22 01267 PWS.pdf
PDF 465 KB Posted
- Attached to
- F100 Blade compressor Rotor, 1st and 2nd Stage Federal contract opportunity
- Solicitation number
- FA812123R0027
About this file
This performance work statement outlines the minimum work requirements to overhaul F100-PW-229 Blade-Compressor Rotor, 1st and 2nd Stage parts to a serviceable condition. Key details include:
-
The contractor shall overhaul the specified rotor parts in accordance with technical orders, applying corrosion protection, inspection, testing, preservation, and packaging. Deficiencies shall be reported using SF368 forms.
-
Work includes cleaning, inspection, matching and balancing blade pairs, applying contractor identification, and preparing items for storage or shipment. The contractor must maintain quality standards and resolve issues reported on PQDR exhibits.
-
The performance objectives are to ensure no defective parts are delivered and meet the delivery schedule. Contractors will be evaluated on meeting quality thresholds and delivery performance. Oversight includes product verification audits of randomly selected items.
-
Reporting requirements encompass production status, deficiencies, shipments, contractor labor hours, and other records to facilitate oversight. The contractor must maintain technical publications and resolve issues identified from teardown deficiency reports.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA812123R0027_______0003 new.pdf | ||
| FA812123R0027_______0002.pdf | ||
| FA812123R0027_______0001.pdf | ||
| GFP_.pdf | ||
| FA812123R0027 DID CDM Monthly Production Report.pdf | ||
| 3573323_CDRL1_REPORT A001-A006.pdf | ||
| FA812123R0027 DID Tech Order Improvement Report and Reply.pdf | ||
| FA812123R0027 DID Deficiency Report.pdf | ||
| FA812123R0027 DID Shipping and Packaging.pdf | ||
| QR for CSI and CAI.pdf | ||
| FA812123R0027 DID CAVAF Reporting.pdf | ||
| 3688558_TRNSPDATA_REPORT.pdf | ||
| 3688557_PKGRQMT_REPORT.pdf | ||
| FA812123R0027.pdf | ||
| FA812123R0027 DID Govt Property Inventory Report.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
For
F100-PW-229 Blade-Compressor Rotor, 1st and 2nd Stage
FILE NUMBER: PR # FD2030-22-01267
REV. 1
DATE: April 26, 2023
PREPARING ORGANIZATION:
AFLCMC/LPSEA
TINKER AFB OK 73145-3030
FD2030‐22‐01267 Page 2 of 37
TABLE OF CONTENTS Page
SECTION I
1.1 DATA
1.2 SECURITY
1.3 QUALITY
1.4 DELIVERY SCHEDULES
1.5 CONDEMNATION……………………………………………………
1.6 HANDLING
1.7 INVENTORY
1.8 PRESERVATION
1.9 RECEIPT/HANDLING OF PQDR EXHIBITS
1.10 GENERAL WORK REQUIREMENTS
1.11 SPECIFIC WORK REQUIREMENTS
1.12 APPLICABLE TECHNICAL ORDERS
1.13 APPLICABLE DIRECTIVES
1.14 APPLICABLE DOCUMENTS
1.15 MISSION ESSENTIAL SERVICES
1.16 CONTRACTOR IDENTIFICATION
SECTION II
2.1 SERVICE SUMMARY REQUIREMENTS
2.2 CONTRACTOR PERFORMANCE EVALUATION
SECTION III
3.1 GOVERNMENT PROPERTY
APPENDIX 1
A1.1 ACRONYMS
APPENDIX 2
A2.1 NOTES
APPENDIX 3
A3.1 PRODUCT VERIFICATION AUDIT PROCEDURES
A3.2 TERMS EXPLAINED
A3.3 RESPONSIBILITIES
A3.4 AUDIT PROCEDURES
A3.5 AUDIT RESULTS
APPENDIX 4
CAV CFM REPORTING REQUIREMENTS………………………………………………………………………………………………26
APPENDIX 5
SCRM…………………………………………………………………………………………………………………………………………………34
FD2030‐22‐01267 Page 3 of 37
SECTION I
DESCRIPTION OF SERVICES
This PWS establishes the minimum work requirements to return F100-PW-229 Blade- Compressor Rotor, 1st and 2nd Stage listed below by National Stock Number (NSN) and Part Number (P/N) to a serviceable, like new condition. F100-PW-229 Blade-Compressor Rotor, 1st and 2nd Stage received by the contractor, as set forth in this contract shall be overhauled/repaired, modified, tested, prepared for storage and shipped in accordance with (IAW) the requirements in this PWS and the contract.
NOUN PART
NUMBER
NSN APPLICABLE
TO
Blade-Compressor Rotor, 1st Stage
4076781 2840-01-364-7141 2J-F100-53-6
Blade-Compressor Rotor, 2nd Stage
4076782 2840-01-364-7142 2J-F100-53-6
1.1 DATA
1.1.1 Reporting Requirements
1.1.1.1 Product Quality Deficiency Report (PQDR – SF 368): The contractor shall prepare a PQDR on all design and quality control (material) deficiencies found IAW the procedures of TO 00-35D-54. Applicable portions of TO 00-35D-54 relative to quality defects will apply. The contractor shall hold exhibits of reported deficient items pending disposition from the ACO representative. Report preparation, distribution, holding and tagging of exhibits shall be IAW TO 00- 35D-54. The contractor shall furnish an information copy of the SF 368 to USAF F100 Engineering Source Authority listed in TO 2J-F100-53-1, WP 600 00.
1.1.1.2 TO System Publication Improvement Report (AFTO Form 22): The contractor shall prepare a PIR when an error or improvement changes the meaning of the instructions or information contained in technical directives and will prevent the adequate performance intended. The contractor shall accomplish a PIR IAW TO 00-5-1 and submit one copy to AFLCMC/ENR. Minor discrepancies of non-technical nature such as improper sequence of pages, typographical errors, transportation errors, misspelled words, etc, shall not be reported. The contractor shall report omissions of pertinent technical data, correction of overhaul procedures in TOs, or desired changes to TO data shall likewise use the AFTO Form 22.
1.1.1.3 Teardown Deficiency Report (TDR): A TDR shall be accomplished on any PQDR exhibit received for investigation. The report shall be completed IAW the
FD2030‐22‐01267 Page 4 of 37 procedures established on DD Form 1423 as set forth in the contract.
1.1.2 Other Records, Forms and Reports
1.1.2.1 The contractor shall make available to the appropriate ACO representative the required information to enable him to review and/or verify monthly production status reports on end items and to enable him to complete his records or to complete such other reports as may be required.
1.1.2.2 CAV AF End Item Production Report (End Item Activity Report): The report shall be completed IAW the procedures established on DD Form 1423, as set forth in the contract and the Appendix 2.
1.1.2.3 CEMS Reporting: N/A The -229 Blade Compress Rotor, 1st and 2nd Stage, are not serialized tracked parts, and therefore, CEMS reporting is not required in this contract.
1.1.2.4 Completed DD Form 1574 Serviceable Tags are required IAW MIL-STD-129P, paragraph 5.2.21.a.
1.1.2.5 The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil.
1.1.2.5.1 Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the CMRA help desk.
1.1.3 Technical Data
1.1.3.1 TOs listed in this specification are the basic directives to be used in accomplishing the overhaul requirements of the contract.
1.1.3.2 TO illustrated parts breakdowns (IPBs) listed in this PWS shall be used in the part replacement requirements of the contract. Replacement parts shall conform to the configurations stipulated in the applicable TO IPB as supplemented by other applicable directives and instructions in this PWS. Part replacement shall be confined to those parts determined to be required to produce a serviceable end item.
1.1.3.3 Directives listed in paragraphs 1.10, 1.11, 1.12, 1.13 & 1.14 and instructions provided throughout this PWS shall be adhered to. Thus obtaining the highest possible quality of workmanship and to maintain acceptable quality standards.
FD2030‐22‐01267 Page 5 of 37
1.1.3.4 Instructions listed in this PWS as “Changes” or “Revisions” to a TO represent publication changes to the Technical Order System and shall be complied with. The sub-paragraphs contain the location of changes as designated and the deletion, change or addition of technical information to be accomplished.
1.1.3.5 In the event of a conflict between the instructions in this PWS and the applicable technical directive, the following order of override precedence applies (descending order): 1) this PWS, 2) the end item TO, 3) other technical directives.
1.2 SECURITY
1.2.1 Contractor’s Security Controls: Equipment and materials covered by this PWS are not classified.
1.3 QUALITY
1.3.1 The contractor Quality Assurance System must comply with the requirements as described in this document and meet one of the following, AS9100, ISO 9001:2008, NATO AQAP-2070 or equivalent.
1.3.2 The contractor shall investigate, take corrective action if necessary, and reply to user initiated PQDR forwarded to them by the ACO. This applies to all PQDRs submitted against products overhauled by the contractor and/or their subcontractor or vendors.
Sufficient priority shall be given to PQDR investigation to allow timely corrective action and to meet requirements of TO 00-35D-54.
1.4 DELIVERY SCHEDULES
1.4.1 The delivery schedules shall be IAW the contract delivery schedules.
1.5 CONDEMNATION
1.5.1 Contractor’s Scrap Procedures: The contractor shall prepare and submit to the Government Property Administrator (GPA) for approval, a written plan that sets forth procedures for handling scrap materials. These procedures shall include the requirements stipulated in the Federal Acquisition Regulation (FAR) 45.1, titled “General”. Disposition of condemned parts containing critical alloys and/or precious metals shall by IAW TO 00-25-113, 00-25-113-F100-ENG and FAR 45.6 titled “Reporting, Reutilization, and Disposal”.
1.5.2 Condemnation: The contractor without written approval of the ACO or his representative shall not condemn End Items.
1.5.2.1 End Items determined by the contractor and verified by the ACO to be beyond economical overhaul shall be disposed of as directed by the ACO in writing.
1.5.2.2 Parts, which have been condemned as a result of NDI methods, other inspection methods, or for other reasons, shall be mutilated to the extent necessary to ensure
FD2030‐22‐01267 Page 6 of 37 that purchasers of scrap are unable to overhaul the item for possible resale or reuse.
All documents and tags pertinent to such condemned parts authorized for transfer to disposal shall bear a certificate to the effect that all required mutilation has been accomplished.
1.5.2.3 The serial number and part number of any life-limited item, which is condemned, must be transmitted to F100 Engineering Source Authority listed in TO 2J-F100-
53-1, WP 600 00.
1.6 HANDLING
1.6.1 The contractor shall have physical custody of end items and parts received at their facility and shall be responsible for their constant care during such custody.
1.6.1.1 The -229 Blade Compress Rotor, 1st and 2nd Stage, are not serialized tracked parts, and therefore, CEMS reporting is not required in this contract.
1.7 INVENTORY
1.7.1 Each end item shall be inspected by the contractor upon receipt to determine its condition and to ensure that its item identification corresponds to that shown on the contract schedule. Non-conforming end items shall be reported to the appropriate ACO representative.
1.8 PRESERVATION
1.8.1 Preservation inspection of end items is not required upon receipt. Adequacy of preservation will be determined when the item is placed in work and if found deficient shall be reported to the appropriate ACO representative.
1.8.2 All Government assets shall be stored in an enclosed and covered area and shall be adequately protected against loss by fire, theft, and physical damage by the elements.
Government owned items and parts shall not be co-mingled with non-Government owned property.
1.9 RECEIPT/HANDLING OF PQDR EXHIBITS
1.9.1 Any exhibit received for the purpose of an investigation into the cause of a material or a quality deficiency shall be kept separated from normal overhaul assets until the
FD2030‐22‐01267 Page 7 of 37 investigation is completed. The contractor shall provide the exhibit receipt date through the ACO with the F100 Engineering Source Authority listed in TO 2J-F100-
53-1, WP 600 00.
1.10 GENERAL WORK REQUIREMENTS
1.10.1 The instructions for the overhaul of items stipulated in this PWS shall be performed IAW the applicable TOs and the below exceptions.
1.10.1.1 The contractor is authorized to inspect per part drawing and part QAD (Quality
Assurance Document).
1.10.2 The contractor shall use protective equipment to protect items from damage as they are processed through the plant. Special protection shall be placed over the machined surfaces of end items.
1.10.3 The contractor shall inspect the various disassembled components or part of the end item to determine if further overhaul is needed. Subsequent overhaul shall be accomplished IAW the applicable portion of the applicable overhaul technical order and supplementary instructions specified herein.
1.10.4 The contractor shall rework all reparable parts so that they are capable of meeting the serviceable requirements of this PWS.
1.10.5 The contractor shall continue to use all parts and assemblies determined serviceable and appropriate as a result of inspections and checks, except as specified in this PWS.
1.10.6 The contractor shall replace condemned parts of the end item with like serviceable parts listed in the applicable technical order IPB unless otherwise specified in or within this PWS.
1.10.7 When overhaul kits are available for the overhaul of an end item, such kits shall be used IAW the applicable technical order and changes thereto or the specific instructions contained in this PWS.
1.10.8 Where the contractor is directed to hold an item for AFLCMC disposition by any cited publication herein or be any statement made within this PWS, such items shall be reported to the ACO through the GPA for disposition.
1.10.9 Overhaul, to the maximum extent, is desired when such overhaul is economically feasible. The contractor is encouraged to submit new or improved overhaul procedures to the Government whenever practical. Procedures may be submitted on an AFTO Form 22 as specified in this PWS or by any other means authorized under this contract. This does not preclude the contractor’s submission of overhaul procedures, which are not economically feasible, when such overhauls are advantageous to the Government.
FD2030‐22‐01267 Page 8 of 37
1.10.10 All of the contractor’s operators of special processes, such as X-ray, radiography machines, Fluorescent Penetrate and Magnetic Particle Inspection Equipment, as well as welders and moralizers, shall be qualified and certified for operation IAW applicable military specifications when listed in the PWS.
1.10.11 Fit and tolerance limits shall be IAW applicable overhaul TO/contractor’s processes and procedures unless otherwise specified.
1.10.12 Fluids, oil, greases and compounds shall conform to and be used as directed in the overhaul TO and instructions contained in this PWS.
1.11 SPECIFIC WORK REQUIREMENTS
1.11.1 Removal
1.11.1.1 Not Applicable.
1.11.2 Disassembly
1.11.2.1 Not Applicable.
1.11.3 Cleaning
1.11.3.1 F100-PW-229 Blade-Compressor Rotor, 1st and 2nd Stage shall be cleaned IAW
TO 2J-F100-53-6 WP 200.
1.11.3.2 The contractor shall ensure that cleaning and preserving materials meet the requirements specified in TO 2J-F100-53-1, TO 2J-F100-53-2 WP 004 00, or TO 2-1-111 and that such materials are properly used during application.
1.11.4 Inspection
1.11.4.1 Inspection of F100-PW-229 Blade-Compressor Rotor, 1st and 2nd Stage shall be accomplished IAW 2J-F100-53-6 WP 315 00.
1.11.5 Corrosion Control
1.11.5.1 The corrosion control of F100-PW-229 Blade-Compressor Rotor, 1st and 2nd Stage during overhaul and storage shall be accomplished IAW TO 2-1-111.
1.11.6 Overhaul
1.11.6.1 Overhaul of F100-PW-229 Blade-Compressor Rotor, 1st and 2nd Stage shall be accomplished IAW 2J-F100-53-6 WP 415 00.
1.11.6.2 The contractor shall identify all overhauled F100-PW-229 Blade-Compressor
FD2030‐22‐01267 Page 9 of 37
Rotor, 1st and 2nd Stage with the contractor’s CAGE IAW MIL-STD-130N.
1.11.7 Matching Sets and Packaging
1.11.7.1 Single blades should be individually packaged and matched into pairs in intermediate container based on moment weight IAW drawing part number 4076791 for 1st stage blades and 4076792 for 2nd stage blades.
11.11.8 Installation
1.11.8.1 Not applicable.
1.11.9 Test and Government Acceptance
1.11.9.1 Inspect, test and check each overhauled item IAW TO 2-1-111.
1.11.9.2 The Government shall accomplish acceptance.
1.11.10 Product Verification Audit (PVA)
1.11.10.1 Overhauled items shall be subject to PVA if requested by the government.
1.11.10.2 To perform PVA, the government shall be permitted to select at random such quantities of items as may be necessary to determine quality of workmanship and materials.
1.11.10.3 After notification by the ACO that a PVA is required, the contractor will follow the procedures of Appendix 3 - Product Verification Audit Procedures.
1.11.11 Technical Publication Compliance
1.11.11.1 Compliance with all TOs, Directives, Government Specifications, Drawings, etc., listed herein is mandatory, unless otherwise specified in this PWS, when:
1.11.11.1.1 They have not been previously accomplished
1.11.11.1.2 They are pertinent to the end item.
1.11.11.1.3 They prescribe Air Force Policies, use of materials and procedures for overhaul.
1.11.11.2 For solicitation purposes, the contractor may contact USAF F100 Engineering Source Authority listed in TO 2J-F100-53-1, WP 600 00, for Instructions for viewing or purchasing technical data required for maintenance of this contract.
Upon contract award, the contractor shall establish and maintain a TO distribution account IAW TO 00-5-1; and be placed on initial distribution for one copy each of the TOs and TCTOs listed in this PWS. The contractor shall contact the TOMA
FD2030‐22‐01267 Page 10 of 37 office at AFLCMC.LPSAA.TOMA@us.af.mil within five (5) working days after contract award for guidance in obtaining a TODO account. Once the contractor’s TODO account is in operation, the contractor shall maintain all TOs and TCTOs and other technical directives listed in the PWS in an updated and current status IAW TO 00-5-1 and TO 00-5-2. The contractor is required to comply with the latest dated TO; TCTO and other technical directives issued and will be contractually covered during the time the work is accomplished. For example, an item already in work will continue to be worked under the existing contractual scope of work until such time that the latest TO revisions can be negotiated as to price and scheduled incorporation. The contractor shall submit a monthly review of changes to TOs, TCTOs, and other applicable directives received during that period. However, if a change is received that has a cost impact greater than 10% and/or is critical to safety of flight, the contractor shall notify the ACO within ten (10) days of receipt of that change and also shall provide the cost impact with his backup data. The contractor shall not begin working with new publication until authorization has been granted by the ACO/PCO.
1.11.11.3 Copies of other Air Force publications required in the performance of work outlined in this PWS will be requisitioned through the ACO. Submit requests to appropriate ACO representative for review. TO 00-5-1 is provided in explanation of the Technical Order System and for pertinent distribution, requisition and storage information.
1.11.11.4 In the event a follow-on to this contract is awarded, the “Package File” at the contract facility as of the end of the previous contract will be applicable to the follow-on contract and will be updated through amendments to the new PWS of the new contract. This procedure will ensure continuity of the publication data from one contract to another.
1.11.11.5 Item Unique Identification (IUID)
1.11.11.5.1 Repair contracts that result in the delivery of tangible personal property to the Government shall follow the latest DoD instructions to install IUID compliant marks in accordance with policy as stated in DFARS 211.274. When directed by the PCO, the contractor shall follow the latest DoD instructions to install IUID compliant marks. TOs and drawings will be complied with for any component where direction is currently called out in the TO or drawings.
1.12 APPICABLE TECHNICAL ORDERS
FD2030‐22‐01267 Page 11 of 37
This is a preliminary list of Technical Orders. The contractor is responsible for ensuring they are using the latest edition.
TECH ORDER BASIC CG CHANGE
NUMBER DATE NO DATE SHORT TITLE
00-5-1 15 Aug 09 22 18 JAN 11 AF TECH ORDER SYSTEM
00-5-15 1 JAN 10 9 18 JAN 11 TIME COMPLIANCE
TECH ORDER SYSTEM
00-20-1 1 SEP 10 5 15 JUN 13 PREV MAINT PROG
00-20-2 1 SEP 10 28 1 NOV 12 MAINT DATA
COLLECTION SYS
00-20-3 1 JAN 09 10 18 JAN 11 MAINT PROC OF
REPARABLE
PROP
00-25-113 1 FEB 07 49 01 DEC 13 CRITICAL ALLOY AND
PRECIOUS METAL
00-35D-54 1 OCT 09 4 18 JAN 11 MATERIAL DEF REPORT &
INVEST SYSTEM
33B-1-1 15 JUN 07 8 15 SEP 10 NONDESTRUCTIVE INSP.
METHODS
2-1-111 15 FEB 90 61 01 JUL 14 STAND MAINT PROCEDURES
2J-F100-9 1 NOV 95 55 01 JUL 14 NONDESTRUCTIVE
INSPECTION
2J-F100-94 1 MAY 92 55 15 FEB 14 IPB SUPPORT
EQUIPMENT
2J-F100-53-1 15 FEB 07 10 15 MAR 15 INST. AND GENERAL INFO
2J-F100-53-2 15 FEB 07 10 15 MAR 15 ON CONDITION MAINT.
2J-F100-53-6 15 FEB 07 10 15 MAR 15 INLET/FAN MODULE
2J-F100-54 15 APR 09 35 01 JUL 14 IPB
FD2030‐22‐01267 Page 12 of 37
1.13 APPLICABLE DIRECTIVES
MILITARY STANDARDS CHANGE DATE TITLE
MIL-STD-129R 18 FEB 14 U.S. MILITARY MARKING FOR
SHIPMENT AND STORAGE
MIL-STD-130N 16 NOV 12 ID MARKING OF U.S. MILITARY
PROP.
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ISO - 9001 15 NOV 08 QUALITY MANAGEMENT
SYSTEMS – REQUIREMENTS –
THIRD EDITION
1.14 APPLICABLE DOCUMENTS
1.14.1 LPF-QAR-001: “GENERAL QUALITY ASSURANCE DOCUMENTS FOR F100
ENGINE FC/DC BREAKOUT COMPONENTS”
1.14.2 LPF-QAR-002: “CHANGE PROCEDURES FOR PROCESS ORDERS”
1.14.3 LPF-QAR-004: “LPFR QUALITY ASSURANCE REQUIREMENTS FOR F100
ENGINE COMPONENTS”
1.14.4 LPF-QAR-006: “LPFR QUALITY ASSURANCE REQUIREMENTS FOR
PRODUCT VERIFICATION AUDIT (PVA) TEST PLANS AND REPORTS
1.14.5 LPF-QPR-007: “LPFR QUALITY PLAN REQUIREMENTS FOR PLASMA
SPRAYED COATINGS”
1.14.6 LPF-QPR-009: “LPFR QUALITY PLAN REQUIREMENTS FOR VACUUM
BRAZED ASSEMBLIES”
1.14.7 LPF-QPR-016: “LPFR QUALITY PLAN REQUIREMENTS FOR DURABILITY
CRITICAL PARTS
1.14.8 LPF-QPR-017: “LPFR QUALITY PLAN REQUIREMENTS FOR CAST
HONEYCOMB RING SEGMENTS AND RING ASSEMBLIES”
FD2030‐22‐01267 Page 13 of 37
1.14.9 LPF-QPR-018: “LPFR QUALITY PLAN REQUIREMENTS FOR
NONDESTRUCTIVE INSPECTION”
1.14.10 LPF-QR-001: “BASIC TECHNICAL DATA REQUIREMENTS FOR FRACTURE
CRITICAL AND DURABILITY CRITICAL PARTS”
1.14.11 LPF-QR-002: “CONDITIONS OF WAIVER FOR FRACTURE CRITICAL AND
DURABILITY CRITICAL PARTS”
1.14.12 EI FOR RQR-1: “GENERIC ENGINEERING INSTRUCTIONS FOR
REMANUFACTURE OF F100 PARTS IN RQR-1”
1.15 MISSION ESSENTIAL SERVICES N/A- Note: Not required in this contract.
1.16 CONTRACTOR IDENTIFICATION
1.16.1 Contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.
FD2030‐22‐01267 Page 14 of 37
SECTION II
SERVICE SUMMARY
The contractor service requirements are summarized into performance objectives that relate directly to the mission essential items. The performance threshold describes the minimum acceptable levels of service for each requirement. The contractor shall be aware that the absence contract requirement from the service summary does not detract from its enforceability nor limit the rights or remedies of the government under any other provision of the contract. The government will use the surveillance methods contained in the Surveillance Plan to evaluate the Contractor’s performance for the performance objectives listed below. In the event the performance objective is not met, the Contractor will be given a reasonable time after notification to correct the unacceptable performance, if such correction is possible. The Contractor shall immediately take corrective action in accordance with the performance threshold(s). In cases where the Contractor fails to implement corrective action, the PCO will take appropriate measures.
NOTE: For those requirements listed in Section II, Service Summary, the Surveillance Plan will follow the methods of surveillance specified in the Surveillance Plan. The Surveillance Plan is authorization for the Government’s PCO to participate in the administration of this contract.
2.1 SERVICE SUMMARY REQUIREMENTS
2.1.1 The contractor shall ensure the performance objectives and performance thresholds identified in table 2-1 of this PWS are achieved as follows:
Table 2-1
Performance Objective
Reference Paragraph
Performance Threshold
SS-1 Quality: PWS # 1.3 No defective parts shall be delivered to the Government.
SS-2 Delivery Performance:
PWS # 1.4 The contractor shall meet the delivery schedule.
2.2 CONTRACTOR PERFORMANCE EVALUATION
2.2.1 The contractor shall be aware that the evaluation of performance will occur when the Program Manager evaluates the services of the contractor to determine whether or not it meets the performance measures of the contract.
FD2030‐22‐01267 Page 15 of 37
2.2.1.1 SS-1: The contractor’s failure to meet the requirements for this item shall result in the possibility of a poor rating under the Contractor Performance Assessment Review (CPAR) and remedies as allowed under Federal Acquisition Regulation (FAR) 52.256-4 Inspection of Services-Fixed Price.
2.2.1.2 SS-2: The contractor’s failure to meet this requirement shall result in a negative
CPAR rating and remedies as allowed under FAR 52.256-4 Inspection of Services- Fixed Price.
FD2030‐22‐01267 Page 16 of 37
SECTION III
GOVERNMENT PROPERTY
3.1 GOVERNMENT PROPERTY
3.1.1 Contractor shall furnish all material, support equipment, tools, test equipment and services. Government Furnish Material shall not be provided.
FD2030‐22‐01267 Page 17 of 37
APPENDIX 1
A1.1 ACRONYMS
ACO Administrative Contracting Officer AFMC Air Force Material Command ALC Air Logistics Center CAGE Contractor and Government Entity CAO Contract Administration Office CEMS Comprehensive Engine Management System DOD Department of Defense EC Engineering Change ESA Engineering Source Authority FAR Federal Acquisition Regulation GFM Government Furnished Material GFP Government Furnished Property GPA Government Property Administrator IAW In Accordance With IPB Illustrated Parts Breakdown MRB Material Review Board NDI Nondestructive Inspection OC-ALC Oklahoma City Air Logistics Center OEM Original Equipment Manufacturer PCO Procurement Contracting Officer PIR Publication Improvement Report PQDR Product Quality Deficiency Report PVA Product Verification Audit QAD Quality Assurance Document QAR Quality Assurance Representative QCD Quality Control Deficiency SL Salvage Layout SR Service Remanufacture TO Technical Order USAF United States Air Force WP Work Package
FD2030‐22‐01267 Page 18 of 37
APPENDIX 2
A2.1 NOTES
A2.1.1 The contractor is authorized to establish and convene a Material Review Board (MRB) to evaluate and determine disposition on non-conforming material or parts. Board members shall consist of representatives from the Contractor’s Quality Production Control, Engineering (Industrial, Product Support or Design) and the Government QAR.
The MRB shall be convened when the contractor identifies non-conformance of material or parts. When MRB action is required on material or parts outside of TO limits, the contractor shall provide information the part number, serial number and statement of non-conformance and recommended corrective action using a Deviation/Waiver submitted on a DoD Request for Variance (RFV) Form 1694.
FD2030‐22‐01267 Page 19 of 37
APPENDIX 3
A3.1 PRODUCT VERIFICATION AUDIT PROCEDURES
A3.1.1 This attachment contains procedures and instructions for contractual accomplishment of Product Verification Audits (PVAs). This attachment does not supersede instructions contained in the contract overhaul work requirements or other contractual provisions. In instances of conflict, the latter applies. The contractual issuance of this attachment and performance of PVAs does not relieve the contractor of the responsibility for maintaining a Quality Control System that will assure productions of items that conform to contractual requirements. PVAs are management tools used to independently evaluate and validate the conformance of an overhauled item and contractor compliance to contractual requirements as well as the adequacy of the Government's contractually stipulated requirements.
A3.2 TERMS EXPLAINED
A3.2.1 PVA. The physical examination, functional testing and complete disassembly of an item to determine conformance to contractual requirements as well as adequacy of the contractual requirements which may require in excess of the original contractor overhaul effort. The audit includes correction of defects, reassembly, retesting, repackaging, remarking, update of records and correction of contractual requirements as required.
A3.2.2 Cognizant Quality Assurance Element. The DOD contract administration service element having direct responsibility for implementing the Government Quality Assurance Program at the contractor's plant.
A3.2.3 Overhaul Work Requirement. Any contract instrument, TO, drawing, specification or directive which contains instructions and requirements for overhaul and rehabilitation of a reparable/unserviceable item.
A3.2.4 Procedural Deficiency. A deficiency which is noted during the audit and which results from either:
A3.2.4.1 Failure by contractor to establish processes/procedures in conformity with contractual requirements; or, A3.2.4.2 Failure by contractor to follow established processes or procedures.
A3.3 RESPONSIBILITIES
A3.3.1 The contractor shall:
FD2030‐22‐01267 Page 20 of 37
A3.3.1.1 Perform audit functions under the surveillance of the cognizant DOD CAO and Air Logistics Center (ALC) representative(s).
A3.3.1.2 Provide technical personnel, tooling, measuring/test equipment, work areas, forms and clerical assistance, as required, to perform the PVA.
A3.3.2 The cognizant DOD QAR shall:
A3.3.2.1 Be designated as audit team chairman, unless otherwise directed by the Procuring Contracting Officer (PCO).
A3.3.2.2 Schedule the product verification audit and select the item(s) to be audited.
A3.3.2.3 Notify the PCO and the contractor when the PVA will begin. Notification shall be provided at least 15 working days prior to the audit date. Scheduled audits may be waived by the PCO on a case-by-case basis.
A3.4 AUDIT PROCEDURES
A3.4.1 Classifying Defects. Defects observed in the audited item(s) will be classified according to the following:
A3.4.1.1 Category I - Critical Defect. Defect that judgment and experience indicates likely to result in hazardous/unsafe conditions for individuals using, maintaining or depending upon the product; or a defect that judgment and experience indicates is likely to prevent performance of the tactical function of a major end item such as an aircraft, engine communication system, surveillance system or major part thereof. Critical defects are furthered identified as follows:
A3.4.1.1.1 Category IA - Defect attributable to the contractor's failure to comply with contractual requirements.
A3.4.1.1.2 Category IB - Defect not attributable to contractor's failure to comply with contractual requirements such as a design deficiency, inadequate or omitted requirement or defective Government Furnished Property (GFP).
A3.4.1.2 Category II - Major Defect. Defect other than critical that is likely to result in failure or reduce materially the usability of unit or product for its intended purpose. Major defects are further identified as follows:
A3.4.1.2.1 Category IIA - Defect attributable to the contractor's failure to comply with
A3.4.1.2.2 Category IIB - Defect not attributable to contractor's failure to comply with contractual requirements such as a design deficiency, inadequate or omitted requirements or defective GFP.
FD2030‐22‐01267 Page 21 of 33
A3.4.1.3 Category III - Minor Defect. Defect that is not likely to reduce materially the usability of the unit or product for its intended purposes or is a departure from established standards having little bearing on the effective use or operation of the unit. Minor defects are further identified as follows:
A3.4.1.3.1 Category IIIA - Defect attributable to the contractor's failure to comply with
A3.4.1.3.2 Category IIIB - Defect not attributable to the contractor.
A3.4.1.4 Category IV - Defect caused during accomplishment of the audit disassembly or inspection process which would not have occurred had the contractor exercised proper care of the audit item, i.e., improper handling, improper disassembly technique.
A3.4.1.5 Procedural Defect – Reference paragraph A3.2.4.
A3.4.2 Scheduling/Frequency
A3.4.2.1 During the initial production phase, one of the first five items may be audited. The frequency for performing subsequent audits will be as specified in the schedule of the contract or by the PCO.
A3.4.2.2 The contractor may be directed by the PCO to extend or increase the frequency of the audits or to increase or decrease the scope thereof pursuant to the "changes" clause of the contract.
A3.4.2.3 Like or similar items may be grouped for audit purposes when the concurrence of the PCO or his designated representative has been obtained.
A3.4.3 Inspection and Test
A3.4.3.1 Audit candidates shall be randomly selected by the cognizant DOD QAR from all items currently available. It shall be the responsibility of the ACO to assure that an adequate number of items from which a random selection can be made are on hand at the time of the audit. Selection, except as specified in paragraph A3.4.3.2 below, shall be made from items which have been accepted by the Government but have not been shipped.
A3.4.3.2 The first five items of the initial production phase shall be set aside after having been tendered by the contractor as in conformity with the contract and inspected by the Government and not rejected for failure to comply with contractual requirements. Upon completing the testing and disassembly portion of the audit of the selected candidate and if no Category I or II defects are found during the audit, the other four items will be accepted by the Government. In any Category I
FD2030‐22‐01267 Page 22 of 33 or II defect is found in the audit candidate, the contractor shall satisfy the Government that such defect does not exist in the other four items prior to Government acceptance thereof. The audit candidate shall be accepted by the Government upon compliance with paragraph A3.4.4.6 below.
A3.4.3.3 The items selected for audit shall be inspected for adherence to preservation, packing, packaging and marking requirements prior to removal from the shipping container. A visual inspection and functional test shall be performed prior to disassembly.
A3.4.3.4 Disassembly shall be performed in a secure area accessible only to audit participants. Normally, audit participation will be limited to specified contractor production and quality control personnel, the cognizant DOD QAR and ALC personnel.
A3.4.3.5 Visual inspection, dimensional checks (such as backlash, end clearance and running clearance) and non-destructive testing will be accomplished during and after disassembly IAW applicable technical directives. Audit findings will be recorded for comparison with contractual requirements and the contractor's production/inspection records. Measuring and test equipment shall be reviewed for current calibration prior to use.
A3.4.3.6 Applicable accessories and components will be functionally tested and inspected to contractual specifications. This action may require disassembly in excess of the original contractor effort as determined necessary by the Government.
A3.4.4 Corrective Actions
A3.4.4.1 In the event a critical or major defect is observed, Government acceptance of further production will be withheld until the Government has either inspected other items for the observed defect(s) or has received suitable evidence from the contractor that the cause of such defect(s) has been corrected and the defect does not exist in other items. In the case where there is a probability of such defect existing in previously shipped items, the contractor will promptly advise the Government of the identity and destination of such previously shipped items.
A3.4.4.2 When Category IA, IIA or IIIA defects are found, the contractor shall implement measures in the overhaul process which will preclude recurrence.
A3.4.4.3 When Category IB, IIB or IIIB defects are found, actions will be taken as directed by the Government pursuant to the contract.
A3.4.4.4 When Category IV defects are noted, the contractor shall take those actions necessary to preclude recurrence.
A3.4.4.5 When Procedural Deficiencies are noted, the contractor shall take those actions
FD2030‐22‐01267 Page 23 of 33 necessary to correct the procedures or operations concerned.
A3.4.4.6 Upon completion of the audit, all defects attributable to failure to comply with contractual requirements or attributable to the performance of the PVA shall be corrected. All noted defects shall be corrected and the item assembled and functionally tested IAW applicable overhaul specifications including preservation, packing, packaging, marking and update of records.
A3.4.4.7 After the audit is completed, the DOD QAR shall conduct a critique attended by contractor personnel and ALC representative(s). Findings, classifications and corrective actions shall be discussed and determination of defect cause(s) established (e.g. workmanship, tooling, technical requirements, etc.). The contractor shall take immediate action to correct and preclude recurrence of all defects or deficiencies attributable to failure to comply with contractual requirements, subject to the provisions of paragraph A3.5.1.10 below.
A3.5 AUDIT RESULTS
A3.5.1 The quality office of the CAO activity shall prepare and forward to the responsible PCO the finalized audit findings within 10 working days after completion of the audit. Finalized findings will contain the following information:
A3.5.1.1 Name and address of the contractor.
A3.5.1.2 Contract number.
A3.5.1.3 Descriptive noun, Federal Stock Number, part number and serial number of the item audited.
A3.5.1.4 Summary of total defects.
A3.5.1.4.1 Category IA
A3.5.1.4.2 Category IB
A3.5.1.4.3 Category IIA
A3.5.1.4.4 Category IIB
A3.5.1.4.5 Category IIIA
A3.5.1.4.6 Category IIIB
A3.5.1.4.7 Category IV
FD2030‐22‐01267 Page 24 of 37
A3.5.1.5 A complete listing of audit findings.
A3.5.1.6 A description of defects listed by category (commencing with critical). The defective item will be identified by part number and standard nomenclature.
A3.5.1.7 Cause(s) for each noted defect.
A3.5.1.8 Corrective action(s) taken on each classified defect attributable to failure to comply with contractual requirements, or a projected target date for completion when not otherwise immediately corrected.
A3.5.1.9 Procedural deficiencies noted and the corrective actions applied.
A3.5.1.10 The signature of the DOD QA participants, contractor management personnel and
ALC representative(s). Non-concurrence with the findings shall be specifically annotated in the vicinity of the applicable signatures. Non-concurrence by the contractor as to the existence or classification of a defect or as to whether or not a defect is attributable to failure to comply with contractual requirements shall be subject to the procedures set forth in the clause entitled "Dispute."
FD2030‐22‐01267 Page 25 of 37
APPENDIX 4
CAVAF REPORTING REQUIREMENTS
The purpose of this attachment is to provide Contract Depot Maintenance (CDM) guidance for contractor technical responsibilities and reporting requirements of the Commercial Asset Visibility Air
Force (CAV AF) system. CAV AF shall be the primary system of record for providing daily status of all
Government owned assets located at contractor repair facilities. Reporting within CAV AF shall not be limited to end items subject to repair but are to include assets stored at a contractor Inventory Control
Point (ICP). Any CAV AF system down‐time will be identified on the CAV AF home page banner.
Contractors are responsible for ensuring current User Guides are utilized by their CAV AF reporters.
NOTE: Contractor User’s Guide may be accessed from the CAV AF homepage.
CAVAF FAMILIARIZATION TRAINING:
1. Familiarization training for CAV AF reporting will be requested by the contractor via the applicable
ICP CAV AF system administrator (SA). For assistance, guidance or questions to specific contract transactionsl reporting requirements may be addressed to the CAV AF contract monitor (CM). ICP CAV
AF (SA and/or CM) points of contact (See Contractor Responsibility Item #4).
CONTRACTOR RESPONSIBILITY:
1. Contractor CAV AF reporting requirements shall be accomplished daily and/or within one (1) business day of a maintenance action occurrence IAW the applicable CAV AF CDRL and CAV AF system, version 8.0.1 or higher. Accurate and timely reporting of maintenance transactions into CAV
AF is critical to the management of repair requirements and the management of world‐wide asset distribution. Contractor shall ensure asset record in CAV AF is an accurate reflection of physical assets on hand at all times. (note a valid PKI is required prior to accomplishing # 2 and #3 of contractor responsibilities)
2. Each CAV AF reporter shall submit a completed System Authorization Access Request, DD Form
2875, per instructions within 10 days after contract award date. All DD Form 2875(s) shall be digitally signed. There “must be two CAV AF reporters” for the contractual reporting requirements to ensure
FD2030‐22‐01267 Page 26 of 37 there is no possibility of a lapse in reporting coverage.
3. User(s) shall complete initial DoD Information Assurance (IA) Cyberawareness Challenge training and submit a course completion certificate with the DD Form 2875. IA Cyberawareness Challenge course completion certification shall be accomplished annually. Users shall access IA training on the
CyberAwareness Challenge website, under the Department of Defense Employees section, click hyperlink; “Launch New CyberAwareness Challenge Department of Defense Version” using the following website: https://iase.disa.eta/cyberchallenge/launchPage.htm
a. First time CAV AF users will email initial IA Cyberawareness Challenge course completion certificates, AF Form 4394, AF User Agreement Statement, and completed DD Form 2875 to point of contact at applicable ICP (see item #4).
b. All following annual course completion certificates shall be completed before lapse in certification occurs and will be emailed to respective ICP identified in paragraph 4a, 4b, and 4c below.
c. Product Functionality Caution: To meet technical functionality requirements, this awareness product was developed to function with Windows operating systems (Wingdow 7, VISTA, and XP), when configured correctly) using either the Internet Explorer (IE) or Firefox browsers. Users employing other operating systems or browser may experience difficulties and may not be able to complete the training or print the certificate of completion. The Cyber Awareness Challenge course completion is a contractual requirement and the contractor must comply.
4. Reporters requiring the default password or password resets should contact their applicable ICP
CAV AF System Administrator POC listed below:
a. Robins AFB, GA, call (478) 327-6602 or 327-6603, or send email request to:
406scms.cav.af.ar@us.af.mil
b. Hill AFB, UT, call (801) 586-3736, or send email request to:
420scms.cdm@us.af.mil
c. Tinker AFB, OK, call (405) 739-3229, or send email request to:
420.scms.tinker.cdm.workflow@us.af.mil
5. To access the CAV AF system, contractor and subcontractor reporters shall follow “initial log‐in procedures” as prescribed within the Contractors User’s Guide.
FD2030‐22‐01267 Page 27 of 37
6. Contractor shall ensure accountability of all Government Furnished Property (GFP) within their Enterprise Resource Planning (ERP) or Commercial Off-the-Shelf (COTS) system, which must be reported accurately for same GFP records within CAV AF at all times.
7. Contractual Induction-at-Risk of end items is prohibited on all repair contracts.
8. Contract/Delivery Order Closure Disposition– Government will provide disposition instructions to contractor’s reporter. Contractor shall begin shipping assets within 10 days of receiving government disposition instructions and have completed all shipping actions 30 days thereafter. Contractor shall be fully responsible to ensure all corresponding CAV AF reporting actions associated with disposition occur within one (1) business day of related shipment action.
9. All NSNs identified as Nuclear Weapon Related Materiel (NWRM) shall require contractor CAV AF reporting for production management, to track and report NWRM end items in repair with Serial
Number identification within one (1) business day for asset visibility and serial number tracking. When receipted, Contractor’s reporter shall capture each NWRM asset’s Serial Number when reparable is received. Contractors shall follow all NWRM management requirements outlined in AFI 20‐110, NWRM Management, to include, but not limited to packaging, marking, labeling, storage, transportation and receipt of all NWRM assets, with emphasis on Positive Inventory Control (PIC) and records management by the contractor and government to assure compliance. The successful application of these procedures requires the full cooperation of all personnel associated with the storage, shipping, transshipping and receiving of all NWRM assets.
SPECIFIC CAVAF CONTRACTOR TRANSACTIONAL REPORTING REQUIREMENTS:
1. “Not‐on‐Contract” (NOC) receipt transactions apply to assets which are associated to a contractor facility DoDAAC and not an active contract delivery order. Regardless of asset condition code status, Not‐on‐contract shall be used for the following reporting actions:
a. Discrepancy Items – Are identified as misrouted shipments, misidentified shipments, or damaged end items. Contractor’s reporter will verify resolution weekly to acquire resolution to discrepancy within 30-days of receipt transaction. The contractor shall comply with disposition instructions provided by the Government within 10-days and complete all associated reporting actions within same period. Contractor reporting actions shall be resolved using reversals of individual record control document numbers (RCDN) or may be accomplished utilizing a ‘bulk’ shipment action of RCDN.
b. Inventory Control Point Items – are identified as assets stored at contractor facility and are not repair end items or discrepancies items. Movement of assets from “Not-on-
FD2030‐22‐01267 Page 28 of 37
Contract” category shall be resolved using reversals of individual record control document numbers (RCDN) or may be accomplished utilizing a ‘bulk’ shipment action of RCDN.
NOTE: Contractor is responsible for all “Not‐on‐Contract” assets ensuring physical asset balances are reflected and CAV AF reporting actions occur within one (1) business day of occurrence.
2. CAV AF receipt or reporting actions will not be utilized for quality deficiency report (QDR) items, as there is a separate process and tracking mechanism for them.
3. All Contract Line Item Number (CLIN) repairable assets shall be receipted in CAV AF under Receipt
Type: On Contract (F). CAV AF generates an RCDN for each unit receipted and allows the reporter to assign a reference or serialization number for tracking purposes. Where no reference or serialization numbers are utilized,the oldest RCDNs (listed first) shall always be processed first. Any reversal actions shall be accomplished using the last RCDNs processed.
4. The “Complete Date” entered into CAV AF cannot be dated prior to the DD250 date entered in the same screen. Contractor will validate that the DD250 shipment number and date entered into CAVAF are accurate. This requirement is also applicable to Condition Code H (Condemned) only when specifically directed by the contract.
5. Proper usage of DD Form 1348‐1A, Issue Release/Receipt Document in relation to CAV AF reporting requirements.
a. Receipt Actions: Contractor’s reporter will use government issued shipment document numbers for CAV AF end item receipt transaction reporting only in the absence of missing DD Form 1348-1A or shipment document number. Contractors are not authorized to generate pseudo shipment document numbers for receipt transactions because this creates disconnects in shipment tracking within government inventory systems. Note: If the DD Form 1348-1A is missing or no shipment document number is available, contractors are to immediately contact Production Management Specialist (PMS), who will acquire government issued shipment document number from the Inventory Management Specialist (IMS).
b. Shipping Actions: DD Form 1348-1A shall be used as the shipping document for shipment transactions of all end items. A DD Form 1348-1A is also applicable to all Consolidated Serviceable Inventory/Consolidated Reparable Inventory (CSI/CRI) assets regardless of tracking or reporting purposes. A Material Inspection and Receiving
FD2030‐22‐01267 Page 29 of 37
Report, DD Form 250 or Requisition and Invoice/Shipping Document, DD Form 1149 are not authorized as a shipment document, and shall not accompany any material shipments on repair contracts. CAVAF provides a DD Form 1348-1A in a Portable Document Format (PDF). DD Form 1348-1A shipping documents will be prepared for each NSN shipment from contractor’s facility, regardless of destination.
The entire form, complete with bar coding, will be printed on a laser printer as specified under technical considerations. It is recommended the PDF be saved at the contractor’s facility prior to printing (note: The DD1348-1A forms are not saved/stored in CAV AF and cannot be reproduced by the system). The Contractor shall print three copies as required for shipping. Place one copy on the outside of the shipment container, one copy inside the shipment container, and retain the third copy for the contractor’s records. For end item shipments the DD Form 1348-1A shipment document number shall be comprised as one of the following actions:
i.Back to Depot Shipments:
(1) For a “single” unit NSN shipment, the default shipment document number will be the CAV AF record control document number (RCDN) of item being shipped.
(2) For “multiple” quantity shipments, it is recommended the CAV AF RCDN of the lead item of the shipment be used as the shipment document number.
ii. Ammended Shipping Instructions (ASI): Are used to divert material that is due-in from a contractor to a requisitioner. Government disposition instructions will provide a shipment document number to the contractor to be utilized for CAV AF shipment transaction reporting and the DD Form 1348‐1A.
c. In the event CAV AF system is inoperable or is on a scheduled downtime:
i. The DD Form 1348-1A shall be manually completed and generated (printed) by contractor, using the AFPUBS website.
ii. When CAV AF is again operational, the contractor shall resume with transactional reporting actions in a timely and accurate manner, including completing a DD Form 1348-1A (printing not required if manual DD1348-1A PDF file utilized) and the shipment process in CAV AF.
6. Upon contract expiration and/or becoming production complete, the contractor will complete a
100% physical inventory inspection. Any assets remaining at the facility within 30‐days must be noted in an email request to the contracting officer (CO) and PMS for disposition instructions by the government.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .