Appendix_E_T53_Incentive_Plan_20Feb20.docx
DOCX document 50 KB Posted
- Solicitation number
- FA8124-20-R-0002
About this file
This document outlines an incentive option plan for the overhaul and repair of T53-L-703 engines. The plan describes how contractor performance will be evaluated over a three year basic period to determine if the contractor earns consideration for award of three-year and two-year incentive options. Key metrics include completion of deficiency reports within technical order timelines, accurate and timely data reporting, no more than two validated customer complaints per year, and compliance with designated turnaround times for at least 90% of orders. The contractor's performance will be reviewed at the beginning of years three and four against these metrics to determine if the incentive options are awarded.
The related pre-solicitation notice announces a teleconference on March 18, 2020 to discuss a competitive contract for T53-L-703 engine depot maintenance being pursued by the Air Force Life Cycle Management Center at Tinker Air Force Base. Interested parties are instructed to register by March 12, 2020 and submit any questions in writing by that same date. Responses to questions will be posted prior to release of the request for proposal.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix E – T53 Incentive Option Plan
INCENTIVE OPTIONS PLAN
FOR THE
OVERHAUL AND REPAIR OF T53-L-703 Engines
PREPARATION DATE: 20 Feb 20
PREPARATION ORGANIZATION:
AFLCMC/LPSC
TINKER AFB, OK
Incentive Option Determining Official (IODO) Approval of Incentive Plan:
| _______________________________ | ________________________ | |
| CHARLES W. DARNELL | Date |
Chief, Propulsion Sustainment Division
1. INTRODUCTION
a. This Incentive Options Plan describes the process for evaluating Contractor performance in earning the three year and two year incentive options for the T53-L-703, hereinafter referred to as T53, engine maintenance workload. The purpose of this plan is to outline the organization, procedures, and evaluation period for implementing the incentive option provisions of the contract.
b. The favorable consideration for award of the first Incentive Option will be reviewed at the beginning of the 3rd year of the basic period and shall be based on meeting Table 1 critical Service Summary (SS) Metrics (outlined below) for year two of the basic period. If satisfactory rating is gained, the Incentive Option Determining Official (IODO) may exercise the 1st three-year option. If rating is unsatisfactory, the 2nd two-year option period will be lost. A second rating evaluation will be conducted at the beginning of the 4th year of the basic period to either successfully gain or lose the 1st three-year option. Refer to below outlined incentive graph scenarios under item c. for gaining and losing options. Both rating evaluations shall be judged against the SS metrics outlined below in Table 1 and further defined in Section 4 – Criteria of this Incentive Plan.
Table 1 – SS Metrics:
Rated Area with Satisfactory achievement of Service Summary Metrics
SS-2 Completion of Deficiency Reports within Technical Order Timelines
SS-3 Accurate and timely submittal of data reports
SS-4 No more than 2 validated customer complaints per year
SS-5 Comply with designated turnaround time
c. Figures 1 and 2 below outline the timing of evaluation and treatment of incentive options. Evaluations will be made at the end of the 2nd and 3rd year of the basic period. The Government retains the right to exercise the incentive options or not regardless of rating.
Figure 1 – Evaluation Timing
Figure 2 – Incentive Option Scenarios
2. DEFINITION OF TERMS
a. Incentive Option Determining Official (IODO): The individual who makes the final determination as whether consideration for award of an incentive option has been earned by the Contractor. The IODO is AFLCMC/LPS Director or Deputy at Tinker AFB, OK. The decisions to consider award of an Incentive Option by the IODO are final and are not subject to FAR 52.233-1, Disputes. The three and two year incentive options set forth in the contract are the maximum amount of incentive options for which consideration for award can be earned over the entire contract performance period. The IODO shall have 60 workdays upon receipt of Government Team review of consideration package to make the final decision.
b. Quality Assurance Specialist(s) (QAS): The individual(s) within DCMA assigned to monitor the contractor’s performance on a continuing basis.
c. Program Manager (PM): The individual appointed to manage the T53 program under the contract.
d. Procurement Contracting Officer (PCO): An individual with the authority to enter, administer, and/or terminate contracts and make related determinations and findings.
e. Contract Specialist: The individual in the Contracting Office assigned to monitor the contract.
3. PROCEDURES
a. DCMA, Government PCO, and Government PM should be made aware of all users’ comments regarding the Contractor’s performance.
b. DCMA, PCO, and PM shall make periodic observations of the contractor’s performance in accordance with Table 1 SS Metrics. The periodic reviews will be used to identify any contractor deficiencies which will be communicated to the contractor via interim letter(s) as required, which addresses areas needing improvement. A letter may also be issued any time it is deemed necessary to highlight areas of Government concern. For each letter issued, the Contractor shall provide a written response within 15 calendar days from the date of the government notice. The response should set forth plans for increasing effectiveness in the areas addressed or explain why it is not feasible to do so.
c. Meeting SS Metrics across years 2 and 3 of the basic period ratings will be used to determine award of the incentive options. Basic year 1 shall be considered a grace period in which a mock review will be conducted at the beginning of year 2 as practice and in preparation for the official evaluation ratings to be performed for year 2 (1st evaluation at beginning of year 3) and year 3 (2nd evaluation at the beginning of year 4) of the contract basic period. The Government team shall prepare the annual Evaluation Summary Report (ESR) in the format shown in Appendix 1 and the Contractor shall prepare the ESR at Appendix 2 to assess the Contractor’s performance on a quarterly basis throughout the rating year period so that feedback / corrective actions may be applied to obtain a successful overall yearly rating. The report shall include significant ratings for each of the Service Summary Metrics listed in this plan. The Government and Contractor teams shall submit evaluations to the Government PCO within 15 workdays after the end of each quarter for checkpoint reviews with the official yearly evaluation for the period being evaluated to be submitted within 15 workdays after the beginning of years 3 and 4 respectively. The contractor’s yearly self-evaluation and the Government final rating shall be submitted to the IODO for final decision. The IODO shall consider the information presented along with any other pertinent information available and reach a decision within 60 workdays as to whether consideration for award of an incentive option has been earned. The IODO has the ability to also override the ESR in determination of incentive option award.
d. Within 5 working days after the IODO decision, the PCO shall issue a letter notifying the Contractor of the decision. This letter will address the results of the evaluation and the key factors in the evaluation, noting any areas that did not meet the satisfactory rating for the evaluation period. Even if the PCO’s notification letter states that favorable consideration for award of incentive options have been earned, this notification does not constitute the exercise of incentive option(s) nor does such notification require the Government to exercise the incentive option(s). Exercise of any Incentive Option shall be at the discretion of the PCO, in accordance with FAR 17.207, and shall be executed by modification to the contract.
e. The IODO may unilaterally change this plan prior to the beginning of the evaluation period. In addition, the Contractor may recommend changes to the plan no later than 60 calendar days prior to the beginning of the evaluation period. The contractor shall be notified of changes to the plan by the PCO, in writing, before the start of the affected evaluation period. Changes to this plan that are applicable to the evaluation period will be incorporated by the mutual consent of both parties.
4. CRITERIA
a. To earn favorable consideration for award of Incentive Option(s), the Contractor must be evaluated favorably by the DCMA and Contracting Office to meet SS Metrics from years 2-3 of the basic period. The satisfactory rating shall be judged on meeting the described threshold for each SS Metrics listed in Table 2 below. Failure to achieve the satisfactory rating for each SS Metric during the evaluation period will result in the Contractor not earning consideration for the incentive option(s), unless the IODO determines via other pertinent information that an incentive option will be awarded.
Table 2 – SS Metrics Defined
| OBJECTIVE |
| PWS REFERENCE |
| THRESHOLD |
| METHOD OF |
SURVEILLANCE
| SS-2: The Contractor shall investigate and document PQDR findings, using JDRS, on all design and quality control (material) deficiencies found IAW the procedures of T.O. 00- 35D-54. |
| Para 1.12.4 |
| The Contractor shall complete investigations within the following timelines: 15 calendar days from receipt of asset for Category I Mishap, 30 calendar days from receipt of asset for Category II Mishap, 20 calendar days from receipt of asset for Category I DR, and 30 calendar days from receipt of asset for Category II DR. |
| Government personnel querying the JDRS system to subtract the Investigation Completion Date from the DR Investigation Start Date. Sampling calculation queries will be made per each DR investigation event. |
SS-3: The Contractor shall prepare accurate data deliverables and submit in a timely manner IAW with each CDRL’s delivery need date.
| Para 1.7.7 |
| The Contractor shall not report more than one document late per quarter and no document shall be received later than five working days. The Contractor shall not submit reports that require more than two corrections per report per quarter. |
| Government personnel reviewing CDRL’s for accuracy and timeliness. Sampling will be performed as CDRL’s are required throughout each year of the contract. |
| SS-4: The Contractor shall have and maintain a program management structure to accomplish administrative planning, coordination of program requirements, and to optimize workflow by organizing, directing, and controlling production and supply actions. |
| Para 1.9.1 |
| The Contractor shall receive no more than two (2) MAJCOM or Program Office customer complaints validated by PCO or ACO per quarter. DCMA Level 1 and 2 Corrective Action Reports (CARs) will not be counted as customer complaints. Only DCMA Level 3 and 4 CARs will be counted as DCMA customer complaints. |
| Sampling Method for SS-4 will occur on a 100% basis upon receipt of a customer complaint as validated by Government personnel. |
SS-5: The Contractor shall comply with the designated turn around times established in below paragraphs to Section 1.7.
| Para 1.7 and all sub paras. |
| The Contractor shall produce CLINs (in aggregate) at a minimum of 90% of the specified turn around time outlined in the PWS. On an annual basis, it will be determined if the Contractor met the 90% minimum by dividing the total quantity of end item CLINs delivered on time by the total number of end item CLINs required to be delivered. For example, at the conclusion of the year of performance, if the Contractor was required to deliver an aggregate total of 1000 end items across all CLINs and delivered 960 on time, the Contractor’s on time delivery would be 96%. |
| Government personnel comparing the calculation of actual delivery dates to the specified time in the PWS. Sampling will be done on a quarterly basis. |
APPENDIX 1 - T53 INCENTIVE OPTION PLAN
GOVERNMENT TEAM EVALUATION SUMMARY REPORT
NOTE: Report shall be conducted quarterly for feedback reviews / corrective actions within the rating period and as a yearly summary for the official rating period evaluation. The IODO will only sign the yearly report.
Contractor: _____________________________________________________________ Contract Number: __________________________ Lead Evaluator: _______________ Office Symbol: ____________________________ Phone: ______________________ Evaluation Period: _______________________________________________________
POSITIVE EVENTS OR FACTORS
Service Summary Metrics:
SS-2 Completion of Deficiency Reports within Technical Order timelines______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ SS-3 Accurate and timely submittal of data reports_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ SS-4 No more than 2 validated customer complaints per year__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ SS-5 Comply with turnaround time__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
NEGATIVE EVENTS OR FACTORS
Service Summary Metrics:
SS-2 Completion of Deficiency Reports within Technical Order timelines______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ SS-3 Accurate and timely submittal of data reports_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ SS-4 No more than 2 validated customer complaints per year__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ SS-5 Comply with turnaround time _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
COMMENTS
(Describe any factors that significantly influenced events noted above)
Lead Evaluator’s Signature: ____________________________ Date: __________________
Incentive Option Determining Official (IODO) Approval:
| _______________________________ | ________________________ | |
| CHARLES W. DARNELL | Date |
Chief, Propulsion Sustainment Division
APPENDIX 2 – T53 INCENTIVE OPTION PLAN
CONTRACTOR TEAM EVALUATION SUMMARY REPORT
NOTE: Report shall be conducted quarterly for feedback reviews / corrective actions within the rating period and as a yearly summary for the official rating period evaluation.
Contractor: ___________________________________________________________________ Contract Number: __________________________ Lead Evaluator: ____________________ Email: ____________________________________Phone: ____________________________ Evaluation Period:______________________________________________________________
POSITIVE EVENTS OR FACTORS
Service Summary Metrics:
SS-2 Completion of Deficiency Reports within Technical Order timelines______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ SS-3 Accurate and timely submittal of data reports_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ SS-4 No more than 2 validated customer complaints per year__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ SS-5 Comply with turnaround time__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
NEGATIVE EVENTS OR FACTORS
Service Summary Metrics:
SS-2 Completion of Deficiency Reports within Technical Order timelines______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ SS-3 Accurate and timely submittal of data reports_______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ SS-4 No more than 2 validated customer complaints per year__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ SS-5 Comply with turnaround time__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
COMMENTS
(Describe any factors that significantly influenced events noted above)
Contractor Evaluator Signature: ___________________________ Date: __________________ image1.emf image2.emf