This document is a set of Questions and Answers regarding Amendment 1 to Solicitation FA706024Q0018 for the JBAB - Scoreboard for Youth Center requirement. The key details are:
The solicitation is for a contractor to provide and install one scoreboard, including a non-illuminated sign, to be mounted on an existing support structure. The existing structure has 6" x 6" steel I-beam columns spaced 10' apart, with rails at 7'5" and 14'6" from the ground. The footer size is 46-1/2" x 46-1/2", but the depth is unknown. Proposals should indicate the estimated completion time. Power is available within 5' of the new scoreboard location. Equipment access to the site is available via a paved path. Additional photos of the existing structure have been added to the Statement of Work. All questions were due on July 16, 2024 by 2PM EDT, and all final offers are due on July 18, 2024 by 2PM EDT.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW - Scoreboard w Installation - Revision 4 Dated 16JUL24.pdf | ||
| JBAB LL _Logo.png | PNG image | |
| WG 15-4281 11APR24.pdf | ||
| Solicitation - FA706024Q0018.pdf | ||
| Scoreboard Drawing.png | PNG image |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF DEFENSE
JOINT BASE ANACOSTIA-BOLLING
& 11TH WING (AFDW)
WASHINGTON DC
READINESS – PARTNERSHIPS – HERITAGE
16 July 2024
MEMORANDUM FOR FA706024Q0018 - JBAB - Scoreboard for Youth Center
FROM: 11 CONS/PKA
SUBJECT: Questions and Answers
1. What type, size, and spacing are the existing columns?
a. The existing columns are 6” x 6” Steel I-beams.
b. The two columns are spaced 10’6” apart (outside to outside), 10’ ft center to center.
c. The existing columns are approximately 17 feet tall.
d. The bottom horizontal rail is 7’-5 ¼” from the ground.
e. The next upper rail is 7’-1 ½” higher than the bottom.
f. There is about 3 extra feet of column that is standing above the upper rail
2. Depth and size of the footers?
a. Depth: The depth is not known at the time.
b. Size: 46-1/2” x 46-1/2”
3. What is the allowed duration of completing the installation work?
a. Proposals should indicate the estimated completion time.
4. Is there a sufficient 120V/20A/60HZ grounded power within 5' of the new scoreboard location?
a. Yes, see the high mounted outlet. Reference Table 4-6 of the Statement of Work.
5. Will the installer be able to access the scoreboard location(s) with a lift device such as a crane or derrick truck without damaging the field, track, fencing, etc?
a. Yes, there is a paved path between the baseball fields and a parking lot access point for equipment use.
6. Are there any more photos available of the existing structure?
a. The Statement of Work has been updated to reflect two additional photos of the existing structure and are listed below.
Attachment:
- Three photos of existing structure
Contracting Officer
Photo 1
Photo 2
Photo 3