Bid_Items_List.xls

XLS spreadsheet 66 KB Posted

Attached to
Carpet BPA Tinker AFB
Solicitation number
FA8101-15-R-0005
Issued by

About this file

Bid Items List for base year plus one option year

View the file

Other files

File Type Posted
Amendment_FA8101-15-R-0005-U0001.pdf PDF
FA8101-15-R-0005_(amend).pdf PDF
Amended_Bid_Items_List.xlsx XLSX spreadsheet
Tinker_Carpet_BPA_Q A.docx DOCX document
Tinker_Carpet_BPA_Q A.docx DOCX document
Appendix_1.pdf PDF
FA8101-15-R-0005.pdf PDF
Statement_of_Work.pdf PDF
Appendix_2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Basic

BID ITEMS - BASIC YEAR
After hours (AH) are between 1700 hrs and 0730 hrs and all day Saturday, Sunday and holidays.
UNITTOTAL
CLINUNITESTIMATECOSTCOST
Preparation Line Items
001Measurement and consultation when requested by Contracting OfficerEA10
002Transport material to the job site (Gov. furnished or contractor furnished):EA50
003Remove existing flooring:
a) Broadloom carpet glued downSY9,000
b) Broadloom carpet and padSY200
c) Carpet tiles/squaresSY10,000
d) Rubber backed carpetSY200
e) Vinyl TileSF6,500
f) Sheet VinylSY2,500
g) Floor repair to include filling all cracks wider than 1/8 in, filling all holes larger thanHR100
¼ in diameter. Float ridges or indentions.
Installation Line Items
004Install flooring:
Note: Installation amount paid shall be for the actual amount of flooring installed not
the amount handled.
a) Carpet - Glue down method. Less than 200 SY (WH)SY3,000
b) Carpet - Glue down method. More than 200 SY (WH)SY10,000
c) Carpet - Glue down method. Less than 200 SY (AH)SY2,000
d) Carpet - Glue down method. More than 200 SY (AH)SY2,000
e) Carpet - Tiles/squares. Less than 200 SY (WH)SY3,500
f) Carpet - Tiles/squares. More than 200 SY (WH)SY10,500
g) Carpet - Tiles/squares. Less than 200 SY (AH)SY2,500
h) Carpet - Tiles/squares. More than 200 SY (AH)SY2,500
i) Carpet - Tackless method. Less than 200 SY (WH)SY500
j) Carpet - Tackless method. More than 200 SY (WH)SY500
k) Carpet - Tackless method. Less than 200 SY (AH)SY500
l) Carpet - Tackless method. More than 200 SY (AH)SY500
m) Carpet - Install single border (two borders double cost)LF5,000
n) Vinyl Tile Less than 225 SF (WH)SF1,000
o) Vinyl Tile More than 225 SF (WH)SF6,000
p) Vinyl Tile Less than 225 SF (AH)SF500
q) Vinyl Tile More than 225 SF (AH)SF500
BID ITEMS
UNITTOTAL
CLINUNITESTIMATECOSTCOST
004 condt) Sheet Vinyl - Less than 25 SY (AH)SY500
u) Sheet Vinyl - More than 25 SY (AH)SY500
Accessory Items
Furnish & Install accessory material:
005a) Metal edge stripping/reducer/transition strip:LF1,000
b) Vinyl edge stripping/reducer/transition strip:LF3,500
$ - 0
Base Molding Items
006Furnish and Install:
a) Rubber cove base, 4 in:LF17,000
b) Rubber cove base, 6 in:LF2,500
c) Vinyl cove base 4 in:LF17,000
d) Vinyl cove base 6 in:LF2,500
e) Remove base molding any size, rubber, vinyl, wood:LF25,000
$ - 0
Stair Tread and Riser Items
Furnish and Install:
007a) Riser 6 or 7 inch highLF1,000
b) Rubber stair nosing:LF1,000
c) Metal stair nosing:LF500
d) Rubber stair treadsLF1,000
e) Remove risers, nosings any size, rubber, vinyl, woodLF1,000
f) Remove stair treads any size, rubber, vinyl, woodLF1,000
$ - 0
Furniture Moving Items
008Furniture removal and replacement:
a) Free standingSY10,000
b) Systems furniture moving, lift methodSY8,000
Note: This would be required in areas that have pre-existing carpet tiles/squares to be
replaced with new carpet tiles.
c) Food machines, safes, water fountains, refrigerators.EA50
d) Move carpet to upper level, per floor. Not to be paid when elevator is availableSY6,000
Installation on Landings, Stages and Stairs
009Installation of carpet on landings, stages and stairs includes wrapping.SY1,000
Miscellaneous Labor Items
010Cut off wood doors, maximum width 4’6"EA50$ - 0
BID ITEMSLabor
UNITTOTAL
CLINCarpet Selection Line ItemsUNITESTIMATECOSTCOST
All carpet to be of one dye lot as much as possible.
Contractor shall be paid for the amount of carpet including waste, and amount required by
the mill as an overage tollerance. Contractor and ordering agency shall agree on
quantity before commencement of work.
011Carpet Mfg Bigelow
a) Junxtion BT 135 (Over 200 SY)SY8,000
b) Junxtion BT 135 (Under 200 SY)SY2,000
c) Botanical Orgin (Over 200 SY)SY2,000
d) Botanical Orgin (Under 200 SY)SY2,000
e) Fluid Form (Over 200 SY)SY1,000
f) Fluid Form (Under 200 SY)SY500
g) Datum (Over 200 SY)SY1,500
h) Datum (Under 200 SY)SY500
i) First One Up (Over 200 SY)SY1,000
j) First One Up (Under 200 SY)SY500
012Carpet Mfg Mannington
a) Portela (Over 200 SY)SY1,000
b) Portela (Under 200 SY)SY500
c) Baracoa II (Over 200 SY)SY2,000
d) Baracoa II (Under 200 SY)SY500
013Carpet Mft Miliken
a) Nordic Stories -Americans-Hidden Plains (Over 200 SY)SY2,000
b) Nordic Stories - Americans-Hidden Plains (Under 200 SY)SY500
c) Tectronic (Over 200 SY)SY2,000
d) Tectronic (Under 200 SY)SY500
014Interface Carpet
a) Mantra (Over 200 SY)SY4,000
b) Mantra (Under 200 SY)SY2,000
Product$ - 0
BID ITEMS
UNITTOTAL
CLINVinyl Selection Line ItemsUNITESTIMATECOSTCOST
Contractor shall be paid for the amount of vinyl including waste, and amount required as
an overage tollerance. Contractor and ordering agency shall agree on quantity before
commencement of work.
015Vinyl Tile
a) Loose Lay Tile 24" x 24" (Over 100 SY)SY4,000
b) Loose Lay Tile 24" x 24" (Under 100 SY)SY2,500
Carpet Treatments and Backing Line Items
016a) Scotchguard Carpet Protector or equal if not included on carpetSY5,000
b) Rebond Urethane 3/8” thickness 6 LBSY500
c) Rebond Urethane 1/2” thickness 7 LBSY500
Vinyl Items$ - 0
TOTAL$ - 0

Option 1

BID ITEMS - OPTION 1
After hours (AH) are between 1700 hrs and 0730 hrs and all day Saturday, Sunday and holidays.
UNITTOTAL
CLINUNITESTIMATECOSTCOST
Preparation Line Items
001Measurement and consultation when requested by Contracting OfficerEA10
002Transport material to the job site (Gov. furnished or contractor furnished):EA50
003Remove existing flooring:
a) Broadloom carpet glued downSY9,000
b) Broadloom carpet and padSY200
c) Carpet tiles/squaresSY10,000
d) Rubber backed carpetSY200
e) Vinyl TileSF6,500
f) Sheet VinylSY2,500
g) Floor repair to include filling all cracks wider than 1/8 in, filling all holes larger thanHR100
¼ in diameter. Float ridges or indentions.
Installation Line Items
004Install flooring:
Note: Installation amount paid shall be for the actual amount of flooring installed not
the amount handled.
a) Carpet - Glue down method. Less than 200 SY (WH)SY3,000
b) Carpet - Glue down method. More than 200 SY (WH)SY10,000
c) Carpet - Glue down method. Less than 200 SY (AH)SY2,000
d) Carpet - Glue down method. More than 200 SY (AH)SY2,000
e) Carpet - Tiles/squares. Less than 200 SY (WH)SY3,500
f) Carpet - Tiles/squares. More than 200 SY (WH)SY10,500
g) Carpet - Tiles/squares. Less than 200 SY (AH)SY2,500
h) Carpet - Tiles/squares. More than 200 SY (AH)SY2,500
i) Carpet - Tackless method. Less than 200 SY (WH)SY500
j) Carpet - Tackless method. More than 200 SY (WH)SY500
k) Carpet - Tackless method. Less than 200 SY (AH)SY500
l) Carpet - Tackless method. More than 200 SY (AH)SY500
m) Carpet - Install single border (two borders double cost)LF5,000
n) Vinyl Tile Less than 225 SF (WH)SF1,000
o) Vinyl Tile More than 225 SF (WH)SF6,000
p) Vinyl Tile Less than 225 SF (AH)SF500
q) Vinyl Tile More than 225 SF (AH)SF500
r) Sheet Vinyl - Less than 25 SY (WH)SY1,000
s) Sheet Vinyl - More than 25 SY (WH)SY5,000
BID ITEMS
UNITTOTAL
CLINUNITESTIMATECOSTCOST
004 condt) Sheet Vinyl - Less than 25 SY (AH)SY500
u) Sheet Vinyl - More than 25 SY (AH)SY500
Accessory Items
Furnish & Install accessory material:
005a) Metal edge stripping/reducer/transition strip:LF1,000
b) Vinyl edge stripping/reducer/transition strip:LF3,500
Base Molding Items
006Furnish and Install:
a) Rubber cove base, 4 in:LF17,000
b) Rubber cove base, 6 in:LF2,500
c) Vinyl cove base 4 in:LF17,000
d) Vinyl cove base 6 in:LF2,500
e) Remove base molding any size, rubber, vinyl, wood:LF25,000
Stair Tread and Riser Items
Furnish and Install:
007a) Riser 6 or 7 inch highLF1,000
b) Rubber stair nosing:LF1,000
c) Metal stair nosing:LF500
d) Rubber stair treadsLF1,000
e) Remove risers, nosings any size, rubber, vinyl, woodLF1,000
f) Remove stair treads any size, rubber, vinyl, woodLF1,000
Furniture Moving Items
008Furniture removal and replacement:
a) Free standingSY10,000
b) Systems furniture moving, lift methodSY8,000
Note: This would be required in areas that have pre-existing carpet tiles/squares to be
replaced with new carpet tiles.
c) Food machines, safes, water fountains, refrigerators.EA50
d) Move carpet to upper level, per floor. Not to be paid when elevator is availableSY6,000
Installation on Landings, Stages and Stairs
009Installation of carpet on landings, stages and stairs includes wrapping.SY1,000
Miscellaneous Labor Items
010Cut off wood doors, maximum width 4’6"EA50
BID ITEMS
UNITTOTAL
CLINUNITESTIMATECOSTCOST
Carpet Selection Line Items
All carpet to be of one dye lot as much as possible.
Broadloom prices are for orders of 100’ or 133.33 SY or more (100'). See line item for
additional price for orders under 133.33 SY (Under100').
Contractor shall be paid for the amount of carpet including waste, and amount required by
the mill as an overage tollerance. Contractor and ordering agency shall agree on
quantity before commencement of work.
011Lee’s Commercial Carpets
a) Artstone II DX936 Broadloom (100')SY8,000
b) Artstone II DX936 Broadloom (Under100')SY2,000
c) Artstone II DX932 Tiles/Squares (100SY)SY2,000
d) Artstone II DX932 Tiles/Squares (Under100SY)SY2,000
e) Bello D7006 Broadloom (100')SY1,000
f) Bello D7006 Broadloom (Under100')SY500
g) Workforce DV186 Broadloom (100')SY1,500
h) Workforce DV186 Broadloom (Under100')SY500
I) Workforce DV182 Tiles/Squares (100SY)SY1,000
j) Workforce DV182 Tiles/Squares (Under100SY)SY1,000
k) Paradiam D7016 Broadloom (100')SY1,000
l) Paradiam D7016 Broadloom (Under100')SY500
m) Paradiam D7012 Tiles/Squares (100SY)SY2,000
n) Paradiam D7012 Tiles/Squares (Under100SY)SY1,000
o) Concept D6366 Broadloom (100')SY1,000
p) Concept D6366 Broadloom (Under100') coordinate of ParadiamSY500
012Interface Carpet
a) Entropy 1660202500 Tiles/Squares Random, no dye lots (100SY)SY4,000
b) Entropy 1660202500 Tiles/Squares Random, no dye lots (Under100SY)SY2,000
013Mannington Carpet
a) Retrospect Broadloom (100')SY1,000
b) Retrospect Broadloom (Under100)SY500
c) Retrospect Tiles/Squares (100SY)SY2,000
d) Retrospect Tiles/Squares (Under100SY)SY500
e) Retrospect Six Foot Goods (50')SY500
f) Retrospect Six Foot Goods (Under50)SY500
BID ITEMS
UNITTOTAL
CLINUNITESTIMATECOSTCOST
Vinyl Selection Line Items
Sheet Vinyl prices are for orders of 55SY or more, roll pricing (RP). See line item for
additional price for orders under 55SY, cut pricing (CP)
Contractor shall be paid for the amount of vinyl including waste, and amount required as
an overage tollerance. Contractor and ordering agency shall agree on quantity before
commencement of work.
014Mannington
a) Folia Sheet Vinyl (RP)SY4,000
b) Folia Sheet Vinyl (CP)SY2,500
c) Facets Sheet Vinyl (RP)SY4,000
d) Facets Sheet Vinyl (CP)SY2,500
Carpet Treatments and Backing Line Items
015a) Scotchguard Carpet Protector or equal if not included on carpetSY5,000
b) Rebond Urethane 3/8” thickness 6 LBSY500
c) Rebond Urethane 1/2” thickness 7 LBSY500
TOTAL0.00

File details come from the government source that posted it. Updated .