About this file

FPI System Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Flourescent Penetrant Inspection System, newest first.
File Type Posted
FPI_System_Amendment_P00002.pdf PDF
FPI_Item_Description_Revised20Dec17_P00002.pdf PDF
FPI_Amendment_FA812518Q0014_P00001.pdf PDF
FPI_Item_Description_13Dec17.pdf PDF
FPI_Item_Description_1Nov17.pdf PDF
FPI_Solicitation_FA812518Q0014.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS & ANSWERS: FPI SYSTEM (FA812518Q0014)

December 20, 2017

Question 1: In reviewing the FPI solicitation for Tinker AFB, we want to confirm that the Air Force is only receiving shipment of the equipment and no installation is expected or required. There are a few references in the RFP and SOW to drain components being “plumbed to the previous station.” We assume these statements are for information only and that the Air Force will perform all necessary connections to power, air, water, drain and industrial waste.

Answer 1: Yes, we are only wanting the delivery of the FPI System. We will connect the two stations, it just needed to be plumbed for this to happen.

Question 2: Please describe how the parts are handled during the testing process. We see no reference to automated material handling by the system manufacturer. Is there an overhead conveyor system with carriers, or are the parts and parts baskets manual transferred between stations?

Answer 2: The system is a manual system, no automation.

Question 3: Are any penetrant or emulsion chemicals desired with the procurement of this equipment?

Answer 3: No chemicals are needed.

Question 4: We see no reference to system startup, testing or calibration by the manufacturer. Please confirm that no site visit will be required by a manufacturer’s technical representative.

Answer 4: No site visit is necessary. Unless there is warranty work.