FA8118-18-R-0015___0001.pdf
PDF 32 KB Posted
- Attached to
- OVERHAUL OF THE B-2 VENT CONTROL VALVE
- Solicitation number
- FA8118-18-R-0015
About this file
Proposal due date extension
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contract_Data_Requirements_List_CDRL_Report.pdf | ||
| CAV_AF_SOW.pdf | ||
| Packaging_Requirements.pdf | ||
| DID_81634C.pdf | ||
| DID_81995.pdf | ||
| Government_Furnished_Property_GFP.xlsx | XLSX spreadsheet | |
| Performance_Work_Statement_PWS.pdf | ||
| Quality_Asurance_Surveillance_Plan_QASP.pdf | ||
| TRANSPORTATION_DATA.pdf | ||
| FA8118-18-R-0015.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
J
2. AMENDMENT/MODIFICATION NO.
FA8118-18-R-0015-0001
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
FD20301500473 06
5. PROJECT NO (If applicable)
6. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, AFSC PZABB
3001 STAFF DR STE 1AC4 99A
TINKER AFB OK 73145-3303
BUYER: Michael Moucka/AFSC/PZABB michael.moucka@us.af.mil Phone: (405) 739- 5457 No Collect Calls
7. ADMINISTERED BY (If other than item 6) CODEFA8118
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA811818R0015
9B. DATED (SEE ITEM 11)
17-APR-2018
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 5-JUL-2018 3:00 PM
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
TAC: F2RS BASIC: (July 2018 – July 2019) $
DODAAC:
TBD OPTION I: (July 2019 – July 2020) $
RIC: TBD OPTION II: (July 2020 – July 2021) $
OPTION III: (July 2021 – July 2022) $
OPTION IV: (July 2022 – July 2023) $ 15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
THE PURPOSE OF THIS AMENDMENT IS TO EXTEND THE PROPOSAL DUE DATE AND REVISE CLIN
0003, 1003, 2003, 3003, AND 4003 VERBIAGE TO REFLECT A TBN PRICING BASED ON FINDINGS
OF TT&E LINE ITEM.
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
BASIC YEAR
REPAIR OF VALVE ASSEMBLY
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
5 EA To be Negotiated
NSN: 4810-01-380-9046 FW
VENT CONTROL VALVE
Device functions as a pressure controler to limt both positive & negitive pressure differentials encountered during ascent / descent by a closed Vent Fuel system of an air vehicle.
Cast Metal Manufacturer Part Number
0XWR4 2880001-105
59211 2880001-105
59211 DAA3272P021-105
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Standard Inspection IUID Required: Yes Physical Item Markings:
IAW MIL-STD-130
Type / Ship To PACRN Mark For
A TBD PAA
Type / Ship To Quantity (U/I) *ARO Funded
Order or Reparable Assets, Whichever is Later
Req No / Pri
Required Delivery
A TBD 2 EA *30 Calendar Days
Proposed Delivery
A TBD 2 EA
After the asset has gone through the teardown, test and evaluation process, the Contractor shall submit a proposal for the repair to the Contracting Officer within 30 days . This proposal will then be evaluated by the government and a firm fixed price will be negotiated and established for CLIN 0001 on the order. Early delivery is acceptable.
OPTION I
REPAIR OF VALVE ASSEMBLY
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
4 EA To be Negotiated
NSN: 4810-01-380-9046 FW
VENT CONTROL VALVE
Device functions as a pressure controler to limt both positive & negitive pressure differentials encountered during ascent / descent by a closed Vent Fuel system of an air vehicle.
Cast Metal Manufacturer Part Number
0XWR4 2880001-105
59211 2880001-105
59211 DAA3272P021-105
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Standard Inspection IUID Required: Yes Physical Item Markings:
IAW MIL-STD-130
Type / Ship To PACRN Mark For
A TBD PAA
Type / Ship To Quantity (U/I) *ARO Funded
Order or Reparable Assets, Whichever is Later
Req No / Pri
Required Delivery
A TBD 2 EA *30 Calendar Days
Proposed Delivery
A TBD 2 EA
After the asset has gone through the teardown, test and evaluation process, the Contractor shall submit a proposal for the repair to the Contracting Officer within 30 days . This proposal will then be
OPTION II
REPAIR OF VALVE ASSEMBLY
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
4 EA To be Negotiated
NSN: 4810-01-380-9046 FW
VENT CONTROL VALVE
Device functions as a pressure controler to limt both positive & negitive pressure differentials encountered during ascent / descent by a closed Vent Fuel system of an air vehicle.
Cast Metal Manufacturer Part Number
0XWR4 2880001-105
59211 2880001-105
59211 DAA3272P021-105
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Standard Inspection IUID Required: Yes Physical Item Markings:
IAW MIL-STD-130
Type / Ship To PACRN Mark For
A TBD PAA
Type / Ship To Quantity (U/I) *ARO Funded
Order or Reparable Assets, Whichever is Later
Req No / Pri
Required Delivery
A TBD 2 EA *30 Calendar Days
Proposed Delivery
A TBD 2 EA
After the asset has gone through the teardown, test and evaluation process, the Contractor shall submit a proposal for the repair to the Contracting Officer within 30 days . This proposal will then be
OPTION III
Item No.
Firm Fixed Price
OPTION III
REPAIR OF VALVE ASSEMBLY
Best Estimated Qty
U/I Unit Price Estimated Total Price
4 EA To be Negotiated
NSN: 4810-01-380-9046 FW
VENT CONTROL VALVE
Device functions as a pressure controler to limt both positive & negitive pressure differentials encountered during ascent / descent by a closed Vent Fuel system of an air vehicle.
Cast Metal Manufacturer Part Number
0XWR4 2880001-105
59211 2880001-105
59211 DAA3272P021-105
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Standard Inspection IUID Required: Yes Physical Item Markings:
IAW MIL-STD-130
Type / Ship To PACRN Mark For
A TBD PAA
Type / Ship To Quantity (U/I) *ARO Funded
Order or Reparable Assets, Whichever is Later
Req No / Pri
Required Delivery
A TBD 2 EA *30 Calendar Days
Proposed Delivery
A TBD 2 EA
After the asset has gone through the teardown, test and evaluation process, the Contractor shall submit a proposal for the repair to the Contracting Officer within 30 days . This proposal will then be
OPTION IV
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Estimated Total Price
OPTION IV
REPAIR OF VALVE ASSEMBLY
3 EA To be Negotiated
NSN: 4810-01-380-9046 FW
VENT CONTROL VALVE
Device functions as a pressure controler to limt both positive & negitive pressure differentials encountered during ascent / descent by a closed Vent Fuel system of an air vehicle.
Cast Metal Manufacturer Part Number
0XWR4 2880001-105
59211 2880001-105
59211 DAA3272P021-105
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Standard Inspection IUID Required: Yes Physical Item Markings:
IAW MIL-STD-130
Type / Ship To PACRN Mark For
A TBD PAA
Type / Ship To Quantity (U/I) *ARO Funded
Order or Reparable Assets, Whichever is Later
Req No / Pri
Required Delivery
A TBD 2 EA *30 Calendar Days
Proposed Delivery
A TBD 2 EA
After the asset has gone through the teardown, test and evaluation process, the Contractor shall submit a proposal for the repair to the Contracting Officer within 30 days . This proposal will then be
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE: A TBD
TO BE DETERMINED 00000-0000
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
File details come from the government source that posted it.