STANDARD FORM 1449 (REV. 4/2002) BACK
COMPUTER GENERATED 11/12/2008, 8:05 AM
| AUTHORIZED FOR LOCAL REPRODUCTION | STANDARD FORM 1449 (REV. 4/2002) | |
| PREVIOUS EDITION IS NOT USABLE | Prescribed by GSA - FAR (48 CFR) 53.212 |
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1 COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
29. AWARD OF CONTRACT: REF. OFFER DATED - - . YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
Total
9. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, 327 CLSG PK
3001 STAFF DR STE 1AG 104A
TINKER AFB OK 73145-3020
BUYER: Margaret A Wright/727ACSGPKC margaret.wright@tinker.af.mil Phone: (405) 739- 4448 Fax: (405) 736-3133 No Collect Calls
15. DELIVER TO CODE
SEE LINE ITEM SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFP
10. THIS ACQUISITION IS
UNRESTRICTED
SET ASIDE: 100 % FOR
SMALL BUSINESS
HUBZONE SMALL BUS
NAICS CODE: 237130
SIZE STD: $33.5
16. ADMINISTERED BY CODE
31c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
26. AWARD AMOUNT (For Gov’t use only)
6. SOLICITATION ISSUE DATE
13b. RATING
DO: A1 52.211-14, 52.211-15
13a. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
12. DISCOUNT TERMS
8. OFFER DUE DATE/LOCAL TIME
3NOV2008 3:00PM
18a. PAYMENT WILL BE MADE BY CODE
(SEE ESP CLAUSE 252.232-7003.)
24.
AMOUNT
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED. SEE ELECTRONIC SUBMISSION OF PAYMENT REQUESTS, CLAUSE 252.232-7003.
THIS IS A TOTAL SMALL BUSINESS SET-ASIDE.
Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 90 days.
High Frequency Global Communications System (HFGCS) Antenna Program Support (APS)
New NAICS code Size Standard Notice: The NAICS code for this buy is 237130 and as of August 18, 2008 the size standard has changed from $31.0M to $33.5M. The size standard that will apply to this buy is $33.5M. Companies sending in a propsal to the Government for this buy will have to update their ORCA profiles in order to pull the updated size validations into their certifications.
(Attach Additional Sheets as Necessary)
FA8106
X
EFT:T
SCD:B
25. ACCOUNTING AND APPROPRIATION DATA SEE FUNDS SCHEDULE
11. DELIVERY FOR FOB DEST.
UNLESS BLOCK IS MARKED
SEE SCHEDULE
1. REQUISITION NUMBER
GFD20300700086
5. SOLICITATION NUMBER
FA8106-08-R-0001
b. TELEPHONE NUMBER (No collect calls) (405 ) 739 -4448 ext.
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
X 30b. NAME AND TITLE OF SIGNER (Type or print)
30c. DATE SIGNED
31b. NAME OF CONTRACTING OFFICER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
4. ORDER NUMBER
3. AWARD/EFFECTIVE DATE
a. NAME Margaret A Wright
7. FOR SOLICITATION
INFORMATION CALL
2. CONTRACT NO.
| 17a. CONTRACTOR/ | FACILITY | ||
| OFFEROR | CODE | CODE |
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 JY
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
SEE LINE ITEM SCHEDULE
(Attach Additional Sheets as Necessary) 32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32b. SIGNATURE OF AUTHORIZED GOV’T REPRESENTATIVE 32c. DATE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
39. S/R VOUCHER NUMBER
40. PAID BY
35. AMOUNT VERIFIED
CORRECT FOR
37. CHECK NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
34. voucher NUMBER
33. SHIP NUMBER
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
PARTIAL FINAL
38. S/R ACCOUNT NUMBER
42d. TOTAL CONTAINERS
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE
42c. DATE REC’D (YY/MM/DD)
Request for Proposal FA8106-08-R-0001 Page 185 of ACPS-version:15.09.05 224 Request for Proposal FA8106-08-R-0001
SUPPLIES OR SERVICES AND PRICES/COSTS
This acquisition is for an Indefinite Delivery/Indefinite Quantity (ID/IQ) Contract as contemplated by FAR 16.504. The total scope of work for which orders may be issued is set forth in the attached Performance Work Statement. All requirements will be acquired by issuance of Delivery/Task Orders. The maximum dollar amount the Government may order under this contract is $77,800,000; the minimum amount is $500.00.
NOTE(s):
1) Periods of Contract Performance (to begin upon date of basic contract award announcement):
Basic Year Year 1: 365 days from
Option 1 Year 2: 365 days from
Option 2 Year 3: 365 days from
Option 3 Year 4: 366 days from
Incentive Option 1 Year 5: 365 days from
Incentive Option 2 Year 6: 365 days from
Incentive Option 3 Year 7: 365 days from
BASIC YEAR - PROGRAM SUPPORT
Item No.
Firm Fixed Price
Best Estimated Qty U/I Unit Price
MO
PROGRAM SUPPORT
THIS LINE ITEM PROVIDES FOR SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPHS 1.1.1, 1.2, 1.3, 1.4, 1.5, 1.6, 1.6.1, 1.6.2, 1.7, 1.8, 1.9, 1.10, 1.10.1, 1.10.2, 1.10.3, AND 1.10.4 OF THE ATTACHED PWS.
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
9001-2000
Class I ODS Substance Application/Use Quantity
None none
Type / Ship To Quantity (U/I) To be determined Req No / Pri Required Delivery
A TBD
12 MO
TBD
Proposed Delivery
BASIC YEAR - PROGRAM ENGINEERING SUPPORT
Time & Material
Ceiling Price
LO
To be Determined
To be Determined = AMOUNT TO BE DETERMINED ON INDIVIDUAL ORDERS ISSUED HEREUNDER.
PROGRAM ENGINEERING SUPPORT
THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.2 OF THE ATTACHED PWS. A PRICING MATRIX FOR EACH LABOR CATEGORY THAT NEEDS TO BE PRICED FOR THIS CLIN IS IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX .
PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
1 LO
RESERVED
BASIC YEAR - UNSCHEDULED MAINTENANCE SUPPORT
UNSCHEDULED MAINTENANCE SUPPORT
THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.3.2 OF THE ATTACHED PWS. A PRICING MATRIX FOR EACH LABOR CATEGORY AND MATERIAL RATE/FACTOR THAT NEEDS TO BE PRICED FOR THIS CLIN ARE IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.
PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - SHORT NOTICE MAINTENANCE SUPPORT
SHORT NOTICE MAINTENANCE SUPPORT
THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.3.3 OF THE ATTACHED PWS. A PRICING MATRIX FOR EACH LABOR CATEGORY AND MATERIAL HANDLING RATE/FACTOR THAT NEEDS TO BE PRICED FOR THIS CLIN ARE IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.
PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - SITE SURVEY/DE-INSTALLATION/INSTALLATION
Estimated Quantity
SITE SURVEY/DE-INSTALLATION/INSTALLATION
THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.4 OF THE ATTACHED PWS. A PRICING MATRIX FOR EACH LABOR CATEGORY AND MATERIAL HANDLING RATE/FACTOR THAT NEEDS TO BE PRICED FOR THIS CLIN ARE IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.
PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - 0006AA - SITE SURVEY
0006AA
SAME AS CLIN 0006
BASIC YEAR - 0006AB - DE-INSTALLATION/INSTALLATION
0006AB
SAME AS CLIN 0006
BASIC YEAR - ANTENNA AND ANTENNA SUBSYSTEMS
Firm Fixed Price Per Event/Occurrence
Amount
See Exhibit H
ANTENNA AND ANTENNA SUBSYSTEMS
THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.4.1 OF THE ATTACHED PWS. ESTIMATED ANTENNAS PER STATION ARE IDENTIFIED IN ATTACHMENT 5. SEE EXHIBIT H
Limitations of Liability: High Value Item
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - PREVENTIVE MAINTENANCE INSPECTION (PMI)
EA
XXXXXXXXXXXXXXXXXXXXX
Not Separately Priced
PREVENTIVE MAINTENANCE INSPECTION (PMI)
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - WEST COAST - PREVENTIVE MAINTENANCE INSPECTION (PMI)
0008AA
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
1 EA
BASIC YEAR - YOKOTA - PREVENTIVE MAINTENANCE INSPECTION (PMI)
0008AB
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - DIEGO GARCIA - PREVENTIVE MAINTENANCE INSPECTION (PMI)
0008AC
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - ANDREWS - PREVENTiVE MAINTENANCE INSPECTION (PMI)
0008AD
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - ASCENSION - PREVENTIVE MAINTENANCE INSPECTION (PMI)
0008AE
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - GUAM - PREVENTIVE MAINTENANCE INSPECTION (PMI)
0008AF
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - PUERTO RICO - PREVENTIVE MAINTENANCE INSPECTION (PMI)
0008AG
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - HICKAM - PREVENTIVE MAINTENANCE INSPECTION (PMI)
0008AH
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - ELMENDORF - PREVENTIVE MAINTENANCE INSPECTION (PMI)
0008AJ
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - SIGONELLA - PREVENTIVE MAINTENANCE INSPECTION (PMI)
0008AK
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - LAJES - PREVENTIVE MAINTENANCE INSPECTION (PMI)
0008AL
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - CROUGHTON - PREVENTIVE MAINTENANCE INSPECTION (PMI)
0008AM
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - OFFUTT - PREVENTIVE MAINTENANCE INSPECTION (PMI)
0008AN
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - PHASE INSPECTION
PHASE INSPECTION
THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.
PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - OFFUTT - PHASE INSPECTION
0009AA
THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - ASCENSION - PHASE INSPECTION
0009AB
THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - YOKOTA - PHASE INSPECTION
0009AC
THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - PUERTO RICO - PHASE INSPECTION
0009AD
THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - GUAM - PHASE INSPECTION
0009AE
THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - WEST COAST- PHASE INSPECTION
0009AF
THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - GBSLP
GBSLP
GROUNDING, BONDING, SHIELDING AND LIGHTNING PROTECTION (GBSLP) - THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.6 OF THE ATTACHED PWS. ESTIMATED GBSLP PER STATION, PER YEAR ARE IDENTIFIED IN ATTACHMENT 3. A PRICING MATRIX FOR EACH LABOR CATEGORY AND MATERIALS THAT NEEDS TO BE PRICED FOR THIS CLIN ARE IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.
PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.
Limitations of Liability: Other Than High Value Item
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - PHASE-OUT PERIOD REQUIREMENTS
Firm Fixed Price -60 Day Period
Estimated Total Price
PHASE-OUT PERIOD REQUIREMENTS
THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.11 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - TRAVEL
THIS CLIN IS FOR TRAVEL (TRANSPORTATION, LODGING, MEALS AND INCIDENTALS) IN ACCORDANCE WITH FAR 31.205-46 AND 52.212-4 ALT I AS DIRECTED BY THE ACO. ALSO IN ACCORDANCE WITH PARAGRAPH 1.12.2 AND 3.4 OF THE ATTACHED PWS.
To be Determined = AMOUNT TO BE DETERMINED ON INDIVIDUAL ORDER ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON INDIVIDUAL ORDERS THAT REQUIRE CONTRACTOR TRAVEL.
MATERIAL (OTHER DIRECT COSTS)
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - OVER AND ABOVE
A PRICING MATRIX FOR EACH LABOR CATEGORY THAT NEEDS TO BE PRICED FOR THIS CLIN IS IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.
OVER AND ABOVE WORK
THE WORK CALLED FOR UNDER THIS CLIN SHALL BE ACCOMPLISHED ONLY WHEN AUTHORIZED BY THE PCO/ACO PRIOR TO PERFORMANCE OF THE WORK IN ACCORDANCE WITH CLAUSE DFARS 252.217-7028 AND AFMC CLAUSE 5352.291-9000.
PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON INDIVIDUAL ORDERS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
BASIC YEAR - DATA
DATA
IN ACCORDANCE WITH THE REQUIREMENTS SET FORTH ON THE DD FORM 1423s, EXHIBITS A, B, C, D, E, F AND G.
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Quantity (U/I) To be determined
DELIVERY IN ACCORDANCE WITH DD FORM 1423s.
OPTION YEAR I - PROGRAM SUPPORT
THIS LINE ITEM PROVIDES FOR SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPHS 1.1.1, 1.2, 1.3, 1.4, 1.5, 1.6, 1.6.1, 1.6.2, 1.7, 1.8, 1.9, 1.10, 1.10.1, 1.10.2, 1.10.3, AND 1.10.4 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - PROGRAM ENGINEERING SUPPORT
PROGRAM ENGINEERING SUPPORT
THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.2 OF THE ATTACHED PWS. A PRICING MATRIX FOR EACH LABOR CATEGORY THAT NEEDS TO BE PRICED FOR THIS CLIN IS IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX .
PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - UNSCHEDULED MAINTENANCE SUPPORT
UNSCHEDULED MAINTENANCE SUPPORT
THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.3.2 OF THE ATTACHED PWS. A PRICING MATRIX FOR EACH LABOR CATEGORY AND MATERIAL HANDLING RATE/FACTOR THAT NEEDS TO BE PRICED FOR THIS CLIN ARE IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.
PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - SHORT NOTICE MAINTENANCE SUPPORT
SHORT NOTICE MAINTENANCE SUPPORT
THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.3.3 OF THE ATTACHED PWS. A PRICING MATRIX FOR EACH LABOR CATEGORY AND MATERIAL HANDLING RATE/FACTOR THAT NEEDS TO BE PRICED FOR THIS CLIN ARE IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.
PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - SITE SURVEY/DE-INSTALLATION/INSTALLATION
SITE SURVEY/DE-INSTALLATION/INSTALLATION
THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.4 OF THE ATTACHED PWS. A PRICING MATRIX FOR EACH LABOR CATEGORY AND MATERIAL HANDLING RATE/FACTOR THAT NEEDS TO BE PRICED FOR THIS CLIN ARE IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.
PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - 1006AA - SITE SURVEY
1006AA
SAME AS CLIN 1006
OPTION YEAR I - 1006AB - DE-INSTALLATION/INSTALLATION
1006AB
SAME AS CLIN 1006
OPTION YEAR I - ANTENNA AND ANTENNA SUBSYSTEMS
THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.4.1 OF THE ATTACHED PWS. ESTIMATED ANTENNAS PER STATION ARE IDENTIFIED IN ATTACHMENT 5. SEE EXHIBIT H
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - PREVENTIVE MAINTENANCE INSPECTION (PMI)
XXXXXXXXXXXXXXXXXXXXXX
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - WEST COAST - PREVENTIVE MAINTENANCE INSPECTION (PMI)
1008AA
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - YOKOTA - PREVENTIVE MAINTENANCE INSPECTION (PMI)
1008AB
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - DIEGO GARCIA - PREVENTIVE MAINTENANCE INSPECTION (PMI)
1008AC
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - ANDREWS - PREVENTIVE MAINTENANCE INSPECTION (PMI)
1008AD
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - ASCENSION - PREVENTIVE MAINTENANCE INSPECTION (PMI)
1008AE
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - GUAM - PREVENTIVE MAINTENANCE INSPECTION (PMI)
1008AF
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - PUERTO RICO - PREVENTIVE MAINTENANCE INSPECTION (PMI)
1008AG
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - HICKAM - PREVENTIVE MAINTENANCE INSPECTION (PMI)
1008AH
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - ELMENDORF - PREVENTIVE MAINTENANCE INSPECTION (PMI)
1008AJ
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - SIGONELLA - PREVENTIVE MAINTENANCE INSPECTION (PMI)
1008AK
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - LAJES - PREVENTIVE MAINTENANCE INSPECTION (PMI)
1008AL
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - CROUGHTON - PREVENTIVE MAINTENANCE INSPECTION (PMI)
1008AM
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - OFFUTT - PREVENTIVE MAINTENANCE INSPECTION (PMI)
1008AN
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - PHASE INSPECTION
THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - DIEGO GARCIA - PHASE INSPECTION
1009AA
THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - ANDREWS - PHASE INSPECTION
1009AB
THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - HICKAM - PHASE INSPECTION
1009AC
THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - ELMENDORF - PHASE INSPECTION
1009AD
THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - SIGONELLA - PHASE INSPECTION
1009AE
THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - LAJES - PHASE INSPECTION
1009AF
THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - CROUGHTON - PHASE INSPECTION
1009AG
THIS LINE ITEM PROVIDES THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.2 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - GBSLP
GBSLP
GROUNDING, BONDING, SHIELDING AND LIGHTNING PROTECTION (GBSLP) - THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.6 OF THE ATTACHED PWS. ESTIMATED GBSLP PER STATION, PER YEAR ARE IDENTIFIED IN ATTACHMENT 3. A PRICING MATRIX FOR EACH LABOR CATEGORY AND MATERIALS THAT NEEDS TO BE PRICED FOR THIS CLIN ARE IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.
PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - PHASE-OUT PERIOD REQUIREMENTS
THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.11 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - TRAVEL
THIS CLIN IS FOR TRAVEL (TRANSPORTATION, LODGING, MEALS AND INCIDENTALS) IN ACCORDANCE WITH FAR 31.205-46 AND 52.212-4 ALT I AS DIRECTED BY THE ACO. ALSO IN ACCORDANCE WITH PARAGRAPH 1.12.2 AND 3.4 OF THE ATTACHED PWS.
To be Determined = AMOUNT TO BE DETERMINED ON INDIVIDUAL ORDER ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON INDIVIDUAL ORDERS THAT REQUIRE CONTRACTOR TRAVEL.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - OVER AND ABOVE
To be Determined = AMOUNT TO BE DETERMINED ON INDIVIDUAL DELIVERY ORDERS ISSUED HEREUNDER.
A PRICING MATRIX FOR EACH LABOR CATEGORY THAT NEEDS TO PRICED FOR THIS CLIN IS IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.
THE WORK CALLED FOR UNDER THIS CLIN SHALL BE ACCOMPLISHED ONLY WHEN AUTHORIZED BY THE PCO/ACO PRIOR TO PERFORMANCE OF THE WORK IN ACCORDANCE WITH CLAUSE DFARS 252.217-7028 AND AFMC CLAUSE 5352.291-9000.
PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON INDIVIDUAL ORDERS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR I - DATA
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Quantity (U/I) To be determined
OPTION YEAR II - PROGRAM SUPPORT
THIS LINE ITEM PROVIDES FOR SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPHS 1.1.1, 1.2, 1.3, 1.4, 1.5, 1.6, 1.6.1, 1.6.2, 1.7, 1.8, 1.9, 1.10, 1.10.1, 1.10.2, 1.10.3, AND 1.10.4 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR II - PROGRAM ENGINEERING SUPPORT
PROGRAM ENGINEERING SUPPORT
THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.2 OF THE ATTACHED PWS. A PRICING MATRIX FOR EACH LABOR CATEGORY THAT NEEDS TO BE PRICED FOR THIS CLIN IS IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX .
PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR II - UNSCHEDULED MAINTENANCE SUPPORT
UNSCHEDULED MAINTENANCE SUPPORT
THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.3.2 OF THE ATTACHED PWS. A PRICING MATRIX FOR EACH LABOR CATEGORY AND MATERIAL HANDLING RATE/FACTOR THAT NEEDS TO BE PRICED FOR THIS CLIN ARE IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.
PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR II - SHORT NOTICE MAINTENANCE SUPPORT
SHORT NOTICE MAINTENANCE SUPPORT
THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.3.3 OF THE ATTACHED PWS. A PRICING MATRIX FOR EACH LABOR CATEGORY AND MATERIAL HANDLING RATE/FACTOR THAT NEEDS TO BE PRICED FOR THIS CLIN ARE IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.
PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR II - SITE SURVEY/DE-INSTALLATION/INSTALLATION
SITE SURVEY/DE-INSTALLATION/INSTALLATION
THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.4 OF THE ATTACHED PWS. A PRICING MATRIX FOR EACH LABOR CATEGORY AND MATERIAL HANDLING RATE/FACTOR THAT NEEDS TO BE PRICED FOR THIS CLIN ARE IDENTIFIED IN ATTACHMENT 7 - PRICING MATRIX.
PERIOD OF PERFORMANCE TO BE INDICATED ON INDIVIDUAL ORDERS ISSUED HEREUNDER. A TOTAL CEILING AMOUNT WILL BE INCLUDED ON APPLICABLE INDIVIDUAL ORDERS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR II - 2006AA - SITE SURVEY
2006AA
SAME AS CLIN 2006
OPTION YEAR II - 2006AB - DE-INSTALLATION/INSTALLATION
2006AB
SAME AS CLIN 2006
OPTION YEAR II - ANTENNA AND ANTENNA SUBSYSTEMS
THIS LINE ITEM PROVIDES FOR LABOR AND/OR MATERIALS THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.4.1 OF THE ATTACHED PWS. ESTIMATED ANTENNAS PER STATION ARE IDENTIFIED IN ATTACHMENT 5. SEE EXHIBIT H
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR II - PREVENTIVE MAINTENANCE INSPECTION (PMI)
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR II - WEST COAST - PREVENTIVE MAINTENANCE INSPECTION (PMI)
2008AA
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR II - YOKOTA - PREVENTIVE MAINTENANCE INSPECTION (PMI)
2008AB
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR II - DIEGO GARCIA - PREVENTIVE MAINTENANCE INSPECTION (PMI)
2008AC
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR II - ANDREWS - PREVENTIVE MAINTENANCE INSPECTION (PMI)
2008AD
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR II - ASCENSION - PREVENTIVE MAINTENANCE INSPECTION (PMI)
2008AE
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR II - GUAM - PREVENTIVE MAINTENANCE INSPECTION (PMI)
2008AF
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO
Application/Use
To be determined
OPTION YEAR II - PUERTO RICO - PREVENTIVE MAINTENANCE INSPECTION (PMI)
2008AG
THIS LINE ITEM PROVIDES FOR THE SERVICES THAT ARE REQUIRED IN ACCORDANCE WITH PARAGRAPH 1.1.5.1 AND 1.1.3.1 OF THE ATTACHED PWS.
Inspection/Acceptance Report: Receiving Report Required
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s)…
This is the start of the file's text. The full file is on GovTribe.
Other files for this federal contract opportunity
Show all 50
Salvage Services has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .