Bid_Items_List.xls
XLS spreadsheet 66 KB Posted
- Attached to
- Carpet BPA Tinker AFB
- Solicitation number
- FA8101-15-R-0005
About this file
Bid Items List for base year plus one option year
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_FA8101-15-R-0005-U0001.pdf | ||
| FA8101-15-R-0005_(amend).pdf | ||
| Amended_Bid_Items_List.xlsx | XLSX spreadsheet | |
| Tinker_Carpet_BPA_Q A.docx | DOCX document | |
| Tinker_Carpet_BPA_Q A.docx | DOCX document | |
| Appendix_1.pdf | ||
| FA8101-15-R-0005.pdf | ||
| Statement_of_Work.pdf | ||
| Appendix_2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Basic
| BID ITEMS - BASIC YEAR | ||||||||
| After hours (AH) are between 1700 hrs and 0730 hrs and all day Saturday, Sunday and holidays. | ||||||||
| UNIT | TOTAL | |||||||
| CLIN | UNIT | ESTIMATE | COST | COST | ||||
| Preparation Line Items | ||||||||
| 001 | Measurement and consultation when requested by Contracting Officer | EA | 10 | |||||
| 002 | Transport material to the job site (Gov. furnished or contractor furnished): | EA | 50 | |||||
| 003 | Remove existing flooring: | |||||||
| a) Broadloom carpet glued down | SY | 9,000 | ||||||
| b) Broadloom carpet and pad | SY | 200 | ||||||
| c) Carpet tiles/squares | SY | 10,000 | ||||||
| d) Rubber backed carpet | SY | 200 | ||||||
| e) Vinyl Tile | SF | 6,500 | ||||||
| f) Sheet Vinyl | SY | 2,500 | ||||||
| g) Floor repair to include filling all cracks wider than 1/8 in, filling all holes larger than | HR | 100 | ||||||
| ¼ in diameter. Float ridges or indentions. | ||||||||
| Installation Line Items | ||||||||
| 004 | Install flooring: | |||||||
| Note: Installation amount paid shall be for the actual amount of flooring installed not | ||||||||
| the amount handled. | ||||||||
| a) Carpet - Glue down method. Less than 200 SY (WH) | SY | 3,000 | ||||||
| b) Carpet - Glue down method. More than 200 SY (WH) | SY | 10,000 | ||||||
| c) Carpet - Glue down method. Less than 200 SY (AH) | SY | 2,000 | ||||||
| d) Carpet - Glue down method. More than 200 SY (AH) | SY | 2,000 | ||||||
| e) Carpet - Tiles/squares. Less than 200 SY (WH) | SY | 3,500 | ||||||
| f) Carpet - Tiles/squares. More than 200 SY (WH) | SY | 10,500 | ||||||
| g) Carpet - Tiles/squares. Less than 200 SY (AH) | SY | 2,500 | ||||||
| h) Carpet - Tiles/squares. More than 200 SY (AH) | SY | 2,500 | ||||||
| i) Carpet - Tackless method. Less than 200 SY (WH) | SY | 500 | ||||||
| j) Carpet - Tackless method. More than 200 SY (WH) | SY | 500 | ||||||
| k) Carpet - Tackless method. Less than 200 SY (AH) | SY | 500 | ||||||
| l) Carpet - Tackless method. More than 200 SY (AH) | SY | 500 | ||||||
| m) Carpet - Install single border (two borders double cost) | LF | 5,000 | ||||||
| n) Vinyl Tile Less than 225 SF (WH) | SF | 1,000 | ||||||
| o) Vinyl Tile More than 225 SF (WH) | SF | 6,000 | ||||||
| p) Vinyl Tile Less than 225 SF (AH) | SF | 500 | ||||||
| q) Vinyl Tile More than 225 SF (AH) | SF | 500 | ||||||
| BID ITEMS | ||||||||
| UNIT | TOTAL | |||||||
| CLIN | UNIT | ESTIMATE | COST | COST | ||||
| 004 cond | t) Sheet Vinyl - Less than 25 SY (AH) | SY | 500 | |||||
| u) Sheet Vinyl - More than 25 SY (AH) | SY | 500 | ||||||
| Accessory Items | ||||||||
| Furnish & Install accessory material: | ||||||||
| 005 | a) Metal edge stripping/reducer/transition strip: | LF | 1,000 | |||||
| b) Vinyl edge stripping/reducer/transition strip: | LF | 3,500 | ||||||
| $ - 0 | ||||||||
| Base Molding Items | ||||||||
| 006 | Furnish and Install: | |||||||
| a) Rubber cove base, 4 in: | LF | 17,000 | ||||||
| b) Rubber cove base, 6 in: | LF | 2,500 | ||||||
| c) Vinyl cove base 4 in: | LF | 17,000 | ||||||
| d) Vinyl cove base 6 in: | LF | 2,500 | ||||||
| e) Remove base molding any size, rubber, vinyl, wood: | LF | 25,000 | ||||||
| $ - 0 | ||||||||
| Stair Tread and Riser Items | ||||||||
| Furnish and Install: | ||||||||
| 007 | a) Riser 6 or 7 inch high | LF | 1,000 | |||||
| b) Rubber stair nosing: | LF | 1,000 | ||||||
| c) Metal stair nosing: | LF | 500 | ||||||
| d) Rubber stair treads | LF | 1,000 | ||||||
| e) Remove risers, nosings any size, rubber, vinyl, wood | LF | 1,000 | ||||||
| f) Remove stair treads any size, rubber, vinyl, wood | LF | 1,000 | ||||||
| $ - 0 | ||||||||
| Furniture Moving Items | ||||||||
| 008 | Furniture removal and replacement: | |||||||
| a) Free standing | SY | 10,000 | ||||||
| b) Systems furniture moving, lift method | SY | 8,000 | ||||||
| Note: This would be required in areas that have pre-existing carpet tiles/squares to be | ||||||||
| replaced with new carpet tiles. | ||||||||
| c) Food machines, safes, water fountains, refrigerators. | EA | 50 | ||||||
| d) Move carpet to upper level, per floor. Not to be paid when elevator is available | SY | 6,000 | ||||||
| Installation on Landings, Stages and Stairs | ||||||||
| 009 | Installation of carpet on landings, stages and stairs includes wrapping. | SY | 1,000 | |||||
| Miscellaneous Labor Items | ||||||||
| 010 | Cut off wood doors, maximum width 4’6" | EA | 50 | $ - 0 | ||||
| BID ITEMS | Labor | |||||||
| UNIT | TOTAL | |||||||
| CLIN | Carpet Selection Line Items | UNIT | ESTIMATE | COST | COST | |||
| All carpet to be of one dye lot as much as possible. | ||||||||
| Contractor shall be paid for the amount of carpet including waste, and amount required by | ||||||||
| the mill as an overage tollerance. Contractor and ordering agency shall agree on | ||||||||
| quantity before commencement of work. | ||||||||
| 011 | Carpet Mfg Bigelow | |||||||
| a) Junxtion BT 135 (Over 200 SY) | SY | 8,000 | ||||||
| b) Junxtion BT 135 (Under 200 SY) | SY | 2,000 | ||||||
| c) Botanical Orgin (Over 200 SY) | SY | 2,000 | ||||||
| d) Botanical Orgin (Under 200 SY) | SY | 2,000 | ||||||
| e) Fluid Form (Over 200 SY) | SY | 1,000 | ||||||
| f) Fluid Form (Under 200 SY) | SY | 500 | ||||||
| g) Datum (Over 200 SY) | SY | 1,500 | ||||||
| h) Datum (Under 200 SY) | SY | 500 | ||||||
| i) First One Up (Over 200 SY) | SY | 1,000 | ||||||
| j) First One Up (Under 200 SY) | SY | 500 | ||||||
| 012 | Carpet Mfg Mannington | |||||||
| a) Portela (Over 200 SY) | SY | 1,000 | ||||||
| b) Portela (Under 200 SY) | SY | 500 | ||||||
| c) Baracoa II (Over 200 SY) | SY | 2,000 | ||||||
| d) Baracoa II (Under 200 SY) | SY | 500 | ||||||
| 013 | Carpet Mft Miliken | |||||||
| a) Nordic Stories -Americans-Hidden Plains (Over 200 SY) | SY | 2,000 | ||||||
| b) Nordic Stories - Americans-Hidden Plains (Under 200 SY) | SY | 500 | ||||||
| c) Tectronic (Over 200 SY) | SY | 2,000 | ||||||
| d) Tectronic (Under 200 SY) | SY | 500 | ||||||
| 014 | Interface Carpet | |||||||
| a) Mantra (Over 200 SY) | SY | 4,000 | ||||||
| b) Mantra (Under 200 SY) | SY | 2,000 | ||||||
| Product | $ - 0 | |||||||
| BID ITEMS | ||||||||
| UNIT | TOTAL | |||||||
| CLIN | Vinyl Selection Line Items | UNIT | ESTIMATE | COST | COST | |||
| Contractor shall be paid for the amount of vinyl including waste, and amount required as | ||||||||
| an overage tollerance. Contractor and ordering agency shall agree on quantity before | ||||||||
| commencement of work. | ||||||||
| 015 | Vinyl Tile | |||||||
| a) Loose Lay Tile 24" x 24" (Over 100 SY) | SY | 4,000 | ||||||
| b) Loose Lay Tile 24" x 24" (Under 100 SY) | SY | 2,500 | ||||||
| Carpet Treatments and Backing Line Items | ||||||||
| 016 | a) Scotchguard Carpet Protector or equal if not included on carpet | SY | 5,000 | |||||
| b) Rebond Urethane 3/8” thickness 6 LB | SY | 500 | ||||||
| c) Rebond Urethane 1/2” thickness 7 LB | SY | 500 | ||||||
| Vinyl Items | $ - 0 | |||||||
| TOTAL | $ - 0 |
Option 1
| BID ITEMS - OPTION 1 | |||||
| After hours (AH) are between 1700 hrs and 0730 hrs and all day Saturday, Sunday and holidays. | |||||
| UNIT | TOTAL | ||||
| CLIN | UNIT | ESTIMATE | COST | COST | |
| Preparation Line Items | |||||
| 001 | Measurement and consultation when requested by Contracting Officer | EA | 10 | ||
| 002 | Transport material to the job site (Gov. furnished or contractor furnished): | EA | 50 | ||
| 003 | Remove existing flooring: | ||||
| a) Broadloom carpet glued down | SY | 9,000 | |||
| b) Broadloom carpet and pad | SY | 200 | |||
| c) Carpet tiles/squares | SY | 10,000 | |||
| d) Rubber backed carpet | SY | 200 | |||
| e) Vinyl Tile | SF | 6,500 | |||
| f) Sheet Vinyl | SY | 2,500 | |||
| g) Floor repair to include filling all cracks wider than 1/8 in, filling all holes larger than | HR | 100 | |||
| ¼ in diameter. Float ridges or indentions. | |||||
| Installation Line Items | |||||
| 004 | Install flooring: | ||||
| Note: Installation amount paid shall be for the actual amount of flooring installed not | |||||
| the amount handled. | |||||
| a) Carpet - Glue down method. Less than 200 SY (WH) | SY | 3,000 | |||
| b) Carpet - Glue down method. More than 200 SY (WH) | SY | 10,000 | |||
| c) Carpet - Glue down method. Less than 200 SY (AH) | SY | 2,000 | |||
| d) Carpet - Glue down method. More than 200 SY (AH) | SY | 2,000 | |||
| e) Carpet - Tiles/squares. Less than 200 SY (WH) | SY | 3,500 | |||
| f) Carpet - Tiles/squares. More than 200 SY (WH) | SY | 10,500 | |||
| g) Carpet - Tiles/squares. Less than 200 SY (AH) | SY | 2,500 | |||
| h) Carpet - Tiles/squares. More than 200 SY (AH) | SY | 2,500 | |||
| i) Carpet - Tackless method. Less than 200 SY (WH) | SY | 500 | |||
| j) Carpet - Tackless method. More than 200 SY (WH) | SY | 500 | |||
| k) Carpet - Tackless method. Less than 200 SY (AH) | SY | 500 | |||
| l) Carpet - Tackless method. More than 200 SY (AH) | SY | 500 | |||
| m) Carpet - Install single border (two borders double cost) | LF | 5,000 | |||
| n) Vinyl Tile Less than 225 SF (WH) | SF | 1,000 | |||
| o) Vinyl Tile More than 225 SF (WH) | SF | 6,000 | |||
| p) Vinyl Tile Less than 225 SF (AH) | SF | 500 | |||
| q) Vinyl Tile More than 225 SF (AH) | SF | 500 | |||
| r) Sheet Vinyl - Less than 25 SY (WH) | SY | 1,000 | |||
| s) Sheet Vinyl - More than 25 SY (WH) | SY | 5,000 | |||
| BID ITEMS | |||||
| UNIT | TOTAL | ||||
| CLIN | UNIT | ESTIMATE | COST | COST | |
| 004 cond | t) Sheet Vinyl - Less than 25 SY (AH) | SY | 500 | ||
| u) Sheet Vinyl - More than 25 SY (AH) | SY | 500 | |||
| Accessory Items | |||||
| Furnish & Install accessory material: | |||||
| 005 | a) Metal edge stripping/reducer/transition strip: | LF | 1,000 | ||
| b) Vinyl edge stripping/reducer/transition strip: | LF | 3,500 | |||
| Base Molding Items | |||||
| 006 | Furnish and Install: | ||||
| a) Rubber cove base, 4 in: | LF | 17,000 | |||
| b) Rubber cove base, 6 in: | LF | 2,500 | |||
| c) Vinyl cove base 4 in: | LF | 17,000 | |||
| d) Vinyl cove base 6 in: | LF | 2,500 | |||
| e) Remove base molding any size, rubber, vinyl, wood: | LF | 25,000 | |||
| Stair Tread and Riser Items | |||||
| Furnish and Install: | |||||
| 007 | a) Riser 6 or 7 inch high | LF | 1,000 | ||
| b) Rubber stair nosing: | LF | 1,000 | |||
| c) Metal stair nosing: | LF | 500 | |||
| d) Rubber stair treads | LF | 1,000 | |||
| e) Remove risers, nosings any size, rubber, vinyl, wood | LF | 1,000 | |||
| f) Remove stair treads any size, rubber, vinyl, wood | LF | 1,000 | |||
| Furniture Moving Items | |||||
| 008 | Furniture removal and replacement: | ||||
| a) Free standing | SY | 10,000 | |||
| b) Systems furniture moving, lift method | SY | 8,000 | |||
| Note: This would be required in areas that have pre-existing carpet tiles/squares to be | |||||
| replaced with new carpet tiles. | |||||
| c) Food machines, safes, water fountains, refrigerators. | EA | 50 | |||
| d) Move carpet to upper level, per floor. Not to be paid when elevator is available | SY | 6,000 | |||
| Installation on Landings, Stages and Stairs | |||||
| 009 | Installation of carpet on landings, stages and stairs includes wrapping. | SY | 1,000 | ||
| Miscellaneous Labor Items | |||||
| 010 | Cut off wood doors, maximum width 4’6" | EA | 50 | ||
| BID ITEMS | |||||
| UNIT | TOTAL | ||||
| CLIN | UNIT | ESTIMATE | COST | COST | |
| Carpet Selection Line Items | |||||
| All carpet to be of one dye lot as much as possible. | |||||
| Broadloom prices are for orders of 100’ or 133.33 SY or more (100'). See line item for | |||||
| additional price for orders under 133.33 SY (Under100'). | |||||
| Contractor shall be paid for the amount of carpet including waste, and amount required by | |||||
| the mill as an overage tollerance. Contractor and ordering agency shall agree on | |||||
| quantity before commencement of work. | |||||
| 011 | Lee’s Commercial Carpets | ||||
| a) Artstone II DX936 Broadloom (100') | SY | 8,000 | |||
| b) Artstone II DX936 Broadloom (Under100') | SY | 2,000 | |||
| c) Artstone II DX932 Tiles/Squares (100SY) | SY | 2,000 | |||
| d) Artstone II DX932 Tiles/Squares (Under100SY) | SY | 2,000 | |||
| e) Bello D7006 Broadloom (100') | SY | 1,000 | |||
| f) Bello D7006 Broadloom (Under100') | SY | 500 | |||
| g) Workforce DV186 Broadloom (100') | SY | 1,500 | |||
| h) Workforce DV186 Broadloom (Under100') | SY | 500 | |||
| I) Workforce DV182 Tiles/Squares (100SY) | SY | 1,000 | |||
| j) Workforce DV182 Tiles/Squares (Under100SY) | SY | 1,000 | |||
| k) Paradiam D7016 Broadloom (100') | SY | 1,000 | |||
| l) Paradiam D7016 Broadloom (Under100') | SY | 500 | |||
| m) Paradiam D7012 Tiles/Squares (100SY) | SY | 2,000 | |||
| n) Paradiam D7012 Tiles/Squares (Under100SY) | SY | 1,000 | |||
| o) Concept D6366 Broadloom (100') | SY | 1,000 | |||
| p) Concept D6366 Broadloom (Under100') coordinate of Paradiam | SY | 500 | |||
| 012 | Interface Carpet | ||||
| a) Entropy 1660202500 Tiles/Squares Random, no dye lots (100SY) | SY | 4,000 | |||
| b) Entropy 1660202500 Tiles/Squares Random, no dye lots (Under100SY) | SY | 2,000 | |||
| 013 | Mannington Carpet | ||||
| a) Retrospect Broadloom (100') | SY | 1,000 | |||
| b) Retrospect Broadloom (Under100) | SY | 500 | |||
| c) Retrospect Tiles/Squares (100SY) | SY | 2,000 | |||
| d) Retrospect Tiles/Squares (Under100SY) | SY | 500 | |||
| e) Retrospect Six Foot Goods (50') | SY | 500 | |||
| f) Retrospect Six Foot Goods (Under50) | SY | 500 | |||
| BID ITEMS | |||||
| UNIT | TOTAL | ||||
| CLIN | UNIT | ESTIMATE | COST | COST | |
| Vinyl Selection Line Items | |||||
| Sheet Vinyl prices are for orders of 55SY or more, roll pricing (RP). See line item for | |||||
| additional price for orders under 55SY, cut pricing (CP) | |||||
| Contractor shall be paid for the amount of vinyl including waste, and amount required as | |||||
| an overage tollerance. Contractor and ordering agency shall agree on quantity before | |||||
| commencement of work. | |||||
| 014 | Mannington | ||||
| a) Folia Sheet Vinyl (RP) | SY | 4,000 | |||
| b) Folia Sheet Vinyl (CP) | SY | 2,500 | |||
| c) Facets Sheet Vinyl (RP) | SY | 4,000 | |||
| d) Facets Sheet Vinyl (CP) | SY | 2,500 | |||
| Carpet Treatments and Backing Line Items | |||||
| 015 | a) Scotchguard Carpet Protector or equal if not included on carpet | SY | 5,000 | ||
| b) Rebond Urethane 3/8” thickness 6 LB | SY | 500 | |||
| c) Rebond Urethane 1/2” thickness 7 LB | SY | 500 | |||
| TOTAL | 0.00 |