Solicitation Amendment 0002.doc
DOC document 41 KB Posted
- Attached to
- Chiller Lease (12 Month)
- Solicitation number
- FA8125-12-Q-0013
About this file
Solicitation Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment 0004.doc | DOC document | |
| PWS Chiller Lease 7 Dec 2011.docx | DOCX document | |
| Solicitation Amendment 0003.doc | DOC document | |
| Solicitation Amendment 0001.doc | DOC document | |
| Wage Determination | — | |
| PWS Chiller Lease 24 Oct 2011.docx | DOCX document | |
| APPENDIX C 11-179.docx | DOCX document | |
| Combined Synopsis - Solicitation | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of this amendment is to incorporate questions and answers. The solicitation closing date will also be extended to 28 Nov 2011, 10am CST.
FIRST: The following questions and answers are hereby incorporated into the twelve (12) month Chiller Lease requirement.
1. PWS paragraph 1.2.1.2 states the piping shall be 2-1/2". Can we use 2-1/2" hose instead of piping?
Answer: Hosing can be used instead of piping.
2. PWS paragraph 1.2.1.3 states install conduit. If rubber jacket power cable is used and is weather proof there is no need to install in conduit. Are we still required to install conduit?
Answer: Rubber jacket power cable is sufficient. No conduit installation is required if weather proof cable is used.
3. Will the chiller be running 24/7 365?
Answer: Yes, the chiller will need to be able to run 24/7, 365 days a year.
SECOND: The solicitation closing date will be extended to 28 Nov 2011, 10am CST.
THIRD: All other terms and conditions remain unchanged and in full effect.
(End of Summary of Changes)