FA810012R0031_______0003.pdf

PDF 15 KB Posted

Attached to
Professional, Administrative and Management Support Services
Solicitation number
FA8100-12-R-0031
Issued by

About this file

Amendment 0003

View the file

Other files

File Type Posted
FA810012R0031 QA.docx DOCX document
FA8100-12-R-0031 AMEND 0002 —
Non_Disclosure_Agreement_Industrial_Safety.doc DOC document
Industrial_Safety_PWS_06_29_12.docx DOCX document
CDRL_A001_DIMGMT_80368A.pdf PDF
LPTA_Section_L_Industrial_Safety.doc DOC document
CDRL_A001_Monthly_Report_Ind_Safety.pdf PDF
FA8100-12-R-0031 Solicitation.pdf PDF
LPTA_Section_M_Industrial_Safety.doc DOC document
Industrial_Safety_QASP_06_13_12.docx DOCX document
Attach_Insurance_Compliance_Requirements.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE Page 1

2. AMENDMENT/MODIFICATION NO.

FA8100-12-R-0031-0003

3. EFFECTIVE DATE

26 JUL 2012

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO (If applicable)

6. ISSUED BY CODE

DEPARTMENT OF THE AIR FORCE, OC-ALC/PKEA

3001 STAFF DR STE 2AF68A

TINKER AFB OK 73145-3303

BUYER: Gay Joseph/PKEA gay.joseph@tinker.af.mil Phone: (405) 739- 2088 No Collect Calls

7. ADMINISTERED BY (If other than item 6) CODEFA8100

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

X

9A. AMENDMENT OF SOLICITATION NO.

FA810012R0031

9B. DATED (SEE ITEM 11)

11-JUL-2012

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Routine

1) THIS AMENDMENT AMENDS EVALUATION METHODOLOGY IN SECTIONS L AND M.

2) THIS AMENDMENT CLARIFIES TELECOMMUTING RESTRICTIONS FOR THIS REQUIREMENT.

SEE PAGE 2 FOR DETAILS.

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

BY ________________________________________________________

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY ____________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

FACILITY CODE

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

PRESCRIBED BY GSA

FAR (48 CFR) 53.243

X

X X

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Amendment/Modification FA8100-12-R-0031-0003

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

The purpose of this amendment is as follows:

FIRST: Section L, Evaluation Factors, paragraph b, Evaluation Methodology (page 2) is amended to read as follows:

Evaluation Methodology The Government will evaluate price for all proposals. The evaluated price will be established for each proposal based upon the total price of all CLINS combined, excluding travel. Upon establishing the evaluated price of the lowest four (4) offerors, only those proposals will be evaluated for technical acceptance. Technical evaluation will be conducted in accordance with the evaluation criteria established below. A simple concurrence in response to stated technical requirements is not an acceptable approach and such an offer will be found non-responsive. If one

(1) of these proposals is found technically unacceptable, the next lowest priced proposal will be submitted for technical acceptance review. Only those proposals determined to be technically acceptable, either initially, or as a result of discussions will be considered for award. Award will be made to the lowest evaluated priced proposal meeting the acceptability standards for the non-cost factors.

SECOND: Section M, Item 6) Evaluation Factors, Evaluation Methodology (page 2) is amended to read as follows:

The Government will evaluate price for all proposals. The evaluated price will be established for each proposal based upon the total price of all CLINS combined, excluding travel. Upon establishing the evaluated price of the lowest four (4) offerors, only those proposals will be evaluated for technical acceptance. Technical evaluation will be conducted in accordance with the evaluation criteria established in the ITO. A simple concurrence in response to stated technical requirements is not an acceptable approach and such an offer will be found non-responsive. If one

(1) of these proposals is found technically unacceptable, the next lowest priced proposal will be submitted for technical acceptance review. Only those proposals determined to be technically acceptable, either initially, or as a result of discussions will be considered for award. Award will be made to the lowest evaluated priced proposal meeting the acceptability standards for the non-cost factors.

THIRD: The following restriction is added to this requirement:

NO TELECOMMUTING IS PERMITTED

FOURTH: The above changes/additions are the only changes to this solicitation.

File details come from the government source that posted it. Updated .