This document provides the format and requirements for a Contract Depot Maintenance Monthly Production Report. The report must be submitted within 10 business days of the previous month's last calendar date. It includes a table with 15 data blocks to report item identification, delivery order numbers, contract line items, quantities on contract and received, items inducted into and awaiting work, quantities produced and shipped, items condemned or shipped as miscellaneous, and a forecast of next month's production. Blocks 1 through 4 require identification information for the production management specialist, contractor, contract number, and government item manager. Part II allows inclusion of a production summary if production forecasts were not met or issues with upcoming production are anticipated.

The related federal contract opportunity is solicitation number FA812123R0027 for F100 blade compressor rotors for the 1st and 2nd stages. The solicitation was issued by the Department of the Air Force Materiel Command Air Force Sustainment Center.

View the file

Other files for this federal contract opportunity

Other files attached to F100 Blade compressor Rotor, 1st and 2nd Stage, newest first.
File Type Posted
FA812123R0027_______0003 new.pdf PDF
FA812123R0027_______0002.pdf PDF
FA812123R0027_______0001.pdf PDF
22 01267 PWS.pdf PDF
FA812123R0027 DID Shipping and Packaging.pdf PDF
GFP_.pdf PDF
3573323_CDRL1_REPORT A001-A006.pdf PDF
FA812123R0027 DID Tech Order Improvement Report and Reply.pdf PDF
FA812123R0027 DID Deficiency Report.pdf PDF
FA812123R0027 DID Govt Property Inventory Report.pdf PDF
QR for CSI and CAI.pdf PDF
FA812123R0027 DID CAVAF Reporting.pdf PDF
3688558_TRNSPDATA_REPORT.pdf PDF
3688557_PKGRQMT_REPORT.pdf PDF
FA812123R0027.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: CONTRACT DEPOT MAINTENANCE (CDM) MONTHLY PRODUCTION REPORT Number: DI-PSSS-81995A Approved Date: 20201130 AMSC Number: F10209 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: 70 (419 SCMS/GUBA) Project Number: PSSS-2020-012 Applicable Forms: N/A Use/Relationship: The Contract Depot Maintenance (CDM) Monthly Production Report provides the Government with monthly maintenance production figures, status and accountability of assets at the contractor facility, performance to schedule, anticipated production for the next month, and a summary of unresolved problems at the end of the report period.

This Data Item Description (DID) contains the format, content, and intended use information for the data deliverable resulting from the work task described in the contract.

a. This DID may be used on any depot level maintenance contract.

b. This DID supersedes DI-PSSS-81995.

Requirements:

1. Reference documents. None.

2. Format. The CDM Monthly Production Report shall be in the Table I format below.

3. Content. The CDM Monthly Production Report shall include the following data, provided by the Production Management Specialist (PMS) and the Contractor, through the end of the month:

3.1 Part I: Blocks 1 through 4 of the report shall contain the following information provided by the PMS:

a. As of date: The day, month, and year (DDMMMYYYY) applicable to the report. Data shall be through the end of the month.

b. Block 1: PMS’s name, PMS’s code, PMS’s email address, and PMS’s phone number.

c. Block 2: Contractor name, the Department of Defense Activity Address Code (DoDAAC) assigned to the contractor for shipment of material, the contractor’s Commercial and Government Entity (CAGE) code, the contractor’s email address, and the contractor’s phone number.

d. Block 3: Contract number and Program (PRGM) or Weapon System (WS) supported.

e. Block 4: Government item manager’s or technical Point of Contact’s (PoC’s) name.

3.2 Blocks A through O of the report shall contain the following information:

a. Block A: Item identification, which shall include the Federal Supply Class (FSC) under

A-1, and the National Item Identification Number (NIIN) of the item being reported under A-2.

b. Block B: Delivery/Call Order number. When the awarded contract is a delivery/call order type, this is the applicable order number. When an item is awarded on more than one order, the order number is repeated for each order until completed. If the current report completes the call, the word “completed” shall be added.

c. Block C: The contract line item number (CLIN), which shall be the CLIN assigned to the National Stock Number (NSN) in the contract.

Source: http://assist.dla.mil -- Downloaded: 2021-01-07T15:21Z Check the source to verify that this is the current version before use.

DI-PSSS-81995A

d. Block D: Quantity on contract or delivery order (DO)/call

e. Block E: Reparables received, which shall be the number of reparable items received for repair, and shall include the quantity of reparables received during the report month under E-1 and the cumulative quantity of reparables received from the start of the contract through the report month under E-2.

f. Block F: Miscellaneous (Misc.) assets received that are not part of the contract, in various condition codes, which shall include the quantity received during the report month under F-1 and the cumulative total received from the start of the contract through the report month under F-2.

g. Block G: Reparables (REPS) on hand, which shall be the number of reparables on hand waiting for induction into repair.

h. Block H: Total number of reparables currently inducted (IND) into work.

i. Block I: Quantity of reparables awaiting parts (AWP).

j. Block J: Quantity (QTY) produced (PROD), which shall include the quantity that completed repair and was produced during the report month under J-1 and the cumulative total that completed repair and was produced from the start of the contract through the report month under J-2.

k. Block K: Serviceables (SERV) on hand, which shall be the quantity of serviceables on hand awaiting shipping action.

l. Block L: Serviceables shipped, which shall be the number of serviceables shipped from the repair facility, and shall include the number of serviceables shipped during the report month under L-1 and the cumulative number of serviceables shipped from the start of the contract under L-2.

m. Block M: QTY condemned, which shall include the quantity of reparables condemned during the report month under M-1 and the cumulative quantity of reparables condemned from the start of the contract under M-2.

n. Block N: Misc. Shipped/Condemned Shipped, which shall include the misc. assets received in Block F that are not part of the contract, in various condition codes or condemned assets shipped during the report month under N-1 and the misc. or condemned assets shipped from the start of the contract through the report month under N-2.

o. Block O: Next Month Forecast PROD, which shall be the quantity of items scheduled to be produced next month.

3.3 Part II, Production Summary. A Production Summary shall be included only if:

a. The previously reported production forecast was not shipped,

b. The current production forecast does not equal the contract scheduled quantity, or

c. The Contractor anticipates a problem with production in the near future.

DI-PSSS-81995A

End of DI-PSSS-81995A. 3

This Mo

To Date

This Mo

To Date

This Mo

To Date

This Mo

To Date

This Mo

To Date

This Mo

To Date

FSC NIIN

1 2 2 1 2

H.

QTY IND

TO

WORK

i.

AWP

G.

REPS ON

HAND

(Not

Inducted)

DURING REPORTING PERIOD

K.

SERV ON

HAND

(Not

Shipped)

N.

MISC.

SHIPPED/

CONDEMNED

SHIPPED

4. GOVERNMENT ITEM MANAGER OR

TECHNICAL POC

2. CONTRACTOR/DODAAC/CAGE CODE/EMAIL/PHONE # 3. CONTRACT NUMBER/WS/PRGM

Part II, Production Summary

E.

REPARABLES

RECEIVED

1 1 2 1

L.

SERVICEABLES

SHIPPED

M.

QTY

CONDEMNED

A.

ITEM

IDENTIFICATION

B.

DELIVERY/

CALL ORDER

NUMBER

TABLE I. Format of (CDM) Monthly Production Report Due Date:

Within 10 business days of the previous month's last calendar date

Part I

F.

MISC.

RECEIVED

1 2

J.

QTY

PROD

O.

NEXT

MONTH

FORECAST

PROD

CONTRACT DEPOT MAINTENANCE (CDM) MONTHLY PRODUCTION REPORT

Month and As-Of

Date

(DDMMMYYYY)

1. PMS/PMS CODE/EMAIL/PHONE #

C.

CONTRACT

LINE ITEM

NUMBER

(CLIN)

D.

QTY ON

CONTRACT

OR

DO/CALL