FA8121-16-R-0001_Responses_to_Questions_16_November_2015.docx

DOCX document 15 KB Posted

Attached to
Maintenance, Repair, and Rebuilding of Equipment
Solicitation number
FA8121-16-R-0001
Issued by

About this file

Responses to Questions 16 Nov 15

View the file

Other files

File Type Posted
T56_3.5_FBO_Questions_and_Responses_10_Dec_15_-_Complete_Log.xls XLS spreadsheet
T56_3.5_FBO_Questions_and_Responses_08_Dec_15_-_Complete_Log.xls XLS spreadsheet
FA812116R0001_______0004_A00Q_CDRL.pdf PDF
FA812116R0001_______0004_PWS_EXHIBIT_A.xls XLS spreadsheet
FA812116R0001_______0004.RTF RTF text file
FA812116R0001_______0004_PWS.docx DOCX document
T56_3_5_Pre-Proposal_Vendor_Telecom_3_5_Overview_and_SAR_Overview_4_Dec_15.pdf PDF
FA812116R0001_______0003_PWS.docx DOCX document
FA812116R0001_______0003.RTF RTF text file
T56_3_5_QA_for_Pre-Proposal_Conference_4_Dec_15_(2).pdf PDF
T56_3_5_Pre-Proposal_Vendor_Telecom_Agenda_4_Dec_15.docx DOCX document
Pre-Proposal_Conference_04_December_2015.docx DOCX document
FA8121-16-R-0001_Responses_to_Questions_20_November_2015.docx DOCX document
FA812116R0001_______0002.RTF RTF text file
FA812116R0001_______0002_PWS_EXHIBIT_A.xls XLS spreadsheet
FA812116R0001_______0002_PWS.docx DOCX document
FA8121-16-R-0001_Responses_to_Questions_17_November_2015.docx DOCX document
FA812116R0001_______0001.RTF RTF text file
FA812116R0001_PWS.docx DOCX document
FA812116R0001_PWS_ATTACHMENt_B.docx DOCX document
FA812116R0001_PWS_ATTACHMENT_E.docx DOCX document
FA812116R0001_PWS_ATTACHMENT_H-1.pdf PDF
FA812116R0001_PWS_ATTACHMENT_G_GFE_NOTICE.docx DOCX document
FA812116R0001_PWS_ATTACHMENT_A.docx DOCX document
FA812116R0001_PWS_ATTACHMENT_D.docx DOCX document
FA812116R0001_APPENDIX_B.docx DOCX document
FA812116R0001_PWS_ATTACHMENT_I_2.docx DOCX document
FA812116R0001_PWS_ATTACHMENT_F_GFM_LISTING.xlsx XLSX spreadsheet
FA812116R0001_APPENDIX_C.xlsx XLSX spreadsheet
FA812116R0001_PWS_ATTACHMENT_H.pdf PDF
FA812116R0001_GFP_Non_Serialized_Items_List.pdf PDF
FA812116R0001_Transportation.pdf PDF
FA812116R0001_PWS_ATTACHMENT_C.xlsx XLSX spreadsheet
FA812116R0001_CDRL.pdf PDF
FA812116R0001_PWS_ATTACHMENT_F.docx DOCX document
FA812116R0001_Packaging.pdf PDF
FA812116R0001_PWS_ATTACHMENT_I_1.pdf PDF
FA812116R0001.RTF RTF text file
FA812116R0001_APPENDIX_D.pdf PDF
FA812116R0001_PWS_ATTACHMENT_G_GFE_LISTING.xlsx XLSX spreadsheet
FA812116R0001_GFP_Serialized_Items_List.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question: Since the contractor will be required to submit an all-inclusive firm fixed price for each overhaul line item, and in order for the contractor to properly cost the expected replacement value, will or can the Government provide the details on the expected incoming units Life Limited Parts (times / cycles for wheels and spacers).

RESPONSE: The specific module serial numbers have not been identified as this time.

Question: Will the compressor and turbine sets provided for induction include the full set of accessories? Or, will they be provided in what is normally called a bare configuration?

RESPONSE: The compressor and turbine sets will be in the USAF module configuration. This is defined by the 2J-T56-54 ILLUSTRATED PARTS BREAKDOWN and 2J-1-24 EQUIPMENT COMPRISING A COMPLETE BASIC GAS TURBINE ENGINE. The modules do not include a full set of accessories. The following is provided for clarification purposes and is not intended to be complete. Please refer to the previously referenced manuals.

The compressor module includes the following accessories: anti-ice system, main pressure scavenge pump, external scavenge oil pump, left and right hand wiring harness, ignition relay, fuel enrichment valve, manifold drain valve, fuel manifolds, and fuel nozzles. The compressor module does not include any other accessory items attached to the accessory gearbox other than those identified in the prior sentence.

The turbine module contains the following accessories: left and right hand thermocouple harnesses, thermocouples, thermocouple block. It does not include the rear scavenge pump and pump support, nor the combustion section.

Question: The RFP requires overhaul of compressor and turbine modules and states in the PWS the units will be in “overall serviceable” condition. Are we correct to assume the incoming units were in operational condition when removed for this program?

RESPONSE: Compressor and Turbine modules sent in are in reparable condition and shall be overhauled / repaired along with installing the new 3.5 kit hardware items to render the overall module to serviceable condition.