Amended_Bid_Items_List.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
Carpet BPA Tinker AFB
Solicitation number
FA8101-15-R-0005
Issued by

About this file

Amended Bid Items List

View the file

Other files

File Type Posted
Amendment_FA8101-15-R-0005-U0001.pdf PDF
FA8101-15-R-0005_(amend).pdf PDF
Tinker_Carpet_BPA_Q A.docx DOCX document
Tinker_Carpet_BPA_Q A.docx DOCX document
Appendix_1.pdf PDF
Bid_Items_List.xls XLS spreadsheet
FA8101-15-R-0005.pdf PDF
Statement_of_Work.pdf PDF
Appendix_2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Basic

BID ITEMS BASIC WITH OPTION PRICES
After hours (AH) are between 1700 hrs and 0730 hrs and all day Saturday, Sunday and holidays.
UNITBasic Total
CLINUNITESTIMATECOSTCOST
Preparation Line Items
001Measurement and consultation when requested by Contracting OfficerEA10

002 Transport material to the job site (Gov. furnished or contractor furnished): EA 50

003Remove existing flooring:
a) Broadloom carpet glued downSY9,000
b) Broadloom carpet and padSY200
c) Carpet tiles/squaresSY10,000
d) Rubber backed carpetSY200
e) Vinyl TileSF6,500
f) Sheet VinylSY2,500
g) Floor repair to include filling all cracks wider than 1/8 in, filling all holes larger thanHR100
¼ in diameter. Float ridges or indentions.
Sub total$ - 0
Installation Line Items
004Install flooring:
Note: Installation amount paid shall be for the actual amount of flooring installed not
the amount handled.
a) Carpet - Glue down method. Less than 200 SY (WH)SY3,000
b) Carpet - Glue down method. More than 200 SY (WH)SY10,000
c) Carpet - Glue down method. Less than 200 SY (AH)SY2,000
d) Carpet - Glue down method. More than 200 SY (AH)SY2,000
e) Carpet - Tiles/squares. Less than 200 SY (WH)SY3,500
f) Carpet - Tiles/squares. More than 200 SY (WH)SY10,500
g) Carpet - Tiles/squares. Less than 200 SY (AH)SY2,500
h) Carpet - Tiles/squares. More than 200 SY (AH)SY2,500
i) Carpet - Tackless method. Less than 200 SY (WH)SY500
j) Carpet - Tackless method. More than 200 SY (WH)SY500
k) Carpet - Tackless method. Less than 200 SY (AH)SY500
BID ITEMSUNITESTIMATEUNIT COSTTOTAL COST
004 CLIN con'tl) Carpet - Tackless method. More than 200 SY (AH)SY500
m) Carpet - Install single border (two borders double cost)LF5,000
n) Vinyl Tile Less than 225 SF (WH)SF1,000
o) Vinyl Tile More than 225 SF (WH)SF6,000
p) Vinyl Tile Less than 225 SF (AH)SF500
q) Vinyl Tile More than 225 SF (AH)SF500
Sub total$ - 0
Accessory Items
Furnish & Install accessory material:
005a) Metal edge stripping/reducer/transition strip:LF1,000
b) Vinyl edge stripping/reducer/transition strip:LF3,500
Sub total$ - 0
Base Molding Items
006Furnish and Install:
a) Rubber cove base, 4 in:LF17,000
b) Rubber cove base, 6 in:LF2,500
c) Vinyl cove base 4 in:LF17,000
d) Vinyl cove base 6 in:LF2,500
e) Remove base molding any size, rubber, vinyl, wood:LF25,000
Sub total$ - 0
Stair Tread and Riser Items
Furnish and Install:
007a) Riser 6 or 7 inch highLF1,000
b) Rubber stair nosing:LF1,000
c) Metal stair nosing:LF500
d) Rubber stair treadsLF1,000
e) Remove risers, nosings any size, rubber, vinyl, woodLF1,000
f) Remove stair treads any size, rubber, vinyl, woodLF1,000
Sub total
Furniture Moving Items
008Furniture removal and replacement:
a) Free standingSY10,000
b) Systems furniture moving, lift methodSY8,000
BID ITEMSUNITESTIMATEUNIT COSTTOTAL COST
008 CLIN con'tNote: This would be required in areas that have pre-existing carpet tiles/squares to be
replaced with new carpet tiles.
c) Safes, RefrigeratorsEA50
d) Move carpet to upper level, per floor. Not to be paid when elevator is availableSY6,000
Installation on Landings, Stages and Stairs
009Installation of carpet on landings, stages and stairs includes wrapping.SY1,000
Miscellaneous Labor Items
010Cut off wood doors, maximum width 4’6"EA50
Sub total
Carpet Selection Line Items
All carpet to be of one dye lot as much as possible.
Contractor shall be paid for the amount of carpet including waste, and amount required by
the mill as an overage tollerance. Contractor and ordering agency shall agree on
quantity before commencement of work.
011Carpet Mfg Bigelow
a) Junxtion BT 135 (Over 100 SY)SY8,000
b) Junxtion BT 135 (Under 100 SY)SY2,000
c) Botanical Orgin (Over 100 SY)SY2,000
d) Botanical Orgin (Under 100 SY)SY2,000
e) Fluid Form (Over 100 SY)SY1,000
f) Fluid Form (Under 100 SY)SY500
g) Datum (Over 100 SY)SY1,500
h) Datum (Under 100 SY)SY500
i) First One Up (Ov er 100 SY)SY1,000
j) First One Up (Under 100 SY)SY500
012Carpet Mfg Mannington
a) Portela (Over 100 SY)SY1,000
b) Portela (Under 100 SY)SY500
c) Baracoa II (Over 100 SY)SY2,000
d) Baracoa II (Under 100 SY)SY500
BID ITEMSUNITESTIMATEUNIT COSTTOTAL COST
013Carpet Mft Miliken
a) Nordic Stories - Americans- Hidden Plains (Over 100 SY)SY2,000
b) Nordic Stories - Americans - Hidden Plains (Under 100 SY)SY500
c) Tectronic (Over 100 SY)SY2,000
d) Tectronic (Under 100 SY)SY500
014Interface Carpet
a) Mantra (Over 100 SY)SY4,000
b) Mantra (Under 100 SY)SY2,000
Material
CLINVinyl Selection Line Items
Contractor shall be paid for the amount of vinyl including waste, and amount required as
an overage tollerance. Contractor and ordering agency shall agree on quantity before
commencement of work.
015Vinyl Tile
a) Loose Lay Tile 24" x 24" (Over 100 SY)SY4,000
b) Loose Lay Tile 24" x 24" (Under 100 SY)SY2,500
Carpet Treatments and Backing Line Items
016a) Scotchguard Carpet Protector or equal if not included on carpetSY5,000
b) Rebond Urethane 3/8” thickness 6 LBSY500
c) Rebond Urethane 1/2” thickness 7 LBSY500
Material

Basic Award Total

Option I

OPTION I Extended Price Estimate
UNITOPTION I
CLINBID ITEMSUNITESTIMATECOST
001Preparation Line ItemsEA10
Measurement and consultation when requested by Contracting Officer
002EA50
Transport material to the job site (Gov. furnished or contractor furnished):
003
Remove existing flooring:SY9,000
a) Broadloom carpet glued downSY200
b) Broadloom carpet and padSY10,000
c) Carpet tiles/squaresSY200
d) Rubber backed carpetSF6,500
e) Vinyl TileSY2,500
f) Sheet VinylHR100
g) Floor repair to include filling all cracks wider than 1/8 in, filling all holes larger than
¼ in diameter. Float ridges or indentions.
Sub Total- 0
004Installation Line Items
Install flooring:
Note: Installation amount paid shall be for the actual amount of flooring installed not
the amount handled.
a) Carpet - Glue down method. Less than 200 SY (WH)SY3,000
b) Carpet - Glue down method. More than 200 SY (WH)SY10,000
c) Carpet - Glue down method. Less than 200 SY (AH)SY2,000
d) Carpet - Glue down method. More than 200 SY (AH)SY2,000
e) Carpet - Tiles/squares. Less than 200 SY (WH)SY3,500
f) Carpet - Tiles/squares. More than 200 SY (WH)SY10,500
g) Carpet - Tiles/squares. Less than 200 SY (AH)SY2,500
h) Carpet - Tiles/squares. More than 200 SY (AH)SY2,500
i) Carpet - Tackless method. Less than 200 SY (WH)SY500
j) Carpet - Tackless method. More than 200 SY (WH)SY500
k) Carpet - Tackless method. Less than 200 SY (AH)SY500
BID ITEMSUNITESTIMATEUNIT COST
004 CLIN con'tl) Carpet - Tackless method. More than 200 SY (AH)SY500
m) Carpet - Install single border (two borders double cost)LF5,000
n) Vinyl Tile Less than 225 SF (WH)SF1,000
o) Vinyl Tile More than 225 SF (WH)SF6,000
p) Vinyl Tile Less than 225 SF (AH)SF500
q) Vinyl Tile More than 225 SF (AH)SF500
Sub Total0.00
Furnish & Install accessory material:
005a) Metal edge stripping/reducer/transition strip:LF1,000
b) Vinyl edge stripping/reducer/transition strip:LF3,500
Sub Total$ - 0
Base Molding Items
006Furnish and Install:
a) Rubber cove base, 4 in:LF17,000
b) Rubber cove base, 6 in:LF2,500
c) Vinyl cove base 4 in:LF17,000
d) Vinyl cove base 6 in:LF2,500
e) Remove base molding any size, rubber, vinyl, wood:LF25,000
Sub Total$ - 0
Furnish and Install:
007a) Riser 6 or 7 inch highLF1,000
b) Rubber stair nosing:LF1,000
c) Metal stair nosing:LF500
d) Rubber stair treadsLF1,000
e) Remove risers, nosings any size, rubber, vinyl, woodLF1,000
f) Remove stair treads any size, rubber, vinyl, woodLF1,000
Sub Total$ - 0
Furniture Moving Items
008Furniture removal and replacement:
a) Free standingSY10,000
b) Systems furniture moving, lift methodSY8,000
BID ITEMSUNITESTIMATEUNIT COST
008 CLIN con'tNote: This would be required in areas that have pre-existing carpet tiles/squares to be
replaced with new carpet tiles.
c) Safes, RefrigeratorsEA50
d) Move carpet to upper level, per floor. Not to be paid when elevator is availableSY6,000
Installation on Landings, Stages and Stairs
009Installation of carpet on landings, stages and stairs includes wrapping.SY1,000
Miscellaneous Labor Items
010Cut off wood doors, maximum width 4’6"EA50
Sub Total$ - 0
Carpet Selection Line Items
All carpet to be of one dye lot as much as possible.
Contractor shall be paid for the amount of carpet including waste, and amount required by
the mill as an overage tollerance. Contractor and ordering agency shall agree on
quantity before commencement of work.
011Carpet Mfg Bigelow
a) Junxtion BT 135 (Over 100 SY)SY8,000
b) Junxtion BT 135 (Under 100 SY)SY2,000
c) Botanical Orgin (Over 100 SY)SY2,000
d) Botanical Orgin (Under 100 SY)SY2,000
e) Fluid Form (Over 100 SY)SY1,000
f) Fluid Form (Under 100 SY)SY500
g) Datum (Over 100 SY)SY1,500
h) Datum (Under 100 SY)SY500
i) First One Up (Ov er 100 SY)SY1,000
j) First One Up (Under 100 SY)SY500
012Carpet Mfg Mannington
a) Portela (Over 100 SY)SY1,000
b) Portela (Under 100 SY)SY500
c) Baracoa II (Over 100 SY)SY2,000
d) Baracoa II (Under 100 SY)SY500
BID ITEMSUNITESTIMATEUNIT COST
013Carpet Mft Miliken
a) Nordic Stories - Americans- Hidden Plains (Over 100 SY)SY2,000
b) Nordic Stories - Americans - Hidden Plains (Under 100 SY)SY500
c) Tectronic (Over 100 SY)SY2,000
d) Tectronic (Under 100 SY)SY500
014Interface Carpet
a) Mantra (Over 100 SY)SY4,000
b) Mantra (Under 100 SY)SY2,000
Material$ - 0
CLINVinyl Selection Line Items
Contractor shall be paid for the amount of vinyl including waste, and amount required as
an overage tollerance. Contractor and ordering agency shall agree on quantity before
commencement of work.
015Vinyl Tile
a) Loose Lay Tile 24" x 24" (Over 100 SY)SY4,000
b) Loose Lay Tile 24" x 24" (Under 100 SY)SY2,500
Carpet Treatments and Backing Line Items
016a) Scotchguard Carpet Protector or equal if not included on carpetSY5,000
b) Rebond Urethane 3/8” thickness 6 LBSY500
c) Rebond Urethane 1/2” thickness 7 LBSY500
Material$ - 0

Total

File details come from the government source that posted it. Updated .