This document provides details for an upcoming federal contract solicitation for the overhaul of B-2 flight control actuators. The solicitation will be issued by December 31, 2019 by the Air Force Sustainment Center on behalf of the Department of the Air Force Materiel Command for a three-year requirements contract with one base year and two option years. The contract will have firm fixed pricing and will consolidate the overhaul and repair of seven different part numbers for B-2 aircraft flight control actuators. Estimated quantities for overhaul and repair will be provided for the base year and two option years. Interested parties must meet qualification requirements and the incumbent is Moog, Inc. Electronic solicitation procedures will be used with response due by January 30, 2020 and estimated award by September 26, 2020.
The document provides product dimensions, materials, and technical orders for the part numbers along with delivery schedule and shipping instructions. It outlines applicable regulations and provides contact information for an ombudsman to address contractor concerns. Qualified vendors must be certified through Defense Logistics Information Service. The agency intends to not use FAR part 12 for commercial items under this solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DID_DI-MGMT-80969.pdf | ||
| DID_DI-MGMT-80441C.pdf | ||
| DID_DI-QCIC-80798C.pdf | ||
| DID_DI-PSSS-81995.pdf | ||
| FA811820R0009 (Updated).pdf | ||
| 2904059_CDRL1_REPORT.pdf | ||
| TRNSPDATA_REPORT.pdf | ||
| DID_DI-PSSS-81656B.pdf | ||
| DID_DI-MGMT-80503.pdf | ||
| DID_DI-ADMN-81249B.pdf | ||
| DID_DI-ADMN-81250B.pdf | ||
| SPI_5488.pdf | ||
| Wage_Determination_Oklahoma.pdf | ||
| B-2_PWS_v4_1_FINAL.pdf | ||
| SGFP.pdf | ||
| Wage_Determination_NewYork.pdf | ||
| SPI_1089.pdf | ||
| DID_DI-SESS-80255A.pdf | ||
| PKGRQMT_REPORT.pdf | ||
| DID_DI-MGMT-81178.pdf | ||
| DID_DI-MGMT-81255.pdf | ||
| CAVAF.pdf | ||
| DID_DI-PSSS-81534A.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATA ITEM DESCRIPTION
Title: Program Progress Report
Number: DI-MGMT-80555A Approval Date: 14 Nov 2006 AMSC Number: 7640 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/DA02 Applicable Forms: N/A
Use/relationship: The Program Progress Report provides the Government with the means to evaluate and monitor the progress made by the contractor of tasks in accomplishing the goals established for the program.
This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
This DID is applicable when the monitoring for the progress of a program is required.
This DID supersede DI-MGMT-80555.
Requirements:
1. Reference documents. None.
2. Format. The Program Progress Report shall be in contractor’s format.
2.1 Title page. The title page shall contain the following:
2.1.1 Title. The title shall identify the subject of the report, program name, or task.
2.1.2 Name of contractor. The name of the contractor preparing the report.
2.1.3 Contract number. The procurement instrument identification number.
2.1.4 Key person. The individual assigned to the task or who produced the report.
2.1.5 Reporting period. The dates the reporting period begins and ends.
2.2 Paper size. The report shall be on 8 ½ x 11 inch or metric size A4 paper and typewritten of otherwise duplicated on nonfading ink.
DI-MGMT-80555A
3. Contents. The report shall contain the following:
3.1 Work summary. A brief summary of work performed during the reporting period providing positive or negative comments.
3.2 Schedule. A statement as to whether task or program is on schedule and if not, efforts planned to meet schedule shall be explained.
3.3 Studies. Discussion of all studies conducted during the reporting period and the results.
3.4 Experimental work/test procedures. An explanation of experimental work accomplished, description of test procedures applied (cite applicable military specification, paragraph number and test parameters), results of test and conclusions determined.
3.5 Designs. A description and illustration of all designs produced, along with required changes made to a previous design and a brief statement of any problems encountered.
3.6 Test equipment. Description, nomenclature and serial number of all test equipment used on the project including appropriate schematic or block diagrams.
3.6.1 List the serial number of all equipment(s) subjected to the testing.
3.6.2 Provide a brief description of all special test equipment designed of constructed for use on the project including appropriate schematic of block diagrams.
3.7 Test performed. Identification and description of all test (s) performed (cite applicable military specification, paragraph number, and test parameters).
3.7.1 Provide control settings of the test sample.
3.7.2 Resolutions of measurement equipment and range of input signals.
3.8 Failures. A brief explanation of any failures associated with test and appropriate photographs, sketches, etc. to show failures, their causes or other unusual conditions.
3.9 Difficulties/problems. Describe any difficulties or problems encountered or which previously existed which could alter the progression of work along with recommendations of resolution.
3.10 Plan. Steps followed during execution of tasks.
DI-MGMT-80555A
3.11 Completion dates. Projected completion dates for each task.
3.12 Percentage. Percentage of task completed to date and percentage of allocated funds expended on tasks.
3.13 Additional information. Other information which may cause a significant change in the work schedule.
4. END OF DI-MGMT-80555A
| DATA ITEM DESCRIPTION |
| Requirements: |
File details come from the government source that posted it. Updated .