Copy_of_Basic_CY16_Attachment_1_TM_Rate_Table_RFP.xls

XLS spreadsheet 27 KB Posted

Attached to
C/KC-135 Engineering Sustainment Support
Solicitation number
FA8105-15-R-0001
Issued by

About this file

Attachment 1 (T M)

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Basic Attachment 1- T&M Labor Rate Table
T&M2016 Rates / Factors
Boeing Aerospace - BAO
1Engineering
2Functional
3Material Burden
4Travel Burden
BDS-Wichita (Italics are Wichita Cost Model Categories)
5W1 - Factory Mod (A/C Installation)
6W2 - Factory Support (Quality Assurance)
7W3 - Fab and Assy.
8W4 - Engineering (Plant Engineering)
9W5 - Logistics
10W6 - Tech Pubs
11W7 - SM&P (SM&P Direct Prop. Prep.)
12W8 - Prop. Mgmt.
13W8 - Prog. Support (Prog Spt Direct Prop Prep)
14W9 - Quality
15R1 - Remote Other
16R3 - Remote Eng.
17Low Value Mat'l factor
18High Value Mat'l factor
19Non Burden Mat'l factor
20Travel Material factor
BR&T
21Engineering (M&P)
BT&E
22Flight Ops and Pilots
San Antonio
23Backshop
24Maint/Mod
25Planning
26Material Factor

Sheet2

Sheet3

File details come from the government source that posted it. Updated .