1337170_CDRL1_REPORT.pdf

PDF 45 KB Posted

Attached to
B-2 Radar Antenna/Circuit Card Repair Federal contract opportunity
Solicitation number
FA8119-15-R-0028
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

CDRL LISTING

View the file

Other files for this federal contract opportunity

Other files attached to B-2 Radar Antenna/Circuit Card Repair, newest first.
File Type Posted
FA811915R0028_______0002.RTF RTF text file
FA811915R0028_______0002_AppendixB_Scheduled_GFE_13Aug15.pdf PDF
FA811915R0028_______0002_PWS_13Aug15.docx DOCX document
FA811915R0028_______0002_AppxB_13Aug15.docx DOCX document
FA811915R0028_______0001_AppxB_14July15.docx DOCX document
FA811915R0028_______0001_AppendixB_Scheduled_GFE_14JULY15.pdf PDF
FA811915R0028_______0001_PWS_14July15.docx DOCX document
FA811915R0028_______0001.RTF RTF text file
FA811915R0028_______0001_AppendixB_Reparables_14JULY15.pdf PDF
TRANSPORTATION DATA.pdf PDF
PACKAGING REQUIREMENTS.pdf PDF
SPI_Drawing.pdf PDF
DID81373.pdf PDF
AppxB_12June15.docx DOCX document
CAVAF SOW.docx DOCX document
DID_MISC_81832.pdf PDF
AppendixB_Scheduled_GFE.pdf PDF
DID_81250A.pdf PDF
DD254Draft.docx DOCX document
DID__MGMT_81634B.pdf PDF
DMSMS_PLAN_FOR_PMS.pdf PDF
FA811915R0028.pdf PDF
DID_DI_QCIC_80798B.pdf PDF
QASP.doc DOC document
SPI_F_01_262_1930.doc DOC document
DID_ALCC_81220A.pdf PDF
DID_MGMT_80368A.pdf PDF
DICMAN80639.pdf PDF
SPI_F_01_516_5536.doc DOC document
DID_80501.pdf PDF
FA811915R0028.pdf PDF
1337170_CDRL1_REPORT.pdf PDF
SPI_F_01_262_1930.doc DOC document
SPI_F_01_516_5536.doc DOC document
DID__MGMT_81634B.pdf PDF
DID_80501.pdf PDF
QASP.doc DOC document
DID_81249A.pdf PDF
DID_ALCC_81220A.pdf PDF
GFMLISTING_13MAY15.pdf PDF
DID_SESS_81656.pdf PDF
DD254Draft.docx DOCX document
APPENDIX_B.docx DOCX document
DID81373.pdf PDF
PACKAGING_REQUIREMENTS.pdf PDF
DICMAN80639.pdf PDF
DID_MISC_81832.pdf PDF
CAVAF_SOW.docx DOCX document
DID_MGMT_80368A.pdf PDF
PWSV8.doc DOC document
Show all 50

B-2 Radar Antenna/Circuit Card Repair has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of11 16

FD20301500003B2 RAD SWITCHING GROUP (MANY NSN'S)

A001

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

Conference Agenda Meeting Agenda

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-ADMIN-81249A CET Paragraph 4.3.3 424 SCMS/GUME

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

DD

8. APP Code:

N/A A

11. As of Date: 13. Date of Subsequent Submission:

SEE BLOCK 16

SEE BLOCK 16

1 XTIME

a. Addressee:

b. Copies:

Final

Draft Reg Repro

SEE BLOCK 16

G. Prepared By: H. Date I. Approved By: J. Date:

424 SCMS/GUME

3001 Staff Drive Tinker AFB, OK 73145-3041

ATTN: TRYELL WOLFE

0 1 0

15. Total: 0 1 0

16. Remarks:

NAME:

NAME:

Hudson, Connie J

Zilar, Dale N

DATE:

DATE:

20 MAR 2014

15 APR 2013

Block 11, 12 &13: Due one week prior to meetings.

Contractors's format is acceptable.

See PWS for more details.

Block 11, 12 &13: Due one week prior to meetings.

Contractors's format is acceptable.

See PWS for more details.

Hudson, Connie J

424 SCMS / GUBAA

405-736-7179

24 MAR 2014 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMC

WOLFE.TYRELL.J.1170965724

405-736-3388 / 338-8349

24 MAR 2014

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of21 16

A002

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

CONFERENCE MINUTES DI-ADMN-81250A N/A

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-ADMIN-81250 N/A 424 SCMS/GUME

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

N/A

8. APP Code:

N/A N/A

11. As of Date: 13. Date of Subsequent Submission:

SEE BLOCK 16

N/A

See Block 16

a. Addressee:

b. Copies:

Final

Draft Reg Repro

SEE BLOCK 16

G. Prepared By: H. Date I. Approved By: J. Date:

424 SCMS/GUME

3001 Staff Drive Tinker AFB, OK 73145-3041

ATTN: TRYELL WOLFE

0 1 0

15. Total: 0 1 0

16. Remarks:

NAME: Hudson, Connie J DATE: 20 MAR 2014

7.1 THIS DATA ITEM DESCRIPTION CONTAINS THE FORMAT AND CONTENT

PREPARATION INSTRUCTIONS FOR THE DATA PRODUCT GENERATED BY THE

SPECIFIC AND DISCRETE TASK REQUIREMENT AS DELINEATED IN THE CONTRACT.

7.2 THIS DID SUPERSEDES DI-ADMN-81250.

Hudson, Connie J

424 SCMS / GUBAA

405-736-7179

24 MAR 2014 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMC

WOLFE.TYRELL.J.1170965724

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of31 16

A003

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

MEETINGS AND CONFERENCES N/A

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-ADMIN-81373 N/A 424 SCMS/GUME

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

N/A

8. APP Code:

N/A N/A

11. As of Date: 13. Date of Subsequent Submission:

N/A

N/A

MTHLY

a. Addressee:

b. Copies:

Final

Draft Reg Repro N/A

G. Prepared By: H. Date I. Approved By: J. Date:

424 SCMS/GUME

3001 Staff Drive Tinker AFB, OK 73145-3041

ATTN: TRYELL WOLFE

0 1 0

15. Total: 0 1 0

16. Remarks:

NAME: Hudson, Connie J DATE: 20 MAR 2014

REPORT SHALL BE SUBMITTED FOR THE MONTH INITIAL DELIVERY ORDER OR

ASSETS ARE RECEIVED AFTER CONTRACT AWARD. ALL REPORTS SHALL BE

MAILED SO AS TO ARRIVE AT 424 SCMS/GUME NO LATER THEN THE TENTH (10TH)

CALENDAR DAY OF THE MONTH FOLLOWING THE REPORTING PERIOD.

Hudson, Connie J

424 SCMS / GUBAA

405-736-7179

24 MAR 2014 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMC

WOLFE.TYRELL.J.1170965724

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of41 16

A004

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

END ITEM (EI) PRODUCTION AND COMPONENT ITEM (CI)

CONSUMPTION REPAIR HISTORY DATA

N/A

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-ALSS-81220A N/A 424 SCMS/GUME

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

NO

8. APP Code:

N/A A

11. As of Date: 13. Date of Subsequent Submission:

SEE BLOCK 16

N/A

ANNLY

a. Addressee:

b. Copies:

Final

Draft Reg Repro

SEE BLOCK 16

424 SCMS/GUME

3001 Staff Drive Tinker AFB, OK 73145-3041

ATTN: TYRELL WOLFE

0 1 0

15. Total: 0 1 0

16. Remarks:

NAME:

NAME:

Hudson, Connie J

Zilar, Dale N

DATE:

DATE:

20 MAR 2014

08 MAR 2013

BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION

UTILIZING WAWF. A COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL

BE SUBMITTED THROUGH WAWF IN ORDER TO RECEIVE PAYMENT FOR DATA

REPORTS.

BLOCK 11: TO BE DETERMINED

BLOCK 12: TO BE SUBMITTED 1 YEAR AFTER CONTRACT AWARD DATE AND 1 YEAR

AFTER ANY OPTION YEAR AWARD DATES.

CONTRACTOR FORMAT IS ACCEPTABLE.

DID REQUIREMENTS ARE NOT TAILORED.

DELIVERY CANNOT BE DEFERRED.

BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION

UTILIZING WAWF. A COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL

BE SUBMITTED THROUGH WAWF IN ORDER TO RECEIVE PAYMENT FOR DATA

REPORTS.

BLOCK 11: TO BE DETERMINED

BLOCK 12: TO BE SUBMITTED 1 YEAR AFTER CONTRACT AWARD DATE AND 1 YEAR

AFTER ANY OPTION YEAR AWARD DATES.

CONTRACTOR FORMAT IS ACCEPTABLE.

DID REQUIREMENTS ARE NOT TAILORED.

DELIVERY CANNOT BE DEFERRED.

COORDINATORS:

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of51 16

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

G. Prepared By: H. Date I. Approved By: J. Date:

Hudson, Connie J

424 SCMS / GUBAA

405-736-7179

24 MAR 2014 //DIGITALLY SIGNED//

424 SCMS / GUMC

WOLFE.TYRELL.J.1170965724

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of61 16

A005

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

Engineering Change Proposal Engineering Change Proposal

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-CMAN-80639C PWS para 4.6 424 SCMS/GUME

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

DD

8. APP Code:

A C

11. As of Date: 13. Date of Subsequent Submission:

N/A

N/A

ASREQ

a. Addressee:

b. Copies:

Final

Draft Reg Repro N/A

424 SCMS/GUME

3001 Staff Drive Tinker AFB, OK 73145-3041

ATTN: TYRELL WOLFE

0 1 0

15. Total: 0 1 0

16. Remarks:

NAME:

NAME:

Hudson, Connie J

Jones, Michael C

DATE:

DATE:

19 MAR 2014

05 MAR 2013

BLK 8: The Government will have 10 days after receipt for approval or disapproval. The contractor shall have 5 days after receipt of the Government comments to resubmit.

BLK 9: DISTRIBUTION STATEMENT C: Distribution authorized to US Government agencies and their contractors. Other requests for this document shall be referred to AFLCMC/WNZEB.

BLK 14: Documents shall be provided to the following personnel via electronic media utilizing standard Microsoft Office applications.

424 SCMS/GUEA

3001 Staff Drive Tinker AFB, OK 73145-3041

ATTN: TYRELL WOLFE

BLK 8: The Government will have 10 days after receipt for approval or disapproval. The contractor shall have 5 days after receipt of the Government comments to resubmit.

BLK 9: DISTRIBUTION STATEMENT C: Distribution authorized to US Government agencies and their contractors. Other requests for this document shall be referred to AFLCMC/WNZEB.

BLK 14: Documents shall be provided to the following personnel via electronic media utilizing standard Microsoft Office applications.

PM: Michael.Slyfield3@robins.af.mil PCO: Mandy.Mathews@robins.af.mil EN: Carol.Hernandez@robins.af.mil

COORDINATORS:

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of71 16

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

G. Prepared By: H. Date I. Approved By: J. Date:

Hudson, Connie J

424 SCMS / GUBAA

405-736-7179

24 MAR 2014 //DIGITALLY SIGNED//

424 SCMS / GUMC

WOLFE.TYRELL.J.1170965724

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of81 16

A006

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

STATUS REPORTS N/A

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-MGMT-80368A N/A 424 SCMS/GUME

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

DD

8. APP Code:

N/A D

11. As of Date: 13. Date of Subsequent Submission:

SEE BLOCK 16

SEE BLOCK 16

See Block 16

a. Addressee:

b. Copies:

Final

Draft Reg Repro

SEE BLOCK 16

G. Prepared By: H. Date I. Approved By: J. Date:

424 SCMS/GUME

3001 Staff Drive Tinker AFB, OK 73145-3041

ATTN: TYRELL WOLFE

0 1 0

15. Total: 0 1 0

16. Remarks:

NAME: Hudson, Connie J DATE: 20 MAR 2014

The report shall be delivered in electronic PDF format through the Wide Area Workflow (WAWF) system no later than 14 calendar days after the conclusion of each month for the duration of the period of performance and may be combined with other reports.

Hudson, Connie J

424 SCMS / GUBAA

405-736-7179

24 MAR 2014 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMC

WOLFE.TYRELL.J.1170965724

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of91 16

A007

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

CONTRACTOR'S CORRECTIVE ACTION PLAN N/A

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-MGMT-80501 N/A 424 SCMS/GUME

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

NO

8. APP Code:

N/A D

11. As of Date: 13. Date of Subsequent Submission:

SEE BLOCK 16

SEE BLOCK 16

ASREQ

a. Addressee:

b. Copies:

Final

Draft Reg Repro

SEE BLOCK 16

424 SCMS/GUME

3001 Staff Drive Tinker AFB, OK 73145-3041

ATTN: TRYELL WOLFE

0 1 0

15. Total: 0 1 0

16. Remarks:

NAME:

NAME:

Hudson, Connie J

Zilar, Dale N

DATE:

DATE:

20 MAR 2014

08 MAR 2013

BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION

UTILIZING WAWF. A COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL

BE SUBMITTED THROUGH WAWF IN ORDER TO RECEIVE PAYMENT FOR DATA

REPORTS.

BLOCK 11: TO BE DETERMINED

BLOCK 12. TO BE DETERMINED

BLOCK 13: TO BE DETERMINED

BLOCK 14A: ALL DIGITAL SUBMISSIONS SHALL BE MADE VIA ELECTRONIC MAIL

TO: APPLICABLE PROGRAM MANAGER.

CONTRACTOR FORMAT IS ACCEPTABLE.

DID REQUIREMENTS ARE NOT TAILORED.

DELIVERY CANNOT BE DEFERRED.

BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION

UTILIZING WAWF. A COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL

BE SUBMITTED THROUGH WAWF IN ORDER TO RECEIVE PAYMENT FOR DATA

REPORTS.

BLOCK 11: TO BE DETERMINED

BLOCK 12. TO BE DETERMINED

BLOCK 13: TO BE DETERMINED

BLOCK 14A: ALL DIGITAL SUBMISSIONS SHALL BE MADE VIA ELECTRONIC MAIL

TO: APPLICABLE PROGRAM MANAGER.

CONTRACTOR FORMAT IS ACCEPTABLE.

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of101 16

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

G. Prepared By: H. Date I. Approved By: J. Date:

16. Remarks:

DID REQUIREMENTS ARE NOT TAILORED.

DELIVERY CANNOT BE DEFERRED.

Hudson, Connie J

424 SCMS / GUBAA

405-736-7179

24 MAR 2014 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMC

WOLFE.TYRELL.J.1170965724

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of111 16

A008

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

CAV AF N/A

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-MGMT-81634B N/A 424 SCMS/GUME

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

N/A

8. APP Code:

N/A N/A

11. As of Date: 13. Date of Subsequent Submission:

SEE BLOCK 16

N/A

See Block 16

a. Addressee:

b. Copies:

Final

Draft Reg Repro

SEE BLOCK 16

G. Prepared By: H. Date I. Approved By: J. Date:

424 SCMS/GUME

3001 Staff Drive, Suite 1AB85A Tinker AFB, OK 73145-3041

ATTN: TYRELL WOLFE

0 2 0

15. Total: 0 2 0

16. Remarks:

NAME: Hudson, Connie J DATE: 04 MAR 2014

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 448 SCMW/FMA in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF.

Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training is provided by 448 SCMW/FMA, (405) 734-1318 or (405) 734-1329.

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 7: Enter the applicable code as listed in DoD 5010.12-M, Chapter 3.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

Hudson, Connie J

424 SCMS / GUBAA

405-736-7179

24 MAR 2014 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMC

WOLFE.TYRELL.J.1170965724

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of121 16

A009

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

DMSMS PLAN N/A

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-MISC-80711A N/A 424 SCMS/GUME

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

N/A

8. APP Code:

N/A N/A

11. As of Date: 13. Date of Subsequent Submission:

N/A

N/A

ASREQ

a. Addressee:

b. Copies:

Final

Draft Reg Repro N/A

G. Prepared By: H. Date I. Approved By: J. Date:

424 SCMS/GUME

3001 Staff Drive Tinker AFB, OK 73145-3041

ATTN: TYRELL WOLFE

0 1 0

15. Total: 0 1 0

16. Remarks:

NAME: Hudson, Connie J DATE: 19 MAR 2014

Block 11 & 12: Submitted to government upon completion of contract.

Hudson, Connie J

424 SCMS / GUBAA

405-736-7179

24 MAR 2014 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMC

WOLFE.TYRELL.J.1170965724

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of131 16

A010

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

Counterfeit Prevention Plan N/A

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-MISC-81832 PWS Para 1.10.7 424 SCMS/GUME

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

NO

8. APP Code:

N/A D

11. As of Date: 13. Date of Subsequent Submission:

See Block 16

See Block 16

See Block 16

a. Addressee:

b. Copies:

Final

Draft Reg Repro See Block 16

G. Prepared By: H. Date I. Approved By: J. Date:

424 SCMS/GUME

3001 Staff Dr Tinker AFB, OK 73145

ATTN: TYRELL WOLFE

0 0 1

15. Total: 0 0 1

16. Remarks:

NAME:

NAME:

Hudson, Connie J

Zilar, Dale N

DATE:

DATE:

05 MAR 2014

12 DEC 2013

The plan shall be delivered in electronic PDF format through the Wide Area Workflow (WAWF) system no later than 90 calendar days after contract award (FA8711).

The plan shall be delivered in electronic PDF format through the Wide Area Workflow (WAWF) system no later than 90 calendar days after contract award (FA8711).

Hudson, Connie J

424 SCMS / GUBAA

405-736-7179

24 MAR 2014 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMC

WOLFE.TYRELL.J.1170965724

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of141 16

A011

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

CERTIFICATION DOCUMENTS MULTI NSN'S

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-QCIC-80798B N/A 424 SCMS/GUME

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

N/A

8. APP Code:

N/A N/A

11. As of Date: 13. Date of Subsequent Submission:

N/A

N/A

See Block 16

a. Addressee:

b. Copies:

Final

Draft Reg Repro N/A

G. Prepared By: H. Date I. Approved By: J. Date:

424 SCMS/GUME

3001 Staff Drive Tinker AFB, OK 73145-3041

ATTN: TYRELL WOLFE

0 1 0

15. Total: 0 1 0

16. Remarks:

NAME: Hudson, Connie J DATE: 20 MAR 2014

This Data Item Description (DID) contains the format and content requirements for calibration reports or certificates accompanying calibrations performed on DoD test, measurement, and diagnostic equipment.

This DID is applicable to contracts requiring calibration of test equipment prior to delivery. This DID is consistent with ISO 17025 requirements for calibration reports or certificate.

Hudson, Connie J

424 SCMS / GUBAA

405-736-7179

24 MAR 2014 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMC

WOLFE.TYRELL.J.1170965724

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of151 16

A012

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

DMSMS Diminishing Manufacturing Sources (DMS) Report (1)

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-SESS-81656 4.15.1, 4.15.2 424 SCMS/GUME

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

XX

8. APP Code:

A C

11. As of Date: 13. Date of Subsequent Submission:

See Block 16

See Block 16

See Block 16

a. Addressee:

b. Copies:

Final

Draft Reg Repro See Block 16

424 SCMS/GUEA

3001 Staff Drive Tinker AFB, OK 73145-3041

ATTN: TYRELL WOLFE

0 1 0

15. Total: 0 1 0

16. Remarks:

NAME:

NAME:

Hudson, Connie J

Privette, Michelle R

DATE:

DATE:

19 MAR 2014

03 MAY 2013

DD 250 Requirement: WAWF

Block 4: The DMSMS forecasting source data shall be in an editable electronic format using XML data standards.

Block 9: Distrubution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use 03May2013). Other requests for this document shall be referred to kelly.harlan@robins.af.mil 408 SCMS/GULB.

Blocks 10-13: The first report shall be submitted within 5 calendar days of the contractor's discovery that one or more of the components or materials intended to be incorporated directly into an end item specified to be delivered under the delivery order or contract is a DMS component, the contractor shall notify the contracting officer in writing.

DMS reports shall be submitted via email.

Block 14: Data shall be submitted in electronic format.

Data to be submitted via email to: TYRELL.WOLFE@US.af.mil

DD 250 Requirement: WAWF

Block 4: The DMSMS forecasting source data shall be in an editable electronic format using XML data standards.

Block 9: Distrubution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use 03May2013). Other requests for this document shall be referred to kelly.harlan@robins.af.mil 408 SCMS/GULB.

Blocks 10-13: The first report shall be submitted within 5 calendar days of the contractor's discovery that one or more of the components or materials intended to be incorporated directly into an end item specified to be delivered under the delivery order or contract is a DMS component, the contractor shall notify the contracting officer in writing.

DMS reports shall be submitted via email.

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of161 16

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

G. Prepared By: H. Date I. Approved By: J. Date:

16. Remarks:

Block 14: Data shall be submitted in electronic format.

Data to be submitted via email to: kelly.harlan@robins.af.mil and vanessa.mcgriff@robins.af.mil

Hudson, Connie J

424 SCMS / GUBAA

405-736-7179

24 MAR 2014 //DIGITALLY SIGNED//

COORDINATORS:

424 SCMS / GUMC

WOLFE.TYRELL.J.1170965724

File details come from the government source that posted it. Updated .