Form 032.doc
DOC document 91 KB Posted
- Attached to
- PM/RM Sciaky Accuweld Systems
- Solicitation number
- FA8125-12-Q-0003
About this file
MXRIWRS FORM 032
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 76 MXW OPERTING INSTRUCTION 21-203.doc | DOC document | |
| Revised PWS Sciaky Accuweld Systems.pdf | ||
| Amendment 5 Sciaky.doc | DOC document | |
| AFMCI 21-127 paragraph 2.6.doc | DOC document | |
| Questions and Answers.doc | DOC document | |
| TO 00-20-1 Chapters 1 7.doc | DOC document | |
| Amendment 3 Sciaky.pdf | ||
| Amendment 2 Sciaky.pdf | ||
| Sciaky Amendment.pdf | ||
| Combined Synopsis.doc | DOC document | |
| PWS SCIAKY ACCUWELD SYSTEMS.pdf | ||
| Wage Determination Sciaky.pdf | ||
| Solicitation Sciaky.doc | DOC document | |
| Appendix C Sciaky Accuweld Systems.pdf | ||
| Appendix B Sciaky.pdf | ||
| Appendix A Sciaky Accuweld Systems.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Housekeeping/FOD/Tool Control Briefing for Contract Employees
| Performance |
| Initials |
| 1. |
| The contractor shall keep the work area clean and neat in accordance with |
Industry Standards, Occupational, Safety and Health Administration (OSHA), fire and safety standards and this PWS.
| 2. |
| Control of Material/Supplies in 76 MXW work areas. The contractor shall ensure |
all material/supplies taken to the on-site work area are secured and maintained under their control at all times. No material or supplies shall remain unattended at the work area unless the material is prominently marked with the contractor’s name and permission to leave the material unattended has been granted by the responsible shop/site manager.
| 3. |
| While performing contract services in or around Maintenance Production Shops, |
the contractor shall comply with AFMCI 21-107, Tool Control and Accountability
Program and Tinker Instruction 21-112, Tool Management. Minimum
Requirements:
| 3.1. |
| All tool brought into the 76 MXW Wing areas shall be secured in a container or |
bag.
| 3.2. |
| Each tool shall be identified and listed separately on a “tool listing” kept inside |
each container or bag.
| 3.3. |
| Contractor personnel shall make the “tool listing” available to government |
personnel when requested.
| 3.4. |
| Contractor personnel shall ensure all tools are secured when not in use. |
| 3.5. |
| Contractor personnel shall ensure no tools are left unattended at any time. |
| 3.6. |
| Contractor personnel shall inventory the container or bag of tools at the |
beginning of the day.
| 3.7. |
| Contractor personnel shall inventory the container or bag of tools at the end of |
each day.
| 3.8. |
| Contractor personnel shall immediately notify the QAP of any tools that are |
missing. Tools not located within one hour of notification will be reported by the
QAP to appropriate government personnel.
| 3.9. |
| Foreign Object Damage (FOD) Prevention. While performing contract services |
in designated FOD Critical Areas in or around Maintenance Production Shops, the contractor shall comply with AFMCI 21-122, Foreign Object Damage (FOD), Dropped Object Prevention (DOP) and Tinker AFB Supplement 1.
I certify by initialing each block above and my signature below, that I have been briefed and understand my responsibility for FOD/Tool Control while on Tinker Air Force Base.
Date
Company Name
Signature of Technician
QAP Signature
OPR/QAP: Provide a copy of this completed form to the Maintenance Contract Support Office, Bldg 3001, Post S-69 or FAX to 736-4268.
MXRIWRS FORM 032 (May 2006)
CONTRACTOR TOOL LISTING
Date: _______________
Company Name:
| Contract #: |
| Estimated Departure Date: |
| Contract Representative: |
| QAP: |
| Wing Work Site Location: |
| Shop OPR: |
| Description of Tool |
| Any particular identifying markings such as: color, brand name, individual or company name markings on the tool. |
| Qty |
MXRIWRS FORM 32-1 (June 2006)
CONTRACTOR EXIT CHECKLIST
Company Name:
| Contract #: |
| Estimated Departure Date: |
| Contract Representative: |
| QAP: |
| Wing Work Site Location: |
| Shop OPR: |
| Task |
| Yes |
| No |
| 1. |
| Review the Contractor’s work to determine if satisfactory services were provided IAW the SOW/PWS. |
If services are not satisfactory, immediately contact the Maintenance Contract Support Office QAP for resolution.
If services are satisfactory, sign the Contractor’s Service Report.
Provide a copy of the Service Report to the Maintenance Contract Support Office per #6 below.
| 2. |
| Check the Contractor’s work area before the Contractor leaves. |
If there are issues, i.e., housekeeping, FOD, tools, material/supplies, etc, request the Contractor to take corrective action.
If the Contractor takes issue with the request, immediately contact the Maintenance Contract Support Office QAP for resolution.
| 3. |
| Did the Contractor obtain a loner tool bag from the Tool Center? |
If the Contractor was issued a loaner tool bag, was it properly returned to the Tool Center?
| 4. |
| Have the Contractor return the Visitor’s Badge to you or bring the Contractor to the Maintenance Contract Support Office to return the badge on the way out of the Building. |
| 5. |
| Escort the Contractor from the Building. |
| 6. |
| Ensure the Maintenance Contract Support Office QAP receives the Visitor Badge, Service Report, and completed Contractor Exit Checklist the same day the Contractor leaves. Should the contractor complete services after normal business hours; paperwork is required the next business day. |
OPR Signature Date
MXRIWRS FORM 32-2 (June 2006)
PAGE
File details come from the government source that posted it. Updated .