FA810608R0001.RTF

RTF text file 8 MB Posted

Attached to
Salvage Services Federal contract opportunity
Solicitation number
FA8106-08-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

RFP (Parts 1 2 3 Combined)

Text of this file

STANDARD FORM 1449 (REV. 4/2002) BACK

COMPUTER GENERATED 11/12/2008, 8:05 AM

AUTHORIZED FOR LOCAL REPRODUCTIONSTANDARD FORM 1449 (REV. 4/2002)
PREVIOUS EDITION IS NOT USABLEPrescribed by GSA - FAR (48 CFR) 53.212

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1 COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

29. AWARD OF CONTRACT: REF. OFFER DATED - - . YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

Total

9. ISSUED BY CODE

DEPARTMENT OF THE AIR FORCE, 327 CLSG PK

3001 STAFF DR STE 1AG 104A

TINKER AFB OK 73145-3020

BUYER: Margaret A Wright/727ACSGPKC margaret.wright@tinker.af.mil Phone: (405) 739- 4448 Fax: (405) 736-3133 No Collect Calls

15. DELIVER TO CODE

SEE LINE ITEM SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFP

10. THIS ACQUISITION IS

UNRESTRICTED

SET ASIDE: 100 % FOR

SMALL BUSINESS

HUBZONE SMALL BUS

NAICS CODE: 237130

SIZE STD: $33.5

16. ADMINISTERED BY CODE

31c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

26. AWARD AMOUNT (For Gov’t use only)

6. SOLICITATION ISSUE DATE

13b. RATING

DO: A1 52.211-14, 52.211-15

13a. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

12. DISCOUNT TERMS

8. OFFER DUE DATE/LOCAL TIME

3NOV2008 3:00PM

18a. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

24.

AMOUNT

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED. SEE ELECTRONIC SUBMISSION OF PAYMENT REQUESTS, CLAUSE 252.232-7003.

THIS IS A TOTAL SMALL BUSINESS SET-ASIDE.

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 90 days.

High Frequency Global Communications System (HFGCS) Antenna Program Support (APS)

New NAICS code Size Standard Notice: The NAICS code for this buy is 237130 and as of August 18, 2008 the size standard has changed from $31.0M to $33.5M. The size standard that will apply to this buy is $33.5M. Companies sending in a propsal to the Government for this buy will have to update their ORCA profiles in order to pull the updated size validations into their certifications.

(Attach Additional Sheets as Necessary)

FA8106

X

EFT:T

SCD:B

25. ACCOUNTING AND APPROPRIATION DATA SEE FUNDS SCHEDULE

11. DELIVERY FOR FOB DEST.

UNLESS BLOCK IS MARKED

SEE SCHEDULE

1. REQUISITION NUMBER

GFD20300700086

5. SOLICITATION NUMBER

FA8106-08-R-0001

b. TELEPHONE NUMBER (No collect calls) (405 ) 739 -4448 ext.

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

X 30b. NAME AND TITLE OF SIGNER (Type or print)

30c. DATE SIGNED

31b. NAME OF CONTRACTING OFFICER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

4. ORDER NUMBER

3. AWARD/EFFECTIVE DATE

a. NAME Margaret A Wright

7. FOR SOLICITATION

INFORMATION CALL

2. CONTRACT NO.

17a. CONTRACTOR/FACILITY
OFFERORCODECODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 JY

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

SEE LINE ITEM SCHEDULE

(Attach Additional Sheets as Necessary) 32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32b. SIGNATURE OF AUTHORIZED GOV’T REPRESENTATIVE 32c. DATE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

39. S/R VOUCHER NUMBER

40. PAID BY

35. AMOUNT VERIFIED

CORRECT FOR

37. CHECK NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

34. voucher NUMBER

33. SHIP NUMBER

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

PARTIAL FINAL

38. S/R ACCOUNT NUMBER

42d. TOTAL CONTAINERS

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE

42c. DATE REC’D (YY/MM/DD)

Request for Proposal FA8106-08-R-0001 Page 185 of ACPS-version:15.09.05 224 Request for Proposal FA8106-08-R-0001

SUPPLIES OR SERVICES AND PRICES/COSTS

This acquisition is for an Indefinite Delivery/Indefinite Quantity (ID/IQ) Contract as contemplated by FAR 16.504. The total scope of work for which orders may be issued is set forth in the attached Performance Work Statement. All requirements will be acquired by issuance of Delivery/Task Orders. The maximum dollar amount the Government may order under this contract is $77,800,000; the minimum amount is $500.00.

NOTE(s):

1) Periods of Contract Performance (to begin upon date of basic contract award announcement):

Basic Year Year 1: 365 days from

Option 1 Year 2: 365 days from

Option 2 Year 3: 365 days from

Option 3 Year 4: 366 days from

Incentive Option 1 Year 5: 365 days from

Incentive Option 2 Year 6: 365 days from

Incentive Option 3 Year 7: 365 days from

BASIC YEAR - PROGRAM SUPPORT

Item No.

Firm Fixed Price

Best Estimated Qty U/I Unit Price

MO

PROGRAM SUPPORT

THIS LINE ITEM PROVIDES FOR SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPHS 1.1.1, 1.2, 1.3, 1.4, 1.5, 1.6, 1.6.1, 1.6.2, 1.7, 1.8, 1.9, 1.10, 1.10.1, 1.10.2, 1.10.3, AND 1.10.4 OF THE ATTACHED PWS.

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

9001-2000

Class I ODS Substance Application/Use Quantity

None none

Type / Ship To Quantity (U/I) To be determined Req No / Pri Required Delivery

A TBD

12 MO

TBD

Proposed Delivery

BASIC YEAR - PROGRAM ENGINEERING SUPPORT

Time & Material

Ceiling Price

LO

To be Determined

To be Determined = AMOUNT TO BE DETERMINED ON INDIVIDUAL ORDERS ISSUED HEREUNDER.

PROGRAM ENGINEERING SUPPORT

THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.2 OF THE ATTACHED PWS. A PRICING MATRIX FOR EACH LABOR CATEGORY THAT NEEDS TO BE PRICED FOR THIS CLIN IS IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX .

PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

1 LO

RESERVED

BASIC YEAR - UNSCHEDULED MAINTENANCE SUPPORT

UNSCHEDULED MAINTENANCE SUPPORT

THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.3.2 OF THE ATTACHED PWS. A PRICING MATRIX FOR EACH LABOR CATEGORY AND MATERIAL RATE/FACTOR THAT NEEDS TO BE PRICED FOR THIS CLIN ARE IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.

PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - SHORT NOTICE MAINTENANCE SUPPORT

SHORT NOTICE MAINTENANCE SUPPORT

THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.3.3 OF THE ATTACHED PWS. A PRICING MATRIX FOR EACH LABOR CATEGORY AND MATERIAL HANDLING RATE/FACTOR THAT NEEDS TO BE PRICED FOR THIS CLIN ARE IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.

PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - SITE SURVEY/DE-INSTALLATION/INSTALLATION

Estimated Quantity

SITE SURVEY/DE-INSTALLATION/INSTALLATION

THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.4 OF THE ATTACHED PWS. A PRICING MATRIX FOR EACH LABOR CATEGORY AND MATERIAL HANDLING RATE/FACTOR THAT NEEDS TO BE PRICED FOR THIS CLIN ARE IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.

PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - 0006AA - SITE SURVEY

0006AA

SAME AS CLIN 0006

BASIC YEAR - 0006AB - DE-INSTALLATION/INSTALLATION

0006AB

SAME AS CLIN 0006

BASIC YEAR - ANTENNA AND ANTENNA SUBSYSTEMS

Firm Fixed Price Per Event/Occurrence

Amount

See Exhibit H

ANTENNA AND ANTENNA SUBSYSTEMS

THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.4.1 OF THE ATTACHED PWS. ESTIMATED ANTENNAS PER STATION ARE IDENTIFIED IN ATTACHMENT 5. SEE EXHIBIT H

Limitations of Liability: High Value Item

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - PREVENTIVE MAINTENANCE INSPECTION (PMI)

EA

XXXXXXXXXXXXXXXXXXXXX

Not Separately Priced

PREVENTIVE MAINTENANCE INSPECTION (PMI)

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - WEST COAST - PREVENTIVE MAINTENANCE INSPECTION (PMI)

0008AA

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

1 EA

BASIC YEAR - YOKOTA - PREVENTIVE MAINTENANCE INSPECTION (PMI)

0008AB

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - DIEGO GARCIA - PREVENTIVE MAINTENANCE INSPECTION (PMI)

0008AC

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - ANDREWS - PREVENTiVE MAINTENANCE INSPECTION (PMI)

0008AD

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - ASCENSION - PREVENTIVE MAINTENANCE INSPECTION (PMI)

0008AE

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - GUAM - PREVENTIVE MAINTENANCE INSPECTION (PMI)

0008AF

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - PUERTO RICO - PREVENTIVE MAINTENANCE INSPECTION (PMI)

0008AG

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - HICKAM - PREVENTIVE MAINTENANCE INSPECTION (PMI)

0008AH

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - ELMENDORF - PREVENTIVE MAINTENANCE INSPECTION (PMI)

0008AJ

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - SIGONELLA - PREVENTIVE MAINTENANCE INSPECTION (PMI)

0008AK

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - LAJES - PREVENTIVE MAINTENANCE INSPECTION (PMI)

0008AL

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - CROUGHTON - PREVENTIVE MAINTENANCE INSPECTION (PMI)

0008AM

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - OFFUTT - PREVENTIVE MAINTENANCE INSPECTION (PMI)

0008AN

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - PHASE INSPECTION

PHASE INSPECTION

THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.

PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - OFFUTT - PHASE INSPECTION

0009AA

THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - ASCENSION - PHASE INSPECTION

0009AB

THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - YOKOTA - PHASE INSPECTION

0009AC

THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - PUERTO RICO - PHASE INSPECTION

0009AD

THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - GUAM - PHASE INSPECTION

0009AE

THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - WEST COAST- PHASE INSPECTION

0009AF

THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - GBSLP

GBSLP

GROUNDING, BONDING, SHIELDING AND LIGHTNING PROTECTION (GBSLP) - THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.6 OF THE ATTACHED PWS. ESTIMATED GBSLP PER STATION, PER YEAR ARE IDENTIFIED IN ATTACHMENT 3. A PRICING MATRIX FOR EACH LABOR CATEGORY AND MATERIALS THAT NEEDS TO BE PRICED FOR THIS CLIN ARE IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.

PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.

Limitations of Liability: Other Than High Value Item

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - PHASE-OUT PERIOD REQUIREMENTS

Firm Fixed Price -60 Day Period

Estimated Total Price

PHASE-OUT PERIOD REQUIREMENTS

THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.11 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - TRAVEL

THIS CLIN IS FOR TRAVEL (TRANSPORTATION, LODGING, MEALS AND INCIDENTALS) IN ACCORDANCE WITH FAR 31.205-46 AND 52.212-4 ALT I AS DIRECTED BY THE ACO. ALSO IN ACCORDANCE WITH PARAGRAPH 1.12.2 AND 3.4 OF THE ATTACHED PWS.

To be Determined = AMOUNT TO BE DETERMINED ON INDIVIDUAL ORDER ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON INDIVIDUAL ORDERS THAT REQUIRE CONTRACTOR TRAVEL.

MATERIAL (OTHER DIRECT COSTS)

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - OVER AND ABOVE

A PRICING MATRIX FOR EACH LABOR CATEGORY THAT NEEDS TO BE PRICED FOR THIS CLIN IS IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.

OVER AND ABOVE WORK

THE WORK CALLED FOR UNDER THIS CLIN SHALL BE ACCOMPLISHED ONLY WHEN AUTHORIZED BY THE PCO/ACO PRIOR TO PERFORMANCE OF THE WORK IN ACCORDANCE WITH CLAUSE DFARS 252.217-7028 AND AFMC CLAUSE 5352.291-9000.

PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON INDIVIDUAL ORDERS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

BASIC YEAR - DATA

DATA

IN ACCORDANCE WITH THE REQUIREMENTS SET FORTH ON THE DD FORM 1423s, EXHIBITS A, B, C, D, E, F AND G.

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Quantity (U/I) To be determined

DELIVERY IN ACCORDANCE WITH DD FORM 1423s.

OPTION YEAR I - PROGRAM SUPPORT

THIS LINE ITEM PROVIDES FOR SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPHS 1.1.1, 1.2, 1.3, 1.4, 1.5, 1.6, 1.6.1, 1.6.2, 1.7, 1.8, 1.9, 1.10, 1.10.1, 1.10.2, 1.10.3, AND 1.10.4 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - PROGRAM ENGINEERING SUPPORT

PROGRAM ENGINEERING SUPPORT

THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.2 OF THE ATTACHED PWS. A PRICING MATRIX FOR EACH LABOR CATEGORY THAT NEEDS TO BE PRICED FOR THIS CLIN IS IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX .

PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - UNSCHEDULED MAINTENANCE SUPPORT

UNSCHEDULED MAINTENANCE SUPPORT

THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.3.2 OF THE ATTACHED PWS. A PRICING MATRIX FOR EACH LABOR CATEGORY AND MATERIAL HANDLING RATE/FACTOR THAT NEEDS TO BE PRICED FOR THIS CLIN ARE IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.

PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - SHORT NOTICE MAINTENANCE SUPPORT

SHORT NOTICE MAINTENANCE SUPPORT

THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.3.3 OF THE ATTACHED PWS. A PRICING MATRIX FOR EACH LABOR CATEGORY AND MATERIAL HANDLING RATE/FACTOR THAT NEEDS TO BE PRICED FOR THIS CLIN ARE IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.

PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - SITE SURVEY/DE-INSTALLATION/INSTALLATION

SITE SURVEY/DE-INSTALLATION/INSTALLATION

THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.4 OF THE ATTACHED PWS. A PRICING MATRIX FOR EACH LABOR CATEGORY AND MATERIAL HANDLING RATE/FACTOR THAT NEEDS TO BE PRICED FOR THIS CLIN ARE IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.

PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - 1006AA - SITE SURVEY

1006AA

SAME AS CLIN 1006

OPTION YEAR I - 1006AB - DE-INSTALLATION/INSTALLATION

1006AB

SAME AS CLIN 1006

OPTION YEAR I - ANTENNA AND ANTENNA SUBSYSTEMS

THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.4.1 OF THE ATTACHED PWS. ESTIMATED ANTENNAS PER STATION ARE IDENTIFIED IN ATTACHMENT 5. SEE EXHIBIT H

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - PREVENTIVE MAINTENANCE INSPECTION (PMI)

XXXXXXXXXXXXXXXXXXXXXX

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - WEST COAST - PREVENTIVE MAINTENANCE INSPECTION (PMI)

1008AA

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - YOKOTA - PREVENTIVE MAINTENANCE INSPECTION (PMI)

1008AB

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - DIEGO GARCIA - PREVENTIVE MAINTENANCE INSPECTION (PMI)

1008AC

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - ANDREWS - PREVENTIVE MAINTENANCE INSPECTION (PMI)

1008AD

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - ASCENSION - PREVENTIVE MAINTENANCE INSPECTION (PMI)

1008AE

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - GUAM - PREVENTIVE MAINTENANCE INSPECTION (PMI)

1008AF

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - PUERTO RICO - PREVENTIVE MAINTENANCE INSPECTION (PMI)

1008AG

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - HICKAM - PREVENTIVE MAINTENANCE INSPECTION (PMI)

1008AH

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - ELMENDORF - PREVENTIVE MAINTENANCE INSPECTION (PMI)

1008AJ

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - SIGONELLA - PREVENTIVE MAINTENANCE INSPECTION (PMI)

1008AK

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - LAJES - PREVENTIVE MAINTENANCE INSPECTION (PMI)

1008AL

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - CROUGHTON - PREVENTIVE MAINTENANCE INSPECTION (PMI)

1008AM

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - OFFUTT - PREVENTIVE MAINTENANCE INSPECTION (PMI)

1008AN

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - PHASE INSPECTION

THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - DIEGO GARCIA - PHASE INSPECTION

1009AA

THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - ANDREWS - PHASE INSPECTION

1009AB

THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - HICKAM - PHASE INSPECTION

1009AC

THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - ELMENDORF - PHASE INSPECTION

1009AD

THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - SIGONELLA - PHASE INSPECTION

1009AE

THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - LAJES - PHASE INSPECTION

1009AF

THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - CROUGHTON - PHASE INSPECTION

1009AG

THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - GBSLP

GBSLP

GROUNDING, BONDING, SHIELDING AND LIGHTNING PROTECTION (GBSLP) - THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.6 OF THE ATTACHED PWS. ESTIMATED GBSLP PER STATION, PER YEAR ARE IDENTIFIED IN ATTACHMENT 3. A PRICING MATRIX FOR EACH LABOR CATEGORY AND MATERIALS THAT NEEDS TO BE PRICED FOR THIS CLIN ARE IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.

PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - PHASE-OUT PERIOD REQUIREMENTS

THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.11 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - TRAVEL

THIS CLIN IS FOR TRAVEL (TRANSPORTATION, LODGING, MEALS AND INCIDENTALS) IN ACCORDANCE WITH FAR 31.205-46 AND 52.212-4 ALT I AS DIRECTED BY THE ACO. ALSO IN ACCORDANCE WITH PARAGRAPH 1.12.2 AND 3.4 OF THE ATTACHED PWS.

To be Determined = AMOUNT TO BE DETERMINED ON INDIVIDUAL ORDER ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON INDIVIDUAL ORDERS THAT REQUIRE CONTRACTOR TRAVEL.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - OVER AND ABOVE

To be Determined = AMOUNT TO BE DETERMINED ON INDIVIDUAL DELIVERY ORDERS ISSUED HEREUNDER.

A PRICING MATRIX FOR EACH LABOR CATEGORY THAT NEEDS TO PRICED FOR THIS CLIN IS IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.

THE WORK CALLED FOR UNDER THIS CLIN SHALL BE ACCOMPLISHED ONLY WHEN AUTHORIZED BY THE PCO/ACO PRIOR TO PERFORMANCE OF THE WORK IN ACCORDANCE WITH CLAUSE DFARS 252.217-7028 AND AFMC CLAUSE 5352.291-9000.

PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON INDIVIDUAL ORDERS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR I - DATA

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Quantity (U/I) To be determined

OPTION YEAR II - PROGRAM SUPPORT

THIS LINE ITEM PROVIDES FOR SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPHS 1.1.1, 1.2, 1.3, 1.4, 1.5, 1.6, 1.6.1, 1.6.2, 1.7, 1.8, 1.9, 1.10, 1.10.1, 1.10.2, 1.10.3, AND 1.10.4 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR II - PROGRAM ENGINEERING SUPPORT

PROGRAM ENGINEERING SUPPORT

THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.2 OF THE ATTACHED PWS. A PRICING MATRIX FOR EACH LABOR CATEGORY THAT NEEDS TO BE PRICED FOR THIS CLIN IS IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX .

PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR II - UNSCHEDULED MAINTENANCE SUPPORT

UNSCHEDULED MAINTENANCE SUPPORT

THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.3.2 OF THE ATTACHED PWS. A PRICING MATRIX FOR EACH LABOR CATEGORY AND MATERIAL HANDLING RATE/FACTOR THAT NEEDS TO BE PRICED FOR THIS CLIN ARE IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.

PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR II - SHORT NOTICE MAINTENANCE SUPPORT

SHORT NOTICE MAINTENANCE SUPPORT

THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.3.3 OF THE ATTACHED PWS. A PRICING MATRIX FOR EACH LABOR CATEGORY AND MATERIAL HANDLING RATE/FACTOR THAT NEEDS TO BE PRICED FOR THIS CLIN ARE IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.

PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR II - SITE SURVEY/DE-INSTALLATION/INSTALLATION

SITE SURVEY/DE-INSTALLATION/INSTALLATION

THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.4 OF THE ATTACHED PWS. A PRICING MATRIX FOR EACH LABOR CATEGORY AND MATERIAL HANDLING RATE/FACTOR THAT NEEDS TO BE PRICED FOR THIS CLIN ARE IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.

PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR II - 2006AA - SITE SURVEY

2006AA

SAME AS CLIN 2006

OPTION YEAR II - 2006AB - DE-INSTALLATION/INSTALLATION

2006AB

SAME AS CLIN 2006

OPTION YEAR II - ANTENNA AND ANTENNA SUBSYSTEMS

THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.4.1 OF THE ATTACHED PWS. ESTIMATED ANTENNAS PER STATION ARE IDENTIFIED IN ATTACHMENT 5. SEE EXHIBIT H

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR II - PREVENTIVE MAINTENANCE INSPECTION (PMI)

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR II - WEST COAST - PREVENTIVE MAINTENANCE INSPECTION (PMI)

2008AA

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR II - YOKOTA - PREVENTIVE MAINTENANCE INSPECTION (PMI)

2008AB

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR II - DIEGO GARCIA - PREVENTIVE MAINTENANCE INSPECTION (PMI)

2008AC

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR II - ANDREWS - PREVENTIVE MAINTENANCE INSPECTION (PMI)

2008AD

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR II - ASCENSION - PREVENTIVE MAINTENANCE INSPECTION (PMI)

2008AE

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR II - GUAM - PREVENTIVE MAINTENANCE INSPECTION (PMI)

2008AF

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO

Application/Use

To be determined

OPTION YEAR II - PUERTO RICO - PREVENTIVE MAINTENANCE INSPECTION (PMI)

2008AG

THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.

Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s)…

This is the start of the file's text. The full file is on GovTribe.

Other files for this federal contract opportunity

Other files attached to Salvage Services, newest first.
File Type Posted
HFGCS APS 15 Jun 09 FA810608R0001.rtf RTF text file
HFGCS APS Amend 0007.pdf PDF
HFGCS Solicitation Amend 4.pdf PDF
RFP Q As 8 MAW —
RFP Q As 7 MAW —
ATTCH 2 - Antenna Database.xlsx XLSX spreadsheet
ATTCH 2 - Antenna Database —
ATTCH 4 - Planned GBSLP Stations Per Year —
Exhibit H - CLIN X007 Antenna and Antenna Subsystems(Cover Sheet).docx DOCX document
Performance Work Statement - FINAL —
ATTCH 4 - Planned GBSLP Stations Per Year.docx DOCX document
ATTCH 5 - SCA WD.doc DOC document
HFGCS_SEP_2007.pdf PDF
HFGCS Solicitation Amend 3.pdf PDF
RFP Q As MAW —
Exhibit H - CLIN 0007 —
RFP 1.pdf PDF
ATTCH 2 - Antenna Database —
ATTCH 3 - Proposed Antenna Replacement Matrix.pdf PDF
Exhibit D - HFGCS D001 CDRL.pdf PDF
ATTCH 3 - Proposed Antenna Replacement Matrix —
Exhibit E - HFGCS E008 CDRL.pdf PDF
Exhibit A - HFGCS A004 CDRL.pdf PDF
Exhibit H - CLIN X007 Antenna and Antenna Subsystems.pdf PDF
Exhibit E - HFGCS E003 CDRL.pdf PDF
Exhibit B - HFGCS B003 CDRL.pdf PDF
Exhibit H - CLIN X007 Antenna and Antenna Subsystems —
Exhibit D - HFGCS D002 CDRL.pdf PDF
Exhibit A - —
Exhibit E - HFGCS E005 CDRL.pdf PDF
Exhibit E - HFGCS E007 CDRL.pdf PDF
ATTCH 4 - Planned GBSLP Stations Per Year —
Exhibit F - HFGCS F002 CDRL.pdf PDF
Exhibit G - HFGCS G002 CDRL.pdf PDF
ATTCH 1 - Locations of the HFGCS Stations.pdf PDF
HFGCS Synopsis.doc DOC document
PWS 14 May 08.pdf PDF
HFGCS Pre-Proposal Conf Q As —
MIL-HDBK-419A.pdf PDF
AntennaPreproposalConfSlides-4Mar08-Final.pdf PDF
HFGCSATTACHMENTF.pdf PDF
HFGCSD-CDRLs.pdf PDF
ATCHB-PWSDefinitions20Feb08_v1_.pdf PDF
HFGCSA-CDRLs.pdf PDF
ATCHA-PWSAcronyms20Feb08_v1_.pdf PDF
APPENDIXC-96-SafetySpecs-PWS_v1_HFGCS-APS.pdf PDF
ATCHE-AntennaDatabase.pdf PDF
HFGCSB-CDRLS.pdf PDF
HFGCSAPSAgenda.pdf PDF
HFGCSAPSInstructions.pdf PDF
Show all 50

Salvage Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .