DID_MGMT_80368A.pdf

PDF 19 KB Posted

Attached to
B-2 Radar Antenna/Circuit Card Repair Federal contract opportunity
Solicitation number
FA8119-15-R-0028
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

DID 80368

View the file

Other files for this federal contract opportunity

Other files attached to B-2 Radar Antenna/Circuit Card Repair, newest first.
File Type Posted
REDACTED_JA_15-00003_Redacted_v2.pdf PDF
FA811915R0028_______0002.RTF RTF text file
FA811915R0028_______0002_AppendixB_Scheduled_GFE_13Aug15.pdf PDF
FA811915R0028_______0002_PWS_13Aug15.docx DOCX document
FA811915R0028_______0002_AppxB_13Aug15.docx DOCX document
FA811915R0028_______0001_AppxB_14July15.docx DOCX document
FA811915R0028_______0001_AppendixB_Reparables_14JULY15.pdf PDF
FA811915R0028_______0001_AppendixB_Scheduled_GFE_14JULY15.pdf PDF
FA811915R0028_______0001_PWS_14July15.docx DOCX document
FA811915R0028_______0001.RTF RTF text file
DID81373.pdf PDF
AppxB_12June15.docx DOCX document
CAVAF SOW.docx DOCX document
DID_MISC_81832.pdf PDF
AppendixB_Scheduled_GFE.pdf PDF
DID_81250A.pdf PDF
TRANSPORTATION DATA.pdf PDF
PACKAGING REQUIREMENTS.pdf PDF
1337170_CDRL1_REPORT.pdf PDF
SPI_Drawing.pdf PDF
DID_ALCC_81220A.pdf PDF
DICMAN80639.pdf PDF
SPI_F_01_516_5536.doc DOC document
DID_80501.pdf PDF
DID_81249A.pdf PDF
PWS06192015.docx DOCX document
DID_SESS_81656.pdf PDF
DD254Draft.docx DOCX document
QASP.doc DOC document
DID_81249A.pdf PDF
DID_ALCC_81220A.pdf PDF
GFMLISTING_13MAY15.pdf PDF
DID_SESS_81656.pdf PDF
DD254Draft.docx DOCX document
FA811915R0028.pdf PDF
1337170_CDRL1_REPORT.pdf PDF
SPI_F_01_262_1930.doc DOC document
SPI_F_01_516_5536.doc DOC document
DID__MGMT_81634B.pdf PDF
DID_80501.pdf PDF
DID_MGMT_80368A.pdf PDF
PWSV8.doc DOC document
DID_81250A.pdf PDF
SPI_Drawing.pdf PDF
DID_DI_QCIC_80798B.pdf PDF
TRANSPORTATION_DATA.pdf PDF
APPENDIX_B.docx DOCX document
DID81373.pdf PDF
PACKAGING_REQUIREMENTS.pdf PDF
DICMAN80639.pdf PDF
Show all 50

B-2 Radar Antenna/Circuit Card Repair has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: Status Report

Number: DI-MGMT-80368A Approval Date: 30 OCT 2006 AMSC Number: 7619 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/DA02 Applicable Forms: N/A

Use/relationship:

The Status Report documents the status of contractor effort towards achieving contract objectives. It identifies accomplishments to date and difficulties encountered, and compare the status achieved to planned goals and the resources expended. It is used by the Government to monitor and evaluate contractor performance.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

It is not intended that all requirements herein should be applied to every program.

Portions of the DID are subject to tailoring by deletion depending on the specific status reporting requirements of the project.

This DID is related to DI-FNCL-80331, Funds and Man-Hour Expenditure Report which can be used in conjunction with this report if paragraph 3.2.3 below is deleted.

This DID supersede DI-MGMT-80368.

Requirements:

1. Reference documents. None.

2. Format. The Status Report shall be in contractor format.

2.1 Identification. The data indicated below shall be contained on a title page or on the first page of the report.

a. Title/identification of the system/component/program/project.

DI-MGMT-80368A

b. Type of report (e.g., monthly, interim, final).

c. Period covered by the report.

d. Contract number.

e. Preparing activity or contractor’s title.

f. Security classification, when required.

g. Distribution Statement.

2.2 Page size. The report shall be on 8 ½ by 11 inch (metric A4) paper.

3. Content. The report shall contain the following:

3.1 Summary. The summary shall include a brief statement of the overall project status , covering the accomplished technical activities and development, objectives of efforts, summary results of efforts, identification of major problems/deficiencies with impact, and recommended solutions.

3.2 Body of report. The Status Report shall contain the following items, where applicable:

3.2.1 Milestone/task status. The status of each milestone/task as defined by the statement of work or contract, as applicable:

a. A statement as to whether or not the program/project/task is on schedule; if not, the effort planned to meet the schedule shall be indicated. Include an overall status of each milestone, task, or unit of work. Include update schedule sheets, milestone charts, or task synopsis sheets identifying phase of task and percentage of completion of each task, technical instruction, or order.

b. A comparison of achieved end-product performance capabilities projected against contract baseline values, requirements, or allocations.

c. Effort expended on each task to date, and a brief description of technical developments and accomplishments.

d. Key dates in any testing program and description of tests performed and significant test results. If applicable, a description of the amount and type of down time on the equipment or system under test.

e. A list of all designs completed and a brief description of each item. For designs in process, provide estimated dates for design and drawing completion.

f. A narrative of outstanding problems existing as of the previous status report, and their resolution status. 2

DI-MGMT-80368A

g. New problem areas encountered or anticipated, their effect on the overall work effort/project and steps being taken to remedy problem situations.

h. Significant results of conferences, trips, or directives for the Contracting officer’s representatives.

i. Any other information which may cause significant changes in the program schedule.

3.2.2 Future plans. Summary of future plans, recommendations and proposals both for the next reporting period and for any long term plans.

3.2.3 Itemized man-hours and costs. Itemized man-hour and cost expenditure incurred for the reporting period by category and task, total contractual expenditures, and funds remaining as of the reporting date.

3.2.4 Contract deliveries status. The status of each deliverable end item, including data deliverables, as required by the contract. Provide item and contract identification, shipping/transmittal data, acceptance status, security classification, and schedule due date information.

3.2.5 Report preparer. Name of person(s) preparing report and telephone number(s).

3.3 Appendices. Appendices where applicable, for tables, references, charts, or other descriptive material. Each appendix shall be identified and referenced in the appropriate area of the report.

4. END OF DI-MGMT-80368A