2169_06 0304 M 420MFP.pdf
PDF 148 KB Posted
- Attached to
- FY22 Grease Laden Ducts Cleaning Services Federal contract opportunity
- Solicitation number
- FA700022Q0008
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4"HTHWR
2"HTHWS
4"HTHWR
2"HTHWR
CV-1 CV-2
4"HTHWS
6"HTHWR
2"HTHWR
3"HTHWR
4"HTHWR
3"HTHWR
6"HTHWR
6"HTHWS
4"BYPASS
NEW 6"VALVE
AA-V-61R W/34"
BYPASS
NEW 6"VALVE
AA-V-61S W/34"
BYPASS
NEW 6"VALVE
AA-V-63S W/34"
BYPASS
(E)1"D(2) (E)12"V(2)
AA-V-61S
AA-V-62R
(BELOW)
NEW 4"VALVE
AA-V-63B W/34"
BYPASS
S c a l e
1OTH CIVIL ENGINEER SQUADRON
U.S. AIR FORCE ACADEMY,
COLORADO
Sheet
ID
Sheet
D e s i g n e r
R e v i e w e r
F i l e
N a m e
D r a f t e r
S u b m i t t e r
D r a w i n g
D a t e
A F A
P r o j e c t
M g r
A E
P r o j e c t
M g r
S y m b
R e v i s i o n s A d d e n d a
D a t e
A p p r
M M F P D W G
S
S A B E R
I I
P r o j e c t
D o c s
U S A F A Q
R e p a i r
H T H W
I s o l a t i o n
V a l v e s C A D A s B u i l t s c u r r e n t D W G M E C H
M M F P d w g
O c t a m
R E P A I R
H T H W
I S O L A T I O N
V A L V E
C A D E T
A R E A
E N L A R G E D
M E C H A N I C A L
R O O M
P L A N S
B U I L D I N G
T
S C H E N D T
T
S C H E N D T
T
S C H E N D T
D
S T Y E R
B
S H E A
R
C R U Z
O D S
A S B U I L T b y
J A W
2169 - CADET FIELD HOUSE MECHANICAL ROOM 2170 - CADET FIELD HOUSE KEYPLAN
MECHANICAL ROOM
NO SCALE
8'4'2'0
SCALE: 14" = 1'-0"
GENERAL NOTES
KEYNOTES
1. NOT ALL DUCTWORK, PIPING, AND ACCESSORIES ARE NECESSARILY SHOWN ON
THIS DRAWING, BUT WHAT WAS DEEMED NECESSARY TO SHOW INTENT OF WORK
INVOLVED IN THIS PROJECT. REFER TO ALL OTHER PLANS, SECTIONS, DETAILS,
SCHEDULES AND SPECIFICATIONS FOR COMPLETE SYSTEM REQUIREMENTS.
2. THE CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO START
OF ANY WORK, AND SHALL NOTIFY CONTRACTING OFFICERS REPRESENTATIVE
IMMEDIATELY OF ANY DISCREPANCY BETWEEN THE DRAWINGS AND THE ACTUAL
FIELD CONDITIONS.
3. PROVIDE AND INSTALL MANUAL AIR VENTS AT ALL HIGH POINTS AND DRAIN
VALVES AT ALL LOW POINTS IN HYDRONIC PIPING.
4. THE MECHANICAL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE
2015 INTERNATIONAL MECHANICAL CODE, ASME B31.1, 2014 EDITION, AS WELL
AS LOCAL CODES THAT MAY APPLY. IN CASE OF CONFLICT BETWEEN THE
CONTRACT DOCUMENTS AND A GOVERNING CODE OR ORDINANCE THE MORE
STRINGENT STANDARD SHALL APPLY.
5. INSULATE ALL PIPING AS SPECIFIED ON THE “MECHANICAL INSULATION
SCHEDULE”.
6. COORDINATE NEW WORK WITH CONTRACTING OFFICER'S REPRESENTATIVE,
CONSTRUCTION PHASING SCHEDULE, AND ACADEMIC SCHEDULES.
7. ALL NEW VALVES 2-1/2” AND LARGER SHALL HAVE BUTT-WELD CONNECTIONS.
VALVES 2” AND SMALLER SHALL HAVE SOCKET WELD OR BUTT WELD CONNECTIONS.
THREADED CONNECTIONS WILL NOT BE PERMITTED.
8. HTHW PIPING 2-1/2” AND LARGER SHALL BE ASTM A53 OR A106 GRADE B
SEAMLESS SCHEDULE 40 BLACK STEEL. HTHW PIPING 2” AND SMALLER SHALL BE
ASTM A53 OR A106 GRADE B SEAMLESS SCHEDULE 80 BLACK STEEL.
9. ALL WELDS ON SUPPLY, RETURN, VENT, AND DRAIN PIPING SHALL BE PERFORMED
BY WELDERS WITH A “PP” STAMP CERTIFICATION AND IN ACCORDANCE WITH ASME
B31.1.
10. CONTRACTOR SHALL HAVE 20% OF ALL NEW WELDS ON HTHW SUPPLY AND RETURN
PIPING X-RAYED BY AN INDEPENDENT CERTIFIED NON-DESTRUCTIVE TESTING
AGENCY. CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE TO SELECT WELDS TO BE X-RAYED.
11. REFER TO THE M-600 SERIES DRAWINGS FOR EQUIPMENT SCHEDULES.
EXISTING ASBESTOS INSULATION ON HTHWS&R PIPING AND VALVES SHALL BE
ABATED TO A DISTANCE OF 5' ON EACH SIDE OF THE EXISTING VALVES PRIOR
TO START OF WORK.
SECURE PIPING TO PREVENT LONGITUDINAL MOVEMENT PRIOR TO REMOVING THE
EXISTING VALVE. REMOVE EXISTING VALVE. REMOVE ASSOCIATED COMPANION
FLANGES ON FLANGED VALVES.
PROVIDE AND INSTALL NEW 6” CLASS 300 CAST STEEL TRIPLE OFFSET ROTARY
VALVE WITH WELDED END CONNECTIONS ALONG WITH THE NECESSARY SECTION OF
STEEL PIPING TO FIT EXISTING PIPE SECTION IN THE EXISTING 6” HTHWS&R
PIPING.
PROVIDE AND INSTALL NEW 4” CLASS 300 CAST STEEL TRIPLE OFFSET ROTARY
VALVE WITH WELDED END CONNECTIONS ALONG WITH THE NECESSARY SECTION OF
STEEL PIPING TO FIT EXISTING PIPE SECTION IN THE EXISTING 4” HTHW
BYPASS PIPING.
PROVIDE AND INSTALL A SEPARATELY PIPED BYPASS AROUND THE TRIPLE OFFSET
ROTARY VALVE CONSISTING OF SOCK-O-LETS WELDED TO THE PIPE ON EACH SIDE
OF THE VALVE, SCHEDULE 80 STEEL PIPE WITH SOCKET WELDED FITTINGS AND A
3/4” CLASS 800 GLOBE STYLE FORGED STEEL BYPASS VALVE WITH SOCKET
WELDED CONNECTIONS.
REINSULATE ALL BARE PIPING AND REPAIR DAMAGED INSULATION UPON
COMPLETION OF THE INSTALLATION.
NOTE:
WORK SHOWN ON THIS DRAWING SHALL BE PERFORMED UNDER CLIN-2.
CONTRACTOR SHALL ORDER VALVES AND PROCEED WITH WORK SHOWN ON
THIS DRAWING AFTER THE OVERALL PROJECT IS 75% COMPLETED.
2169 - CADET FIELD HOUSE
TEMPORARY BOILER CONNECTION LOCATION PLAN
SCALE: 116" = 1'-0"
0 8' 16' 32'
BLDG 2169
B L D G
TEMPORARY
BOILER WATER
CONNECTIONS
TEMPORARY
BOILER POWER
CONNECTIONS
(E) IRRIGATION
BACKFLOW
PREVENTER
File details come from the government source that posted it. Updated .