This document is Appendix D - Estimated Workload for a federal contract opportunity. It provides an estimated workload for the contract period, including details on aircraft tail induction tests, technical engineering support for aircraft hardness maintenance/hardness surveillance (HM/HS) tests, and preventative maintenance activities for the Portable Hardness Surveillance Test Set (PHSTS) trailer.
The key details include an estimate of contractor support required for each HM/HS test, including 10 days for a senior engineer and 12 days for a first technician, with a total expenditure not to exceed $3,500 for miscellaneous materials and supplies. The document also outlines the preventative maintenance activities and intervals for the PHSTS trailer, such as certified DOT inspections, roadworthiness inspections, tire replacements, and inspections/maintenance of the fire suppression system and environmental control unit.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SSS HMHS 9Oct24.pdf | ||
| PWS - HMHS - 2024.pdf | ||
| 2024 Appendix C -Test Support Oct 24 Update.pdf | ||
| 2024 Appendix B - GFP PHSTS Inventory.xlsx | XLSX spreadsheet | |
| 2024 Appendix A - PHSTS Equipment.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix D
ESTIMATED WORKLOAD DATA
1. This is an estimated workload for the contract period. The estimated data is provided as a guide to the contractor in estimating manpower, workload, and for scheduling requirements.
2. The following workload data represents the Government’s best estimate of the volume of work shown for each category listed. This exhibit is not intended to cover all workload items but lists the major categories of work.
Aircraft Tail Induction Test 1 Spring Test 2 Fall
Technical Engineering Support for Aircraft HM/HS Tests CY
Test Preparation 2 times yearly Test Conduct 2 times yearly Post Test Activity 2 times yearly Pre/ Post-Test Field Mapping 2 times yearly
The Contractor personnel shall cooperate with 555 SWES personnel to execute LLCW test activities. The contractor shall provide a senior engineer and technician as technical support for each test.
The following is an estimate of contractor support to be expended for each LLCW test at Palmdale during the test period.
Test Requirements
Senior Engineer 10 days including 2 days for travel. Estimated 90 hours First Technician 12 days including 2 days for travel. Estimated 110 hours
The contractor shall provide miscellaneous materials and supplies and shipping of parts and equipment for test periods with total expenditures not to exceed $3,500.00. During this period of performance, the Contactor shall refurbish PHSTS and/or GFP equipment for testing.
Preventative Maintenance Activities and Intervals for the PHSTS Trailer
PM Activity Minimum Required Interval Perform a certified DOT inspection on the Trailer (includes brake testing, tire pressure and condition, external lighting, compressed air lines and fittings, suspension system, and external reflectors).
Prior to transport of PHSTS
Perform roadworthiness inspection. Prior to transport of PHSTS Replace individual tires. As needed Perform fire suppression, safety lighting, and fire extinguisher inspections and maintenance by certified technician in accordance with OEM requirements.
Annually
Perform ECU inspection and maintenance by certified technician in accordance with OEM requirements.
Annually