Attachment 7 - Revised Seed SOW - Paint Hangar 1.docx

DOCX document 16 KB Posted

Attached to
Protective Coatings IDIQ Federal contract opportunity
Solicitation number
FA706022R0033
Issued by
Department of the Air Force

View the file

Other files for this federal contract opportunity

Other files attached to Protective Coatings IDIQ, newest first.
File Type Posted
Attachment 10 - Sections L and M revised.docx DOCX document
Amendment 3 FA706022R00330003.pdf PDF
Attachment 12 - Questions and Answers corrected.docx DOCX document
Amendment 2 FA706022R00330002.pdf PDF
Attachment 9 -Wage Determination - Buildings DC20220002 07082022.pdf PDF
Amendment 1 - Attachment 6 - FOPR for Seed Project-signed.pdf PDF
Amendment 1 - FA706022R00330001.pdf PDF
Attachment 12 - Questions and Answers.docx DOCX document
Attachment 8 - Revised Seed Site Layout - Paint Hangar 1.pptx PPTX presentation
Attachment 5 - Subcontractor Consent.docx DOCX document
Attachment 10 - Sections L and M.docx DOCX document
Attachment 4 - Financial Reference.docx DOCX document
Attachment 2 - MACC Conditions.docx DOCX document
Attachment 11- CUI JBAB Base Access Registration Form.xlsx XLSX spreadsheet
Attachment 7 - Seed SOW - Paint Hangar 1.docx DOCX document
Attachment 8 - Seed Site Layout - Paint Hangar 1.pptx PPTX presentation
Solicitation - FA706022R0033.pdf PDF
Attachment 1 - SOW 5 Year Protective Coating IDIQ - 6-13-22.docx DOCX document
Attachment 3 - Past Performance Information Form.docx DOCX document
Attachment 6 - FOPR for Seed Project-signed.pdf PDF
Attachment 9 - Wage Determination - Buildings DC20220002 06242022.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA706022R0033

Attachment 7 Revised Statement of Work 20 July 2022 Hangar 1 – Paint Offices Joint Base Anacostia-Bolling (JBAB) Washington, D.C. 20032

1. SCOPE OF WORK: The work consists of all labor, equipment, and materials to paint the selected offices, briefing room, and processing area/s for the Passenger Deployment Function (PDF) in the Installation Deployment Reception/Processing Center (IDRC). This facility was the first hangar on the installation and the goal of the project is to renovate the spaces in a manner similar to the original finishes. Work includes: move furniture & equipment necessary to complete the work and move back into position when work is completed, repair wall surfaces; patch small chips and nail holes; texture as necessary; all areas with wallpaper will need wallpaper removed and walls skim coated, primed, and textured as necessary to match areas without wallpaper, paint all areas with two coats of semi-gloss/satin finish paint, and strip existing paint from interior trim (door casing and base) and doors (including door frames) and refinish with stain.

1.a Submittals – the contractor shall submit the following information to the Contracting Officer for approval prior to installation:

-- Selected paint IAW with the IDIQ SOW
-- Paint color options available for the Government to make a color selection(s)
-- Selected stain and clear coat for the trim and doors
-- Stain color options available for the Government to make a color selection

2. Overall Project Management 2.a Program Manager – The contractor shall provide a fully qualified on-site manager who shall be responsible for the performance of the work. The name of the person and all alternates shall be designated in writing to the Contracting Officer. The project manager shall have full authority to act for the contractor. The project manager shall be on-site during normal work hours and for contingencies requiring work beyond normal work hours.

2.b SCHEDULE: The contractor shall furnish a moving schedule for approval 3 calendar days in advance to Contracting Officer/Representative. Contractor shall notify the contracting officer of changes to the schedule 2 days in advance of the scheduled day concerned.

2.c Period of Performance: The contractors shall completed all task within this project during the period of performance of 90 days from the issuance of the Notice to Proceed.

2.d Timeliness is a priority for this project. Upon receipt of Notice to Proceed, the contractor will notify the Project Manager within three working days so the government can move non-relevant existing equipment so that it will not interfere with the contractor’s work.

2.d.1. The contractor shall commence all specified work starting from the notice to Proceed.

2.d.2. The contractor shall provide the Project Manager with a schedule of work within 3 working days of the Notice to Proceed. The schedule is subject to the approval of the government.

2.c.3. Normal daytime business working hours will be 0700 to 1600 Monday through Friday. If the contractor wishes to work at nighttime or during other unscheduled times, contractor must obtain permission from the Contracting Officer/Representative. If access to the facility/job site is closed due to authority instructions or due to inclement weather the contractor will be given recovery days to complete the job at the JBAB.

--End of Statement of Work --