FA8105-22-R-0006-0002.pdf

PDF 806 KB Posted

Attached to
KC-135 Avionics Sustainment Engineering Services
Solicitation number
FA810522R0006
Issued by

View the file

Other files

File Type Posted
Cover Letter.pdf PDF
ASESFollow-OnFINALPWS14Jul22.pdf PDF
FA810522R00060001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

JLSUVY

2. AMENDMENT/MODIFICATION NO.

FA8105-22-R-0006-0002

3. EFFECTIVE DATE

21 JUL 2022

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO (If applicable)

6. ISSUED BY CODE

DEPARTMENT OF THE AIR FORCE, AFLCMC WLTK

3001 STAFF DR STE 2AI 85A

TINKER AFB OK 73145-3303

BUYER: Diana Kennedy/AFLCMC/WLT diana.kennedy@us.af.mil Phone: (405) 736- 1863

7. ADMINISTERED BY (If other than item 6) CODEFA8105

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

X

9A. AMENDMENT OF SOLICITATION NO.

FA810522R0006

9B. DATED (SEE ITEM 11)

13-MAY-2022

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 31-AUG-2022 3:00 PM

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

FMS REQUIREMENT

Routine

The purpose of the amendment is to extend the proposal response date, update the Performance Work Statement (PWS) and add contract line item numbers (CLINS).

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

BY ________________________________________________________

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY ____________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

FACILITY CODE

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

PRESCRIBED BY GSA

FAR (48 CFR) 53.243

X

X X

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

FA8105-22-R-0006-0002

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

The purpose of this amendment is to extend the proposal response time as follows:

FIRST: The PWS for C/KC135 Avionics Sustaining Engineering Services (ASEs) dated 14 July 2022 is hereby incorporated into the request for Proposal and replaces the prior PWS for C/KC135 ASES.

SECOND: As a result of "FIRST," CLINS 0005, 1005, 2005, 3005 and 4005 are hereby added as shown in Section B.

THIRD: As a result of "FIRST" and "SECOND," the proposal response date is hereby extended as follows:

From: 3:00 PM local time, 12 July 2022

To: 3:00 PM central time, 31 August 2022

FOURTH: All other provisions, terms and conditions remain the same.

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Assumptions

The contractor shall provide Services as defined in the attached Performance Work Statement to support C/KC135 Avionics Sustaining Engineering Services (ASES) with a twoyear basic contract period, four (4) twoyear options. Options to extend the term of contract may be awarded at the Governments discretion.

1) Ordering Period: (Basic period to begin upon date of contract award execution) (Option periods awarded at the Governments discretion)

Basic Estimated to be 03 Apr 23 through 02 Apr 25 Option 1 Estimated to be 03 Apr 25 through 02 Apr 27 Option 2 Estimated to be 03 Apr 27 through 02 Apr 29 Option 3 Estimated to be 03 Apr 29 through 02 Apr 31 Option 4 Estimated to be 03 Apr 31 through 02 Apr 33

2) The services and prototyping the government seeks are highly specialized to C/KC135 aircraft. The contractor must be capable of sustaining avionics systems. Rockwell Collins (also known as Collins Aerospace) is the original manufacture and integrator for over 95% of the C/KC135 avionics including the Communication Navigation Surveillance/Air Traffic Management (CNS/ATM), Global Air Traffic Management (GATM) and Pacer CRAG (Compass, Radar and GPS) avionics modification that provide for an integrated avionics solution on C/KC135 aircraft.

3) The contract line item number (CLIN) structure allows for multiple task assignments to be awarded from single proposals and allows for multiple deliverables on an individual order without use of subcontract line item numbers (SubCLINs) to facilitate multiple funding appropriations when required.

The CLIN structure is not sequentially numbers, but instead allows for future CLINs if needed.

4) The minimum basic order will be for one month of CLIN 0002 Recurring Engineering Support.

5) Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available for the minimum order. The Government reserves the right to cancel this solicitation, either before or after the closing date for receipt of proposals. In the event the Government cancels this request, the Government has no obligation to reimburse for any costs.

6) Federal Acquisition Regulation (FAR) clause 52.2178, Option to Extend Services: If FAR 52.2178, Option to Extend Services, is exercised, within the terms of the clause stated herein, the basic contract prices specified in the existing contract ordering period immediately preceding the exercise of FAR

52.2178 will apply to all task orders issued under the Option to Extend Services. The CLIN structure for continued performance of services under the option will be incorporated via modification at the time of option exercise.

7.) CONTRACT APPEARANCE: The resulting contract may be awarded using a different contract writing system which may result in a different format or appearance. This contract may also be bilaterally reissued after award at the exercise of an option with a different format or appearance.

Task Order Proposal Preparation Item No.

Firm Fixed Price Quantity U/I Unit Price Estimated Total Price TBN

LO To be Negotiated

CLIN ACRN ACRN Total

0001 AA

R425 The contractor will perform activities on behalf of the KC135 Avionic Sustainment Engineering Service (ASES) Performance Work Statement (PWS). These activities include incorporating section 3.1.1.5. This is expected to be used with contract line item numbers (CLIN) 00100068.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity Prohibited IAW PWS Paragraph 3.2.9 Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

A TBD LO TBC

Proposed Delivery

A TBD LO

Recurring Engineering Support OnSite Liaison Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

24 MO

CLIN ACRN ACRN Total

Recurring Engineering Support OnSite Liaison

0002 AA

R425 Recurring Engineering Services (USAF) The contractor will perform activities on behalf of the KC135 ASES PWS. These activities include incorporating PWS Section 3.2, 3.3, subsection 3.3.1 (paragraphs 3.3.1.1 thru 3.3.1.4.4) and 3.3.2 (paragraphs 3.3.2.1 thru 3.3.2.9). This CLIN will include reoccurring technical support in the PWS Table 3.3 for Category A.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Wide Area Work Flow (WAWF) Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Class I ODS Substance Application/Use Quantity Prohobited IAW PWS paragraph 3.2.9 Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

MO TBC

Proposed Delivery

MO

Recurring Engineering Support Item No.

Incentive Firm Target Estimated Quantity

U/I Target Cost Target Profit Estimated Total Price

LO To be Negotiated

CLIN ACRN ACRN Total

0003 AA

R425 Recurring Engineering Services (USAF) The contractor will perform activities on behalf of the KC135 ASES PWS.This line item is reserved for future use to be negotiated.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

Recurring Engineering Support

ISO 90012008 2008

Class I ODS Substance Application/Use Quantity Prohobited IAW PWS paragraph 3.2.9 Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Proposed Period of Performance

LO

Recurring Engineering Support Item No.

Cost Plus Incentive Fee Estimated Quantity

U/I Est Target Cost Target Fee Total Estimated Cost

LO To be Negotiated

CLIN ACRN ACRN Total

0004 AA

R425 Recurring Engineering Services (USAF) The contractor will perform activities on behalf of the KC135 ASES PWS.This line item is reserved for future use to be negotiated.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Class I ODS Substance Application/Use Quantity Prohobited IAW PWS paragraph 3.2.9 Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Recurring Engineering Support Proposed Period of Performance

LO

Fuel Management Performance System (FMPS)/Flight Performance Algorithm (FPA) Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

CLIN ACRN ACRN Total

0005 AA

NSN: R425

Recurring Engineering Services The contractor will perform activities on behalf of the KC135 ASES PWS paragraph 3.3.1.3 and its subparagraphs.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Certificate of Conformance Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

1 LO TBC

Proposed Delivery

1 LO

NonRecurring Engineering Service Requirements Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

1 LO To be Negotiated

CLIN ACRN ACRN Total

0010 AA

R425 NonRecurring Engineering Services (USAF) The contractor will perform activities on behalf of the KC135 ASES PWS. These activities include incorporating PWS section 3.4 NonRecurring Engineering Services Requirements and individual order documents.

In accordance with (IAW) with PWS 3.1.1 Task assignment will be used to authorize nonrecurring engineering Support Services under the PWS. A Task Assignment is a Legacy Tanker Division developed form that identifies the problem, defines the work to be accomplished, specifies due dates, priorities, and provides the funding information for the support being acquired.

Quality Standard, inspection and acceptance must be cited on the order IAW FAR Part 46 and its supplements.

The total price for task assignment will be negotiated for each task order.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity Prohobited IAW PWS paragraph 3.2.9 Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

LO TBC

Proposed Delivery

LO

NonRecurring Engineering Service Requirements Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

1 LO To be Negotiated

CLIN ACRN ACRN Total

0011 AA

R425 NonRecurring Engineering Services (USAF) The contractor will perform activities on behalf of the KC135 ASES PWS. These activities include incorporating PWS section 3.4 NonRecurring Engineering Services Requirements and individual order documents.

IAW with PWS 3.1.1 Task assignment will be used to authorize nonrecurring engineering Support Services under the PWS. A Task Assignment is a Legacy Tanker Division developed form that identifies the problem, defines the work to be accomplished, specifies due dates, priorities, and provides the funding information for the support being acquired.

Quality Standard, inspection and acceptance must be cited on the order IAW FAR Part 46 and its supplements.

The total price for task assignment will be negotiated for each task order.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity Prohobited IAW PWS paragraph 3.2.9 Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Proposed Period of Performance

LO

Informational Only

NonRecurring Engineering Service Requirements Item No.

Incentive Firm Target Estimated Quantity

U/I Target Cost Target Profit Target Price

1 LO To be Negotiated

CLIN ACRN ACRN Total

0020 AA

R425 NonRecurring Engineering Services (USAF) The contractor will perform activities on behalf of the KC135 ASES PWS. These activities include incorporating PWS section 3.4 NonRecurring Engineering Services Requirements and individual order documents.

IAW with PWS 3.1.1 Task assignment will be used to authorize nonrecurring engineering Support Services under the PWS. A Task Assignment is a Legacy Tanker Division developed form that identifies the problem, defines the work to be accomplished, specifies due dates, priorities, and provides the funding information for the support being acquired.

Quality Standard, inspection and acceptance must be cited on the order IAW with FAR Part 46 and its supplements.

The target price for task assignment will be negotiated for each task order.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Class I ODS Substance Application/Use Quantity Prohoibited IAW PWS paragraph 3.2.9 Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

LO TBC

Proposed Delivery

LO

NonRecurring Engineering Service Requirements Item No.

Incentive Firm Target Estimated Quantity

U/I Target Cost Target Profit Target Price

1 LO To be Negotiated

CLIN ACRN ACRN Total

0021 AA

R425 NonRecurring Engineering Services (USAF) The contractor will perform activities on behalf of the KC135 ASES PWS. These activities include incorporating PWS section 3.4 NonRecurring Engineering Services Requirements and individual order documents.

IAW with PWS 3.1.1 Task assignment will be used to authorize nonrecurring engineering Support Services under the PWS. A Task Assignment is a Legacy Tanker Division developed form that identifies the problem, defines the work to be accomplished, specifies due dates, priorities, and provides the funding information for the support being acquired.

Quality Standard, inspection and acceptance must be cited on the order IAW with FAR Part 46 and its supplements.

The target price for task assignment will be negotiated for each task order.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Class I ODS Substance Application/Use Quantity Prohobited IAW PWS paragraph 3.2.9 Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

LO TBC

Proposed Delivery

LO

NonRecurring Engineering Service Requirements Item No.

Cost Plus Fixed Fee Estimated Quantity

U/I Estimated Cost Fixed Fee Est Total Cost

1 LO To be Negotiated

CLIN ACRN ACRN Total

0030 AA

R425 NonRecurring Engineering Services (USAF) The contractor will perform activities on behalf of the KC135 ASES PWS. These activities include incorporating PWS section 3.4 NonRecurring Engineering Services Requirements and individual order documents.

IAW with PWS 3.1.1 Task assignment will be used to authorize nonrecurring engineering Support Services under the PWS. A Task Assignment is a Legacy Tanker Division developed form that identifies the problem, defines the work to be accomplished, specifies due dates, priorities, and provides the funding information for the support being acquired.

Quality Standard, inspection and acceptance must be cited on the order IAW with FAR Part 46 and its supplements.

The estimated (Est) total cost for task assignment will be negotiated for each task order.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Class I ODS Substance Application/Use Quantity Prohobited IAW PWS paragraph 3.2.9 Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

LO TBC

Proposed Delivery

LO

NonRecurring Engineering Service Requirements Item No.

Cost Plus Fixed Fee Estimated Quantity

U/I Estimated Cost Fixed Fee Est Total Cost

1 LO To be Negotiated

CLIN ACRN ACRN Total

0031 AA

R425 NonRecurring Engineering Services (USAF) The contractor will perform activities on behalf of the KC135 ASES PWS. These activities include incorporating PWS section 3.4 NonRecurring Engineering Services Requirements and individual order documents.

IAW with PWS 3.1.1 Task assignment will be used to authorize nonrecurring engineering Support Services under the PWS. A Task Assignment is a Legacy Tanker Division developed form that identifies the problem, defines the work to be accomplished, specifies due dates, priorities, and provides the funding information for the support being acquired.

Quality Standard, inspection and acceptance must be cited on the order IAW with FAR Part 46 and its supplements.

The estimated (Est) total cost for task assignment will be negotiated for each task order.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Class I ODS Substance Application/Use Quantity Prohibited IAW PWS Paragraph 3.2.9

Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

LO TBC

Proposed Delivery

LO

To be negotiated on the task assignment.

NonRecurring Engineering Service Requirements Item No.

Cost Plus Incentive Fee Estimated Quantity

U/I Est Target Cost Target Fee Total Estimated Cost

1 LO To be Negotiated

CLIN ACRN ACRN Total

0040 AA

R425 NonRecurring Engineering Services (USAF) The contractor will perform activities on behalf of the KC135 ASES PWS. These activities include incorporating PWS section 3.4 NonRecurring Engineering Services Requirements and individual order documents.

IAW with PWS 3.1.1 Task assignment will be used to authorize nonrecurring engineering Support Services under the PWS. A Task Assignment is a Legacy Tanker Division developed form that identifies the problem, defines the work to be accomplished, specifies due dates, priorities, and provides the funding information for the support being acquired.

Quality Standard, inspection and acceptance must be cited on the order IAW with FAR Part 46 and its supplements.

The total estimated cost for task assignment will be negotiated for each task order.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Class I ODS Substance Application/Use Quantity Prohobited IAW PWS Paragraph 3.2.9 Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

LO TBC

Proposed Delivery

LO

NonRecurring Engineering Service Requirements Item No.

Cost Plus Incentive Fee Estimated Quantity

U/I Est Target Cost Target Fee Total Estimated Cost

1 LO To be Negotiated

CLIN ACRN ACRN Total

0041 AA

R425 NonRecurring Engineering Services (USAF) The contractor will perform activities on behalf of the KC135 ASES PWS. These activities include incorporating PWS section 3.4 NonRecurring Engineering Services Requirements and individual order documents.

IAW with PWS 3.1.1 Task assignment will be used to authorize nonrecurring engineering Support Services under the PWS. A Task Assignment is a Legacy Tanker Division developed form that identifies the problem, defines the work to be accomplished, specifies due dates, priorities, and provides the funding information for the support being acquired.

Quality Standard, inspection and acceptance must be cited on the order IAW with FAR Part 46 and its supplements.

The total estimated cost for task assignment will be negotiated for each task order.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Class I ODS Substance Application/Use Quantity Prohobited IAW PWS paragraph 3.2.9 Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

Proposed Delivery

LO

NonRecurring Engineering Service Requirements Item No.

Time & Material Estimated Quantity

U/I Fixed Rate Ceiling Price

1 LO To be Negotiated

CLIN ACRN ACRN Total

0050 AA

Title: Labor Categories R425 NonRecurring Engineering Services (USAF) The contractor will perform activities on behalf of the KC135 ASES PWS. These activities include incorporating PWS section 3.4.1 and individual order documents.

IAW with PWS 3.1.1 Task assignment will be used to authorize nonrecurring engineering Support Services under the PWS. A Task Assignment is a Legacy Tanker Division developed form that identifies the problem, defines the work to be accomplished, specifies due dates, priorities, and provides the funding information for the support being acquired.

Quality Standard, inspection and acceptance must be cited on the order IAW with FAR Part 46 and its supplements.

The Ceiling Price will be determined on the task order.

This CLIN is intended to use if an occurence should occur as an emergency situation under PWS paragraph 3.4.1 Aircraft Mishap Incident Investigations.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Class I ODS Substance Application/Use Quantity Prohobited IAW PWS paragraph 3.2.9 Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required

LO TBC

Proposed Delivery

LO

LI Y

NonRecurring Engineering Service Requirements Item No.

Time & Material Estimated Quantity

U/I Fixed Rate Ceiling Price

LO To be Negotiated

CLIN ACRN ACRN Total

0051 AA

Title: Labor Category R425 NonRecurring Engineering Services (USAF) The contractor will perform activities on behalf of the KC135 ASES PWS. These activities include incorporating PWS section 3.4.1 and individual order documents.

IAW with PWS 3.1.1 Task assignment will be used to authorize nonrecurring engineering Support Services under the PWS. A Task Assignment is a Legacy Tanker Division developed form that identifies the problem, defines the work to be accomplished, specifies due dates, priorities, and provides the funding information for the support being acquired.

IAW with PWS 3.1.1 Task assignment will be used to authorize nonrecurring engineering Support Services under the PWS. A Task Assignment is a Legacy Tanker Division developed form that identifies the problem, defines the work to be accomplished, specifies due dates, priorities, and provides the funding information for the support being acquired.

Quality Standard, inspection and acceptance must be cited on the order IAW with FAR Part 46 and its supplements.

The Ceiling Price will be determined on the task order.

This CLIN is intended to use if an occurrence should occur as an emergency situation under PWS paragraph 3.4.1 Aircraft Mishap Incident Investigations.

Limitations of Liability: Other Than High Value Item

Inspection: Origin

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Class I ODS Substance Application/Use Quantity Prohobited IAW PWS paragraph 3.2.9 Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

LO TBC

Proposed Delivery

LO

Test Procedures Item No.

Incentive Firm Target Estimated Quantity

U/I Target Cost Target Profit Target Price

1 EA To be Negotiated

CLIN ACRN ACRN Total

0060 AA

AD24

The contractor will perform activities on behalf of the KC135 ASES PWS. These activities include incorporating PWS section 3.4.6 as directed with each individual task assignment.

Quantity Variance (Over Percent): (Under Percent):

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Class I ODS Substance Application/Use Quantity Prohoibited IAW PWS paragraph 3.2.9 Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

EA TBC

Proposed

EA

Technical Support Modification Requirements Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

1 LO

CLIN ACRN ACRN Total

0061 AA

R425 Technical Order Sustainment Contractor shall perform in accordance with performance work Statement (PWS) paragraphs as follows:3.3.1.4, 3.3.2.1.8,

3.2.11.1 and Table 3.3 Technical Order (T.O) Category B.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

LO TBC

Proposed Delivery

LO

Technical Support (Nonrecurring Engineering) Requirements Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

1 LO

CLIN ACRN ACRN Total

0062 AA

R426 Nonrecurring Engineering Services Contractor shall perform in accordance with each task order and the C/KC135 ASES performance work Statement (PWS) paragraphs as follows:3.3.1.4, 3.3.2.1.8, 3.2.11.1 and table 3.3 Technical Order (T.O) Category A.

Technical Support (Nonrecurring Engineering) Requirements

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Class I ODS Substance Application/Use Quantity Prohibited IAW PWS paragraph 3.2.9 Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

LO TBC

Proposed Delivery

LO

Technical Support (Nonrecurring Engineering) Requirements Item No.

Incentive Firm Target Estimated Quantity

U/I Target Cost Target Profit Target Price

1 LO To be Negotiated

CLIN ACRN ACRN Total

0063 AA

R426 Contractor shall perform in accordance with each task order and the C/KC135 ASES performance work Statement (PWS) paragraphs as follows:3.3.1.4, 3.3.2.1.8, 3.2.11.1 and table 3.3 Technical Order (T.O) Category B.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Class I ODS Substance Application/Use Quantity Prohobited IAW PWS paragraph 3.2.9 Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Technical Support (Nonrecurring Engineering) Requirements

LO TBC

Proposed Delivery

LO

Technical Support (Nonrecurring Engineering) Requirements Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Target Cost % Est Total Cost

EA % To be Negotiated

CLIN ACRN ACRN Total

0064 AA

R426 Contractor shall perform in accordance with each task order and the C/KC135 ASES performance work Statement (PWS) paragraphs as follows:3.3.1.4, 3.3.2.1.8, 3.2.11.1 and table 3.3 Technical Order (T.O) Category D.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Class I ODS Substance Application/Use Quantity Prohobited IAW PWS paragraph 3.2.9 Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

EA TBC

Proposed Delivery

EA

Technical Support (Nonrecurring Engineering) Requirements Item No.

Cost Plus Incentive Fee Estimated Quantity

U/I Est Target Cost Target Fee Total Estimated Cost

LO To be Negotiated

Technical Support (Nonrecurring Engineering) Requirements CLIN ACRN ACRN Total

0065 AA

R426 Contractor shall perform in accordance with each task order and the C/KC135 ASES performance work Statement (PWS) paragraphs as follows:3.3.1.4, 3.3.2.1.8, 3.2.11.1 and table 3.3 Technical Order (T.O) Category D.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Class I ODS Substance Application/Use Quantity Prohobited IAW PWS paragraph 3.2.9 Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

LO TBC

Proposed Delivery

LO

Data Item No.

To Be Negotiated Quantity U/I Unit Price

LO TBN

DATA

Data Contractor shall provide the data identified in Section J, Exhibit A in accordance with the Performance Work Statement or Task Assignment hereof. The Government shall have unlimited rights to all developed software, test materials, documents, notes, records, and software documentation meeting the criteria specified in Defense Federal Acquisition Regulation Supplement (DFARS) 252.2277013, 252.2277014 and 252.2277015. The costs associated with data are included in CLINS.

Exhibit: A Class I ODS Substance Application/Use Quantity Prohobitied IAW PWS paragraph 3.2.9

Material Item No.

Cost Reimbursement No Fee

Material Estimated Quantity

U/I Est Unit Cost Total Estimated Cost

1 LO To be Negotiated

CLIN ACRN ACRN Total

0067 AA

NSN: 1680

Material is for supporting Prototypes. IAW PWS 3.3.2.1.8 prototype efforts will be addressed in individual task assignments.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBD ORIGIN

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

A TBD LO TBC

Proposed Delivery

A TBD LO

Travel Item No.

Cost Reimbursement No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

CLIN ACRN ACRN Total

0068 AA

TRAV

Travel (Base) Informational IAW with FAR Part 31, Joint Travel Regulation (JTR), 3.3.1.1 bullet h, PWS paragraph 3.3.1.2 bullet g, 6.2 and each individual task assignment and ASES PWS. Travel request must be submitted to the cognate COR for the task order and approved by the Procurement Contracting Officer (PCO)/Administrative Contracting Officer (ACO) before travel begins and is subject to the limitation of cost 52.23220.

Travel

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Class I ODS Substance Application/Use Quantity Prohobited IAW PWS paragraph 3.2.9 Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

Req No / Pri

Required Delivery

LO TBC

Proposed Delivery

LO

Agile Software Proposal Preparation Item No.

Firm Fixed Price Quantity U/I Unit Price Estimated Total Price TBN

LO To be Negotiated

CLIN ACRN ACRN Total

0076 AA

R425 Agile Software Proposal Preparation The contractor will perform activities on behalf of the KC135 Avionic Sustainment Engineering Service (ASES) Performance Work Statement (PWS). These activities include incorporating section 3.1.1.5. This is expected to be used with contract line item numbers (CLIN) 00770082, in the event a task assignment is requested.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity Prohobited IAW PWS paragraph 3.2.9 Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of

Agile Software Proposal Preparation

LO TBC

Proposed Period of Performance

LO

Agile Software Development Item No.

Fixed Price Level of Effort Estimated Quantity

U/I Estimated Unit Price Estimated Total Price

1 LO

CLIN ACRN ACRN Total

0077 AA

R425 Agile Software Development IThe contractor will perform activities on behalf of the KC135 ASES PWS. These activities include incorporating PWS section 3.3.2.10, 3.3.2.10.3, and 3.3.2.10.4.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Certificate of Conformance Class I ODS Substance Application/Use Quantity Prohobited IAW PWS paragraph 3.2.9 Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Proposed Period of Performance

LO

Agile Software Review Item No.

Fixed Price Level of Effort Estimated Quantity

U/I Estimated Unit Price Estimated Total Price

Agile Software Review

1 LO

CLIN ACRN ACRN Total

0078 AA

R425 Agile Software Reviews The contractor will perform activities on behalf of the KC135 ASES PWS. These activities include incorporating PWS section

3.3.2.10.5 and 3.3.2.10.5.2.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Certificate of Conformance Class I ODS Substance Application/Use Quantity Prohobited IAW PWS paragraph 3.2.9 Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Proposed Period of Performance

LO

Agile Software Release Cycle Item No.

Cost Plus Fixed Fee Estimated Quantity

U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

CLIN ACRN ACRN Total

0079 AA

R425 Agile Software Release Cycle The contractor will perform activities on behalf of the KC135 ASES PWS. These activities include in PWS section 3.3.2.10.6.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Prohobited IAW PWS paragraph 3.2.9

Agile Software Release Cycle Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Proposed Period of Performance

LO

Agile Design Documentation Item No.

Cost Plus Fixed Fee Estimated Quantity

U/I Estimated Cost Fixed Fee Est Total Cost

LO

CLIN ACRN ACRN Total

0080 AA

R425 Agile Design Documentation The contractor will perform activities on behalf of the KC135 ASES PWS. These activities include incorporating PWS section 3.3.2.10.5.2.1.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Proposed Period of

LO

Agile Sprint Review Item No.

Cost Plus Incentive Fee Estimated Quantity

U/I Est Target Cost Target Fee Total Estimated Cost

1 LO

CLIN ACRN ACRN Total

0081 AA

R425 Agile Sprint Reviews The contractor will perform activities on behalf of the KC135 ASES PWS. These activities include incorporating PWS section

3.3.2.10.5 and 3.3.2.10.5.1.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Class I ODS Substance Application/Use Quantity Prohobited IAW PWS paragraph 3.2.9 Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Proposed Period of Performance

LO

Agile Test Item No.

Cost Plus Fixed Fee Estimated Quantity

U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

CLIN ACRN ACRN Total

0082 AA

R425 Test Procedures The contractor will perform activities on behalf of the KC135 ASES PWS. These activities include incorporating PWS section 3.3.2.10.1.

Agile Test

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Class I ODS Substance Application/Use Quantity Prohobited IAW PWS paragraph 3.2.9 Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Proposed Period of Performance

LO

FMS Task Order Proposal Preparation Item No.

Firm Fixed Price Quantity U/I Unit Price Estimated Total Price TBN

LO To be Negotiated

CLIN ACRN ACRN Total

0101 AA

R425 FMS Task Assignment B&P The contractor will perform activities on the United States of America Letter of Offer and Acceptance (LOA) and KC135 ASES PWS. These activities include incorporating section 3.1.1.5. This is expected to be used with contract line item numbers (CLIN) 01060110.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Foreign Military Sales :FMS Case:

FMS Task Order Proposal Preparation Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Delivery

LO TBC

Proposed Delivery

LO

FMS Recurring Engineering Support Item No.

Firm Fixed Price Quantity U/I Unit Price Estimated Total Price 1 LO To be Negotiated

Turkey

France

EA

Chile

EA

CLIN ACRN ACRN Total

0102 AA

R425 FMS Recurring Engineering Services Requirements The contractor will perform activities on behalf of the KC135 ASES PWS. These activities include incorporating PWS Section 3.2, 3.3, subsection 3.3.1 (paragraphs 3.3.1.1 thru 3.3.1.4.4) and 3.3.2 (paragraphs 3.3.2.1 thru 3.3.2.9). This CLIN will include reoccurring technical support in the PWS Table 3.3 for Category A.

FMS requirements will include Letter of Offer and Acceptance with amendments as appropriate. Each Country will be assigned a SubCLIN when funding becomes available.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Foreign Military Sales :FMS Case:

Class I ODS Substance Application/Use Quantity Prohobited IAW PWS paragraph 3.2.9 Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of

Proposed Period of Performance

LO

FMS Recurring Engineering Support Item No.

Cost Plus Incentive Fee Estimated Quantity

U/I Est Target Cost Target Fee Total Estimated Cost

1 LO To be Negotiated

Turkey

EA

France

EA

Chile

EA

CLIN ACRN ACRN Total

0103 AA

R425 FMS Recurring Engineering Services Requirement The contractor will perform activities on behalf of the United States of America Letter of Offer and Acceptance (LOA) and KC135 ASES PWS. These activities include the PWS section 3.3.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Foreign Military Sales :FMS Case:

Class I ODS Substance Application/Use Quantity Prohobited IAW PWS paragraph 3.2.9 Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Proposed Period of

FMS Recurring Engineering Support Item No.

Incentive Firm Target Estimated Quantity

U/I Target Cost Target Profit Target Price

1 LO To be Negotiated

Turkey

EA

France

EA

Chile

EA

CLIN ACRN ACRN Total

0104 AA

R425 FMS Recurring Engineering Services Requirement The contractor will perform activities on behalf of the United States of America Letter of Offer and Acceptance (LOA) and KC135 ASES PWS. These activities include the PWS section 3.3.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Foreign Military Sales :FMS Case:

Class I ODS Substance Application/Use Quantity Prohobited IAW PWS paragraph 3.2.9 Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Proposed Period of Performance

LO

FMS Recurring Engineering Support Item No.

Cost Plus Fixed Fee Estimated

U/I Estimated Cost Fixed Fee Est Total Cost

FMS Recurring Engineering Support 1 LO To be Negotiated

CLIN ACRN ACRN Total

0105 AA

R425 FMS Recurring Engineering Services Requirement The contractor will perform activities on behalf of the United States of America Letter of Offer and Acceptance (LOA) and KC135 ASES PWS. These activities include the PWS section 3.3.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 90012008 2008

Foreign Military Sales :FMS Case:

Class I ODS Substance Application/Use Quantity Prohobited IAW PWS paragraph 3.2.9 Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Proposed Period of Performance

LO

FMS NonRecurring Engineering Service Requirements Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

1 LO To be Negotiated

Turkey

EA

France

EA

Chile

EA

CLIN ACRN ACRN Total

0106 AA

R425 FMS NonRecurring Engineering Services Requirement

FMS NonRecurring Engineering Service Requirements The contractor will perform activities on behalf of the United States of America Letter of Offer and Acceptance (LOA) and KC135 ASES PWS. These activities include incorporating PWS section 3.4 and individual order documents.

In accordance with (IAW) with PWS 3.1.1 Task assignment will be used to authorize nonrecurring engineering Support Services under the PWS. A Task Assignment is a Legacy Tanker Division developed form that identifies the problem, defines the work to be accomplished, specifies due dates, priorities, and provides the funding information for the support being acquired.

Quality Standard, inspection and acceptance must be cited on the order IAW FAR Part 46 and its supplements.

The total price for task assignment will be negotiated for each task order.

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Foreign Military Sales :FMS Case:

Class I ODS Substance Application/Use Quantity Prohobited IAW PWS paragraph 3.2.9 Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

LO TBC

Proposed Period of Performance

LO

FMS NonRecurring Engineering Services Requirements Item No.

Incentive Firm Target Estimated Quantity

U/I Target Cost Target Profit Target Price

1 LO To be Negotiated

Turkey

EA

France

EA

Chile

EA

CLIN ACRN ACRN Total

FMS NonRecurring Engineering Services Requirements

0107 AA

R425 FMS NonRecurring Engineering Services Requirement The contractor will perform activities on behalf of the United States of America Letter of Offer and Acceptance (LOA) and KC135 ASES PWS. These activities include incorporating PWS section 3.4 and individual order documents.

IAW with PWS 3.1.1 Task assignment will be used to authorize nonrecurring engineering Support Services under the PWS.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .