Amended_Bid_Items_List.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- Carpet BPA Tinker AFB
- Solicitation number
- FA8101-15-R-0005
About this file
Amended Bid Items List
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_FA8101-15-R-0005-U0001.pdf | ||
| FA8101-15-R-0005_(amend).pdf | ||
| Tinker_Carpet_BPA_Q A.docx | DOCX document | |
| Tinker_Carpet_BPA_Q A.docx | DOCX document | |
| Appendix_1.pdf | ||
| Bid_Items_List.xls | XLS spreadsheet | |
| FA8101-15-R-0005.pdf | ||
| Statement_of_Work.pdf | ||
| Appendix_2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Basic
| BID ITEMS BASIC WITH OPTION PRICES | |||||
| After hours (AH) are between 1700 hrs and 0730 hrs and all day Saturday, Sunday and holidays. | |||||
| UNIT | Basic Total | ||||
| CLIN | UNIT | ESTIMATE | COST | COST | |
| Preparation Line Items | |||||
| 001 | Measurement and consultation when requested by Contracting Officer | EA | 10 |
002 Transport material to the job site (Gov. furnished or contractor furnished): EA 50
| 003 | Remove existing flooring: | ||||
| a) Broadloom carpet glued down | SY | 9,000 | |||
| b) Broadloom carpet and pad | SY | 200 | |||
| c) Carpet tiles/squares | SY | 10,000 | |||
| d) Rubber backed carpet | SY | 200 | |||
| e) Vinyl Tile | SF | 6,500 | |||
| f) Sheet Vinyl | SY | 2,500 | |||
| g) Floor repair to include filling all cracks wider than 1/8 in, filling all holes larger than | HR | 100 | |||
| ¼ in diameter. Float ridges or indentions. | |||||
| Sub total | $ - 0 | ||||
| Installation Line Items | |||||
| 004 | Install flooring: | ||||
| Note: Installation amount paid shall be for the actual amount of flooring installed not | |||||
| the amount handled. | |||||
| a) Carpet - Glue down method. Less than 200 SY (WH) | SY | 3,000 | |||
| b) Carpet - Glue down method. More than 200 SY (WH) | SY | 10,000 | |||
| c) Carpet - Glue down method. Less than 200 SY (AH) | SY | 2,000 | |||
| d) Carpet - Glue down method. More than 200 SY (AH) | SY | 2,000 | |||
| e) Carpet - Tiles/squares. Less than 200 SY (WH) | SY | 3,500 | |||
| f) Carpet - Tiles/squares. More than 200 SY (WH) | SY | 10,500 | |||
| g) Carpet - Tiles/squares. Less than 200 SY (AH) | SY | 2,500 | |||
| h) Carpet - Tiles/squares. More than 200 SY (AH) | SY | 2,500 | |||
| i) Carpet - Tackless method. Less than 200 SY (WH) | SY | 500 | |||
| j) Carpet - Tackless method. More than 200 SY (WH) | SY | 500 | |||
| k) Carpet - Tackless method. Less than 200 SY (AH) | SY | 500 | |||
| BID ITEMS | UNIT | ESTIMATE | UNIT COST | TOTAL COST | |
| 004 CLIN con't | l) Carpet - Tackless method. More than 200 SY (AH) | SY | 500 | ||
| m) Carpet - Install single border (two borders double cost) | LF | 5,000 | |||
| n) Vinyl Tile Less than 225 SF (WH) | SF | 1,000 | |||
| o) Vinyl Tile More than 225 SF (WH) | SF | 6,000 | |||
| p) Vinyl Tile Less than 225 SF (AH) | SF | 500 | |||
| q) Vinyl Tile More than 225 SF (AH) | SF | 500 | |||
| Sub total | $ - 0 | ||||
| Accessory Items | |||||
| Furnish & Install accessory material: | |||||
| 005 | a) Metal edge stripping/reducer/transition strip: | LF | 1,000 | ||
| b) Vinyl edge stripping/reducer/transition strip: | LF | 3,500 | |||
| Sub total | $ - 0 | ||||
| Base Molding Items | |||||
| 006 | Furnish and Install: | ||||
| a) Rubber cove base, 4 in: | LF | 17,000 | |||
| b) Rubber cove base, 6 in: | LF | 2,500 | |||
| c) Vinyl cove base 4 in: | LF | 17,000 | |||
| d) Vinyl cove base 6 in: | LF | 2,500 | |||
| e) Remove base molding any size, rubber, vinyl, wood: | LF | 25,000 | |||
| Sub total | $ - 0 | ||||
| Stair Tread and Riser Items | |||||
| Furnish and Install: | |||||
| 007 | a) Riser 6 or 7 inch high | LF | 1,000 | ||
| b) Rubber stair nosing: | LF | 1,000 | |||
| c) Metal stair nosing: | LF | 500 | |||
| d) Rubber stair treads | LF | 1,000 | |||
| e) Remove risers, nosings any size, rubber, vinyl, wood | LF | 1,000 | |||
| f) Remove stair treads any size, rubber, vinyl, wood | LF | 1,000 | |||
| Sub total | |||||
| Furniture Moving Items | |||||
| 008 | Furniture removal and replacement: | ||||
| a) Free standing | SY | 10,000 | |||
| b) Systems furniture moving, lift method | SY | 8,000 | |||
| BID ITEMS | UNIT | ESTIMATE | UNIT COST | TOTAL COST |
| 008 CLIN con't | Note: This would be required in areas that have pre-existing carpet tiles/squares to be | ||
| replaced with new carpet tiles. | |||
| c) Safes, Refrigerators | EA | 50 | |
| d) Move carpet to upper level, per floor. Not to be paid when elevator is available | SY | 6,000 |
| Installation on Landings, Stages and Stairs | |||
| 009 | Installation of carpet on landings, stages and stairs includes wrapping. | SY | 1,000 |
| Miscellaneous Labor Items | |||||
| 010 | Cut off wood doors, maximum width 4’6" | EA | 50 | ||
| Sub total | |||||
| Carpet Selection Line Items | |||||
| All carpet to be of one dye lot as much as possible. | |||||
| Contractor shall be paid for the amount of carpet including waste, and amount required by | |||||
| the mill as an overage tollerance. Contractor and ordering agency shall agree on | |||||
| quantity before commencement of work. | |||||
| 011 | Carpet Mfg Bigelow | ||||
| a) Junxtion BT 135 (Over 100 SY) | SY | 8,000 | |||
| b) Junxtion BT 135 (Under 100 SY) | SY | 2,000 | |||
| c) Botanical Orgin (Over 100 SY) | SY | 2,000 | |||
| d) Botanical Orgin (Under 100 SY) | SY | 2,000 | |||
| e) Fluid Form (Over 100 SY) | SY | 1,000 | |||
| f) Fluid Form (Under 100 SY) | SY | 500 | |||
| g) Datum (Over 100 SY) | SY | 1,500 | |||
| h) Datum (Under 100 SY) | SY | 500 | |||
| i) First One Up (Ov er 100 SY) | SY | 1,000 | |||
| j) First One Up (Under 100 SY) | SY | 500 | |||
| 012 | Carpet Mfg Mannington | ||||
| a) Portela (Over 100 SY) | SY | 1,000 | |||
| b) Portela (Under 100 SY) | SY | 500 | |||
| c) Baracoa II (Over 100 SY) | SY | 2,000 | |||
| d) Baracoa II (Under 100 SY) | SY | 500 | |||
| BID ITEMS | UNIT | ESTIMATE | UNIT COST | TOTAL COST | |
| 013 | Carpet Mft Miliken | ||||
| a) Nordic Stories - Americans- Hidden Plains (Over 100 SY) | SY | 2,000 | |||
| b) Nordic Stories - Americans - Hidden Plains (Under 100 SY) | SY | 500 | |||
| c) Tectronic (Over 100 SY) | SY | 2,000 | |||
| d) Tectronic (Under 100 SY) | SY | 500 |
| 014 | Interface Carpet | |||
| a) Mantra (Over 100 SY) | SY | 4,000 | ||
| b) Mantra (Under 100 SY) | SY | 2,000 | ||
| Material | ||||
| CLIN | Vinyl Selection Line Items | |||
| Contractor shall be paid for the amount of vinyl including waste, and amount required as | ||||
| an overage tollerance. Contractor and ordering agency shall agree on quantity before | ||||
| commencement of work. |
| 015 | Vinyl Tile | ||
| a) Loose Lay Tile 24" x 24" (Over 100 SY) | SY | 4,000 | |
| b) Loose Lay Tile 24" x 24" (Under 100 SY) | SY | 2,500 |
| Carpet Treatments and Backing Line Items | ||||
| 016 | a) Scotchguard Carpet Protector or equal if not included on carpet | SY | 5,000 | |
| b) Rebond Urethane 3/8” thickness 6 LB | SY | 500 | ||
| c) Rebond Urethane 1/2” thickness 7 LB | SY | 500 | ||
| Material |
Basic Award Total
Option I
| OPTION I Extended Price Estimate | |||||
| UNIT | OPTION I | ||||
| CLIN | BID ITEMS | UNIT | ESTIMATE | COST |
| 001 | Preparation Line Items | EA | 10 | ||
| Measurement and consultation when requested by Contracting Officer | |||||
| 002 | EA | 50 | |||
| Transport material to the job site (Gov. furnished or contractor furnished): | |||||
| 003 | |||||
| Remove existing flooring: | SY | 9,000 | |||
| a) Broadloom carpet glued down | SY | 200 | |||
| b) Broadloom carpet and pad | SY | 10,000 | |||
| c) Carpet tiles/squares | SY | 200 | |||
| d) Rubber backed carpet | SF | 6,500 | |||
| e) Vinyl Tile | SY | 2,500 | |||
| f) Sheet Vinyl | HR | 100 | |||
| g) Floor repair to include filling all cracks wider than 1/8 in, filling all holes larger than | |||||
| ¼ in diameter. Float ridges or indentions. | |||||
| Sub Total | - 0 | ||||
| 004 | Installation Line Items | ||||
| Install flooring: | |||||
| Note: Installation amount paid shall be for the actual amount of flooring installed not | |||||
| the amount handled. | |||||
| a) Carpet - Glue down method. Less than 200 SY (WH) | SY | 3,000 | |||
| b) Carpet - Glue down method. More than 200 SY (WH) | SY | 10,000 | |||
| c) Carpet - Glue down method. Less than 200 SY (AH) | SY | 2,000 | |||
| d) Carpet - Glue down method. More than 200 SY (AH) | SY | 2,000 | |||
| e) Carpet - Tiles/squares. Less than 200 SY (WH) | SY | 3,500 | |||
| f) Carpet - Tiles/squares. More than 200 SY (WH) | SY | 10,500 | |||
| g) Carpet - Tiles/squares. Less than 200 SY (AH) | SY | 2,500 | |||
| h) Carpet - Tiles/squares. More than 200 SY (AH) | SY | 2,500 | |||
| i) Carpet - Tackless method. Less than 200 SY (WH) | SY | 500 | |||
| j) Carpet - Tackless method. More than 200 SY (WH) | SY | 500 | |||
| k) Carpet - Tackless method. Less than 200 SY (AH) | SY | 500 | |||
| BID ITEMS | UNIT | ESTIMATE | UNIT COST | ||
| 004 CLIN con't | l) Carpet - Tackless method. More than 200 SY (AH) | SY | 500 | ||
| m) Carpet - Install single border (two borders double cost) | LF | 5,000 | |||
| n) Vinyl Tile Less than 225 SF (WH) | SF | 1,000 | |||
| o) Vinyl Tile More than 225 SF (WH) | SF | 6,000 | |||
| p) Vinyl Tile Less than 225 SF (AH) | SF | 500 | |||
| q) Vinyl Tile More than 225 SF (AH) | SF | 500 | |||
| Sub Total | 0.00 | ||||
| Furnish & Install accessory material: | |||||
| 005 | a) Metal edge stripping/reducer/transition strip: | LF | 1,000 | ||
| b) Vinyl edge stripping/reducer/transition strip: | LF | 3,500 | |||
| Sub Total | $ - 0 | ||||
| Base Molding Items | |||||
| 006 | Furnish and Install: | ||||
| a) Rubber cove base, 4 in: | LF | 17,000 | |||
| b) Rubber cove base, 6 in: | LF | 2,500 | |||
| c) Vinyl cove base 4 in: | LF | 17,000 | |||
| d) Vinyl cove base 6 in: | LF | 2,500 | |||
| e) Remove base molding any size, rubber, vinyl, wood: | LF | 25,000 | |||
| Sub Total | $ - 0 |
| Furnish and Install: | |||||
| 007 | a) Riser 6 or 7 inch high | LF | 1,000 | ||
| b) Rubber stair nosing: | LF | 1,000 | |||
| c) Metal stair nosing: | LF | 500 | |||
| d) Rubber stair treads | LF | 1,000 | |||
| e) Remove risers, nosings any size, rubber, vinyl, wood | LF | 1,000 | |||
| f) Remove stair treads any size, rubber, vinyl, wood | LF | 1,000 | |||
| Sub Total | $ - 0 | ||||
| Furniture Moving Items | |||||
| 008 | Furniture removal and replacement: | ||||
| a) Free standing | SY | 10,000 | |||
| b) Systems furniture moving, lift method | SY | 8,000 |
| BID ITEMS | UNIT | ESTIMATE | UNIT COST | |
| 008 CLIN con't | Note: This would be required in areas that have pre-existing carpet tiles/squares to be | |||
| replaced with new carpet tiles. | ||||
| c) Safes, Refrigerators | EA | 50 | ||
| d) Move carpet to upper level, per floor. Not to be paid when elevator is available | SY | 6,000 |
| Installation on Landings, Stages and Stairs | |||
| 009 | Installation of carpet on landings, stages and stairs includes wrapping. | SY | 1,000 |
| Miscellaneous Labor Items | |||||
| 010 | Cut off wood doors, maximum width 4’6" | EA | 50 | ||
| Sub Total | $ - 0 | ||||
| Carpet Selection Line Items | |||||
| All carpet to be of one dye lot as much as possible. | |||||
| Contractor shall be paid for the amount of carpet including waste, and amount required by | |||||
| the mill as an overage tollerance. Contractor and ordering agency shall agree on | |||||
| quantity before commencement of work. | |||||
| 011 | Carpet Mfg Bigelow | ||||
| a) Junxtion BT 135 (Over 100 SY) | SY | 8,000 | |||
| b) Junxtion BT 135 (Under 100 SY) | SY | 2,000 | |||
| c) Botanical Orgin (Over 100 SY) | SY | 2,000 | |||
| d) Botanical Orgin (Under 100 SY) | SY | 2,000 | |||
| e) Fluid Form (Over 100 SY) | SY | 1,000 | |||
| f) Fluid Form (Under 100 SY) | SY | 500 | |||
| g) Datum (Over 100 SY) | SY | 1,500 | |||
| h) Datum (Under 100 SY) | SY | 500 | |||
| i) First One Up (Ov er 100 SY) | SY | 1,000 | |||
| j) First One Up (Under 100 SY) | SY | 500 | |||
| 012 | Carpet Mfg Mannington | ||||
| a) Portela (Over 100 SY) | SY | 1,000 | |||
| b) Portela (Under 100 SY) | SY | 500 | |||
| c) Baracoa II (Over 100 SY) | SY | 2,000 | |||
| d) Baracoa II (Under 100 SY) | SY | 500 |
| BID ITEMS | UNIT | ESTIMATE | UNIT COST | |
| 013 | Carpet Mft Miliken | |||
| a) Nordic Stories - Americans- Hidden Plains (Over 100 SY) | SY | 2,000 | ||
| b) Nordic Stories - Americans - Hidden Plains (Under 100 SY) | SY | 500 | ||
| c) Tectronic (Over 100 SY) | SY | 2,000 | ||
| d) Tectronic (Under 100 SY) | SY | 500 |
| 014 | Interface Carpet | ||||
| a) Mantra (Over 100 SY) | SY | 4,000 | |||
| b) Mantra (Under 100 SY) | SY | 2,000 | |||
| Material | $ - 0 | ||||
| CLIN | Vinyl Selection Line Items | ||||
| Contractor shall be paid for the amount of vinyl including waste, and amount required as | |||||
| an overage tollerance. Contractor and ordering agency shall agree on quantity before | |||||
| commencement of work. |
| 015 | Vinyl Tile | ||
| a) Loose Lay Tile 24" x 24" (Over 100 SY) | SY | 4,000 | |
| b) Loose Lay Tile 24" x 24" (Under 100 SY) | SY | 2,500 |
| Carpet Treatments and Backing Line Items | |||||
| 016 | a) Scotchguard Carpet Protector or equal if not included on carpet | SY | 5,000 | ||
| b) Rebond Urethane 3/8” thickness 6 LB | SY | 500 | |||
| c) Rebond Urethane 1/2” thickness 7 LB | SY | 500 | |||
| Material | $ - 0 |
Total
File details come from the government source that posted it. Updated .