Question_and_Answers_2_-_AWP_South_Dock.pdf
PDF 67 KB Posted
- Attached to
- Aerial Work Platforms Federal contract opportunity
- Solicitation number
- FA8125-18-R-0018
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| South_B2280_Drawings.docx | DOCX document | |
| Solicitation_Amendment-2-AWP.pdf | ||
| Question_and_Answers_for_AWP_South_Dock.pdf | ||
| South_B2280_Drawings.docx | DOCX document | |
| Solicitation_Amendment-1-AWP.pdf | ||
| Site_Visit_Details.pdf | ||
| SOW_08.07.18.pdf | ||
| Solicitation-AWP.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
September 4, 2018 Questions & Answers: Aerial Work Platform
FA8125-18-R-0018
QUESTION & ANSWERS:
1. Question:
What is the required minimum clearance between the bottom of AWP in the highest position to the floor?
Answer:
The highest aircraft tail (vertical) is approximately 43 feet. Personnel will be required to perform hands on corrosion control operations (masking, sanding, sealing, etc...) to the aircraft. The platform shall be designed in a manner that will allow a person standing on the AWP to physically touch the aircraft.
2. Question:
Please see updated drawings of B2280. AMOVA should be replaced with successful contractor.