Altitude_Chamber_Pictorial_Libary.pdf

PDF 19 MB Posted

Attached to
Altitude Chamber Test Stand Upgrade Federal contract opportunity
Solicitation number
FA8125-18-R-0003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

Pictures of the Altitude Chamber.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHAMBER 1

CHAMBER 2

FACING

NORTHWEST

VACUUM SIDE

CABIN SIDE

CABIN SUPPLY

VALVE (CSV_1)

VACUUM SIDE

VACUUM TO

AMBIENT (3”)BLEED

VALVE (BV3_1)

VACUUM TO

AMBIENT (4”) BLEED

VALVE (BV4_1)

FACING

NORTHWEST

CABIN SIDE

POSITIVE (AMBIENT)

PRESSURE

(VACUUM OFFSET)

VACUUM LINE

FACING WEST

BV3_1

BV4_1AMBIENT

AIR

AMBIENT

AIR

COMPRESSED AIR

WHEN

DEMANDED

2” NOMINAL

PRESSURE BLEED

VALVE (PBV_1)

PRESSURE CONTROL

VALVE (PCV_1)

PRESSURE SUPPLY

VALVE (PSV_1)

BV3_1

CABIN SUPPLY

VALVE 2

(CSV_2)

FACING

NORTH

CHAMBER 2

(BV4_2)

(BV3_2)

FACING

NORTHEAST

FACING SOUTHEAST

FROM WEST SIDE

(BV4_2)

(BV3_2)

ALTITUDE SIDE OF

VALVE (CSV_1)

EAST FACING

WEST

FACING SOUTHEAST

HOFFMAN

COMPRESSOR

OUTSIDE AMBIENT

INLET

FACING NORTHEAST

PRESSURE CONTROL

VALVE (PCV_1)

PRESSURE SUPPLY

VALVE (PSV_1)

FACING EAST FROM

WEST SIDE

LATCHES (SAME ON

BOTH CHAMBERS

CABIN SUPPLY LINE

FACING NORTH FROM

BEHIND CONSOLE

10”, 6”, & 4” (NOMINAL)

ORIFICES RESPECTIVELY

2” AND 1” FLOW

CONTROL VALVES

CONTROLS

WHICH CHANNEL

IS USED FOR

FLOW READING

ABOVE CHAMBER 2

FACING SE

4”, 6”, & 10” (NOMINAL)

ORIFICES

1” AND 2” FLOW

CONTROL VALVES

FACING WEST FROM

2” NOMINAL ORIFICE PLATES

2” FLOW CONTROL

VALVES FCV_4A/B/C

1” FLOW CONTROL

VALVE FCV_4D

1” NOMINAL ORIFICE PLATE

FACING NE FROM

CHAMBER ATMOSPHERE/ALTITUDE

VACUUM CONTROL VALVE (VCV_1)

ABOVE CHAMBER 1

VACUUM VALVE (VCV_1)

FACING NW FROM

ABOVE CONSOLE

2” FLOW ISOLATION

VALVE (FIV_4)

10” FLOW

CONTROL

VALVE 1 (FCV_1

6” FLOW

CONTROL

VALVE 2 (FCV_2

4” FLOW

CONTROL VALVE

3 (FCV_3

10” FLOW

CONTROL

VALVE 1 (FCV_1

6” FLOW

CONTROL

VALVE 2 (FCV_2

4” FLOW

CONTROL VALVE

3 (FCV_3

FACING SOUTH

CHAMBER

ATMOSPHERE/ALTITUDE

VACUUM CONTROL

VALVE (VCV_2)

VALVE (CSV_2)

FACING EAST

10” FLOW

CONTROL

VALVE 1 (FCV_1

6” FLOW

CONTROL

VALVE 2 (FCV_2

4” FLOW

CONTROL VALVE

3 (FCV_3

2” FLOW ISOLATION

VALVE (FIV_4)

FACING SW

CHAMBER

ATMOSPHERE/ALTITUDE

VACUUM CONTROL

VALVE (VCV_1)

FACING NW

INSIDE CONTROL BOX

FACING NW

FACING SW

TRANSDUCER

READINGS

CHAMBER 2

ROUTING FROM

TRANSDUCERS

TO DIGITAL

READOUTS

BV3_1

OPEN/CLOSE

BV4_1

OPEN/CLOSE

OPEN/CLOSE CHANNEL

FLOW CONTROL VALVES

(FCV_1, FCV _2, FCV_3)

BV3_2 &

BV4_2

OPEN/CLOSE

TRANSDUCER

READINGS

CHAMBER 1

CHANNEL

TOGGLE

ISOLATION VALVE (FIV_4)

OPEN / CLOSE

BV3_2 &

BV4_2

OPEN/CLOSE

CHANNEL

DIFFERENTIAL

SELECTOR

CHANNEL

DIFFERENTIAL

INDICATOR LIGHTS

CHANNEL

INDICATOR LIGHTS

BAROMETRIC

PRESSURE /

TEMPERATURE

HOFFMAN

BLOWER OPEN /

CLOSE,

INDICATORS, AND

READOUTs

UNDERNEATH

CONTROLS AREA

UNDERNEATH

CONTROLS AREA

OPENS/CLOSES

VACUUM VALVES

(VCV_1 & VCV_2)

DOOR SEALS

DOOR SEALS

INSIDE

COIL OF TUBING

WILL STAY

(REQUIRED)

UNITS UNDER TEST

(UUT) MOUNTED

TO DOOR VIA

PROVIED FIXTURES

/ MOUNT PLATES

FACING NE FROM

FACING SW FROM

• CSV – CABIN SUPPLY VALVE

• VCV – VACUUM CONTROL VALVE

• BV – BLEED VALVE

• PCV – PRESSURE CONTROL VALVE

• PSV – PRESSURE SUPPLY VALVE

• PBV – PRESSURE BLEED VALVE

• FIV – FLOW ISOLATION VALVE

• FCV – FLOW CONTROL VALVE

File details come from the government source that posted it.