FA811825R0037.pdf
PDF 22 MB Posted
- Attached to
- REMANUFACTURE OF C-130 BUTTERFLY VALVE
- Solicitation number
- FA811825R0037
About this file
This document is a Request for Proposals (RFP) for the remanufacture of C-130 Butterfly Valves issued by the Department of the Air Force Materiel Command Air Force Sustainment Center. The solicitation (FA811825R0037) is a total small business set-aside, specifically for Women-Owned Small Business (WOSB), with a NAICS code of 336413 and a size standard of 1,250 employees. The contract is a firm-fixed-price requirements type with a five-year structure: a three-year basic period followed by a two-year option period.
The procurement seeks the remanufacture of C-130 Butterfly Valves, with an estimated quantity of 9 units per year during the basic period and option periods. Key requirements include delivering 3 units every 30 days, with an initial delivery of 9 units within 140 calendar days after receipt of order. The solicitation will be open until 3 June 2025 at 3:00 PM, with award based solely on price, targeting the lowest total evaluated price from a responsive and responsible offeror. Contractors must have a minimum score of 110 in the Supplier Performance Risk System (SPRS) and comply with National Institute of Standards and Technology (NIST) Special Publication 800-171 cybersecurity requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DID_81995A_CDM.pdf | ||
| DID_80969_SURGE.pdf | ||
| 4092946_PKGRQMT_REPORT.pdf | ||
| DID_80441D_GPI.pdf | ||
| DID_81838_CAV.pdf | ||
| DID_80503_RoD.pdf | ||
| SOW.pdf | ||
| GFP FD20302500502.pdf | ||
| 4810013806588TP_JQRR.pdf | ||
| CAV_AF_Reporting_Requirements_v7.pdf | ||
| 4092930_CDRL_REPORT.pdf | ||
| 4112410_TRNSPDATA_REPORT.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)
PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)
23. ACCOUNTING AND APPROPRIATION DATA
SEE SCHEDULE
24. TOTAL AWARD AMOUNT (For Government Use Only)
TELEPHONE NUMBER
UNIQUE ENTITY
IDENTIFIER
CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
NO COLLECT CALLS
4. SOLICITATION NUMBER
FA8118-25-R-0037
X X
6.SOLICITATION ISSUE DATE
3 APR 2025
8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: 100 % FOR
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOSB PROGRAM
HUBZONE SMALL
BUSINESS EDWOSB
SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS NAICS: 336413
8(A) SIZE STANDARD: 1,250
DATE SIGNED
28. UNITED STATES OF AMERICA (Signature of Contracting Officer)
26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER
SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH
ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
THIS IS A TOTAL SMALL BUSINESS SET-ASIDE.
Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.
Dates will be updated prior to award
*120
DO: A1
FA8118
X
Total
14 EFT:T
SCD:B
(Type or Print)
(Brief Description)
Other Aircraft Part and Auxiliary Equipment Manufacturing
(Agency Use) LATE OFFERS ARE SUBJECT TO LATE PROPOSAL PROVISIONS INCORPORATED HEREIN. ALL OFFERS ARE SUBJECT TO SUCH PROVISIONS, REPRESENTATIONS, CERTIFICATIONS AND SPECIFICATIONS AS ARE ATTACHED OR INCORPORATED BY REFERENCE. SOLICITATION: OFFERS WILL BE RECEIVED AT THE ISSUING OFFICE
UNTIL
3JUN2025 3:00PM
(SEE ESP CLAUSE 252.2327003.)
X
DEPARTMENT OF THE AIR FORCE, AFSC PZABB
3001 STAFF DR STE 1AC4 99A
TINKER AFB OK 731453303
BUYER: Aczavius Smith/AFSC/PZABB aczavius.smith@us.af.mil Phone: (405) 844 8091
X
SOLICITATION/CONTRACT
BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.
NO RESPONSE FOR REASONS CHECKED
SOLICITATION NUMBER FA811825R0037
FROM: AFFIX
STAMP
HERE
TO:
ATTN:
PART I THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
A 5YEAR (THREEYEAR BASIC AND 1 TWOYEAR OPTION PERIODS) FIRM FIXED PRICE REQUIREMENTS TYPE CONTRACT IS
CONTEMPLATED.
NOTE:
(b) ALL work shall be completed in accordance with the requirements specified herein (including attachments hereto) and all costs associated with work specifications, technical orders, and/or cost associated with Over and Above request (excluding missing parts) shall be included in the unit price. The government shall only pay the contractor for missing components after review and approval of O&A request. No additional cost will be allowed (i.e. material handling, profit, direct or indirect costs).
Aczavius Smith at aczavius.smith@us.af.mil and Contracting Officer, M. Ryan Churchwell at matthew.churchwell.2@us.af.mil.
A score of 110 must be in SPRS, if assessment score is less than 110 a contractors must submit a copy of their plan with their proposal.
REMANUFACTURE OF C130 BUTTERFLY VALVE 3 YEAR BASIC
Information CLIN Item No.
NSN:
Manufacturer Part Number
Associated Document(s) Line Item(s)
Priority:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
IUID Required:
Physical Item Markings:
IAW MILSTD130
REMANUFACTURE OF C130 BUTTERFLY VALVE
3 Year Basic, Year 1 Item No.
Best Estimated Qty
U/I Unit Price Estimated Total Price
REMANUFACTURE OF C130 BUTTERFLY VALVE
3 Year Basic, Year 1
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Associated Document(s) Line Item(s)
Priority:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
IUID Required:
Physical Item Markings:
IAW MILSTD130
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO 9EA 140 calendar days. Deliver 3EA every 30 days thereafter.
Req No / Pri
Required Delivery
Proposed Delivery
3 Year Basic, Year 2 Item No.
Best Estimated Qty
U/I Unit Price Estimated Total Price
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Associated Document(s) Line Item(s)
Priority:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
IUID Required:
Physical Item Markings:
IAW MILSTD130
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO 9EA 140 calendar days. Deliver 3EA every 30 days thereafter.
Req No / Pri
Required Delivery
Proposed
3 Year Basic, Year 3 Item No.
Best Estimated Qty
U/I Unit Price Estimated Total Price
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Associated Document(s) Line Item(s)
Priority:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
IUID Required:
Physical Item Markings:
IAW MILSTD130
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO 9EA 140 days ARO and REP. Deliver 3EA every 30 days thereafter.
Req No / Pri
Required
3 Year Basic, Year 3 Proposed Delivery
DATA
3 Year Basic Item No.
Quantity U/I Unit Price
EXHIBIT ITEM
NO.
RELATED
LINE ITEM
NO.
DATA ITEM DECRIPTION QTY FREQ UNIT
PRICE
TOTAL
PRICE
Associated Document(s) Line Item(s)
Priority:
OVER AND ABOVE 3 YEAR BASIC
3 Year Basic Item No.
Quantity U/I Unit Price
DESCRIPTION
FIXED PRICED ITEMS
Associated Document(s) Line Item(s)
Priority:
REMANUFACTURE OF C130 BUTTERFLY VALVE
2 Year Option Information CLIN Item No.
NSN:
Manufacturer Part Number
Associated Document(s) Line Item(s)
Priority:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
2 Year Option Information CLIN
IUID Required:
Physical Item Markings:
IAW MILSTD130
REMANUFACTURE OF C130 BUTTERFLY VALVE
2 Year Option, Year 1 Item No.
Best Estimated Qty
U/I Unit Price Estimated Total Price
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Associated Document(s) Line Item(s)
Priority:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
IUID Required:
Physical Item Markings:
IAW MILSTD130
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
2 Year Option, Year 1 Type / Ship To Quantity (U/I) *ARO 9EA 140 calendar days. Deliver 3EA every 30 days thereafter.
Req No / Pri
Required Delivery
Proposed Delivery
REMANUFACTURE OF C130 BUTTERFLY VALVE
2 Year Option, Year 2 Item No.
Best Estimated Qty
U/I Unit Price Estimated Total Price
CLIN ACRN ACRN Total
NSN:
Manufacturer Part Number
Associated Document(s) Line Item(s)
Priority:
Inspection:
Acceptance:
Inspection/Acceptance Report:
Quality Assurance:
Title Number Date Tailoring
IUID Required:
Physical Item Markings:
IAW MILSTD130
2 Year Option, Year 2
Transportation From Continental United States CONUS (CONUS) Sources
Type / Ship To PACRN Mark For
Type / Ship To Quantity (U/I) *ARO 9EA 140 calendar days. Deliver 3EA every 30 days thereafter.
Req No / Pri
Required Delivery
Proposed Delivery
DATA
2 Year Option Item No.
Quantity U/I Unit Price Amount
EXHIBIT ITEM
NO.
RELATED
LINE ITEM
NO.
DATA ITEM DECRIPTION QTY FREQ UNIT
PRICE
TOTAL
PRICE
Associated Document(s) Line Item(s)
Priority:
OVER AND ABOVE 2 YEAR OPTION
2 Year Option Item No.
Quantity U/I Unit Price
DESCRIPTION
FIXED PRICED ITEMS
Associated Document(s) Line Item(s)
Priority:
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE:
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
SECTION D
PACKAGING AND MARKING
SECTION E
INSPECTION AND ACCEPTANCE
52.2462 INSPECTION OF SUPPLIESFIXEDPRICE
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(IAW FAR 46.311, DFARS 246.202-4(1))
If more than one standard is listed, the offeror shall indicate its selection by checking the appropriate block.
Title Number Date Tailoring *See Individual Line Item Schedule
52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)
(IAW FAR 46.316)
INSPECTION AND ACCEPTANCE (SEP 1999)
(IAW FAR 46.401(b), FAR 46.503)
[CONTRACTOR FILLIN]
See schedule for items with the following code(s) listed below :
Inspection Code and Address:
PART I THE SCHEDULE
SECTION F
DELIVERIES OR PERFORMANCE
52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)
(IAW FAR 11.703(b))
52.242-15 STOP-WORK ORDER (AUG 1989)
(IAW FAR 42.1305(b)(1))
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)
(IAW FAR 42.1305(c))
52.247-30 F.O.B. ORIGIN, CONTRACTOR'S FACILITY (FEB 2006)
(IAW FAR 47.303-2(c))
52.247-55 F.O.B. POINT FOR DELIVERY OF GOVERNMENT-FURNISHED PROPERTY
(JUN 2003)
(IAW FAR 47.305-12(a)(2))
52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS (JAN 1991)
(IAW FAR 47.303-17(f))
F.O.B. ORIGIN (OCT 1993)
(IAW FAR 47.305(b))
[CONTRACTOR FILLIN]
PART I THE SCHEDULE
SECTION G
CONTRACT ADMINISTRATION DATA
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))
WAWF payment instructions
Document type
(Contracting Officer: Insert applicable document type(s).
Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (standalone) and “Receiving Report” (standalone) document type may be used instead.)
Inspection/acceptance location
(Contracting Officer: Insert inspection and acceptance locations or “Not applicable.”) Document routing
Field Name in WAWF Data to be entered in WAWF
(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)
Payment request and supporting documentation.
e.g
WAWF email notifications
(Contracting Officer: Insert applicable email addresses or “Not applicable.”)
WAWF point of contact.
(Contracting Officer: Insert applicable information or “Not applicable.”)
ACCOUNTING AND APPROPRIATION DATA (AUG 1998)
AA
ACRN TOTAL $ 0.00
ACTIVITY ADDRESS CODE/ROUTING IDENTIFIER CODE (RIC) (MAR 2010)
(IAW AFI 24-230, DoD 4000.25-6M)
PART II CONTRACT CLAUSES
SECTION I
CONTRACT CLAUSES
5352.201-9101 OMBUDSMAN (JUN 2023)
(IAW DAFFARS 5301.9103)
AFSC/PZC
405 736 3273 000 000 0000
52.202-1 DEFINITIONS (JUN 2020)
(IAW FAR 2.201)
52.203-3 GRATUITIES (APR 1984)
(IAW FAR 3.202)
52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
(IAW FAR 3.404)
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)
(IAW FAR 3.503-2)
52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)
(IAW FAR 3.502-3)
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR
IMPROPER ACTIVITY (MAY 2014)
(IAW FAR 3.104-9(a))
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
(IAW FAR 3.104-9(b))
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS
(JUN 2020)
(IAW FAR 3.808(b))
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS (JAN 2017)
(IAW FAR 3.909-3 (b))
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS
(SEP 2011)
(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))
252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER
DEFENSE-CONTRACT-RELATED FELONIES (JAN 2023)
(IAW DFARS 203.570-3)
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS
(DEC 2022)
(IAW DFARS 203.970)
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT
AWARDS (JUN 2020)
(IAW FAR 4.1403(a))
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
(IAW FAR 4.1105(b))
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)
(IAW FAR 4.1804(c), FAR 12.301(d))
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS
(DEC 2014)
(IAW FAR 4.1202(b))
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS
(NOV 2021)
(IAW FAR 4.1903)
52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES
DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED ENTITIES
(DEC 2023)
(IAW FAR 4.2004)
52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND
VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)
(IAW 4.2105(b))
52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUN 2023)
(IAW FAR 4.2203)
52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS- PROHIBITION
(DEC 2023)
(IAW FAR 4.2306(c))
252.204-7000 DISCLOSURE OF INFORMATION (OCT 2016)
(IAW DFARS 204.404-70(a))
252.204-7002 PAYMENT FOR SUBLINE ITEMS NOT SEPARATELY PRICED (APR 2020)
(IAW DFARS 204.7109(a))
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
(IAW DFARS 204.404-70(b))
252.204-7009 LIMITATIONS ON THE USE OR DISCLOSURE OF THIRD-PARTY CONTRACTOR
REPORTED CYBER INCIDENT INFORMATION (JAN 2023)
(IAW DFARS 204.7304(b))
252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT
REPORTING (JAN 2023)
(IAW DFARS 204-7304(c))
252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT
REPORTING DEVIATION 2024-O0013, REVISION 1 (MAY 2024)
(IAW Class Deviation 2024-O0013 Rev. 1)
252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION
SUPPORT (JAN 2023)
(IAW DFARS 204.7403(b), DFARS 212.301(f)(i)(F))
252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE
TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023)
(IAW DFARS 204.2105(c))
252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023)
(IAW DFARS 204.7304(e))
252.204-7021 Contractor Compliance with the Cybersecurity Maturity Model Certification Level Requirement (JAN 2023) (IAW DFARS 204.7503(a) and 204.7503(b))
Scope.
Requirements.
Subcontracts.
252.204-7022 EXPEDITING CONTRACT CLOSEOUT (MAY 2021)
(IAW DFARS 204.804-70)
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT
(NOV 2021)
(IAW FAR 9.409)
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS
(NOV 2015)
(IAW FAR 9.108-5(b))
252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE
GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM
(MAY 2019)
(IAW DFARS 209.409)
52.211-5 MATERIAL REQUIREMENTS (AUG 2000)
(IAW FAR 11.302)
52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)
(IAW FAR 11.604(b))
252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)
(IAW DFARS 211.274-5(a), DFARS 212.301(f)(xii))
Definitions
Unique item identifier.
52.215-2 AUDIT AND RECORDS--NEGOTIATION (JUN 2020)
(IAW FAR 15.209(b)(1))
52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)
(IAW FAR 15.209(h))
52.215-14 INTEGRITY OF UNIT PRICES (NOV 2021)
(IAW FAR 15.408(f)(1))
52.216-18 ORDERING (AUG 2020)
(IAW FAR 16.506(a))
52.216-19 ORDER LIMITATIONS (OCT 1995)
(IAW FAR 16.506(b))
Minimum order
Maximum order i.e
52.216-21 REQUIREMENTS (OCT 1995)
(IAW FAR 16.506(d)(1))
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(IAW FAR 17.208(g))
Anytime prior to contract expiration 30
5 Years
252.217-7001 SURGE OPTION (DEC 2018)
(IAW DFARS 217.208-70(b))
General
252.217-7028 OVER AND ABOVE WORK (DEC 1991)
(IAW DFARS 217.7702)
Definitions.
52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2020)
(IAW FAR 19.507(c))
52.219-14 LIMITATIONS ON SUBCONTRACTING (DEVIATION 2021-O0008) (FEB 2023)
(IAW Deviation 2021-O0008 Rev 1.)
[Contracting Officer check as appropriate.]
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP 2023)
(IAW FAR 19.309(c))
[Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.]
[Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.]
[Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.]
[Complete only if the Contractor represented itself as a veteranowned small business concern in paragraph (h)(6) of this clause.]
[Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.]
[Contractor to sign and date and insert authorized signer’s name and title.]
52.222-19 CHILD LABOR--COOPERATION WITH AUTHORITIES AND REMEDIES (FEB 2024)
(IAW FAR 22.1505(b))
52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)
(IAW FAR 22.1310(a)(1), DFARS 222.1310(a)(1))
Definitions
Equal opportunity clause
52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)
(IAW FAR 22.1408(a))
Equal opportunity clause.
Subcontracts.
52.222-37 EMPLOYMENT REPORTS ON VETERANS (JUN 2020)
(IAW FAR 22.1310(b))
52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR
RELATIONS ACT (DEC 2010)
(IAW FAR 22.1605)
52.222-50 COMBATING TRAFFICKING IN PERSONS (NOV 2021)
(IAW FAR 22.1705(a)(1))
52.223-23 SUSTAINABLE PRODUCTS AND SERVICES (DEVIATION 2025-O0004) (MAR 2025)
(IAW 23.109(a))
252.223-7008 PROHIBITION OF HEXAVALENT CHROMIUM (JAN 2023)
(IAW DFARS 223.7306, DFARS 212.301(f)(xxi))
252.223-7009 PROHIBITION OF PROCUREMENT OF FLUORINATED AQUEOUS FILM-FORMING
FOAM FIRE-FIGHTING AGENT FOR USE ON MILITARY INSTALLATIONS
(MAR 2024)
(IAW DFARS 223.7404)
52.224-3 PRIVACY TRAINING (JAN 2017)
(IAW FAR 24.302(a))
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2021)
(IAW FAR 25.1103(a))
252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (APR 2022)
(IAW DFARS 225.7002-3(a))
252.225-7013 DUTY-FREE ENTRY (NOV 2023)
(IAW DFARS 225.1101(4))
252.225-7048 EXPORT-CONTROLLED ITEMS (JUN 2013)
(IAW DFARS 225.7901-4)
252.225-7052 RESTRICTION ON THE ACQUISITION OF CERTAIN MAGNETS, TANTALUM, AND
TUNGSTEN (MAY 2024)
(IAW DFARS 225.7018-5)
252.225-7061 RESTRICTION ON THE ACQUISITION OF PERSONAL PROTECTIVE EQUIPMENT
AND CERTAIN OTHER ITEMS FROM NON-ALLIED FOREIGN NATIONS (JAN 2023)
(IAW DFARS 225.7023-4)
252.225-7967 PROHIBITION REGARDING RUSSIAN FOSSIL FUEL BUSINESS OPERATIONS
(DEVIATION 2024-O0006, REVISION 1) (FEB 2024) (FEB 2024)
(IAW CLASS DEVIATION 2024-O0006, REVISION 1)
252.225-7972 PROHIBITION ON THE PROCUREMENT OF FOREIGN-MADE UNMANNED AIRCRAFT
SYSTEMS (AUG 2024) (DEVIATION 2024-O0014) (AUG 2024)
(IAW Deviation 2024-O0014)
Definition.
Covered foreign country
Prohibition https://www.trade.gov/consolidatedscreeninglist
Subcontracts
52.226-7 DRUG-FREE WORKPLACE (MAY 2024)
(IAW FAR 26.506)
52.226-8 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE
DRIVING (MAY 2024)
(IAW FAR 26.605)
252.226-7001 UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC
ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS CONCERNS
(JAN 2023)
(IAW DFARS 226.104)
52.227-1 AUTHORIZATION AND CONSENT (JUN 2020)
(IAW FAR 27.201-2(a)(1))
52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT
INFRINGEMENT (JUN 2020)
(IAW FAR 27.201-2(b))
52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
(IAW FAR 29.401-3(a))
52.229-12 TAX ON CERTAIN FOREIGN PROCUREMENTS (FEB 2021)
(IAW 29.402-3(b))
252.229-7014 FULL EXEMPTION FROM TWO-PERCENT EXCISE TAX ON CERTAIN FOREIGN
PROCUREMENTS. (OCT 2022)
(IAW DFARS 229-402(k))
52.232-1 PAYMENTS (APR 1984)
(IAW FAR 32.111(a)(1))
52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)
(IAW FAR 32.111(b)(1))
52.232-11 EXTRAS (APR 1984)
(IAW FAR 32.111(c)(2))
52.232-17 INTEREST (MAY 2014)
(IAW FAR 32.611(a), FAR 32.611(b))
52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
(IAW FAR 32.806(a)(1))
52.232-25 PROMPT PAYMENT (JAN 2017)
(IAW FAR 32.908(c))
Invoice payments— Computing penalty amount.
7th
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD
MANAGEMENT (OCT 2018)
(IAW FAR 32.1110(a)(1))
52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)
(IAW FAR 32.706-3)
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
SUBCONTRACTORS (MAR 2023)
(IAW FAR 32.009-2)
252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS
(DEC 2018)
(IAW DFARS 232.7004(a))
252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)
(IAW DFARS 232.7102)
52.233-1 DISPUTES (MAY 2014)
(IAW FAR 33.215)
52.233-3 PROTEST AFTER AWARD (AUG 1996)
(IAW FAR 33.106(b))
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
(IAW FAR 33.215(b))
52.240-1 PROHIBITION ON UNMANNED AIRCRAFT SYSTEMS MANUFACTURED OR
ASSEMBLED BY AMERICAN SECURITY DRONE ACT-COVERED FOREIGN
ENTITIES (NOV 2024)
(IAW FAR 40.202-8)
52.242-13 BANKRUPTCY (JUL 1995)
(IAW FAR 42.903)
52.243-1 CHANGES--FIXED-PRICE (AUG 1987)
(IAW FAR 43.205(a)(1))
252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)
(IAW DFARS 243.205-70)
252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2022)
(IAW DFARS 243.205-71)
52.244-6 SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
(DEVIATION 2025-O0003) (MAR 2025)
(IAW FAR 44.403)
252.244-7000 SUBCONTRACTS FOR COMMERCIAL ITEMS AND COMMERCIAL COMPONENTS
(DOD CONTRACTS) (NOV 2023)
(IAW DFARS 244.403)
52.245-1 GOVERNMENT PROPERTY (SEP 2021)
(IAW FAR 45.107(a), DFARS 237.7003(c), DFARS 245.107)
52.245-9 USE AND CHARGES (APR 2012)
(IAW FAR 45.107(c))
252.245-7003 CONTRACTOR PROPERTY MANAGEMENT SYSTEM ADMINISTRATION (APR 2012)
(IAW DFARS 245.107(3))
252.245-7004 REPORTING, REUTILIZATION, AND DISPOSAL (DEVIATION 2022-O0006)
(NOV 2021)
(IAW Deviation 2022-O0006)
) Definitions.
) Inventory disposal schedules
Appropriate Federal Condition Codes
Proceeds from sales of surplus property
Demilitarization, mutilation, and destruction
Classified Contractor inventory
Inherently dangerous Contractor inventory
Contractor inventory located in foreign countries
Disposal of scrap Contractor with scrap procedures
Scrap warranty.
Sale of surplus Contractor inventory.
Restrictions on purchase or retention of Contractor inventory
Demilitarization, mutilation, or destruction on Contractor or subcontractor premises
Demilitarization, mutilation, or destruction off Contractor or subcontractor premises.
Failure to demilitarize
252.245-7005 MANAGEMENT AND REPORTING OF GOVERNMENT PROPERTY (JAN 2024)
(IAW DFARS 245.107(4))
52.247-1 COMMERCIAL BILL OF LADING NOTATIONS (FEB 2006)
(IAW FAR 47.104-4(a), FAR 47.104-4(b))
52.247-68 REPORT OF SHIPMENT (REPSHIP) (FEB 2006)
(IAW FAR 47.208-2)
252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA--BASIC (OCT 2024)
(IAW DFARS 247.574(a) and (a)(1))
52.248-1 VALUE ENGINEERING (JUN 2020)
(IAW FAR 48.201(b), FAR 48.201(f))
52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE)
(APR 2012)
(IAW FAR 49.502(b)(1)(i))
52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984)
(IAW FAR 49.504(a)(1))
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
(IAW FAR 52.107(b))
Also, the full text of a clause may be accessed electronically at this/these address(es):
NOTE:
FIND regulation reference
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)
(IAW FAR 52.107(f))
Defense Federal Acquisition Regulation Supplement Chapter 2
52.253-1 COMPUTER GENERATED FORMS (JAN 1991)
(IAW FAR 53.111)
PART III LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J
LIST OF ATTACHMENTS
PART IV REPRESENTATIONS AND INSTRUCTIONS
SECTION K
REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS
OF OFFERORS OR RESPONDENTS
252.203-7005 REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS
(SEP 2022)
(IAW DFARS 203.171-4(b))
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2025-O0003 and
2025-O0004) (MAR 2025)
(IAW FAR 4.1202(a))
336413 1,250
X __ X __ X __
(see note) Note: If this clause is applicable it will be listed in the appropriate clause section of this document.
52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS -
REPRESENTATION AND DISCLOSURES (DEC 2023)
(IAW FAR 4.2306(b))
252.204-7007 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)
(IAW DFARS 204.1202)
252.204-7008 COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION
CONTROLS (OCT 2016)
(IAW DFARS 204.7304(a))
252.204-7016 COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES --
REPRESENTATION (DEC 2019)
(IAW 204.2105(a))
252.204-7017 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE
TELECOMMUNICATIONS EQUIPMENT OR SERVICES--REPRESENTATION
(MAY 2021)
(IAW DFARS 204.2105(b))
252.204-7019 NOTICE OF NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS
(NOV 2023)
(IAW DFARS 204.7304(d))
Requirement.
Procedures.
Summary level scores.
Basic Assessments.
Medium and High Assessments.
Accessibility.
52.207-4 ECONOMIC PURCHASE QUANTITY--SUPPLIES (AUG 1987)
(IAW FAR 7.203)
OFFEROR RECOMMENDATIONS
ITEM QUANTITY QUOTATION PRICE TOTAL
52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY
OR A FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)
(IAW FAR 9.104-7(d)) is [ ] is not [ ] is [ ] is not [ ]
52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS--CERTIFICATION
(NOV 2021)
(IAW FAR 9.109-5)
252.209-7011 REPRESENTATION FOR RESTRICTION ON THE USE OF CERTAIN INSTITUTIONS
OF HIGHER EDUCATION (OCT 2023)
(IAW DFARS 209.170-4)
THE FOLLOWING IS FILLIN DATA FOR PROVISION 52.2048 PARA (c)(2)(iii):
52.22218 CERTIFICATION REGARDING KNOWLEDGE OF CHILD LABOR FOR LISTED END PRODUCTS (FEB 2021)
Listed end products
Certification
52.223-22 PUBLIC DISCLOSURE OF GREENHOUSE GAS EMISSIONS AND REDUCTION
GOALS--REPRESENTATION (DEC 2016)
(IAW FAR 23.502)
Offeror is to check applicable blocks in paragraphs (b)(1) and (2) [ ] does, [ ] does not
[ ] does, [ ] does not
52.225-18 PLACE OF MANUFACTURE (AUG 2018)
(IAW FAR 25.1101(f))
[ ] In the United States
[ ] Outside the United States
252.225-7966 PROHIBITION REGARDING RUSSIAN FOSSIL FUEL BUSINESS
OPERATIONS-REPRESENTATION (DEVIATION 2024-O0006, REVISION 1)
(MAR 2024)
(IAW CLASS DEVIATION 2024-O0006, REVISION 1)
52.229-11 TAXES ON CERTAIN FOREIGN PROCUREMENTS - NOTICE AND
REPRESENTATION (JUN 2020)
(IAW FAR 29.402-3(a))
Definitions.
Foreign person
Specified Federal procurement payment
United States person www.irs.gov/w14.
Offeror shall select one https://www.irs.gov/help/taxlawquestions.
PART IV REPRESENTATIONS AND INSTRUCTIONS
SECTION L
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
(IAW FAR 4.1105(a)(1))
52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (AUG 2020)
(IAW FAR 4.1804(a), FAR 12.301(d))
52.204-22 ALTERNATIVE LINE ITEM PROPOSAL (JAN 2017)
(IAW FAR 4.1008)
52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)
(IAW FAR 4.2105(a))
Definitions.
Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, substantial or essential component
Prohibition.
Procedures.
https://www.sam.gov
Representations.
Disclosures.
52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES -
REPRESENTATION (OCT 2020)
(IAW FAR 4.2105(c))
Definitions.
Procedures.
Representations.
252.204-7024 NOTICE ON THE USE OF THE SUPPLIER PERFORMANCE RISK SYSTEM
(MAR 2023)
(IAW DFARS 204.7604)
Definitions.
Item risk
Price risk
Supplier risk https://piee.eb.mil/, https://www.sprs.csd.disa.mil/reference.htm.
https://www.sprs.csd.disa.mil/pdf/SPRS DataEvaluationCriteria.pdf.
52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY
PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)
(IAW FAR 11.604(a))
52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (NOV 2021)
(IAW FAR 15.209(a))
252.215-7008 ONLY ONE OFFER (DEC 2022)
(IAW DFARS 215.408(3))
252.215-7013 SUPPLIES AND SERVICES PROVIDED BY NONTRADITIONAL DEFENSE
CONTRACTORS (JAN 2023)
(IAW DFARS 215.408(6))
52.216-1 TYPE OF CONTRACT (APR 1984)
(IAW FAR 16.105)
(see individual line item)
252.225-7973 PROHIBITION ON THE PROCUREMENT OF FOREIGN-MADE UNMANNED AIRCRAFT
SYSTEMS-REPRESENTATION (AUG 2024) (DEVIATION 2024-O0014) (AUG 2024)
(IAW DEVIATION 2024-O0014)
Definition
Prohibition https://www.trade.gov/consolidatedscreeninglist
Representations
52.233-2 SERVICE OF PROTEST (SEP 2006)
(IAW FAR 33.106(a))
(See page 1 Issuing Office)
52.247-46 SHIPPING POINT(S) USED IN EVALUATION OF F.O.B. ORIGIN OFFERS (APR 1984) (IAW FAR 47.305-3(b)(4)(ii))
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
(IAW FAR 52.107(a))
NOTE:
FIND regulation reference
Section L – Instructions to Offerors
12. Program Structure and Objective
1.1. The Government plans to award a single contract for the C-130 Butterfly Valve. This firm-fixed-price type contract will include a One 3 Year Basic Period and One 2-year option period.
2.0 General Instructions.
2.1. This competitive acquisition will be conducted utilizing price as the only evaluated factor. Contract award will be made to the offeror with the lowest total evaluated price (TEP). The offer shall be compliant with the requirements as stated in the Statement of Work (SOW). Non-conformance with the instructions provided in the Instructions to Offeror (ITO) may result in an offeror being ineligible for award. Offerors shall provide evidence of qualification in accordance with FAR 52.209-1.
2.1.1. The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated claims.
2.1.2. The proposal acceptance period is specified in SF 1447 Section A (Block 18) of the contract/solicitation. By signing the Request for Proposal (RFP), the offeror has made a clear statement that the proposal is valid until the date specified.
2.2. General Information
2.2.1. Point of Contact
The Contracting Officer (CO) is the sole point of contact for this acquisition. Address any questions or concerns you may have to the CO. Written requests for clarification may be sent to the CO at the address located in SF 1447 Section A (Block 7) of the contract/solicitation.
2.2.2. Debriefings
The CO will promptly notify offerors of any decision to exclude them from the competitive range, whereupon they may request and receive a debriefing in accordance with FAR 15.505. Offerors excluded from the competitive range may request a pre-award debriefing, or they may choose to wait until after the source selection decision to request a post-award debriefing.
However, offerors excluded from the competitive range are entitled to no more than one debriefing for each proposal. The CO will notify unsuccessful offerors in accordance with FAR 15.503. Upon such notification, unsuccessful offerors may request and receive a debriefing. Offerors desiring a debriefing must make their request in accordance with the requirements of FAR
15.505 or 15.506, as applicable.
3.0. Factor 1 - Price
3.1. The offeror shall complete Schedule of Supplies or Services and Prices/Costs of the solicitation to include all unit prices and extended prices for each CLIN and/or SubCLIN. These instructions are to assist you in submitting information required to evaluate the reasonableness of your proposed prices/costs. Compliance with these instructions is mandatory and failure to comply may result in rejection of your proposal.
3.1.1. Price Reasonableness and Balance
Offerors’ proposals will be evaluated for reasonableness and balance. The burden of proof for credibility of proposed prices rests with the offeror. Additionally, unbalanced pricing may pose an unacceptable risk to the Government and may be a reason to reject an offeror’s proposal.
3.2. Pricing Information Requirements
In accordance with FAR 15.403-1(b)(1), prices based on adequate price competition do not require submission of certified cost or pricing data. If, after receipt of proposals, there is insufficient information available to determine price reasonableness, balance and/or price realism, the offeror may be required to submit other than certified cost or pricing data. FAR does not preclude the requirement for obtaining other than certified cost or pricing data under certain circumstances, and the Government reserves the right to obtain data as appropriate. If, after receipt of proposals, the CO determines there is insufficient information available to determine price reasonableness and none of the exceptions in FAR 15.403-1 apply, the offeror shall be required to submit certified cost or pricing data.
4.0. Solicitation Requirements
4.1. Solicitation/Contract Form SF 1447
The offeror shall complete Blocks 13 and 27 of the SF1447. Signature by the offeror on the SF1447 constitutes an offer, which the Government may accept.
4.1.1. Supplies or Services and Prices/Costs
The offeror shall complete pricing information in Supplies or Services and Prices/Costs section of the solicitation.
4.1.2. Contract Clauses
The offeror shall complete provisions/clauses as required.
4.1.3. Representations, Certifications, and other Statements of Offerors The Offeror has completed the annual representations and certifications electronically via the System for Award Management (SAM). After reviewing the SAM database information, the Offeror verifies by submission of this offer that the representations and certifications currently posted electronically at FAR 52.204-8, Annual Representations and Certifications, are correct.
4.2. Ombudsman
An Ombudsman has been appointed to hear concerns from offerors or potential offerors during the proposal development phase of this acquisition. The Ombudsman for this acquisition is OC-ALC/PZC. This does not diminish the authority of the program director or CO, but communicates offeror concerns, issues, disagreements and recommendations to the appropriate Government personnel. When requested, the Ombudsman shall maintain strict confidentiality as to the source of the concern. The Ombudsman does not participate in the evaluation of proposals or in the source selection process; interested parties are invited to call OC-ALC/PZC at 405-736-3273.
4.3 Supplier Performance Risk System (SPRS)
In accordance with DAFFARS 5309.105-1 the Supplier Performance Risk System (SPRS) is checked for supplier risk assessments when determining responsibility. DFARS 252.204.7303(b) states that the contracting officer shall verify that the summary level score of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old, unless a lesser time is specified in the solicitation) for each covered contractor information system that is relevant to an offer, contract, task order, or delivery order are posted in Supplier Performance Risk System (SPRS). Offerors are required to represent they will implement National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 SP 800-171 (reference the provision DFARS 252.204-7008). A score of 110 must be in SPRS, if assessment score is less than 110 a contractor must submit a plan with their proposal to become compliant.
PART IV REPRESENTATIONS AND INSTRUCTIONS
SECTION M
EVALUATION FACTORS FOR AWARD
EVALUATION CRITERIA FOR AWARD (OCT 1997)
(IAW FAR 13.106-2(b), FAR 14.201-5(c), FAR 15.204-5(c))
Evaluation Factors Order of Importance Price or Cost 01
NOTICE FOR OPTIONS:
52.217-3 EVALUATION EXCLUSIVE OF OPTIONS (APR 1984)
(IAW FAR 17.208(a))
52.247-47 EVALUATION-F.O.B. ORIGIN (JUN 2003)
(IAW FAR 47.305-3(f)(2))
ITEM NO MODE OF TRANSPORTATION
Section M Evaluation Factors for Award
1.0. Price-Only Competition
Basis for Contract Award This acquisition will utilize price as the only evaluated factor. Award will be made to the offeror with the lowest total evaluated price (TEP) and whose proposal conforms to the solicitation requirements (to include all stated terms, conditions, representations, and certifications). In order to be eligible for award, the offeror must be an approved source IAW FAR 52.209-1, Qualification Requirements. The Government reserves the right to award without discussions. However, the Government reserves the right to conduct discussions if determined necessary by the Contracting Officer.
13. Solicitation Requirements (Terms and Conditions) Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, Statement of Work (SOW) requirements, in addition to the price factor. Failure to comply with the terms and conditions of the solicitation may result in the Offeror being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and must provide complete supporting rationale. The Government reserves the right to determine any such exceptions unacceptable, and the proposal, therefore, ineligible for award.
1.2 Number of Contracts to Be Awarded
The Government intends to select one contractor for this acquisition. However, the Government reserves the right not to award a contract at all, depending on the quality of the proposals and prices submitted and the availability of funds.
1.3 Competitive Range Determination
If discussions are conducted, the Government shall establish a competitive range comprised of the most highly rated proposals, in accordance with (IAW) FAR 15.306(c). During the evaluation process multiple competitive range determinations may be made that eliminate Offerors from the competition IAW FAR 15.505. A competitive range determination may eliminate Offerors based on their initial proposal evaluation results, after discussions (if necessary), prior to issuance of the Final Proposal Revision (FPR) request, or for efficiency. If Offerors are excluded from the competitive range, they may request a debriefing IAW FAR 15.505.
23. Discussions The Government intends to award without discussions but reserves the right to conduct discussions if necessary. Therefore, it is imperative that Offerors submit their best terms initially. However, if during the evaluation period it is determined to be in the best interest of the Government to hold discussions, the contracting officer may request, or allow for offerors to provide, proposal revisions to clarify and document understandings reached during discussions. At the conclusion of discussions, each offeror still in the competitive range shall be given an opportunity to submit a FPR. The Request for FPR letter will include specific instructions on how offerors will submit FPRs.
2.0. Evaluation Factor
2.1. Factor 1- Price
Price proposals will be evaluated as follows:
2.1.1. Completeness
Proposals will be reviewed for completeness. Incomplete proposals will be considered ineligible for award.
2.1.2. Price Reasonableness
The proposed prices will be evaluated for reasonableness. Reasonableness must represent a price to the Government a prudent person would pay in the conduct of competitive business. Normally, price reasonableness is established through adequate price competition, but may also be determined through price analysis techniques as described in FAR 15.404-1(b)(2).
2.1.3. Unbalanced pricing
Offerors’ proposals will be reviewed for unbalanced pricing. The Government will evaluate any supporting information provided by the Offeror explaining variances that appear unbalanced. Evaluated offers that are determined to be unbalanced may be deemed ineligible for award by the Contracting Officer if a determination is made that lack of balance poses an unacceptable risk to the Government. Unbalanced pricing exists when, despite an acceptable total price, the price of one or more line items (including sub line items) is significantly over or understated as demonstrated by application of price analysis techniques, such that:
13. There is reasonable doubt the offer would result in the lowest overall cost to the Government, even though it is the lowest priced offer; or
14. The offer is so grossly unbalanced; its acceptance would be tantamount to allowing an advanced payment.
2.1.4. Total Evaluated Price (TEP):
The TEP will be calculated as the sum of the total proposed prices for all separately priced line items (including sub line items).
The total proposed price for each separately priced line item shall be calculated as the proposed unit price multiplied by the corresponding quantity/BEQ.
The total proposed price for all options will be added to the total proposed price for the basic requirement as a part of the TEP calculation.
The TEP will be used for evaluation purposes only. Evaluation of options shall not obligate the Government to exercise such options.
The TEP will be calculated as the sum of the offeror’s proposed prices for the base period and all option periods.
File details come from the government source that posted it. Updated .