EP-090134-03-03.pdf
PDF 438 KB Posted
- Attached to
- Repair of PMXG Reverse Osmosis System Federal contract opportunity
- Solicitation number
- FA8125-15-R-0010
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2263-201.pdf | ||
| PLOT_PLAN.pdf | ||
| 2263-203.pdf | ||
| EP-090134-03-01_Sheet_1.pdf | ||
| EP-090134-03-01_Sheet_2.pdf | ||
| tinker_map.JPG | JPG image | |
| FA8125-15-R-0010 _Solicitation_13_April_2015.pdf | ||
| Appendix_A2-RO_PMXG_Maintenance_Contract.xls | XLS spreadsheet | |
| Appendix_A1-RO_PMXG_Maintenance_Contract.xlsx | XLSX spreadsheet | |
| Wage_Determination_Dated_Version_19_Dated_(December_22_2014).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A A
B B
C C
D D
58"
52"
69 1/4"
Table
ITEM DESCRIPTION LOCATION MAX. FLOW SIZE CONNECTION MATERIAL
H REPRESSURE PUMP SUCTION REPRESS PUMP SKID 300 GPM 6" 150# FLANGE SCH 80 PVC
J PERMEATE OUTLET REPRESS PUMP SKID 300 GPM 4" 150# FLANGE SCH 80 PVC
K PERMEATE FLUSH TO RO REPRESS PUMP SKID 50 GPM 2" 150# FLANGE SCH 80 PVC
L UV RECIRC FEED TO TANK REPRESS PUMP SKID 10 GPM 1" 150# FLANGE SCH 80 PVC
DATE
FRAC.
DRN.
APP'D.
DEC.
DRAWING NO.
SCALE
FILE ID.
SHEET
REV.
OF
REPRESSURIZATION PUMP SKID
GENERAL DIMENSIONAL DRAWING
REVISIONS
NO. BY REMARKS
INCORPORATED
DATE
TINKER AIR FORCE BASE EP-090134-03-03
1 1 AGG
7/10/2009 1
1 2/4/10 AGG MODIFIED SKID & SIZE OF PANEL
TO RO MCP 460V/60Hz/3Ph
H 9 1/2"12 1/4"
J
K
L
AQUAFINE SL-1
UV STERILIZER
AQUAFINE
UV INTENSITY
METER
EBARA 15 HP, 400V/60Hz/3Ph
304SS PUMPS
300 GPM @ 60 PSI
MODEL 3U 50-160-1
POWDER COATED
STRUCTURAL STEEL SKID
NOTE: ALL PIPING SCH 80 PVC EXCEPT BUTTERFLY ISOLATION VALVES
AND 316SS UV LIGHT TRAPS.
53 1/8" 59 3/4"
DISCHARGE
PRESSURE
TRANSMITTER
DISCHARGE
CHECK
VALVE
ISOLATION
VALVES
Model
File details come from the government source that posted it. Updated .