WORK.
8. SEE OTHER DETAILS AND DRAWINGS FOR MINOR DEMOLITION WORK ASSOCIATED WITH INSTALLATION OF NEW STRUCTURAL STEEL.
10.3
D
EXISTING RIGID RAIL
FALL PROTECTION TO REMAIN, TEMPORARILY RESUPPORT
A B A
NDON
ED
RUN
W A Y
BEAM
A B A
NDON
ED
RUN
W A Y
BEAM
E X I S T I N G
RUN
W A Y
BEAM
E X I S T I N G
RUN
W A Y
BEAM
E X I S T I N G
RUN
W A Y
BEAM
E X I S T I N G
RUN
W A Y
BEAM
A B A
NDON
ED
RUN
W A Y
BEAM
A B A
NDON
ED
RUN
W A Y
BEAM
)AT STRENGTHENING LOCATIONS
RELOCATE CONDUIT ALONG THE COLUMN FLANGE TO
AP
PR
DA
T E R
EV
I S I O N S D
ES
CR
I
PT
I O N S Y M B O L
)ACCOMMODATE
NEW RUNWAY BEAM SUPPORT FRAMING
EXISTING FALL PROTECTION
6 TO REMAIN
C
W
ARD
P
ARK
W
AY
I
SS
U E
DA
T E
/07/
SCA
L E As
I n d ic ate d D
RA
W I N G
CO
D E:
P M A N I S P R O J E C T
E
NG
I N
EE
R A R C H I T E C T D
ES
I G N
ED
B Y
P M A N I S D
RA
W N
B Y
C
MC
GEE
C H E C
KED
B Y
K N I E L
SE
N -S H E
FF
I E L D D E P A R T M
ENT
O F
T
HE
AR
M Y U S.
AR
M Y
CORPS
O F
ENG
I
NEERS
T U L
SA
D I S T R I
CT
OK
L
AHO
M A
BURNS
M cD O N
NE
L L K
AN
S
AS
C I T Y
)TO REMAIN
P Y R I G
B
URN
S
A N D
M
CDONN
E L L
E
NG
I N
EE
R I N G
CO
M P A N Y
I
NC
)PORTIONS OF EXISTING RUNWAY BEAMS TO REMAIN
PORTIONS OF EXISTING RUNWAY BEAMS TO REMAIN
IN
KE
R
A
IR
F
OR
C E
BA
S E
O K L A H O M A
C I
TY
O K L H O M A B
H
AN
G A R
A L
TE
R
AT
ION
DE
M O L I T I O N
P L A
)2
OPTION TO REMOVE ABANDONED EXISTING RUNWAY BEAMS
EXISTING TELEPLATFORMS/COMPONENTS, RUNWAY BEAMS AND HANGER CONNECTIONS TO BE DEMOLISHED
OPTION TO REMOVE ABANDONED EXISTING RUNWAY BEAMS
A1 DEMOLITION PLAN
A SCALE: 1/16" = 1'-0"
0 8' 16' 32'
S-003
1 2 3 4 5 6 7 8 9
C D.1 E G
J K L M
NOTES:
1. CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND DIMENSIONS.
2. SEE S-001 FOR GENERAL NOTES.
3. CONTRACTOR SHALL REMOVE/CLEAN PEELING PAINT AT NEW RUNWAY BEAM CONNECTIONS AND NEW STRUCTURAL STEEL LOCATIONS, AND APPLY 2 COATS PRIMER AS INDICATED IN THE GENERAL NOTES.
4. EXISTING TELESCOPING PLATFORMS AND RUNWAY BEAMS SHALL BE REMOVED PRIOR TO ANY STRENGTHENING WORK.
8' )10
D1 S-203
TELESCOPING PLATFORM CONTROL CABINET (4 TYPICAL)
C1 S-204
A1 S-203
A5 S-205
A1 S-205
9X )D1 S-205
TRUSS
9X C 9X C 9X
AP
PR
DA
T E R
EV
I S I O N S D
ES
CR
I
PT
I O N S Y M B O L
)CONNECTION STRENGTHENING, SEE D7/S-204
8'
)1/4" TEK SCREW @ 12" OC MAX SPACING INTO TOP FLANGE OF EXISTING BEAM
D 8 AT STRENGTHENING LOCATIONS, TYP
BEAM STRENGTHENING, TYP
SS
U E
DA
T E
/07/
SCA
L E As
I n d ic ate d D
RA
W I N G
CO
D E:
P R O J E C T
E
NG
I N
EE
R A R C H I T E C
)D1 S-206
7 S-202
8' )6
A7 S-204
D7 S-204 D E P A R T M
ENT
O F
T
HE
AR
M Y U S.
AR
M Y
CORPS
O F
ENG
I
NEERS
T U L
SA
D I S T R I
CT
OK
L
AHO
M
HATCH REPRESENTS WALKABLE CEILING LOCATION
D
ES
I G N
ED
B Y
P M A N I S D
RA
W N
B Y
C
MC
GEE
C H E C
KED
B Y K N I E L
SE
N -S H E
FF
I E L D P M A N I S
) (SOUTH DOCK)
D1 5 S-202
-8
BURNS
M cD O N
NE
L L
W
ARD
P
ARK
W
AY
K
AN
S
AS
C I T Y
)4
RUNWAY BEAM
P Y R I G
B
URN
S
A N D
M
CDONN
E L L
E
NG
I N
EE
R I N G
CO
M P A N Y
I
NC
)D1 3 S-201
1'
0"
9X B
H
AN
G A R
A L
TE
R
AT
ION
SOU
T H
DOCK
CEI
L
ING
F
RA
M
ING
P L
AN
)E5 S-101
D3 C 9X C 9X C 9X )S-206
NO WALKABLE CEILING BETWEEN GRID 1 AND 2
1 S-200
S-207
EXTERIOR LADDER ACCESS TO WALKABLE CEILING LEVEL
A1 S-207
A4
10'
)D4
S-207 S-207 N
A1 SOUTH DOCK CEILING FRAMING PLAN
SCALE: 1/16" = 1'-0"
0 8' 16' 32'
IN
KE
R
A
IR
F
OR
C E
BA
S E
O K L A H O M A
C I
TY
O K L H O M A
)SHEET REFERENCE NUMBER:
S-100
1 2 3 4 5 6 7 8 9
C D.1 E G
J K L
G
ENERGY CHAIN SUPPORT BEAM BY TELEPLATFORM SUPPLIER, FIELD LOCATE POSITION TO AVOID
CEILING MOUNTED SUPPLY AIR
A5 S-205
A1 S-205
D1 S-205
RUNWAY BEAM SUPPORT POINTS (BEARING), 3 TYP
EXISTING ENERGY NEW RUNWAY BEAMS
CHAIN LOCATION,
TELEPLATFORM SUPPLIER TO REUSE IF POSSIBLE
EXISTING ENERGY
AP
PR
DA
T E R
EV
I S I O N S D
ES
CR
I
PT
I O N S Y M B O L
)CHAIN LOCATION, TELEPLATFORM SUPPLIER TO REUSE IF POSSIBLE
-8
)EXISTING RIGID RAIL FALL PROTECTION
NEW RUNWAY BEAM AND ENERGY CHAIN SECTION E5 SCALE: 1/8" = 1'-0"
23'
E N D
S T O
)0 4' 8' 16'
3' - 0" *
28' - 0" *
8' - 0" *
36' - 0" *
21' - 0" *
-8 N
EW
RUN
W A Y
BEAM
N
EW
RUN
W A Y
BEAM
N
EW
RUN
W A Y
BEAM
N
EW
RUN
W A Y
BEAM
I
SS
U E
DA
T E
/07/
SCA
L E As
I n d ic ate d D
RA
W I N G
CO
D E:
)D 8
D1 S-206
A7 S-204 -8 ) #3
6"
M I N
T Y P )6
7'
9" )#1
BURNS
M cD O N
NE
L L
W
ARD
P
ARK
W
AY
K
AN
S
AS
C I T Y
)D7 S-204
7'
9"
)BOTTOM OF RUNWAY BEAM ELEVATION ~ 50'-8" ABOVE FINISH FLOOR
70,000 LB MAXIMUM TELESCOPING PLATFORM SYSTEM WEIGHT
ES
I G N
ED
B Y
P M A N I S D
RA
W N
B Y
C
MC
GEE
C H E C
KED
B Y K N I E L
SE
N -S H E
FF
I E L D P M A N I S P R O J E C T
E
NG
I N
EE
R A R C H I T E C
)FUSELAGE #1/#2 TELESCOPING PLATFORM SYSTEM LOADING DIAGRAM
#4
70,000 LB MAXIMUM TELESCOPING PLATFORM SYSTEM WEIGHT
P Y R I G
B
URN
S
A N D
M
CDONN
E L L
E
NG
I N
EE
R I N G
CO
M P A N Y
I
NC
8'
)4
1'
0" )B
RUNWAY BEAM
2 SUPPORT POINTS
(SUSPENDED, 5
SIMILAR,
E5 S-101
D3 S-206
#2
6'
0"
E N D
S T O
)RUNWAY BEAM SUPPORT POINTS (SUSPENDED, 16 SIM)
E P A R T M
ENT
O F
T
HE
AR
M Y U S.
AR
M Y
CORPS
O F
ENG
I
NEERS
T U L
SA
D I S T R I
CT
OK
L
AHO
M
)FUSELAGE #3/#4 TELESCOPING PLATFORM SYSTEM LOADING DIAGRAM
A6 T
IN
KE
R
A
IR
F
OR
C E
BA
S E
O K L A H O M A
C I
TY
O K L H O M A B
H
AN
G A R
A L
TE
R
AT
ION
RUN
W
AY
B
EAM
A
ND
T E
LE
S C O P
ING
P L A T F O
RM
P
LAN
) TELESCOPING PLATFORM LOADING DIAGRAM
SCALE:NTS
TELESCOPING PLATFORM COORDIANTION NOTES:
PLATFORM SUPPLIER S-207
TO COORDINATE BOLT
SPACING WITH EXISTING BEAMS)
A4 S-207
A1 S-207
D4 S-207 1.
CONTRACTOR AND TELESCOPING PLATFORM SUPPLIER SHALL COORDINATE THE FOLLOWING ITEMS:
A. EXISTING BUILDING DIMENSIONS AND STRUCTURAL INFORMATION.
B. RUNWAY BEAM HANGER BOLT LOCATION/SIZE/HOLE/BOLT PATTERN WITH STRUCTURE.
C. POSITION AND LOCATION OF ENERGY CHAIN.
D. LOCATION OF PLATFORM CONTROL CABINETS (ONE CABINET PER PLATFORM).
N E. FURNISH AND INSTALL SUPPORT STEEL FOR CABINET ONCE LOCATIONS ARE COORDINATED.
A1 RUNWAY PLAN
2. TELESCOPING PLATFORM SUPPLIER IS RESPONSIBLE FOR:
SCALE: 1/16" = 1'-0"
A
0 8' 16' 32' A.
ROUTING UTILITIES TO NEW ENERGY CHAIN AND CABINET LOCATIONS IF NEEDED.
B. SUPPORT FOR ENERGY CHAIN (FROM NEW RUNWAY BEAMS).
C. COORDINATION OF ENERGY CHAIN WITH SUPPLY AIR REGISTERS.
D. COORDINATION OF PLATFORM CONTROL CABINETS WITH EXISTING EXISTING FACILITY INFRASTRUCTURE. PROPOSED CABINET LOCATIONS ARE ILLUSTRATED ON S-101.
E. FIELD COORDINATION OF RUNWAY BEAM ATTACHMENT POINTS INCLUDING BOLT SIZE AND SPACING.
S-101
1 2 3 4 5 6 7 8 9
C D.1 E G
J K L M
NOTES:
F 12
10.3
1.
CONTRACTOR SHALL REMOVE CORROSION AT INDICATED CONNECTIONS.
2. (
AP
PR
DA
T E R
EV
I S I O N S D
ES
CR
I
PT
I O N S Y M B O L
)CONTRACTOR SHALL SUBMIT METHOD OF CORROSION REMOVAL FOR REVIEW AND APPROVAL.
3. CONTRACTOR SHALL ENGAGE THE SERVICES OF A NONDESTRUCTIVE TESTING COMPANY TO OBTAIN THE FOLLOWING INFORMATION:
A. NONDESTRUCTIVE TESTING OF EXISTING FLANGE TO FLANGE AND WEB TO WEB WELDS OF THE INDICATED CONNECTIONS.
B. ULTRASOUND THICKNESS MEASUREMENTS/D GAGE METER TESTING OF THE FLANGE AND WEBS. MEASURE THICKNESS IN EACH FLANGE IN 3 PLACES AND MEASURE THICKNESS IN EACH WEB IN 3 PLACES.
C. NONDESTRUCTIVE TESTING COMPANY SHALL NUMBER EACH CONNECTION AND PROVIDE A REPORT FOR EACH CONNECTION WHICH INCLUDES THE WELD INSPECTION RESULTS AND THE THICKNESS MEASUREMENTS.
D. VARIOUS CONNECTIONS INCLUDE STEEL PLATE/STIFFENERS. ANY SIMILAR
5 A1 S-110
A4
S-110 SIM
SIM
TRUSS BOTTOM CHORD INSPECTION POINT LOCATIONS
COMPONENTS SHALL ALSO BE CLEANED, TESTED, AND MEASURED, SIMILAR TO THE FLANGE AND WEBS INDICATED ABOVE.
4. CONTRACTOR SHALL SUBMIT ALL THE INFORMATION OBTAINED TO THE CONTRACTING OFFICER FOR REVIEW.
5. AFTER INFORMATION AND REPORT HAVE BEEN REVIEWED, AND RESULTS OF INFORMATION AND REPORT DO NOT CAUSE STRENGTHENING OF CONNECTION, CONTRACTOR SHALL PRIME ALL EXPOSED STEEL AT TRUSS CONNECTIONS USING THE FOLLOWING:
A. PREPARE SURFACES FOR PAINTING IN ACCORDANCE WITH SSPC SP6.
B. PRIMER: SSPC PAINT 20 OR SSPC PAINT 29 (ZINC RICH PRIMER).
C. 2 COATS OF PRIMER SHALL BE APPLIED.
D. PRIMER SELECTED SHALL BE COMPATIBLE WITH EXISTING COATING.
I
SS
U E
DA
T E
/07/
SCA
L E As
I n d ic ate d D
RA
W I N G
CO
D E:
)D
P R O J E C T
E
NG
I N
EE
R A R C H I T E C T )N
D1 WALKABLE CEILING TRUSS CONNECTION INSPECTION
D
ES
I G N
ED
B Y
P M A N I S D
RA
W N
B Y
C
MC
GEE
C H E C
KED
B Y K N I E L
SE
N -S H E
FF
I E L D P M A N I S
)SCALE: 1/32" = 1'-0"
0 16'
32' 64'
PHOTOGRAPH IS INDICATIVE
OF THE TYPICAL TRUSS CONNECTION
TO BE INSPECTED. SOME CONNECTIONS INCLUDE ADDITIONAL STEEL PLATE/STIFFENERS WHICH ALSO NEED TO BE CLEANED FROM CORROSION AND INSPECTED
3 THICKNESS MEASUREMENTS PER EACH FLANGE, ONE AT WELD, ONE AT THE TIP OF FLANGE, AND ONE NEAR THE FLANGE TO WEB RADIUS, EACH FLANGE IN CONNECTION
D E P A R T M
ENT
O F
T
HE
AR
M Y U S.
AR
M Y
CORPS
O F
ENG
I
NEERS
T U L
SA
D I S T R I
CT
OK
L
AHO
M A
BURNS
M cD O N
NE
L L
W
ARD
P
ARK
W
AY
K
AN
S
AS
C I T Y
)3 THICKNESS MEASUREMENTS PER EACH WEB, ONE AT WELD, ONE IN THE MIDDLE OF THE WEB, AND ONE NEAR THE FLANGE TO WEB RADIUS, EACH WEB IN CONNECTION
P Y R I G
B
URN
S
A N D
M
CDONN
E L L
E
NG
I N
EE
R I N G
CO
M P A N Y
I
NC
)REMOVE CORROSION AND PERFORM NON DESTRUCTIVE TEST AND MEASUREMENTS FOR PERFORATIONS/REDUCED CROSS SECTION
IN
KE
R
A
IR
F
OR
C E
BA
S E
O K L A H O M A
C I
TY
O K L H O M A B
H
AN
G A R
A L
TE
R
AT
ION
W A L K
AB
L E
C E I L
ING
T
RUSS
C O
NN
E C T
ION
IN
S
PEC
T I O N
P L A N
)B APPROXIMATE SHAPE OF CORRODED
CONNECTION AND NONDESTRUCTIVE TESTING AND MEASUREMENT AREA
A1
) CONNECTION - SIDE VIEW
SCALE: NTS
CONNECTION - TOP DOWN VIEW
A4
)SCALE:NTS
S-110
E
GRID
T
RUSS
SCA
L
D1 D C C X E X
IS
T I N G
J O I
STS
B A
DE
T A
IL
SCA
L
A1 F
IL
E
DA
T E 5/ 1/
)COPYRIGHT © 2018 BURNS AND MCDONNELL ENGINEERING COMPANY, INC.
TINKER AIR FORCE BASE, OKLAHOMA CITY, OKLHOMA
DEPARTMENT OF THE ARMY
C
)DESIGNED BY: ISSUE DATE:
US
A
RMY
C O R P S
O F
E N G I N
EE
RS
T U
LS
A
D I S T R I
CT
)REVISIONS
S H
EET
R
EF
E R E
NC
E
NU
M
BE
R S
)B2280 HANGAR ALTERATION
GRID 1 FRAMING ELEVATION
U.S. ARMY CORPS OF ENGINEERS
TULSA DISTRICT
OKLAHOMA
BURNS & McDONNELL 9400 WARD PARKWAY KANSAS CITY, MO 64114 (816) 333-9400
P.MANIS DRAWN BY: C.MCGEE CHECKED BY:
K.NIELSEN-SHEFFIELD
P.MANIS
05/07/2018
SCALE:
As Indicated DRAWING CODE:
SYMBOL
DESCRIPTION
DATE APPR.
TRU
SS
R I D G E L K J G E D T O P
CH
O R D
S T R E
NG
T H E N I N G A S T
RU
SS
S P L I C E
ST
R E
NG
T H E N I N G
O N
V I S I B L E
S I D E
O F
T
RU
S S
TYP
A S
S I M
TYP
LOC
AT
I O N
O F
N
EW
CH
A
NN
E L
TRU
SS
R I D G E
E X I
ST
I N G
STE
E L
D E C K 1/4
1/
R A I L I N G
S I G N
IF
I
ES
E N D
O F
W A L K
AB
L E
C E I L I N G
GRID
PHO
T O
SCA
L E N
TS
A5
)PROJECT ENGINEER/ARCHITECT
1 2 3 4 5 6 7 8 9
DATE:
5/11/2018 1:41:
PM
L K J TRUSS RIDGE
G E D.1 C
AP
PR
DA
T E R
EV
I S I O N S D
ES
CR
I
PT
I O N S Y M B O
A5
S-201 SIM
10 TYP
TRUSS MEMBER STRENGTHENING
A1 S-201
BOTTOM CHORD STRENGTHENING
TRUSS SPLICE STRENGTHENING
36' - 0" * 8' - 0" * 28' - 0" * 3' - 0" *
D1 GRID 3 TRUSS
SCALE: 1/8" = 1'-0"
0 4' 8' 16'
TYP EACH
D END
| 1/4 | 4 |
| 1/4 | 4 |
1"
M A X
M A T C H
SP
L I C E
P L
TH
I C
KN
E S S I
SS
U E
DA
T E
/07/
SCA
L E As
I n d ic ate d D
RA
W I N G
CO
D E:
P M A N I S P R O J E C T
E
NG
I N
EE
R A R C H I T E C T D
ES
I G N
ED
B Y
P M A N I S D
RA
W N
B Y
C
MC
GEE
C H E C
KED
B Y
K N I E L
SE
N -S H E
FF
I E L D D E P A R T M
ENT
O F
T
HE
AR
M Y U S.
AR
M Y
CORPS
O F
ENG
I
NEERS
T U L
SA
D I S T R I
CT
OK
L
AHO
M A
BURNS
M cD O N
NE
L L K
AN
S
AS
C I T Y
)1/4 1 AT BOLT
)NEW PL 1/2 X 3, NOTCH UP TO 1" AT FLANGE SPLICE PLATE, GRADE 50, TOP AND BOTTOM, GRIDS 3, 5, 7, 9, 11
1/4 1
SPACINGS
EACH END
EACH END
3/16 3
3/16 5
ALL EXISTING ANGLES TO REMAIN
EXISTING VERTICAL OR DIAGONAL TRUSS SHAPE (WIDE FLANGE)
W
ARD
P
ARK
W
AY
)EXISTING WEB SPLICE PLATE, TYP
NEW L4X4X1/4, EACH SIDE
NOTCH WALKABLE CEILING DECK AND EXISTING ANGLES
TO INSTALL NEW L4X4, EACH SIDE
5" FIELD MEASURE 5"
VARIES FROM 1'-0" TO 2'-6"
SPLICE RETROFIT TOP VIEW
EXISTING FLANGE SPLICE PLATE, TYP
P Y R I G
B
URN
S
A N D
M
CDONN
E L L
E
NG
I N
EE
R I N G
CO
M P A N Y
I
NC
)RESUPPORT
FIELD CONFIRM
CONDITIONS PRIOR
NOTE: AT GRID 1, PL 1/2 X 3 REQUIRED AT ONE FLANGE ONLY
B
H
AN
G A R
A L
TE
R
AT
ION
GRID
F
RA
M
ING
E L E V A T
ION
)EXISTING FALL
TO DRILLING FOR
DRILL EXISTING TOP CHORD
AT BOLT
1/4 1
PROTECTION
B TO NEW BEAM
3" 9"
NEW BOLTS TO ACCEPT 3/4" DIA A490 BOLTS
TYP EACH END
| 1/4 | 4 |
| 1/4 | 4 |
VA
R I E S M I N
)NEW PL 1/2 X 3, TOP AND BOTTOM
SPACINGS
1/4 1
AT GRIDS 3, 5, 7, 9, 11
VA
R I E S M I
)1' - 0" 1' - 0" 9" 3" TYP
NEW W8X40
1' - 6" 8' - 0" * 11' - 6"
NOTCH PLATE
TO FIT SPLICE, 2" MIN
A D7 S-204
SIM
A7
S-204 SIM
SPLICE RETROFIT TRUSS ELEVATION (DIAGONAL SHOWN, VERTICAL SIMILAR)
SPLICE RETROFIT SECTION (ADJACENT TO SPLICE)
SPLICE RETROFIT ELEVATION (AT SPLICE SECTION)
IN
KE
R
A
IR
F
OR
C E
BA
S E
O K L A H O M A
C I
TY
O K L H O M A
)SHEET REFERENCE
A1 DETAIL
A5 TRUSS WEB SPLICE RETROFIT DETAIL
NUMBER:
SCALE: 1/2" = 1'-0"
0 1' 2' 4' SCALE: 1 1/2" = 1'-0"
0 1/2' 1' 1 1/2'
S-201
1 2 3 4 5 6 7 8 9
L K J TRUSS RIDGE
G E D.1 C
) A5 S-201 11
SIM
A1 S-204
SS
U E
DA
T E
/07/
SCA
L E As
I n d ic ate d D
RA
W I N G
CO
D E:
P M A N I S P R O J E C T
E
NG
I N
EE
R A R C H I T E C T D
ES
I G N
ED
B Y
P M A N I S D
RA
W N
B Y
C
MC
GEE
C H E C
KED
B Y
K N I E L
SE
N -S H E
FF
I E L D D E P A R T M
ENT
O F
T
HE
AR
M Y U S.
AR
M Y
CORPS
O F
ENG
I
NEERS
T U L
SA
D I S T R I
CT
OK
L
AHO
M A
BURNS
M cD O N
NE
L L
W
ARD
P
ARK
W
AY
K
AN
S
AS
C I T Y
) A1 S-201 SIM
AP
PR
DA
T E R
EV
I S I O N S D
ES
CR
I
PT
I O N S Y M B O L
)D1 GRID 5 TRUSS
L K J TRUSS RIDGE
0 4' 8' 16'
G E D.1 C
TEMPORARILY RELOCATE UTILITY/DUCT SUPPORT DURING STRENGTHENING AT
THIS LOCATION
P Y R I G
B
URN
S
A N D
M
CDONN
E L L
E
NG
I N
EE
R I N G
CO
M P A N Y
I
NC
)A5
S-201 SIM
11 TYP
S-204 SIM
A1 S-201 SIM
TEMPORARILY RELOCATE UTILITY/DUCT SUPPORT DURING STRENGTHENING AT
T
IN
KE
R
A
IR
F
OR
C E
BA
S E
O K L A H O M A
C I
TY
O K L H O M A B
H
AN
G A R
A L
TE
R
AT
ION
GRID
AND
F
RA
M
ING
E L E V A T
ION
)THIS LOCATION
) GRID 7 TRUSS
0 4' 8' 16'
S-202
F E D C B A F
IL
E
D A T E 5/ 1/
)COPYRIGHT © 2018 BURNS AND MCDONNELL ENGINEERING COMPANY, INC.
TINKER AIR FORCE BASE, OKLAHOMA CITY,
OKLHOMA
B2280 HANGAR ALTERATION
GRID 9 AND 11 FRAMING ELEVATION
DEPARTMENT OF THE ARMY
U.S.
ARMY
CORPS
OF
ENGINEERS
TULSA DISTRICT
OKLAHOMA
BURNS & McDONNELL 9400 WARD PARKWAY KANSAS CITY, MO 64114
(816) 333-9400
DESIGNED BY: P.MANIS
DRAWN BY: C.MCGEE CHECKED BY:
K.NIELSEN-SHEFFIELD
P.MANIS
ISSUE DATE: 05/07/2018
SCALE:
As Indicated
DRAWING CODE:
PROJECT ENGINEER/ARCHITECT
S H
EET
R
EF
E R E
NC
E
NU
M
BE
R S
)SYMBOL
REVISIONS DESCRIPTION
US
A
RMY
C O R P S
O F
E N G I N
EE
RS
T U L
SA
D I S T R I C T C
)DATE APPR.
T
RU
SS
R I
DG
E L K J G E D
TE
M P
OR
A R I L Y
R E
LOC
ATE
U T I L
IT
Y
DUC
T
S U P P
OR
T
DUR
I N G
ST
R E
NG
T H E N I N G
AT
T H E S E
L O C
AT
I
ON
S T
RU
SS
S P L I C E
S T R E
NG
T H E N I N G A S
S I M
TYP
GRID
T
RUSS
SCA
L
D1 T
RU
SS
R I
DG
E G J A S
S I M
T Y P T
RU
SS
S P L I C E
ST
R E N G T H E
NIN
G G
RID
T
RUSS
SCA
L
A1
1 2 3 4 5 6 7 8 9
DATE:
5/11/2018 1:41:
PM
G TRUSS
RIDGE
1' - 8" * 16' - 4" * 9' - 0" * 9' - 0" * 16' - 4" * 2' - 8" *
2 1/2" 2 1/2"
5/16 3
TRIM DECK AND SUPPORT ANGLE TO INSTALL BOLTS AND STIFFENERS
1/4 4 TOP AND
AP
PR
DA
T E R
EV
I S I O N S D
ES
CR
I
PT
I O N S Y M B O L
)TULSA DISTRICT
F A5 S-205
A1 S-205
D1 S-205
EXISTING FALL PROTECTION BEAM
PL 3/4X4X8 AT EACH
1/4 4
BTM PL TYP
RUNWAY BEAM
NEW BRACKET TO COLUMN
EXISTING W21X112 COLUMN
W33X201
EXISTING RUNWAY BEAMS (NORTH DOCK)
S-206
THREE RUNWAY BEAMS, SUPPORTED BY NEW BEAM (SOUTH DOCK)
NEW BRACKET TO COLUMN
EXISTING W21X112 COLUMN
ROW OF BOLTS
3/4" DIA A490 BOLTS
FIELD DRILL WEB
TO ACCEPT NEW BOLTS
RUNWAY BEAM CONNECTION TO STRUCTURE
GRIND EXISTING
PL3/8X3 1/2X7
1/4" TEK SCREW
AT 12" OC MAX SPACING AT STRENGTHENED ROOF BEAMS
NEW C9X20
PL3/8X4 1/2X12, 3 1/2" SLOT TO ACCEPT 1/2" STIFFENER
1/4 3
50'
C O N F I R M
W I T H
T E L E S C O
PI
N G
P L A T F O R M
S U P P L I E R
)RUNWAY BEAM
ATTACHMENT ANGLES/OFF PRIOR TO INSTALLING NEW W8
1/4 3
EA SIDE
EXISTING WALL FRAMING, WALL PANEL NOT SHOWN
W8X40 WITH STIFFENERS
STUB HANGER, RIGIDLY WELDED TO CONTINUOUS RUNWAY BEAM
50' - 8"
Level 1 100' - 0"
NEW RUNWAY BEAM
I
SS
U E
DA
T E
/07/
SCA
L E As
I n d ic ate d D
RA
W I N G
CO
D E:
P M A N I S P R O J E C T
E
NG
I N
EE
R A R C H I T E C T D
ES
I G N
ED
B Y
P M A N I S D
RA
W N
B Y
C
MC
GEE
C H E C
KED
B Y
K N I E L
SE
N -S H E
FF
I E L D D E P A R T M
ENT
O F
T
HE
AR
M Y U S.
AR
M Y
CORPS
O F
ENG
I
NEERS
T U L
SA
D I S T R I
CT
OK
L
AHO
M A
BURNS
M cD O N
NE
L L
W
ARD
P
ARK
W
AY
K
AN
S
AS
C I T Y
)BY TELEPLATFORM SUPPLIER, RUNWAY BEAM TO BE CONTINUOUS (NOT SIMPLE SPAN) FOR LENGTH OF RUNWAY BEAM
D7 TYPICAL RUNWAY BEAM HANGER SECTION
FIELD VERIFY ALL CONDITIONS/DIMENSIONS PRIOR TO CONSTRUCTION
C1 WALL FRAMING GRID 10.3
1/2" STIFFENER,
3/8" FILLET WELD EACH
SCALE: 1" = 1'-0"
0 1/2' 1' 2'
0 4' 8' 16'
SIDE, FLGS AND WEB
STEEL DECK
NOT SHOWN, TRIM DECK AND SUPPORT ANGLE
3" 6" 6" 6" 6" 3"
2 ROWS OF (4)
3/4" DIA A490 BOLTS
TO INSTALL STIFFENER
AND BOLTS
TOP SURFACE OF NEW ANGLE TO BE FLUSH WITH
CO
P Y R I G
B
URN
S
A N D
M
CDONN
E L L
E
NG
I N
EE
R I N G
CO
M P A N Y
I
NC
)EXISTING ANGLE, ADD 3/8" X3" PL INTERMEDIATE CONNECTORS, 3/16" FILLET TO NEW AND EXISTING
NEW L4X4X1/4,
EACH SIDE 3/16 3
PL 3/8" X 3" WIDE
TYP EACH ANGLE EACH END
GRIND EXISTING RUNWAY BEAM ATTACHMENT ANGLES/OFF PRIOR TO
6" 6"
1/2" STIFFENER,
CJP TO FLG AND WEB, 3 AS SHOWN
T
IN
KE
R
A
IR
F
OR
C E
BA
S E
O K L A H O M A
C I
TY
O K L H O M A
)ANGLE LEG
INSTALLING NEW W8 W8X40
H
AN
G A R
A L
TE
R
AT
ION
GRID
0.3
F
RA
M
ING
E L E V A T I O N
EXISTING ANGLES
NEW L4X4
RUNWAY BEAM BY TELEPLATFORM SUPPLIER
A A1 SECONDARY STRENGTHENING A7 TYPICAL RUNWAY BEAM HANGER SECTION
SCALE: 1/2" = 1'-0"
0 1' 2' 4'
SCALE: 1" = 1'-0"
0 1/2' 1' 2'
S-204
1 2 3 4 5 6 7 8 9
DATE:
5/11/2018 1:41:58 PM
9 10
GRIND/REMOVE EXISTING RUNWAY
BEAM SUPPORT TO INSTALL NEW W8, TYP
RUNWAY BEAM
G
3/8" STIFFENER,
3/16" FILLET 3 EDGES, BOTH SIDES
1'
6"
AP
PR
DA
T E R
EV
I S I O N S D
ES
CR
I
PT
I O N S Y M B O
)E
END STOP
3/8" STIFFENER, EACH SIDE
PL 1/2X12X18, SKEWED
1/4
3 EDGES
1/4 18 3 EDGES
23' - 6"
1/4
NEW BEAM
TYP
1/4 18
NEW L4X4 NOT SHOWN
TYP
D1 SECTION D7 SECTION
SKEWED PL 1/2X4X 6,
(2) (
)3/4" DIA BOLTS
0 1' 2' 4'
9 10
SCALE: 3/4" = 1'-0"
PL 1/2X12X18, SKEWED
0 1' 2' 3'
SS
U E
DA
T E
/07/
SCA
L E As
I n d ic ate d D
RA
W I N G
CO
D E:
P M A N I S P R O J E C T
E
NG
I N
EE
R A R C H I T E C T D
ES
I G N
ED
B Y
P M A N I S D
RA
W N
B Y
C
MC
GEE
C H E C
KED
B Y
K N I E L
SE
N -S H E
FF
I E L D D E P A R T M
ENT
O F
T
HE
AR
M Y U S.
AR
M Y
CORPS
O F
ENG
I
NEERS
T U L
SA
D I S T R I
CT
OK
L
AHO
M A
BURNS
M cD O N
NE
L L
W
ARD
P
ARK
W
AY
K
AN
S
AS
C I T Y
)11
D7 S-205
NEW W8X24 BRACE
C L8X6X3/4X10" LONG
* 1' - 1 3/4"
* 7 3/4"
NEW BRACE, CONNECT TO COLUMN AT GRID G 11
| 1/4 | 5 |
| 1/4 | 5 |
EA ANGLE
3 EDGES
TYP
3/8" STIFFENER,
150' - 8"
1/4 3 EDGES
PROVIDE INTERMEDIATE
EACH SIDE
1/4
TYP
| 1/4 | 18 |
| 1/4 | 18 |
CONNECTORS IN ACCORDANCE WITH AISC
(4) (
P Y R I G
B
URN
S
A N D
M
CDONN
E L L
E
NG
I N
EE
R I N G
CO
M P A N Y
I
NC
)3/4" DIA A490 BOLTS
1/2" STIFFENER
3/4" STIFFENER, EACH SIDE, EACH
FLANGE, EXTEND STIFFENER TO EXISTING WALL PANEL FACE
1/4 2 EDGES
EXISTING W12X27
(5) 3/8" STIFFENERS, 1/4" FILLET EACH SIDE, 3 EDGES, 4" ON CENTER
| 1/4 | 5 |
| 1/4 | 5 |
EA ANGLE
W16X67 BRACKET, CJP TO COLUMN, FLG AND WEB
TYP
EXISTING CONDUIT ATTACHED
TO COLUMN FLANGE, RELOCATE CONDUIT AT NEW W16 BRACKET
2 3/4" BOLT GAGE, COORDINATE WITH
TELESCOPING PLATFORM SUPPLIER
23' - 6"
END STOP
28' - 9"
PL 1/2X12X18 SKEWED TO MATCH 2L ANGLE
B
H
AN
G A R
A L
TE
R
AT
ION
F R
AM
ING
S E C T
IONS
A
ND
DE
T A
ILS
) CUT WALL PANEL AND PASS CHANNEL THROUGH
9" 9 1/2"
10 3/4"
* 3"
IN
KE
R
A
IR
F
OR
C E
BA
S E
O K L A H O M A
C I
TY
O K L H O M A
)SHEET REFERENCE
A1 SECTION
A5 SECTION
NUMBER:
SCALE: 3/4" = 1'-0"
0 1' 2' 3'
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
S-205
1 2 3 4 5 6 7 8 9
AP
PR
DA
T E R
EV
I S I O N S D
ES
CR
I
PT
I O N S Y M B O
EXISTING W12
8' - 0"
3/16 4-16
NEW C9X20
STAGGER TYP
(3)
3/8" STIFFENERS EA SIDE, 1/4" FILLET EACH SIDE, 3 EDGES, 4" ON CENTER
E NEW RUNWAY BEAM
EXISTING FALL PROTECTION RAIL TO REMAIN
CONTRACTOR SHALL PROVIDE
FIELD MEASUREMENTS OF CONNECTION FOR CONNECTION EVALUATION, SUBMIT TO CONTRACTING OFFICER FOR REVIEW
) SECTION
SCALE: 1" = 1'-0"
8' - 0"
D3 I
SS
U E
DA
T E
/07/
SCA
L E As
I n d ic ate d D
RA
W I N G
CO
D E:
P M A N I S P R O J E C T
E
NG
I N
EE
R A R C H I T E C T D
ES
I G N
ED
B Y
P M A N I S D
RA
W N
B Y
C
MC
GEE
C H E C
KED
B Y
K N I E L
SE
N -S H E
FF
I E L D D E P A R T M
ENT
O F
T
HE
AR
M Y U S.
AR
M Y
CORPS
O F
ENG
I
NEERS
T U L
SA
D I S T R I
CT
OK
L
AHO
M A
BURNS
M cD O N
NE
L L
W
ARD
P
ARK
W
AY
K
AN
S
AS
C I T Y
) SECTION
0 1/2' 1' 2' 0 1' 2' 3'
EXISTING W21X111 COLUMNS
1' - 8" 25' - 4" 25' - 4" 1' - 8"
EXISTING W21X111 COLUMNS
P Y R I G
B
URN
S
A N D
M
CDONN
E L L
E
NG
I N
EE
R I N G
CO
M P A N Y
I
NC
10'
)A1 S-205
EXISTING CEILING FRAMING
6'
0"
)EXISTING FALL PROTECTION RAIL
SKEWED PL 1/2X4X6,
(2) (
T
IN
KE
R
A
IR
F
OR
C E
BA
S E
O K L A H O M A
C I
TY
O K L H O M A B
H
AN
G A R
A L
TE
R
AT
ION
F R
AM
ING
S E C T
IONS
A
ND
DE
T A
)3/4" DIA BOLTS
A6 S-206
W8X24, CJP TO EXISTING W12X27 BEAM
NEW W8X24
)A1 PARTIAL PLAN A6 SECTION
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
SCALE: 3/4" = 1'-0"
0 1' 2' 3'
S-206
1 2 3 4 5 6 7 8 9
(3) 3/8" STIFFENERS, 2
1/4" FILLET EACH SIDE,
FILE:
DATE:
5/11/2018 1:41:59 PM
3 EDGES, 4" ON CENTER 1' - 4"
EXISTING W12X27 1 2
US ARMY CORPS OF ENGINEERS ®
TULSA DISTRICT
AP
PR
DA
T E R
EV
I S I O N S D
ES
CR
I
PT
I O N S Y M B O L )F
2' - 4" FIELD CONFIRM
COORDINATE BOLT SIZE AND SPACING WITH TELESCOPING PLATFORM SUPPLIER
(3) 3/8" STIFFENERS, 1/4" FILLET EACH SIDE, 3 EDGES
1' - 4"
EXISTING W12X27
6' - 0" END STOP
COORDINATE HOLE SIZE AND SPACING
WITH TELESCOPING PLATFORM SUPPLIER
SS
U E
DA
T E
/07/
SCA
L E As
I n d ic ate d D
RA
W I N G
CO
D E:
P M A N I S P R O J E C T
E
NG
I N
EE
R A R C H I T E C T D
ES
I G N
ED
B Y
P M A N I S D
RA
W N
B Y
C
MC
GEE
C H E C
KED
B Y
K N I E L
SE
N -S H E
FF
I E L D D E P A R T M
ENT
O F
T
HE
AR
M Y U S.
AR
M Y
CORPS
O F
ENG
I
NEERS
T U L
SA
D I S T R I
CT
OK
L
AHO
M A
BURNS
M cD O N
NE
L L
W
ARD
P
ARK
W
AY
K
AN
S
AS
C I T Y
)6' - 0" END STOP
D1 SECTION
D4 SECTION
0 1' 2' 3'
0 1' 2' 4'
1 2 3
1 2
(3) 3/8" STIFFENERS, 1/4" FILLET EACH SIDE, 3 EDGES, 4" ON CENTER
1' - 4" EXISTING W12X36
(3) 3/8" STIFFENERS EA SIDE, 1/4" FILLET EACH SIDE, 3 EDGES, 4" ON CENTER
1' - 4"
EXISTING W12X19
P Y R I G
B
URN
S
A N D
M
CDONN
E L L
E
NG
I N
EE
R I N G
CO
M P A N Y
I
NC
)COORDINATE HOLE SIZE AND PLACEMENT WITH TELESCOPING PLATFORM
B SUPPLIER
COORDINATE HOLE SIZE AND SPACING
T
IN
KE
R
A
IR
F
OR
C E
BA
S E
O K L A H O M A
C I
TY
O K L H O M A B
H
AN
G A R
A L
TE
R
AT
ION
F R
AM
ING
S E C T
IONS
A
ND
DE
T A
)WITH TELESCOPING PLATFORM SUPPLIER
A
) SECTION
SCALE: 1/2" = 1'-0"
0 1' 2' 4'
SECTION
A4
)SCALE: 1/2" = 1'-0"
0 1' 2' 4'
S-207 image3.png image91.png image92.png image93.png image94.png image95.png image96.png image97.png image98.png image99.png image4.png image100.png image101.png image102.png image103.png image104.png image105.png image106.png image107.png image108.png image109.png image5.png image110.png image111.png image112.png image113.png image114.png image115.png image116.png image117.png image118.png image119.png image6.png image120.png image121.png image122.png image123.png image124.png image125.png image126.png image127.png image128.png image7.png image129.png image130.png image131.png image132.png image133.png image134.png image135.png image136.png image137.png image8.png image138.png image139.png image140.png image141.png image142.png image143.png image144.png image145.png image146.png image147.png image148.png image149.png image150.png image151.png image152.png image9.png image10.png image11.png image12.png image13.png image14.png image15.png image16.png image17.png image18.png image19.png image20.png image21.png image22.png image23.png image24.png image25.png image26.png image27.png image28.png image29.png image30.png image31.png image32.png image33.png image34.png image35.png image36.png image37.png image38.png image39.png image40.png image41.png image42.png image43.png image44.png image45.png image46.png image47.png image48.png image49.png image50.png image51.png image52.png image53.png image54.png image55.png image56.png image57.png image58.png image59.png image60.png image61.png image62.png image63.png image64.png image65.png image66.png image67.png image68.png image69.png image70.png image71.png image1.png image72.png image73.png image74.png image75.png image76.png image77.png image78.png image79.png image80.png image2.png image81.png image82.png image83.png image84.png image85.png image86.png image87.png image88.png image89.png image90.png