3573323_CDRL1_REPORT A001-A006.pdf
PDF 118 KB Posted
- Attached to
- F100 Blade compressor Rotor, 1st and 2nd Stage Federal contract opportunity
- Solicitation number
- FA812123R0027
About this file
This Contract Data Requirements List (CDRL) outlines six reporting requirements for a contract to provide maintenance and repair services for F100 engine components. The contractor must submit annual inventory reports of government property within seven days of the reporting period end, and report any shipping or packaging discrepancies within 48 hours using Standard Form 364. The contractor is also required to report end item transactions through the Commercial Asset Visibility system daily and submit DD250 forms electronically. Deficiency reports must be submitted as defined in TO 00-35D-54 using Standard Form 368. Monthly production status reports are due within five days of the previous month end and must include inventory totals for each repair location. Finally, the contractor must report technical manual errors or needed changes using Air Force Technical Order Form 22 as required. All reports are to be sent to the 421st Supply Chain Management Squadron at Tinker Air Force Base.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA812123R0027_______0003 new.pdf | ||
| FA812123R0027_______0002.pdf | ||
| FA812123R0027_______0001.pdf | ||
| GFP_.pdf | ||
| FA812123R0027 DID CDM Monthly Production Report.pdf | ||
| FA812123R0027 DID Tech Order Improvement Report and Reply.pdf | ||
| FA812123R0027 DID Deficiency Report.pdf | ||
| QR for CSI and CAI.pdf | ||
| FA812123R0027 DID CAVAF Reporting.pdf | ||
| 3688558_TRNSPDATA_REPORT.pdf | ||
| 3688557_PKGRQMT_REPORT.pdf | ||
| FA812123R0027.pdf | ||
| FA812123R0027 DID Govt Property Inventory Report.pdf | ||
| 22 01267 PWS.pdf | ||
| FA812123R0027 DID Shipping and Packaging.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
F100-PW-229 / Multiple Items
E. CONTRACT / PR NO.
FD20302201267
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Government Property (GP) Inventory Report
3. SUBTITLE
Annual Government Property Physical Inventory Report
4. AUTHORITY
DI-MGMT-80441D
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
421 SCMS/GUMAB
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ANNLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 04 OCT 2022DATE:
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Block 4:
a. All reports shall be submitted in the English Language.
2. Blocks 10, 11, 12, 13:
a. This report will be provided annually. Reporting Period is one year.
b. The data is representative of the Contractor's Internal Property Control System and shall be current as of the last day of the annual reporting period. If requested outside of an annual cadence, the data shall be current as of the date requested.
c. The report shall be delivered within seven (7) calendar days of the end of the first reporting period and annually thereafter, or within seven (7) calendar days of government request.
3. Block 9:
a. DISTRIBUTION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only, critical technology. (1 October 2022) Other requests for this document shall be referred to 848 SCMG/EN, Tinker Air Force Base, Oklahoma.
b. EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:
EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App.
2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.
c. DESTRUCTION NOTICE : For classified documents, follow the procedures IAW DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, and DoDM 5200.01 Vol 3, DoD Information Security Program: Protection of Classified Information, Enclosure 3, paragraph 17.
For unclassified, destroy by any method that will prevent disclosure of contents or reconstruction of the document IAW DoDI 5230.24 Enclosure 3, Paragraph 17.
4. Block 7, 14: Submit the Annual Government Property Physical Inventory Report to the following email address:
vicki.guthrie@us.af.mil
COORDINATORS:
See Block 16 0 1 0
0 1 015. TOTAL
Page 1 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 01 May 2023
PREVIOUS EDITION MAY BE USED.
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
05 OCT 2022
I. APPROVED BY
//ELECTRONICALLY SIGNED//
Guthrie, Vicki L
421 SCMS / GUMAB 405-736-4395 / 336-4395
J. DATE
04-OCT-22
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
F100-PW-229 / Multiple Items
E. CONTRACT / PR NO.
FD20302201267
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Report of Shipping (Item) and Packaging Discrepancy
3. SUBTITLE
SF-364 (ROD)
4. AUTHORITY
DI-MGMT-80503
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
421 SCMS/GUMAB
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
As Required
13. DATE OF SUBSEQUENT
SUBMISSION
As Required
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 04 OCT 2022DATE:
Changes to the office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.
Contractor will use WEBSDR to submit an electronic SF-364 (Standard Form) IAW TO 00-35D-54 upon discovery of discrepancies for items of supply received for: overage, wrong item, duplication of shipment, misdirected shipment, nonreceipt, damage, and/or improperly packaged shipment. If the contractor submits a SF-364, Block 12 of the SF-364 must contain the following information for the missing items:
1.) NSN
2.) Part Number 3.) Nomenclature 4.) Quantity missing 5.) Price for part replacement to include all administrative and labor costs.
Additionally, all tags that accompanied the component, (i.e. shipping labels, repairable tags, and condition tags will be scanned and attached to the ROD request.
DCMA/QAR and/or Plant Clearance Officer must validate the discrepancy upon unpacking of the component. SDR/ROD must be submitted to the PCO/PMS within 48 hours of inventory receipt/induction.
BLOCK 9: Distribution Statement D: Distribution authorized to the Department of Defense and US DOD Contractors only, Critical Technology. Other requests shall be referred to 848 SCMG/EN, Tinker Air Force Base, OK. (1 October 2022)
Control Warning Notice: Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC, Sec 2751 Et Seq) or the Export Administration Act of 1979, Title 50, USC, App 240 I Et Seq, as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.
DESTRUCTION NOTICE : For classified documents, follow the procedures IAW DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, and DoDM 5200.01 Vol 3, DoD Information Security Program: Protection of Classified Information, Enclosure 3, paragraph 17.
For unclassified, destroy by any method that will prevent disclosure of contents or reconstruction of the document IAW DoDI 5230.24 Enclosure 3, Paragraph 17.
BLOCK 11: Within 5 working days of discovery of discrepancy.
BLOCK 14: E-mail copies to addressees per attached Distribution Matrix. Report of Discrepancy shall be submitted to the material originator.
Note: It is permissible to submit paper SF 364s until access to WEBSDR is attained.
421 SCMS/GUMAB
3001 Staff Drive, Annex 4, Suite # 1AF1 115 Tinker Air Force Base, Oklahoma 73145 Attention : Vicki L. Guthrie
0 1 0
0 1 015. TOTAL
Page 2 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 01 May 2023
FOB DESTINATION
COORDINATORS:
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
05 OCT 2022
I. APPROVED BY
//ELECTRONICALLY SIGNED//
Guthrie, Vicki L
421 SCMS / GUMAB 405-736-4395 / 336-4395
J. DATE
04-OCT-22
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
F100-PW-229 / Multiple Items
E. CONTRACT / PR NO.
FD20302201267
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Commercial Asset Visibility (CAV) Reporting
3. SUBTITLE
CFM End Item Reporting
4. AUTHORITY
DI-MGMT-81838
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
See Block 16
6. REQUIRING OFFICE
421 SCMS/GUMAB
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
Seee Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 04 OCT 2022DATE:
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Block 5: Contract Reference: PWS and CAV AF Reporting Requirements Document.
2. Block 4: All reporting shall be submitted in the English Language.
3. Blocks 10, 11, 12, 13:
a. Date of first submission shall be within 24 hours following a supply or maintenance transaction, after the contract award date.
b. Contractor reporting requirements to CAV AF shall be submitted daily and/or within 24 hours of a supply or maintenance action occurrence IAW the CAV AF Reporting Requirements Document.
c. Data shall be current within 24 hours of the last End Item maintenance occurrence.
4. Blocks 7, 8, 14:
a. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF website or CICA XML.
b. The contractor shall submit a DD Form 250 (Material Inspection and Receiving Report) electronically via the Internet to iRAPT (WAWF) website address: https://wawf.eb.mil, using DODAAC FA8251. MARK FOR: Address in block 14A.
c. A Letter of Transmittal shall be submitted in the month the delivery order is completed, covering all reports transmitted for that order. Submit the Letter to the following email address: vicki.guthrie@us.af.mil
COORDINATORS:
See Block 16 0 1 0
0 1 015. TOTAL
Page 3 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 01 May 2023
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
05 OCT 2022
I. APPROVED BY
//ELECTRONICALLY SIGNED//
Guthrie, Vicki L
421 SCMS / GUMAB 405-736-4395 / 336-4395
J. DATE
04-OCT-22
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
F100-PW-229 / Multiple Items
E. CONTRACT / PR NO.
FD20302201267
F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Deficiency Report (DR)
3. SUBTITLE
DR
4. AUTHORITY
DI-PSSS-81535A
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
421 SCMS/GUMAB
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
ASREQ
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
As Required
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 04 OCT 2022DATE:
Block 11, 12, 13: As defined by T.O. 00-35D-54, submit a report whenever a material or quality deficiency occurs using SF 368 or equivalent.
Changes to office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.
COORDINATORS:
421 SCMS/GUMAB
3001 Staff Drive, Annex 4, Suite # 1AF1 915 Tinker Air Force Base, Oklahoma 73145 Attention : Vicki L. Guthrie
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
05 OCT 2022
I. APPROVED BY
//ELECTRONICALLY SIGNED//
Guthrie, Vicki L
421 SCMS / GUMAB 405-736-4395 / 336-4395
J. DATE
04-OCT-22
Page 4 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 01 May 2023
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
F100-PW-229 / Multiple Items
E. CONTRACT / PR NO.
FD20302201267
F. CONTRACTOR
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Contract Depot Maintenance (CDM) Monthly Production Report
3. SUBTITLE
CDM Production Monthly Status Report
4. AUTHORITY
DI-PSSS-81995A
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
421 SCMS/GUMAB
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
MTHLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 04 OCT 2022DATE:
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Block 4:
a. All reporting shall be submitted in the English Language.
b. The Contractor's CAV AF Reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities); shop floor, bond room and/or receiving/shipping docks, etc. for each repair.
c. The Contractor shall report by contract delivery order on all applicable categories, totals and on-hand balances, providing TABLE I (DI-PSSS-81995A) for EACH repair location, including subcontractor facilities, for the contracts maintenance occurrence actions during the reporting period.
d. The Contractor shall report on production, providing TABLE I (DI-PSSS-81995A) for EACH repair location, including subcontractor facilities, for which the contractor produced assets during the reporting period.
2. Blocks 10, 11, 12, 13:
a. The reports shall be provided monthly within 5 (five) business days of the previous month's last calendar date.
b. Reports shall continue to be submitted by the contractor unless the requirement is terminated by the assigned Contracting Officer at the request of the Program Manager (PM) and the Production Management Specialist (PMS).
c. The Final Report submitted following the final reporting period on the contract shall be annotated "Final Report".
3. Block 9:
a. DISTRIBUTION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only, critical technology. Other requests for this document shall be referred to 848 SCMG/EN, Tinker Air Force Base, Oklahoma. (1 October 2022)
b. EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:
EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App.
2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.
c. DESTRUCTION NOTICE : For classified documents, follow the procedures IAW DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, and DoDM 5200.01 Vol 3, DoD Information Security Program: Protection of Classified Information, Enclosure 3, paragraph 17.
For unclassified, destroy by any method that will prevent disclosure of contents or reconstruction of the document IAW DoDI 5230.24 Enclosure 3, Paragraph 17.
4. Block 7, 14: Submit the CDM Production Monthly Status Reports to the following email address:
vicki.guthrie@us.af.mil
See Block 16 0 1 0
0 1 015. TOTAL
Page 5 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 01 May 2023
COORDINATORS:
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
05 OCT 2022
I. APPROVED BY
//ELECTRONICALLY SIGNED//
Guthrie, Vicki L
421 SCMS / GUMAB 405-736-4395 / 336-4395
J. DATE
04-OCT-22
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
F100-PW-229 / Multiple Items
E. CONTRACT / PR NO.
FD20302201267
F. CONTRACTOR
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Technical Order Improvement Report and Reply
3. SUBTITLE
AFTO Form 22
4. AUTHORITY
DI-TMSS-80229D
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
421 SCMS/GUMAB
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
11. AS OF DATE
As Required
12. DATE OF FIRST
SUBMISSION
As Required
13. DATE OF SUBSEQUENT
SUBMISSION
As Required
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 04 OCT 2022DATE:
Changes to the office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.
This report shall be submitted IAW TO 00-5-1 using AFTO 22 for Air Force TOs. The contractor shall report when an error or improvement changes the meaning of the instructions or information contained in the technical directives where it may prevent mission performance. Also, this report shall be used by the contractor to indicate omissions of pertinent overhaul procedures in TOs or desired changes to TO date.
Block 9: Distribution Statement D: Distribution authorized to the Department of Defense and US DOD Contractors only, critical technology. (1 October 2022) Other requests shall be referred to 848 SCMG/EN, Tinker Air Force Base, Oklahoma.
Control Warning Notice: Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC, Sec 2751 Et Seq) or the Export Administration Act of 1979, Title 50, USC, App 240 I Et Seq, as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.
DESTRUCTION NOTICE : For classified documents, follow the procedures IAW DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, and DoDM 5200.01 Vol 3, DoD Information Security Program: Protection of Classified Information, Enclosure 3, paragraph 17.
For unclassified, destroy by any method that will prevent disclosure of contents or reconstruction of the document IAW DoDI 5230.24 Enclosure 3, Paragraph 17.
COORDINATORS:
421 SCMS/GUMAB
3001 Staff Drive, Annex 4, Suite 1AF1 115 Tinker Air Force Base, Oklahoma 73145 Attention : Vicki L. Guthrie
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
05 OCT 2022
I. APPROVED BY
//ELECTRONICALLY SIGNED//
Guthrie, Vicki L
421 SCMS / GUMAB 405-736-4395 / 336-4395
J. DATE
04-OCT-22
Page 6 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 01 May 2023
File details come from the government source that posted it. Updated .