Copy_of_Boeing_CY16_Exhibit_C_Recurring_Engineering_Tasks_CPFF.xls
XLS spreadsheet 33 KB Posted
- Attached to
- C/KC-135 Engineering Sustainment Support
- Solicitation number
- FA8105-15-R-0001
About this file
Exhibit C
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA810515R0001_______0004.pdf | ||
| FA810515R0001_______0003.pdf | ||
| PWS_BoeingESSContract_CY16_Final_3Mar15.docx | DOCX document | |
| FA810515R0001_______0002.pdf | ||
| FA810515R0001_______0001.pdf | ||
| PWS_for_Boeing_ESS_Contract_(CY16)_Final_Final(R1)_11_Feb_15.docx | DOCX document | |
| FA810515R0001.pdf | ||
| Copy_of_Boeing_CY16_Exhibit_B_Recurring_Engineering_FFP.xls | XLS spreadsheet | |
| Copy_of_Basic_CY16_Attachment_1_TM_Rate_Table_RFP.xls | XLS spreadsheet | |
| PWS_Boeing_ESS_Contract_19_Nov_14.docx | DOCX document | |
| CDRLs_A001_A008.pdf | ||
| TM_86_01N_1April2009.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Option 4 Exhibit C | COST PLUS FIXED FEE - COMPLETION | ||||||
| Exhibit Line Item Number | Engineering Task | IAW PWS Paragraph | Period of Performance | Quantity | Estimated Cost | Fixed Fee | Estimated Total Price |
| C001 | Post Production Aircraft Support | 3.3.2.1 | 1 Jan 2016-31 Dec 2016 | LO | |||
| C002 | Weapon Systems Integrity Program (WSIP) | 3.3.2.2.1 | 1 Jan 2016-31 Dec 2016 | LO | |||
| C003 | Aircraft Structural Integrity Program (ASIP) | 3.3.2.2.2 | 1 Jan 2016-31 Dec 2016 | LO | |||
| C004 | Functional Systems Integrity Program/Mechanical Systems Integrity Program (FSIP/MECSIP) | 3.3.2.2.3 | 14 Sep 2016 - 13 Sep 2017 | LO | |||
| C005 | Structures Working Group (SWG) | 3.3.2.2.4 | 1 Jan 2016-31 Dec 2016 | LO | |||
| C006 | Corrosion Prevention and Control Program (CPCP) | 3.3.2.2.5 | 1 Jan 2016-31 Dec 2016 | LO | |||
| C007 | Conference Attendance/Support | 3.3.2.3 | 1 Jan 2016-31 Dec 2016 | LO | |||
| C008 | Pre-Proposal Review of Engineering Assignments | 3.3.2.4 | 1 Jan 2016-31 Dec 2016 | LO | |||
| C009 | Structural Liasion Engineering Training for New Employees | 3.3.2.5 | 1 Jan 2016-31 Dec 2016 | LO | |||
| C010 | Assessment of 4-year/8-year Programmed Depot Maintenance (PDM) Program | 3.3.2.6 | 1 Jan 2016-31 Dec 2016 | LO |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .