This solicitation is for repair and overhaul services for J85-GE-5/21 engine components. Key details include:
-
Services required are performance based technical, logistics management and repair of unserviceable J85 engine components and assemblies to return them to serviceable condition.
-
The contract will be for 10 years as a firm fixed price indefinite delivery indefinite quantity type contract with a 5 year basic ordering period and five 1-year options.
-
The sole awardee will be Aero Turbine, Inc. using other than full and open competition procedures due to only one responsible source.
-
Components included are internal high strength steel, casting and forging parts and flight control and accessory assemblies such as main fuel control, afterburner fuel control and pumps.
-
The Department of the Air Force Materiel Command Air Force Sustainment Center issued the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_7_AMD02_Provision_Clause_Matrix.pdf | ||
| FA812222R0003_______0001.pdf | ||
| Exhibits_A_thru_GC.xlsx | XLSX spreadsheet | |
| Attachment_5_Special_Packaging_Instructions.pdf | ||
| Exhibits_A_thru_GC.xlsx | XLSX spreadsheet | |
| Attachment_6_DOL_Wage_Determination_SanJoaquin_CA.pdf | ||
| Attachment_2_J85MISTR_PWS_03Jun2022.pdf | ||
| FA812222R0003.pdf | ||
| Attachment_4_Transportation_Data.pdf | ||
| Attachment_3_Packaging_Requirements.pdf | ||
| Attachment_1_DIDs.pdf | ||
| Exhibit_HC_CDRL_REPORT.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE Page 1
2. AMENDMENT/MODIFICATION NO.
FA8122-22-R-0003-0002
3. EFFECTIVE DATE
7 NOV 2022
4. REQUISITION/PURCHASE REQ. NO.
FD20302001876 01
5. PROJECT NO (If applicable)
FA812222R0003
6. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, AFSC PZAAB
3001 STAFF DR STE 1AG1 98C
TINKER AFB OK 73145-3303
BUYER: Tran Tran/AFSC/PZAAB tran.tran.1@us.af.mil Phone: (405) 734- 8035
7. ADMINISTERED BY (If other than item 6) CODE
DCMA STOCKTON
3247 WEST MARCH LANE
SUITE 300
STOCKTON CA 95219
FA8122 S0507A
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
AERO TURBINE, INC
6800 LINDBERGH ST
STOCKTON CA 95206-3934
UNITED STATES
(209) 983-1112 Attn: DOUGLAS CLAYTON EMail Address: dclayton@aeroturbineinc.com
CODE 0T790
X
9A. AMENDMENT OF SOLICITATION NO.
FA812222R0003
9B. DATED (SEE ITEM 11)
24-JUN-2022
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Payment Office: HQ0339
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
FA8122-22-R-0003-0002
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is to make the following changes:
FIRST: Update the size status of contractor Aero Turbine from Small Business to Large Business.
SECOND: Incorporate new Clauses and Provisions for Large Business size status via Attachment_7_AMD02_Provision_Clause_Matrix.
THIRD: The Closing Date/Response Time remain unchanged.
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
In accordance with the attached CAV AF Reporting Requirements (see the document listed in Section J), the Contractor shall include a DD1348-1 when assets are shipped. DCMA Quality Assurance Representatives (QARs) will not approve or sign the DD1348-1, but will ensure a DD1348-1 is included with each returned asset. If a DD1348-1 is not included with each returned asset, DCMA will not sign the receiving report (DD250).
Instructions to Contractor To assure timely and equitable evaluation of proposals, follow the instructions contained herein. Contractor is required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Contractor must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.
If the contractor believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the contractor shall immediately notify the PCO in writing with supporting rationale.
1. Price Proposal
a) Complete relevant sections of the RFP. In doing so, the contractor accedes to the contract terms and conditions as written in the RFP Sections A through K. These sections constitute the model contract.
b) Insert proposed unit prices in the spreadsheet, Exhibits_A_thru_GC, for each Contract Line Item Number (CLIN) and Exhibit Line Item Number (ELIN) for Base Year 1 and Base Year 2 (yellow highlighted cells only). All unit prices shall be rounded to two decimal points.
c) Complete the necessary fill-ins and certifications in Sections I through K. Section K shall be returned in its entirety. For Sections C through I, the contractor shall submit only those pages that require a fill-in.
2. Certified Cost and Pricing Data is required in accordance with FAR 15.403. A fully-encoded cost model in MS Excel format is required.
3. The contractor shall submit historical data relevant to the proposed effort in Excel format to the cognizant Defense Contract Audit Agency (DCAA) office prior to proposal submission.
Historical data shall include both hours & costs, as well as sufficient data columns to allow segregation and analysis of data. This information shall be delivered to include Mr. Joseph Allen, at joseph.allen@dcaa.mil.
4. No proposal preparation costs will be paid by the Government.
5. The government reserves the right to change the shipping location to ship-in-place as required.
OVER & ABOVE USAF LABOR WRAP RATE
See Exhibit A Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price
1 LO
*See Exhibit A for all Ordering Periods Over & Above USAF Labor Wrap Rate Over and Above work in support of work performed in Schedule B. The over and above work is not included in the scope and prices for the basic work CLINs established in Section B. Over and above efforts shall be accomplished as authorized by the ACO/PCO in accordance with DFARS Clause 252.217-7028 entitled "Over and Above Work". The over and above work requirements shall be IAW PWS paragraph 1.10.11 and other work identified by the ACO/PCO as meeting the definition of over and above work required to perform this contract. When over and above work is required a subCLIN shall be established on the order for authorization and funding. Delivery will be as negotiated between the Contractor and ACO/PCO. *Fixed Hourly Rate Items.
Priority: E
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 ACCT 09
Type / Ship To Quantity (U/I) As negotiated by PCO Req No / Pri
Required Delivery
A SW3211 1 LO As negotiated by PCO
Proposed Delivery
A SW3211 1 LO
OVER & ABOVE USN LABOR WRAP RATE
See Exhibit B Item No.
Firm Fixed Price
OVER & ABOVE USN LABOR WRAP RATE
See Exhibit B Estimated Quantity
U/I Unit Price
1 LO
*See Exhibit B for all Ordering Periods
OVER & ABOVE USN LABOR WRAP RATE
Over and Above work in support of work performed in Schedule B. The over and above work is not included in the scope and prices for the basic work CLINs established in Section B. Over and above efforts shall be accomplished as authorized by the ACO/PCO in accordance with DFARS Clause 252.217-7028 entitled "Over and Above Work". The over and above work requirements shall be IAW PWS paragraph 1.10.11 and other work identified by the ACO/PCO as meeting the definition of over and above work required to perform this contract. When over and above work is required a subCLIN shall be established on the order for authorization and funding. Delivery will be as negotiated between the Contractor and ACO/PCO. *Fixed Hourly Rate Items.
Priority: E
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 ACCT 09
Type / Ship To Quantity (U/I) As negotiated by PCO Req No / Pri
Required Delivery
A SW3211 1 LO As negotiated by PCO
Proposed
OVER & ABOVE USAF MATERIAL HANDLING RATE
See Exhibit C Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price
1 LO
*See Exhibit C for all Ordering Periods Over & Above USAF Material Handling Rate Over and Above work in support of work performed in Schedule B. The over and above work is not included in the scope and prices for the basic work CLINs established in Section B. Over and above efforts shall be accomplished as authorized by the ACO/PCO in accordance with DFARS Clause 252.217-7028 entitled "Over and Above Work". The over and above work requirements shall be IAW PWS paragraph 1.10.11 and other work identified by the ACO/PCO as meeting the definition of over and above work required to perform this contract. When over and above work is required a subCLIN shall be established on the order for authorization and funding. Delivery will be as negotiated between the Contractor and ACO/PCO. *Fixed Hourly Rate Items.
Priority: E
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 ACCT 09
Type / Ship To Quantity (U/I) As negotiated by PCO Req No / Pri
Required Delivery
A SW3211 1 LO As negotiated by PCO
Proposed
OVER & ABOVE USN MATERIAL HANDLING RATE
See Exhibit D Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price
1 LO
*See Exhibit D for all Ordering Periods Over & Above USN Material Handling Rate Over and Above work in support of work performed in Schedule B. The over and above work is not included in the scope and prices for the basic work CLINs established in Section B. Over and above efforts shall be accomplished as authorized by the ACO/PCO in accordance with DFARS Clause 252.217-7028 entitled "Over and Above Work". The over and above work requirements shall be IAW PWS paragraph 1.10.11 and other work identified by the ACO/PCO as meeting the definition of over and above work required to perform this contract. When over and above work is required a subCLIN shall be established on the order for authorization and funding. Delivery will be as negotiated between the Contractor and ACO/PCO. *Fixed Hourly Rate Items.
Priority: E
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 ACCT 09
Type / Ship To Quantity (U/I) As negotiated by PCO Req No / Pri
Required Delivery
A SW3211 1 LO As negotiated by PCO
Proposed
CONTRACT DATA REQUIREMENTS LIST (CDRL) and DATA ITEM DESCRIPTION (DID)
See Exhibit E Item No.
Not Separately Priced Quantity U/I Unit Price
LO NSP
DATA
Contract Data Requirements List (CDRLs) IAW DD Form 1423-1. This will not be Waived.
CLIN 0005 – EXHIBIT HC
DATA AND REPORTING
Provide data reporting in accordance with DD Form 1423-1 [CDRLs, Contract Data Requirements List] and DD Form 1664 [DIDs, Data Item Description] for reports as detailed below (IAW SOW para 1.12):
CDRL Report Distribution Reference
A001 Teardown Deficiency Report AFLCMC/LPSCB
421 SCMS/GUMDA
DI-PSSS-81534A
PWS PARA 1.12.2
A002 Contract Depot Maintenance (CDM) Production Report
Via Email to:
421 SCMS/GUMDA
AFSC/PZAAB
DCMA (QAR)
DI-PSSS-81995
PWS PARA 1.12.3
A003 Deficiency Report (DR) AFLCMC/LPSCB DI-PSSS-81535A
PWS PARA 1.12.4
A004 Report of Shipping (Item) and Packaging Discrepancy
Web SDR (DLA)
421 SCMS/GUMDA
AFSC/PZAAB
DI-MGMT-80503
PWS PARA 1.12.5
A005 Commercial Asset Visibility Air Force (CAVAF) / Government Furnished Material (GFM) Report
No Output Report Required
DI-MGMT-81634C
PWS PARA 1.12.6
A006 Government Industry Data Exchange Program (GIDEP) Alert/Safe-Alert Report
421 SCMS/GUMDA
AFSC/PZAAB
DI-QCIC-80125B
PWS PARA 1.12.7
A007 Time Compliance Technical Order (TCTO) Reporting
AFLCMC/LPSCB DI-MGMT-81325C
PWS PARA 1.12.8
A008 Comprehensive Engine Management System (CEMS) Reporting
AFLCMC/LPSC
421 SCMS/GUMDA
AFSC/PZAAB
DI-MGMT-81324C
PWS PARA 1.12.9
A009 Government Industry Data Exchange Program (GIDEP) Alert/Safe-Alert Response
421 SCMS/GUMDA
AFSC/PZAAB
DI-QCIC-80126B
PWS PARA 1.12.10
A010 Technical Order Improvement Report and Reply
421 SCMS/GUMDA
AFSC/PZAAB
DI-TMSS-80229D
PWS PARA 1.12.11
A011 Contractor’s Progress and Status Report 421 SCMS/GUMDA
AFSC/PZAAB
DI-MGMT-81928
PWS PARA 1.12.12
A012 Commercial Asset Visibility (CAV) Reporting
421 SCMS/GUMDA
AFSC/PZAAB
DI-MGMT-81838
PWS PARA 1.12.13
CONTRACT DATA REQUIREMENTS LIST (CDRL) and DATA ITEM DESCRIPTION (DID)
See Exhibit E A013 Contract Government Furnished
Material (GFM) Requisition and Inventory Report
421 SCMS/GUMDA
AFSC/PZAAB
DI-MGMT-82128
PWS PARA 1.12.14
A014 Government Property Inventory Report 421 SCMS/GUMDA
AFSC/PZAAB
DI-MGMT-80441C
PWS PARA 1.12.15
A015 Counterfeit Prevention Plan 421 SCMS/GUMDA
AFSC/PZAAB
DI-MISC-81832
PWS PARA 1.12.16
Priority: R Exhibit: HC
REAR SPOOL
See Exhibit F Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit F for estimated quantities per Ordering Period
NSN: 2840-01-486-1845 OK
REAR SPOOL
The rear spool holds stages 4-8 compressor blades of the compressor rotor assembly which is used in conjunction with the compressor stator assembly to supply compressed air in large masses to the combustion section.
Inconel 718 Manufacturer Part Number 0T790 5126T37P03 99207 5126T37P03 Priority: E
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2000 AS 9110
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PBN ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 35 Days* Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days*
*After receipt of order or reparable, whichever is later.
Early delivery is acceptable.
FRONT FRAME
See Exhibit G Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit G for estimated quantites per Ordering Period
NSN: 2840-00-868-9161 OK
FRONT FRAME, AIRCRAFT
Frame, Front directs air into Compressor and is housing for engine number 1 bearing
Alternate NSN: 2840-00-075-8748
AMS 5504, AMS 5613
Manufacturer Part Number 0T790 6000T94G01 24446 6000T94G01 99207 6000T94G01 Priority: E
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2000 AS9110
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PBO ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 60 Days* Second 30% of the CLIN quantity due 80 Days* Remaining 30% of the CLIN quantity due 95 Days*
HOUSING, MECHANICAL
See Exhibit H Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit H for estimated quantites per Ordering Period
NSN: 3040-00-011-0704 OK
HOUSING, MECHANICAL
A driver shaftgear bearing (9) and a housing assembly support the forward end of the shaftgear where it enters the PTO housing.
Alloy Manufacturer Part Number 0T790 175R122P9 24446 175R122P009 24446 175R122P9 99207 175R122P009 99207 175R122P9 Priority: E
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS, FAR 52.246.11, FAR Part 52.212-4, ISO 9001:2000, AS 9100, NATO AQAP 2070, (or equivalent) IUID Required: Yes Physical Item Markings:
Serial Number Required
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PBR ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 35 Days* Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days*
GEARBOX ACCESSORY D
See Exhibit J Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit J for estimated quantities per Ordering Period
NSN: 2840-01-294-7882 OK
GEARBOX, ACCESSORY D
The accessory drive gearbox is mounted beneath the mainframe. There are 7 mounting pads on the gearbox casing. Six of the pads are used to mount accessories, and the seventh pad is the gearbox-to-mainframe power input mount.
ALTERNATE NSN: 2840-00-493-4441; NSN: 2840-00-133-9783
Magnesium AMS 4434 Manufacturer Part Number 0T790 6003T95G07 99207 6003T95 99207 6003T95G07 Priority: E
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF
Quality Assurance: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS, FAR 52.246.11, FAR Part 52.212-4, ISO 9001:2000, AS 9100, NATO AQAP 2070, (or equivalent) IUID Required: Yes Physical Item Markings:
Serial Number Required
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAW ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 60 Days* Second 30% of the CLIN quantity due 80 Days* Remaining 30% of the CLIN quantity due 95 Days*
COVER ACCESSORY, GEARBOX
See Exhibit K Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit K for estimated quantities per Ordering Period
NSN: 2840-00-110-6672 OK
COVER ACCESSORY, GEARBOX
Cover maintains gear train position for Accy Drive Gearbox Assy.
ALTERNATE NSN: 2840-00-949-0447; NSN: 2840-00-991-4178
AMS 4434
Manufacturer Part Number 0T790 37R601155P139 99207 37R601155P139
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS, FAR 52.246.11, FAR Part 52.212-4, ISO 9001:2000, AS 9100, NATO AQAP 2070, (or equivalent) IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PBV ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 35 Days* Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days*
HOUSING, GEARBOX, TUR
See Exhibit L Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*Seen Exhibit L for estimated quantities per Ordering Period
NSN: 2840-00-795-1513 OK
HOUSING, GEARBOX, TUR
Holds internal gearbox components.
Alloy Manufacturer Part Number 0T790 37R601155P104 24446 37R601155P104 99207 37R601155P104 Priority: E
Inspection: Origin
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2000
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PBW ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 35 Days* Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days*
STAGE 1 TURBINE NOZZLE
See Exhibit M Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit M for estimated quantities per Ordering Period
NSN: 2840-01-284-5408 OK
STAGE 1 TURBINE NOZZLE
This item is used to direct hot exhaust gases generated during engine operation into the Turbine area to generate thrust.
Corrosion resistant steel Manufacturer Part Number 0T790 6041T41G15 60168 6041T41G15 99207 6014T41G09 99207 6041T41G15 Priority: E
Inspection: Origin
Quality Assurance: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS, FAR 52.246.11, FAR Part 52.212-4, ISO 9001:2000, AS 9100, NATO AQAP 2070, (or equivalent) IUID Required: Yes Physical Item Markings:
Serial Number Required
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAK ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 60 Days* Second 30% of the CLIN quantity due 80 Days* Remaining 30% of the CLIN quantity due 95 Days*
STAGE 2 TURBINE NOZZLE
See Exhibit N Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit N for estimated quantities per Ordering Period
NSN: 2840-01-286-0722 OK
STAGE 2 TURBINE NOZZLE
Directs hot gases generated during engine operation into turbine area to generate thrust.
AMS 5536 Nickel Alloy. corrosion and heat resistant.
Manufacturer Part Number 0T790 6051T51G01 99207 6051T51G01 Priority: E
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS, FAR 52.246.11, FAR Part 52.212-4, ISO 9001:2000, AS 9100, NATO AQAP 2070, (or equivalent) IUID Required: Yes
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAL ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 70 Days* Second 30% of the CLIN quantity due 90 Days* Remaining 30% of the CLIN quantity due 105 Days*
AB DIFFUSER CASE
See Exhibit P Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit P for estimated quantities per Ordering Period
NSN: 2840-01-176-9156 OK
AB DIFFUSER CASE
This item houses the inner cone, flameholder and diffuser liner in which the exhaust gases from the turbine are mixed with additional fuel and ignited.
ALTERNATE NSN: 2840-01-221-5370; NSN: 2840-01-040-4252; NSN: 2840-01-130-9346
Inconel 718 Manufacturer Part Number 0T790 6029T59G02
1FY82 6029T59G02
99207 6029T59G02 Priority: E
Inspection: Origin
Quality Assurance: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS, FAR 52.246.11, FAR Part 52.212-4, ISO 9001:2000, AS 9100, NATO AQAP 2070, (or equivalent) IUID Required: Yes Physical Item Markings:
Serial Number Required
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAE ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 35 Days* Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days*
CASING ASSEMBLY AFTERBURNER
See Exhibit Q Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit Q for estimated quantities per Ordering Period
NSN: 2840-01-490-1337 OK
CASING ASSEMBLY AFTERBURNER
Houses the AB Liner and provides the area necessary for the complete combustion of the exhaust gas-fuel mixture before it is ejected through the exhaust nozzle.
ALTERNATE NSN: 2840-01-531-9757
Primarily AMS5525 Steel, Corrosion and Heat-Resistant.
Manufacturer Part Number 0T790 5125T85G01 99207 5125T85G01
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2000 AS9110
IUID Required: Yes Physical Item Markings:
Serial Number Required
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAS ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 35 Days* Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days*
STACKED RING LINER AFTERBURNER
See Exhibit R Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit R for estimated quantities per Ordering Period
NSN: 2840-01-245-9464 OK
STACKED RING LINER AFTERBURNER
The afterburner casing and liner assembly provides the area necessary for the complete combustion of the exhaust gas-fuel mixture before it is ejected through the exhaust nozzle.
Cobalt Alloy Manufacturer Part Number 0T790 6041T18G04 99207 6041T18G02 99207 6041T18G03
99207 6041T18G04 Priority: E
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS, FAR 52.246.11, FAR Part 52.212-4, ISO 9001:2000, AS 9100, NATO AQAP 2070, (or equivalent) IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PBJ ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 35 Days* Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days*
FLAMEHOLDER, AFTERBURNER
See Exhibit S Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit S for estimated quantities per Ordering Period
NSN: 2840-01-231-1048 OK
FLAMEHOLDER, AFTERBURNER
Functions as a pilot burner, maintains the flame front in position that assures complete combustion of the exhaust gas-fuel mixture in the afterburner.
ALTERNATE NSN: 2840-00-784-9697; NSN: 2840-00-856-3488
AMS 5532
Manufacturer Part Number 0T790 6005T64P40
99207 6005T64P40 Priority: E
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2000 AS9110
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PCC ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 35 Days* Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days*
TANK, LUBRICATING OIL
See Exhibit T Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit T for estimated quantities per Ordering Period
NSN: 2840-01-077-0702 OK
TANK, LUBRICATING OIL
Holds 4 quarts oil for engine lubrication of rotating components, within a closed loop system.
ALTERNATE NSN: 2840-00-867-6280
AMS 4006 Aluminum
0T790 6003T12P03 451C6 6003T12P03 99207 6003T12P03 Priority: E
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2000 AS9110
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAG ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 35 Days* Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days*
FUEL NOZZLE ASSEMBLY
See Exhibit U Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit U for estimated quantities per Ordering Period
NSN: 2915-00-106-5464 OK
FUEL NOZZLE ASSEMBLY
Nozzle injects pressurized fuel into air flow entering the combustion chamber. The mixture is ignited and increases pressure and temperature of the gas flow through the engine, which provides driving force to the engine turbines.
Unknown, Proprietary Manufacturer Part Number 0T790 37D401657P111 71895 12874 71895 47727 71934 5232905 99207 37C301297P106 99207 37D401657P111 99207 37D401657P116 Priority: E
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS, FAR 52.246.11, FAR Part 52.212-4, ISO 9001:2000, AS 9100, NATO AQAP 2070, (or equivalent) IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAF ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 35 Days* Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days*
T-5 MOTOR AND CAM ASSEMBLY
See Exhibit V Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit V for estimated quantities per Ordering Period
NSN: 2915-01-538-1154 OK
T-5 MOTOR AND CAM ASSEMBLY
Through linkage in AB control, the motor rotation will move hydraulic servoflapper. The flapper movement causes nozzle opening to change in direction that will correct existing difference between reference and thermocouple indication. If engine temperature measured by harness is higher than reference, the action is to open the nozzle.
Not Listed Manufacturer Part Number 0T790 4016T79P02 89944 A5464220075-A2 99207 4016T79P02 Priority: E
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2000
IUID Required: Yes Physical Item Markings:
Serial Number Required
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PBT ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 35 Days* Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days*
DRAIN VALVE ASSEMBLY
See Exhibit W Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
DRAIN VALVE ASSEMBLY
See Exhibit W
1 EA
*See Exhibit W for estimated quantities per Ordering Period
NSN: 2915-00-875-5114 OK
DRAIN VALVE ASSEMBLY
The afterburner manifold drain valve removes fuel from the main and pilot spraybar fuel manifolds when the engine is shut down to prevent post-shutdown fires.
Proprietary Manufacturer Part Number 0T790 37D401691G002 24446 37D401691G002 99207 37D401691G002 Priority: E
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS, FAR 52.246.11, FAR Part 52.212-4, ISO 9001:2000, AS 9100, NATO AQAP 2070, (or equivalent) IUID Required: Yes Physical Item Markings:
Serial Number Required
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PBP ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 35 Days* Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days*
PRESSURE AND DRAIN VALVE ASSEMBLY
See Exhibit X Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit X for estimated quantities per Ordering Period
NSN: 2915-00-896-0173 OK
PRESSURE AND DRAIN VALVE ASSEMBLY
Valve closes during startup to allow fuel manifolds to pressurize, and opens at shutdown to drain manifolds.
Proprietary Manufacturer Part Number 0T790 37C301344G002 24446 37C301344G002 99207 37C301344G002 Priority: E
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS, FAR 52.246.11, FAR Part 52.212-4, ISO 9001:2000, AS 9100, NATO AQAP 2070, (or equivalent) IUID Required: Yes Physical Item Markings:
Serial Number Required
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PCM ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 60 Days* Second 30% of the CLIN quantity due 80 Days* Remaining 30% of the CLIN quantity due 95 Days*
AFTERBURNER MAIN SPRAYBAR
See Exhibit Y Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit Y for estimated quantities per Ordering Period
NSN: 2915-00-909-9119 OK
AFTERBURNER MAIN SPRAYBAR
Regulates flow to orifices in a fuel tube to spray fuel for afterburner operation.
AMS 5353 or AMS 5362 Manufacturer Part Number 0T790 37D401750P104 71895 15575 71895 19253 99207 37D401750P103 99207 37D401750P104 Priority: E
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2000
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PCO ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 35 Days* Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days*
AFTERBURNER PILOT SPRAYBAR
See Exhibit Z Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit Z for estimated quantities per Ordering Period
NSN: 2915-00-782-1759 OK
AFTERBURNER PILOT SPRAYBAR
Injects Fuel for ignition of the afterburner.
ALTERNATE NSN: 2915-00-909-6837
AMS5353
Manufacturer Part Number 0T790 5011T29P01 71895 24007 99207 5011T29P01 Priority: E
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS, FAR 52.246.11, FAR Part 52.212-4, ISO 9001:2000, AS 9100, NATO AQAP 2070, (or equivalent) IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PCJ ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 35 Days* Second 30% of the CLIN quantity due 65 Days*
ISOCHRONOUS GOVERNOR ASSEMBLY
See Exhibit AA Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit AA for estimated quantities per Ordering Period
NSN: 2915-01-145-0158 OK
ISOCHRONOUS GOVERNOR ASSEMBLY
Emergency fuel regulation in the event of main fuel control failure; meters fuel for 105% engine speed.
ALTERNATE NSN: 2915-00-980-2701
Proprietary Manufacturer Part Number 0T790 5053T27P01 66503 8005-015 99207 5053T27P01 Priority: E
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS, FAR 52.246.11, FAR Part 52.212-4, ISO 9001:2000, AS 9100, NATO AQAP 2070, (or equivalent) IUID Required: Yes Physical Item Markings:
Serial Number Required
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PBG ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 35 Days*
Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days*
COOLER, LUBRICATING
See Exhibit BA Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit BA for estimated quantities per Ordering Period
NSN: 2935-00-857-3659 OK
COOLER, LUBRICATING
Cools engine oil by heat exchange with fuel supply.
Proprietary Manufacturer Part Number 0T790 37D401061P107 70210 156880-1-1 99207 37D401061P107 Priority: E
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2000 AS9110
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAJ ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days*
COOLER, LUBRICATING
See Exhibit CA Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit CA for estimated quantities per Ordering Period
NSN: 2935-00-932-2487 OK
COOLER, LUBRICATING
Cools engine oil by heat exchange with fuel supply.
Proprietary Manufacturer Part Number 0T790 37D401061P105 70210 154410-3-1 99207 37D401061P105 Priority: E
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS, FAR 52.246.11, FAR Part 52.212-4, ISO 9001:2000, AS 9100, NATO AQAP 2070, (or equivalent) IUID Required: Yes Physical Item Markings:
Serial Number Required
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAK ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
First 40% of the CLIN quantity due 35 Days* Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days*
VARIABLE GEOMETRY ACTUATOR
See Exhibit DA Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit DA for estimated quantities per Ordering Period
NSN: 3010-00-911-4336 OK
VARIABLE GEOMETRY ACTUATOR
Positions the angle of the inlet guide vanes and compressor bleed valves as scheduled by a signal from the main fuel control.
Proprietary Manufacturer Part Number 98391 7257-3P01 98391 7257-3P02 99207 5002T48P01 99207 5002T48P02 Priority: E
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2000 AS9110
IUID Required: Yes Physical Item Markings:
Serial Number Required
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PBM ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 35 Days* Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days*
VEN ACTUATOR
See Exhibit EA Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit EA for estimated quantities per Ordering Period
NSN: 2995-01-007-4738 OK
VEN ACTUATOR
The actuators are driven by the flexible shafts attached at one end to the actuators and the other end to the power unit.
Proprietary Manufacturer Part Number
0KDP7 895249
0T790 5014T92P01 78062 895249 99207 5014T92P01 Priority: E
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS, FAR 52.246.11, FAR Part 52.212-4, ISO 9001:2000, AS 9100, NATO AQAP 2070, (or equivalent) IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAB ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 35 Days* Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days*
POWER DRIVEN ROTARY PUMP
See Exhibit FA Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit FA for estimated quantities per Ordering Period
NSN: 4320-00-871-7807 OK
POWER DRIVEN ROTARY PUMP
Provides lubricating and oil scavenging functions. Pumps oil from tank, through oil cooler, through oil filter, and into accessory drive gearbox.
ALTERNATE NSN: 4320-00-918-0354; NSN: 4320-00-909-0779
Housing Cast Aluminum Manufacturer Part Number 0T790 6009T83P02
51663 RR16500A23
99207 6009T83P02 Priority: E
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2000 AS9110
IUID Required: Yes Physical Item Markings:
Serial Number Required
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PCS ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 35 Days* Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days*
BLEED VALVE
See Exhibit GA Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit GA for estimated quantities per Ordering Period
NSN: 4820-01-341-2016 OK
BLEED VALVE
Bleeds compressor discharge air during enginge start and engine operation preventing engine stalls.
410 Stainless Steel Manufacturer Part Number 0T790 37E501502P113 11245 378-G10 11245 37E501502P113 99207 37E501502P113 99207 37E501502P113D 99207 37E501502P113X Priority: E
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2000 AS9110
IUID Required: Yes Physical Item Markings:
Serial Number Required
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAQ ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 60 Days* Second 30% of the CLIN quantity due 80 Days* Remaining 30% of the CLIN quantity due 95 Days*
UPSTREAM CASE
See Exhibit HA Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit HA for estimated quantities per Ordering Period
NSN: 4820-00-710-0849 OK
UPSTREAM CASE
Part of engine bleed valve assembly.
410 Stainless Steel Manufacturer Part Number 0T790 378A11 11245 378A11 Priority: E
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2000 AS9110
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
A SW3211 PAY ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 35 Days* Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days*
DOWNSTREAM CASE
See Exhibit JA Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit JA for estimated quantities per Ordering Period
NSN: 4820-00-710-0978 OK
DOWNSTREAM CASE
Outer half of bleed valve assembly.
410 Stainless Steel Manufacturer Part Number 0T790 378A10 11245 378A10 11245 378A12 Priority: E
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001:2000
IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
A SW3211 PBE ACCT 09
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
A SW3211 1 EA TBC
Proposed Delivery
A SW3211 1 EA
The delivery for each CLIN is divided into increments of the order quantity as follows:
First 40% of the CLIN quantity due 35 Days* Second 30% of the CLIN quantity due 65 Days* Remaining 30% of the CLIN quantity due 95 Days*
AFTERBURNER FUEL PUMP
See Exhibit KA Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Amount
1 EA
*See Exhibit KA for estimated quantities per Ordering Period
NSN: 2915-01-572-3727 OK
AFTERBURNER FUEL PUMP
The afterburner fuel pump is mounted on forward left-hand pad of…