SAFETY APPENDIX
35 KB Posted
- Attached to
- PM/RM Metallograph Microscope Federal contract opportunity
- Solicitation number
- FA8125-10-Q-0435
About this file
Safety Appendix
Text of this file
19 APRIL 2010
APPENDIX "C"
PREVENTIVE & REMEDIAL MAINTENANCE
OF
SIX (6) METALLOGRAPH MICROSCOPES
PRE FILE NO: SEG-10-220
PREPARED BY: 72 ABW/SEG
SECTION I - GENERAL REQUIREMENTS
A.
Safety Program Requirements. The contractor will implement a safety program that ensures protection of Government personnel and property. The program will consist of, as a minimum:
1.
Mishap notification/reporting as defined in paragraph B. below.
2.
A Safety Program that addresses, as a minimum, the subjects listed in Safety Program Elements, Section II and to be used during performance of the work described in the contract.
B.
Mishap Notification.
1.
The contractor shall notify the procuring Safety Office or a designated Government Representative (GR) within one (1) hour of all mishaps or incidents. A written report of the mishap/incident shall be sent within three calendar days to the GR, who will forward it to the Procuring Safety Office. For information not available at the time of initial written report, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the Safety Office.
2.
Mishap notifications shall contain, as a minimum, the following information:
a.
Contract, Contract Number, Name and Title of Person(s) Reporting b.
Date, Time and exact location of accident/incident c.
Brief Narrative of accident/incident (Events leading to accident/incident) d.
Cause of accident/incident, if known e.
Estimated cost of accident/incident (material and labor to repair/replace) f.
Nomenclature of equipment and personnel involved in accident/incident g.
Corrective actions (taken or proposed) h.
Other pertinent information
3.
If requested by the designated government representative, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.
C.
The safety provisions of this contract, shall apply to any subcontracts/subcontractors.
D. Safety requirements listed herein that do not concern contractor’s operations or services shall be considered self-deleting as mutually agreed by the contractor and the procuring office.
SECTION II - SAFETY PROGRAM ELEMENTS
The contractor’s Safety Program shall clearly define procedures, personnel qualifications, facilities and required equipment necessary to fulfill the following elements:
Element/Requirement
Referenced Benchmark
Mishap Notification/Reporting
AFI 91-204
Explosive Safety Standards
AFMAN 91-201
Code for Fireworks Display
NFPA 1123
Housekeeping
AFOSH Std 91-501 Material Handling Equipment (MHE) AFOSH Std 91-46 and AFOSH Std 91-501 Handling, Storage and use of
Flammable/Combustible Liquid
Vehicle Operations
AFI 91-207
Tool Control
AFI 21-101, AFMC
Sup.
Foreign Object Damage (FOD) AFI 21-101, AFMC Sup
Tobacco Use in the Air Force
AFI 40-102
Hazardous Energy Control
Confined Spaces
AFOSH Std 91-25
Welding Operations
AFOSH 91-5
Fire Protection
Tinker Instruction 32-2001
SECTION III - BIBLIOGRAPHY OF PUBLICATIONS/DIRECTIVES
These publications/directives and all supplements/changes thereto apply to the extent required by the provisions of Sections I, and II.
AFI 91-204
Feb 06 Safety Investigations and Reports
AFI 91-207
May 07 USAF Traffic Safety Program
AFOSH Std 91-66 Oct 97 General Industrial Operations
AFOSH Std 91-501 Jul 04
Air Force Consolidated Occupational Safety
Standard
AFOSH Std 91-100 May 98 Aircraft Flight Line – Ground Operations and Activities
AFI 21-101
Jun 06
Aircraft and Equipment Maintenance Management
AFI 21-101,
Dec 07 Aircraft and Equipment Maintenance Management AFMC Sup
AFI 40-102
Jun 02
Tobacco Use in the Air Force
AFOSH Std 91-25 Feb 98
Confined Spaces
AFOSH Std 91-5 May 97 Welding, Cutting, and Blazing
Tinker Instruction
32-2001 Sept 97 Fire Protection Program
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Untitled .pdf | ||
| Untitled .pdf | ||
| FA8125-10-Q-0435.pdf | ||
| Wage Determination.pdf | ||
| QASP.doc | DOC document | |
| PWS.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .