3568211_CDRL1_REPORT.pdf

PDF 98 KB Posted

Attached to
F100 Lock Ring, Turbine N Federal contract opportunity
Solicitation number
FA812123R0026
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This document contains two Contract Data Requirements Lists (CDRLs) related to a federal solicitation for a F100 lock ring turbine component. The CDRLs require the contractor to submit a First Article Qualification Test Plan and Procedures within 30 calendar days of award, including inspection plans to verify drawing, material, and manufacturing requirements. The contractor must also submit a Test/Inspection Report within 120 calendar days of government approval of the test plan, documenting satisfaction of all drawing, inspection, material, and manufacturing requirements. Deliverables shall be submitted electronically in PDF format. The solicitation is issued by the Department of the Air Force Materiel Command Air Force Sustainment Center for F100 lock ring turbine components (Solicitation Number FA812123R0026). Distribution of the deliverables is unlimited.

View the file

Other files for this federal contract opportunity

Other files attached to F100 Lock Ring, Turbine N, newest first.
File Type Posted
3689402_QUALRQMT.pdf PDF
2901454_QUALRQMT.pdf PDF
3030906_QAIRQMT_REPORT.pdf PDF
1573896_ITMDESC_REPORT.pdf PDF
2835331_UIIEC_REPORT.pdf PDF
Surplus_Material_Eval.pdf PDF
DID_Test_Inspect.pdf PDF
3709067_BIDSET_REPORT.pdf PDF
2901456_SMW_REPORT.pdf PDF
FA812123R0026.pdf PDF
3698873_FA_REPORT.pdf PDF
2986513_EDL_REPORT.pdf PDF
DID_FA.pdf PDF
FA Test_Plans.pdf PDF
3703513_TRNSPDATA_REPORT.pdf PDF
3703512_PKGRQMT_REPORT.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100 P/N 4088463

E. CONTRACT / PR NO.

FD20302300240

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

First Article Qualification Test Plan and Procedures

3. SUBTITLE

NSN: 2840016195780NZ Noun: Synchronizing Ring

4. AUTHORITY

DI-NDTI-81307A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

AFLCMC/LPSAA

7. DD 250 REQ

SD

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

1 XTIME

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

n/a

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Litchfield, Kenzi JNAME: 03 OCT 2022DATE:

Block 9: DIST STATEMENT REQUIRED: Distribution Statement A: Approved for public release; distribution is unlimited. Controlling DoD office is 848 SCMG/421 GUEA.

Disposal and destruction notices: Dispose of by putting it in a recycle container or regular trash receptacle.

Block 14: Deliveries shall be submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format.

Contractor must provide a plan to ensure that all drawing requirements are met on each first article. The plan should include the equipment and facilities utilized to verify all drawing requirements. As a minimum, the following information is required.

a. A list of all drawing dimension, tolerances and the equipment utilized to verify each dimension. An actual drawing should be submitted to correlate with the dimension list.

b. A plan to verify that all non-destructive inspections are met.

c. A plan to verify that all visual inspection requirements are met.

d. A plan to verify material properties to include mechanical properties, metallurgical properties and chemical compositions.

e. A plan to verify that all significant manufacturing processes are performed by sources that are currently approved/ certified by the OEM (P&W) or the CEA (AFLCMC/LPSAA).

f. A plan to verify that all forging or casting sources are currently approved/certified by the OEM (P&W) or the CEA (AFLCMC/LPSAA) if applicable. Guidelines for first article test plans are contained within LPF-QAR-003, attached.

A government representative must coordinate on the first article test plan. The first article test plan shall be received 30 calendar days from the date of contract.

Contractor will include any QAR findings relative to the test report with the final test report submitted to

AFLCMC/LZPED.

COORDINATORS:

AFLCMC/LZPED

3001 Staff Dr, Ste 1AB 85A Tinker AFB, OK 73145-3041 Attn: FA Monitor

0 2 0

0 2 015. TOTAL

G. PREPARED BY

Litchfield, Kenzi J

421 SCMS / GUMAC

405-582-1884

H. DATE

05 OCT 2022

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Fabrie, Cyle R

AFLCMC / LPSEA 405-582-5574 / 852-5574

J. DATE

05-OCT-22

Page 1 of 2DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 31 May 2023

PREVIOUS EDITION MAY BE USED.

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100 P/N 4088463

E. CONTRACT / PR NO.

FD20302300240

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Test/Inspection Report

3. SUBTITLE

NSN: 2840016195780NZ Noun: Synchronizing Ring

4. AUTHORITY

DI-NDTI-80809B/T

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

AFLCMC/LPSAA

7. DD 250 REQ

SD

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

1 XTIME

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

n/a

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Litchfield, Kenzi JNAME: 03 OCT 2022DATE:

Block 9: Distribution Statement A: Approved for public release; distribution is unlimited. Controlling DoD office is 848

SCMG/421 GUEA.

Disposal and destruction notices: Dispose of by putting it in a recycle container or regular trash receptacle.

Block 14: Deliveries shall be submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format.

Contractor format acceptable unless otherwise defined by applicable Data Item Description (DID).

The first article test report shall satisfy all requirements in the first article test plan. All drawing requirements must be satisfied including dimensions, visual inspections, non-destructive inspections (NDIs), manufacturing processes and material requirements. The test report shall indicate that any sources used to perform significant manufacturing processes are approved/certified by the OEM (P&W) or the CEA (AFLCMC/LPSAA).

A copy of the part process sheets shall be provided also. A government representative must coordinate on the test report.

Guidelines for the test reports are contained within LPF-QAR-003 Rev E, attached.

The first article test reports shall be received at OC-ALC/ENRS 120 calendar days from the date of government approval of test plan.

Contractor will include any QAR findings relative to the test report with the final test report submitted to

AFLCMC/LZPED.

COORDINATORS:

AFLCMC/LZPED

3001 Staff Dr, Ste 1AB 85A Tinker AFB, OK 73145-3041 Attn: FA Monitor

0 2 0

0 2 015. TOTAL

G. PREPARED BY

Litchfield, Kenzi J

421 SCMS / GUMAC

405-582-1884

H. DATE

05 OCT 2022

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Fabrie, Cyle R

AFLCMC / LPSEA 405-582-5574 / 852-5574

J. DATE

05-OCT-22

Page 2 of 2DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 31 May 2023

PREVIOUS EDITION MAY BE USED.

File details come from the government source that posted it. Updated .