This document contains a log of questions and answers related to a draft request for proposal for T53 engine overhauls and repairs. The U.S. Air Force Materiel Command seeks to award a competitive fixed-price commercial small business set-aside contract for depot maintenance of T53-L-703 engines. Questions focus on pricing structure, acceptable parts and materials, reporting requirements, and timelines. The log provides clarification that the contract will be awarded based on best price using LPTA evaluation and will have a single awardee. Only Honeywell and other pre-approved parts may be used, and the awardee must have a U.S. national who can access the Comprehensive Engine Maintenance System for reporting. The target date for formal RFP release is May 4, 2020.

View the file

Other files

File Type Posted
T53 APPENDIX A - PWS 25 Mar 20.docx DOCX document
T53_DID_A012_DI_MGMT_80628_Records_Maintenance.pdf PDF
T53_CDRL_A011_Failure_Analysis.pdf PDF
T53_DID_A011_DI_ALSS_81534_Failure_Analysis.pdf PDF
T53_DID_A014_DI_NDTI_80809B_Test_Inspection_Report_Test_Cell_Run_Sheets.pdf PDF
T53_DID_A006_DI_ALSS_81534_Teardown_Report.pdf PDF
T53_DID_A004_DI_MGMT_81325A_CEMS.pdf PDF
T53_CDRL_A004_CEMS_TCTO_Reporting.pdf PDF
T53_DID_A009_DI_ADMN_81250A_PMR_Minutes.pdf PDF
Appendix_E_T53_Incentive_Plan_20Feb20.docx DOCX document
T53_DID_A005_DI_ALSS_81534_CEMS.pdf PDF
T53_DID_A007_DI_ALSS_80728A_Production_Report.pdf PDF
Appendix_A_T53_PWS_JAN20.docx DOCX document
T53_2_YEAR_DEPOT_HISTORY_Feb2020.xlsx XLSX spreadsheet
T53_DID_A001_DI_MGMT_80227_Transition_PhaseIn.pdf PDF
Appendix_C_T53_LPTA_ITO_25Feb20.docx DOCX document
T53_CDRL_A002_CEMS_Data_Reporting.pdf PDF
T53_CDRL_A010_Teardown_Deficiency_Report.pdf PDF
T53_CDRL_A003_CEMS_SRAN.pdf PDF
T53_DID_A013_DI_MGMT_81642_Small_Business_Reporting.pdf PDF
T53_PWS_Attachment_B_CEMS_Access_Process_for_New_Contractor.pdf PDF
T53_CDRL_A012_Records_Maintenance.pdf PDF
Appendix_B_T53_Pricing_Matrix_25Feb20.xlsx XLSX spreadsheet
T53_DID_A002_DI_MGMT_81324A_CEMS.pdf PDF
T53_CDRL_A001_Contractor_Progress_Report_Transition_PhaseIn.pdf PDF
T53_CDRL_A007_Production_Report.pdf PDF
T53_CDRL_A013_Small_Business_Subcontractor_Report.pdf PDF
FA812420R0002.pdf PDF
T53_CDRL_A006_Teardown.pdf PDF
T53_CDRL_A005_CEMS_Reporting_CAMS.pdf PDF
T53_CDRL_A014_Test_Inspection_Report_Test_Cell_Run_Sheets.pdf PDF
T53_DID_A008_DI_ADMN_81249A_PMR_Agenda.pdf PDF
T53_CDRL_A008_PMR_Agenda.pdf PDF
T53_DID_A003_DI_MGMT_81326_CEMS.pdf PDF
T53_PWS_ATTACHMENT_A_CDRLS_DIDS_SUMMARY_JAN20.xls XLS spreadsheet
T53_CDRL_A009_PMR_Minutes.pdf PDF
T53_DID_A010_DI_ALSS_81534_Teardown_Deficiency_Report.pdf PDF
Appendix_D_T53_LPTA_Evaluation_Factors_for_Award_25Feb20.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

F138 DRAFT RFP QUESTIONS / GOVERNMENT RESPONSES April 2020
Question NumberReferenceFocus Area:Vendor Questions / CommentsGovernment Response
1PWS para 1.0 ScopeCLIN PricingQUESTION: For bidding purposes, are Fuel Controls and Governors considered part of the Engine?Government Response: Yes. All accessories and components are required to be made serviceable to equate to a serviceable RFI engine.
2Contract StructureAward EvaluationQUESTION: Will the bid be analyzed by best price or best value?Government Response: The contract award will based on best price – LPTA.
3Contract StructureAward EvaluationQUESTION: Will the USAF consider awarding the contract to more than one company to protect their supply chain from poor performance?Government Response: No. Effort will be a single award competitive FAR 12 commercial Small Business Set Aside award. Prime vendor and sub vendors to the third tier must have the appropriate certifications and OEM license to perform T53 requirements.
4PWS Para 1.1.1 and 1.7 and all sub paras - Repair and Investigation RequiremensAcceptable material / pricing structureQUESTION: Would parts with the CAGE Code 81996 identified be eligible for installation as a replacement part whether they be new surplus parts, overhauled parts or other condition?Government Response: PWS language has been modified under para 1.1.1 to reflect contacting the Cognizant Engineering Authority for disposition if a Army part (Cage Code 81996) is received. Use of these parts may be allowed on case-by-case basis if deemed approved by CEA.
5PWS Para 1.1.1Acceptable material / pricing structureQUESTION: Would Turbine Blades with unapproved Honeywell heat lot codes be eligible for installation as a replacement part whether the blades are new surplus parts, overhauled or other condition?Government Response: PWS para 1.1.1 has been added to specify that only Honeywell approved heat lot codes are acceptable. Other parts are not eligible for installation.
6PWS Paras 1.1.1, 1.62, and 1.7 with all sub paras.Acceptable material / pricing structureQUESTION: Would Life Limited Components (LLS) such as Discs, Spools, Spacers, Rotors, Wheels etc., whether New Surplus, Overhauled, or other condition, be eligible for installation without an accompanied genuine Honeywell 8130-3? This excludes Honeywell Service Center Maintenance Release Certificates.Government Response: PWS para 1.1.1. has been added to specify parts usage from approved Honeywell 8130-3s. Other parts are not accepted for installation. This excludes parts via Honeywell Service Center Maintenance Release Certificates.
7PWS Para 1.7 and all sub paras - Repair and Investigation RequiremensAcceptable material / pricing structureQUESTION: Would New Surplus, Overhaul or other condition LLC be eligible for installation due to unknown traceability, or ambiguity of its origin of manufacture?Government Response: PWS para 1.1.1. has been added to specify parts usage from approved Honeywell 8130-3s. Other parts are not accepted for installation. This excludes parts via Honeywell Service Center Maintenance Release Certificates.
8PWS Para 1.1.1Acceptable material / pricing structureQUESTION: Would New Surplus, Overhauled or other condition LLC that have applied a technical bulletin or other method to formulate an assigned (penalized/assumed) hour life or assigned (penalized/assumed) cycle life be eligible for installation as a replacement part, whether in concurrence or not with Honeywell SB T53-L-703-0020?Government Response: No. PWS para 1.1.1 has been added to clarify usage of parts. Only the parts that are in concurrence with the Honeywell SB T53-L-703-0020 and Air Force Technical Order 2J-T53-4 Supplement D are eligible for lifing limits / usage.
9PWS Para 1.1.1Acceptable material / pricing structureQUESTION: Would new surplus, overhauled or other condition LLC be eligible for installation without its accompanying original installation component card verifying its history of installation and operation?Government Response: No. Only approved cage code LLCs may be installed. PWS para 1.1.1 has been added to clarify parts installation usage.
10PWS Para 1.1.1Acceptable material / pricing structureQUESTION: Are parts not listed as Honeywell, able to be installed? If not, and they find them, would they need to remove them?Government Response: PWS para 1.1.1 has been added to clarify that only parts with an approved cage code may be used. Other parts shall be removed and replaced with parts from an approved cage code. Air Force approved cage codes are IAW Air Force AFMC Form 761 Screening Analysis Worksheet.
11PWS Para 1.9.6 - CEMS ReportingSystem Access/CEMS ReportingQUESTION: Does a potential vendor have to have a US Based / US national to gain access and report for CEMS?Government Response: Yes, the company chosen must have US based US national for this role.
12Government Contracts - Posting Website www.beta.sam.govDocument AccessQUESTION: Where can the Draft RFP & PWS be found?Government Response: www.beta.sam.gov
13Contract StructureSource SelectionQUESTION: Will the award be designated as a SB Hub Zone Set Aside and if a company is a Hub Zone SB, will they receive the pricing discount to their Total Evaluated Price for LPTA award?Government Response: The T53 effort will be a SB set aside effort but not a specific Hub Zone Set Aside effort. If a company is a Hub Zone designated Small Business, then yes, they will receive the pricing discount. Draft RFP and formal RFP will ensure appropriate clauses are applied.
14Contract Acquisition TimelineDocument TimelineQUESTION: What is the expected timeline for formal RFP release / posting?Government Response: Targeted release date for formal RFP is 4 May 20
15Pricing MatrixPricingQUESTION: Would the Government consider review of the FFP pricing structure for the repair CLIN levels since the material parts can widely vary in cost from 100K to 250K within each level of repair depending on what is required?Government Response: Careful consideration has been given to the pricing strategy. The Government will remain with a fixed price strategy for each repair level. Prices should include all parts to make the engine serviceable for that repair level.

File details come from the government source that posted it. Updated .