This document outlines first article testing requirements for a federal contract solicitation. The solicitation is for the procurement of three F100 Lock Rings, Turbine N (NSN 2840016195780NZ) to be used in F100 series turbine engines. First article samples will undergo inspection and testing at the contractor's facility per the specifications in LPF-QAR-003, with one sample subject to destructive testing. The first article submission is due within 30 calendar days of award with notification of testing 10 days prior. The cognizant Air Force engineering authority must approve the first article test plan and will evaluate the test results. Accepted first article samples will be incorporated into delivered production quantities, while non-conforming samples will be condemned and disposed of by the contractor. First article testing is required for all offerors except the prime contractor, Pratt & Whitney, to verify part quality and compliance with the technical data package.

View the file

Other files for this federal contract opportunity

Other files attached to F100 Lock Ring, Turbine N, newest first.
File Type Posted
FA Test_Plans.pdf PDF
3703513_TRNSPDATA_REPORT.pdf PDF
3703512_PKGRQMT_REPORT.pdf PDF
3689402_QUALRQMT.pdf PDF
2901454_QUALRQMT.pdf PDF
3030906_QAIRQMT_REPORT.pdf PDF
1573896_ITMDESC_REPORT.pdf PDF
2835331_UIIEC_REPORT.pdf PDF
Surplus_Material_Eval.pdf PDF
DID_Test_Inspect.pdf PDF
3709067_BIDSET_REPORT.pdf PDF
2901456_SMW_REPORT.pdf PDF
FA812123R0026.pdf PDF
3568211_CDRL1_REPORT.pdf PDF
2986513_EDL_REPORT.pdf PDF
DID_FA.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST ARTICLE REQUIREMENTS 1. DATE

10 MAY 2023(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

77445 / 4088463

4. NSN

2840016195780NZ

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 3 UNIT(S) OF LOT / ITEM 1

AND WILL BE: PART OF PRODUCTION QUANTITY X IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

X REQUIRED NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

X REQUIRED NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A. X CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

IDENTIFIED IN PART DRAWING, SUB-TIER DRAWINGS (IF AN ASSEMBLY), AND SPECIFICATIONS IDENTIFIED THEREIN.

B. The detailed technical requirements for First Article approval tests are contained in

BLOCK 12 OF THIS FORM AND LPF-QAR-003

(Cite Spec and Para number)

C. X TEST PLAN REQUIRED

Number of days for government approval / disapproval 30 days.

D. Contractor's notification to ACO and

PCO

(Requesting Activity) of test time and location due 10 days prior to start of testing.

E. X TEST REPORT REQUIRED

(1) Forwarded to

AFLCMC/LZPED

FA Monitor DODAAC FA8111

3001 Staff Drive, STE 1AB85A

TINKER AFB, OK 73145-3041

(2) Government written notice of approval / disapproval due 60 days after receipt of contractor's report.

F. FIRST ARTICLE DELIVERY

(1) Due within calendar days from date contract.

(2) Notify calendar days prior to shipment.

(3) Delivered to government at

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$2,500.0000

Page 1 of 3AFMC IMT 260, 20020830, V-3 Version 5Generated by PRPS using Jasper Reports on 31 May 2023

10 MAY 2023(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

10. DISPOSITION OF FIRST ARTICLES

Approved First Articles will be forwarded to

(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

Disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

X Other Disposition:

See block 12 of this form

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. X Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, X DoD, Air Force.

b. X Offerors currently in production of the same or similar article for a Government, X DoD, Air Force contract and who have received First Article approval under the existing contract.

c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, X DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. X Provided not more than 36 months have elapsed since completion of the contract.

e. First Article testing will not be waived.

f. X See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

12. REMARKS

Fabrie, Cyle RNAME: 15 MAY 2023DATE:

Block 3: Part Number: 4088463

Block 9: additional information for part C&E:

C. 1) DD Form 1423 ELIN:

2) Deliver due _____ calendar days from date of contract

E. 1) DD Form 1423 ELIN:

2) Due ______ calendar days from date of contract

Block 5. First Article Quantity is 3 parts:

-2 parts will be part of production quantity -1 part will be in addition to production quantity

Block 9.B First article test requirements shall be per LPF-QAR-003 and the following:

-a. All three first articles shall be inspected in accordance with the requirements of paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPF-QAR-003.

-b. The assembly detail part numbers (if an assembly), shall be inspected per paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPF-QAR-003 prior to assembly.

-c. After completion of inspections per 9.B.a above, one article shall be destructively tested/evaluated in accordance with the requirements of paragraph 3.6 of LPF-QAR-003.

-NOTE: Deliveries (FAT test plan and Reports) are preferably submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format.

Block 10. Disposition of First Articles:

-1 First Article part will be destructively tested. This item will be condemned and disposed of at vendor's facility.

Page 2 of 3AFMC IMT 260, 20020830, V-3 Version 5Generated by PRPS using Jasper Reports on 31 May 2023

10 MAY 2023(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

Block 11. The cognizant Government engineering authority shall be the final authority for determining if a contractor meets the conditions of waiver identified in 11.a and/or 11.c.

First article testing is waived if the offeror is the prime contractor, Pratt & Whitney.

This is a critical part used in the F100 series turbine engine. Poor quality parts will have an adverse effect on mission capability and system safety. For this reason, First Article Testing is required to insure first time manufacturers or manufacturers that have not produced the item within three years manufacture parts in accordance with the drawing and specification requirements.

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING TEST

(Name, Organization, Phone)

Fabrie, Cyle R

AFLCMC / LP S E A

405-582-5574

852-5574

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

Fabrie, Cyle R

AFLCMC / LP S E A

405-582-5574

852-5574

Page 3 of 3AFMC IMT 260, 20020830, V-3 Version 5Generated by PRPS using Jasper Reports on 31 May 2023

File details come from the government source that posted it. Updated .