2350_XQPZ 18 0145 RPR HVAC East Kitchen.pdf
PDF 6 MB Posted
- Attached to
- FY22 Grease Laden Ducts Cleaning Services
- Solicitation number
- FA700022Q0008
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CADET
CATM
BCT
CEMETERY
EISENHOWER
GOLF COURSE
WASTE WATER
COMMUNITY CENTER
SERVICE AND
PINE VALLEY HOUSING
DOUGLASS VALLEY HOUSING
HOSPITAL
OFFICERS'
SENIOR OFFICERS'
HOUSING
GE AND FERL
AIRFIELD
ROD AND GUN CLUB
SUPPLY AREA
VISITOR CENTER
NONPOTABLE
RESERVOIR #4
NONPOTABLE
RESERVOIR #3
NONPOTABLE
RESERVOIR #2
NONPOTABLE
RESERVOIR #1
POTABLE
RESERVOIR #1
POTABLE
RESERVOIR #2
POTABLE
RESERVOIR #4
POTABLE
RESERVOIR #3
KETTLE LAKES
RECREATION AREA
THUNDERBIRD
AIRMAN
AIRFIELD
OPERATIONS
EQUESTRIAN
CENTER
VOQ
CLUB
OVERLOOK #2
OVERLOOK #3
ACA
DEM
Y D
RIV
E
NOR
TH
GATE
BLV
D
A C A D E M Y
D R
IV
E
INTERIOR DRIVE
ACAD
EMY
DRIVE
CROSS
DRIV
E
PARA
DE LO
OP STAD
IU
M
BLVD
COMMUNITY CENTER DRIVE
PINE DRIVE
SO
U
TH
GATE BLVD
SOUTH ENTRANCE
NORTH ENTRANCE
S
TA
D
IU
M
B
LV
D
STADIUM
INTERQUEST PKWY
BRIARGATE
PKWY
NORTHGATE ROAD
FIE
LD
H
OU
SE
D R.
CADET DRIVE
CADET DRIVE
AREA
ATHLETIC
FIELDS
DEADMAN'S LAKE
FAMCAMP
FALCON
AUTO AND
WOOD CRAFTS
FIRE ROAD 701
PLANT #1
PLANT #3
PLANT #2
CITY TREATMENT PLANT
PI
NE
D
RI
VE
JACK'S VALLEY ROAD
MUNITIONS
STORAGE AREA
CONTRACTOR
STAGING AREA
HEAT PLANT
AOG
PREP SCHOOL
AIR ACADEMY
HIGH SCHOOL
DOUGLASS VALLEY
ELEMENTARY
SOUTH GATE
NORTH GATE
MAIN
AUXILIARY
AIRFIELD
AARDVARK
BASE CIVIL ENGINEERS
BLDG 8120
BASE CONTRACTING
BLDG 8110
OVERLOOK
IN
TE
RI
O R D
RI
VE
ACADEMY DRIVE
OVERLOOK #1
BLDG 8486 PASS AND
REGISTR. FACILITY
TREATMENT PLANT
DWG NO.
XQPZ 180145
G-001
DRAWING INDEX
DRAWING TITLE
COVER SHEET AND INDEX
RPR HVAC EAST KITCHEN
MITCHELL HALL (BUILDING 2350)
SCALE:1"=2000'-0"
0 2000'2000' 1000'
NN
= ACCESS ROUTE
DATE
APPROVED
SAFETY
COMMUNICATIONS
BIO-ENVIRONMENTAL
ANTI-TERRORISM
ENVIRONMENTAL
PROGRAMS
OFFICE
AFA PM
FIRE DEPARTMENT
OPERATIONS
CUSTOMER
SIGNATURE
COORDINATION
ENGINEERING
USING AGENCY/
SECURITY FORCES
OFFICE
Sheet
ID
Sheet
D e s i g n e r
R e v i e w e r
F i l e
N a m e
D r a f t e r
S u b m i t t e r
D r a w i n g
D a t e
A F
A
P r o j e c t
M g r
A E
P r o j e c t
M g r
S y m b R e v i s i o n s A d d e n d a
D a t e
A p p r
S c a l e
1OTH CIVIL ENGINEER SQUADRON
U.S. AIR FORCE ACADEMY,
COLORADO
G
C
V S
D
W G
G-001
SCHENDT
ENGINEERING
CORPORATION
CONSULTING ENGINEERS
* PH. (719) 637-8850 *
sec@secengr.com
5145 CENTENNIAL BLVD
COLORADO SPRINGS, CO 80919
K
M
E R
O L A
D
V
A N
D
L E
T
H
A R
V E
Y
K
M
E R
O L A
B
B
U R
G E
S S
B
B
U R
G E
S S
P R
P
H
V A
C
E
A S
T
K
I T
C H
E N
M I T
C H
E L
L
H
A L
L
X Q
Z
C O
V E
R
S
H E
T
I
D E
X
PROJECT
LOCATION
FOR CONSTRUCTION
FINAL SUBMITTAL
G-002 GENERAL PROJECT NOTES
G-101 CADET AREA - ROAD CLOSURE SITE PLAN
M-001 MECHANICAL LEGEND
M-002 MECHANICAL GENERAL PROJECT REQUIREMENTS
MD101 MECHANICAL DEMOLITION PLAN - FAIRCHILD HALL BUILDING 2354 UTILITY TUNNEL
MD102 MECHANICAL DEMOLITION PLAN - MEZZANINE LEVEL
M-100 CADET AREA - PARTIAL SITE PLAN
M-101 MECHANICAL NEW WORK PLAN - FAIRCHILD HALL BUILDING 2354 UTILITY TUNNEL
M-102 MECHANICAL NEW WORK PLAN - FAIRCHILD HALL BUILDING 2354 MECHANICAL ROOM 1H6
M-103 MECHANICAL NEW WORK PLAN - DOCK LEVEL
M-104 MECHANICAL NEW WORK PLAN - SERVICE LEVEL
M-105 MECHANICAL NEW WORK PLAN - DINING LEVEL
M-106 MECHANICAL NEW WORK PLAN - MEZZANINE LEVEL
M-301 MECHANICAL SECTIONS
M-501 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-701 MECHANICAL CONTROLS
E-001 ELECTRICAL LEGEND AND GENERAL NOTES
E-101 ELECTRICAL NEW WORK PLAN - MEZZANINE LEVEL
E-102 ELECTRICAL NEW WORK PLAN - FAIRCHILD HALL BUILDING 2354
E-601 SCHEDULES
AutoCAD SHX Text
AIR FORCE ACADEMY
AutoCAD SHX Text
UNITED STATES
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text Y
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
Sheet
ID
Sheet
D e s i g n e r
R e v i e w e r
F i l e
N a m e
D r a f t e r
S u b m i t t e r
D r a w i n g
D a t e
A F
A
P r o j e c t
M g r
A o j e c t
M g r
S y m b R e v i s i o n s A d d e n d a
D a t e
A p p r
S c a l e
1OTH CIVIL ENGINEER SQUADRON
U.S. AIR FORCE ACADEMY,
COLORADO
G
N
O T
D
W G
SCHENDT
ENGINEERING
CORPORATION
CONSULTING ENGINEERS
* PH. (719) 637-8850 *
sec@secengr.com
5145 CENTENNIAL BLVD
COLORADO SPRINGS, CO 80919
U S
A F
A
P
R O
J E
C
O
X
Q P
Z
R P
R
H
V A
C
E
A S
T
K
I T
C H
E N
M I T
C H
E L
L
H
A L
L
G E
N E
R A
L
P
R O
J E
T
E S
G-002
J
W
E L L S
K
M
E R
O L A
K
M
E R
O L A
N A
T
H
A R
V E
Y
D
V
L E
K
M
E R
O L A
GENERAL CONSTRUCTION NOTES:
1. EXISTING UTILITY LINES ARE PRESENT IN THE PROJECT AREA, INCLUDING BUT NOT LIMITED TO: TELECOM, GAS, ELECTRIC, WATER, AND SANITARY SEWER.
EXISTING UTILITIES HAVE NOT BEEN POTHOLED OR SURVEYED AND HAVE BEEN SHOWN ON THESE DRAWINGS BASED ON CAD INFORMATION PROVIDED BY
USAFA. IT IS ASSUMED THAT UTILITIES EXIST IN THE PROJECT AREA IN ADDITION TO WHAT IS SHOWN. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING
EXACT LOCATIONS AND ELEVATIONS OF ALL UTILITIES AND EQUIPMENT PRIOR TO EXCAVATION. IN THE EVENT THAT AN EXISTING UTILITY LINE IS DISCOVERED, AND IS NOT IDENTIFIED ON THE DRAWINGS, THE CONTRACTOR SHALL SURVEY THE SAID UTILITY AND NOTIFY THE GIS DEPARTMENT (719-333-3749) TO BE
RECORDED INTO THE AFA GIS MAPPING SYSTEM.
2. THE MAIN AREA OF WORK FOR THIS PROJECT IS SHOWN ON THE PLANS. CONTRACTOR IS TO LIMIT CONSTRUCTION ACTIVITIES AND DISTURBANCES TO THIS
AREA AND AREAS DEEMED NECESSARY TO ACCESS TO PERFORM WORK. ADDITIONAL AREAS MAY INCLUDE; MECHANICAL ROOMS, ELECTRICAL ROOMS, COMMUNICATIONS ROOMS, AND CORRIDORS.
3. REQUIRED ABATEMENT OF HAZARDOUS MATERIALS IN A SINGLE ENTIRE MECHANICAL ROOM SHALL PROCEED PRIOR TO START OF PROJECT.
4. THE CONTRACTOR SHALL BE REQUIRED TO SHUTDOWN CERTAIN UTILITIES, AS CONNECTIONS TO EXISTING SERVICES ARE MADE. MOST OF THESE
SHUTDOWNS SHOULD BE LOCALIZED AND MAY ONLY AFFECT THE HVAC ZONE UNDER CONSTRUCTION.
5. THE MAJORITY OF WORK OUTSIDE MITCHELL HALL IS ANTICIPATED TO OCCUR DURING NORMAL BUSINESS HOURS. CONSTRUCTION WORK INSIDE MITCHELL
HALL IS LIMITED TO 7 P.M. TO 4 A.M. AND CONSTRUCTION WORK IN KITCHEN AREAS IS LIMITED TO 10 P.M. TO 4 A.M. CONTRACTOR SHOULD PLAN ON
WORKING AFTER HOURS, WEEKENDS, NIGHT SHIFTS, AND HOLIDAY WORK.
6. FOR AN INTEGRAL AND COHESIVE TRANSITION. THE CONTRACTOR SHALL JOINTLY DEVELOP A PHASING PLAN WITH 10 CONS CONTRACTING OFFICER TO
MINIMIZE IMPACT TO BUILDING OPERATIONS. ANY CHANGES TO THE PHASING PLAN MUST BE APPROVED BY THE COR.
7. THE CONTRACTOR SHALL INSTALL LOW PROFILE BARRICADES TO MARK CLOSED AREAS AND OPEN TRENCHES. ALL BARRICADES MUST BE ILLUMINATED AT
NIGHT AND MEET THE REQUIREMENTS OF ETL 04-2 AND UFC 3-260-01. THE COR MUST APPROVE BARRICADE DESIGN AND LOCATIONS PRIOR TO
IMPLEMENTATION.
8. CONTRACTOR IS RESPONSIBLE TO IDENTIFY ALL NEW CONFINED SPACES (AS DEFINED IN 29 CFR 1910.146) CREATED BY THIS PROJECT, AND KNOWN HAZARDS
WITHIN THESE SPACES. THE INFORMATION SHOULD INCLUDE SPACE NOMENCLATURE (E.G. HVAC, MANHOLE, TANK, ETC.), SPACE LOCATIONS (BLDG NUMBER, ROOM, OR GPS COORDINATES), AND ANY KNOWN HAZARDS SUCH AS POTENTIAL ATMOSPHERIC CONDITIONS, INWARD SLOPING OR CONVERGING WALLS, ETC.). SEND INFORMATION TO:
HQ USAFA/SE
8110 SECURITY DR
USAF ACADEMY, CO. 80840
OR EMAIL TO: USAFA.SEG@USAFA.EDU
9. CONTRACTOR SHALL SUBMIT A TRAFFIC PLAN FOR VEHICLES UTILIZED DURING CONSTRUCTION AND DEMOLITION EFFORTS. THE TRAFFIC PLAN SHALL BE
REVIEWED BY USAFA CE.
10. WORK INTERRUPTIONS AND DELAYS: THE CONTRACTOR MAY BE REQUIRED TO TEMPORARILY STOP WORK FOR OPERATIONAL REQUIREMENTS, SPECIAL
EVENTS, INSTALLATION EXERCISES, CADET PARADES, OR WHILE DISTINGUISHED VISITOR (DV) FAMILIARIZATION VISITS/TOURS ARE CONDUCTED. PARTICULAR
INTERRUPTIONS AND WORK STOPPAGE IS TO BE EXPECTED DURING THE WEEKS OF GRADUATION (LATE MAY/EARLY JUNE), PARENTS WEEKEND (USUALLY IN
CONJUNCTION WITH LABOR DAY), AND CORONA (FALL). OFFICIAL LATE REPORTING AND SNOW CALLS WILL AFFECT THE CONTRACTOR'S WORK PERIODS. THE
CONTRACTOR MUST MAKE ALLOWANCES FOR THESE EVENTS AND RESULTING LOST TIME WILL NOT BE REIMBURSABLE. NOTIFICATION TO THE CONTRACTOR
SHALL BE PROVIDED BY THE APPLICABLE CONTRACTING OFFICER. WORK MAY BE ALLOWED IN CERTAIN AREAS DURING THESE EVENTS. CHECK WITH THE AFA
CONTRACTING OFFICER. FOR THESE ACTIVITIES WHEN WORK MAY BE RESTRICTED, THE CONTRACTOR SHALL HAVE THE AREAS CLEANED, EQUIPMENT AND
MATERIAL ORGANIZED AS DIRECTED BY THE CONTRACTING OFFICER.
11. ALL PENETRATIONS IN OR THROUGH FIRE RATED PARTITIONS SHALL BE FIRE-STOPPED SUCH THAT THE PENETRATION MEETS OR EXCEEDS THE FIRE RATING
OF THE WALL.
12. THE CONTRACTOR IS RESPONSIBLE FOR PATCHING, PAINTING, REPAIRING OR THE REPLACEMENT OF ALL WALLS, CEILINGS OR OTHER BUILDING ELEMENTS
WHICH ARE DISTURBED AS PART OF THE DEMOLITION AND/OR INSTALLATION OF NEW WORK. PATCHING AND NEW WORK SHALL MATCH EXISTING ADJACENT
FINISHES AND TEXTURES UNLESS OTHERWISE NOTED.
GENERAL DEMOLITION NOTES:
1. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO START OF ANY WORK AND SHALL NOTIFY CONTRACTING OFFICERS REPRESENTATIVE
IMMEDIATELY OF ANY DISCREPANCY BETWEEN THE DRAWINGS AND THE ACTUAL FIELD CONDITIONS.
2. NOT ALL EXISTING UTILITIES EQUIPMENT, DUCTWORK, AND PIPING ARE NECESSARILY SHOWN ON THESE DRAWINGS BUT WHAT WAS DEEMED NECESSARY TO
SHOW THE INTENT OF WORK INVOLVED IN THIS PROJECT.
3. CONTRACTOR SHALL REMOVE ALL MATERIALS AS REQUIRED AND SHALL GIVE THE CONTRACTING OFFICERS REPRESENTATIVE THE OPPORTUNITY TO INSPECT
SUCH MATERIALS FOR POTENTIAL SALVAGE. CONTRACTOR SHALL REMOVE FROM THE SITE ALL MATERIALS DEEMED "NON-SALVAGEABLE" BY THE
CONTRACTING OFFICERS REPRESENTATIVE. CONTRACTOR SHALL TURN OVER TO THE CONTRACTING OFFICERS REPRESENTATIVE ALL MATERIALS DEEMED
"SALVAGEABLE" BY THE OWNER. CONTRACTOR SHALL RECYCLE ALL MATERIALS DEEMED “RECYCLABLE” BY THE OWNER.
4. THE EQUIPMENT SHOWN AS HATCHED ON THE DRAWINGS REPRESENT THE MAJORITY OF THE EQUIPMENT TO BE REMOVED. IT DOES NOT NECESSARILY SHOW
ALL THE ASSOCIATED HARDWARE SUCH AS SUPPORTS, HANGERS, PIPING APPURTENANCES, CONDUIT, BOXES, WIRING, ETC. TO ALSO BE REMOVED.
5. THE CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL NECESSARY POWER OUTAGES WITH THE GOVERNMENT'S REPRESENTATIVE (2 WEEKS IN
ADVANCE) PRIOR TO PROCEEDING WITH SUCH WORK. THE CONTRACTOR SHALL INSURE THAT THE OPERATIONS IN ADJACENT AREAS OR PORTIONS OF THE
FACILITY ARE NOT INTERRUPTED OR RESTRICTED WITHOUT PRIOR APPROVAL.
6. THE CONTRACTOR SHALL COMPLETELY REMOVE ALL ELECTRICAL WIRING, CONDUIT, BOXES, DEVICES, DISCONNECTS, FIXTURES, MOUNTING HARDWARE, ETC.
WHICH ARE ASSOCIATED WITH THE EQUIPMENT INDICATED BY HATCHING UNLESS OTHERWISE NOTED.
7. ALL DEMO SITES MUST BE PROTECTED FROM UNAUTHORIZED ENTRY. ABATEMENT OF ASBESTOS/LEAD (IF ANY) MUST COMPLY WITH ALL STATE AND FEDERAL
STANDARDS. ADDITIONALLY, ENSURE USAFA WORKERS/CADETS ARE PROTECTED FROM FUMES DURING APPLICATION OF ANY VAPOR PRODUCING PRODUCTS
(I.E. FLOOR FINISHING, PAINTING, ETC.)
8. SUBMIT DUST CONTROL PLAN TO 10CES. INSIDE MITCHELL HALL KITCHEN CONTRACTOR SHALL PROVIDE ALL REQUIRED CONSTRUCTION DUST CONTROL
MEASURES TO MITIGATE ALL CONSTRUCTION RELATED AIRBORNE MATERIALS, AND SHALL NOT COMMENCE CONSTRUCTION UNTIL THESE INSTALLED
MEASURES HAVE BEEN APPROVED BY 10CES COR.
GENERAL COMMUNICATION NOTES:
1. CONTACT 10CS/SCXP AT (719) 333-7461 IF TELEPHONE OR DATA SERVICE WILL BE DISRUPTED AS A RESULT OF CONSTRUCTION OR RENOVATION.
2. ALL COMMUNICATIONS CABLES NEED TO BE IDENTIFIED AND PROTECTED THROUGHOUT THE PROJECT. SPECIAL CARE MUST BE TAKEN WHEN ANY WORK IS
BEING DONE NEAR ANY OF THE TELECOMM ROOMS.
3. ENSURE EXISTING TELECOMMUNICATIONS EQUIPMENT IS PROTECTED IN ALL THE AFFECTED AREAS OF THIS PROJECT. CONTRACTOR IS RESPONSIBLE TO
REPAIR OR REPLACE COMMUNICATION CABLE AND/OR EQUIPMENT THAT IS DAMAGED AS A RESULT OF THE RENOVATION.
4. CONTRACTOR IS RESPONSIBLE FOR RELOCATING ANY EXISTING CONDUIT WITH THIS INITIATIVE THAT MAY BE AFFECTED IN THE SUBJECT AREA. 10CS IS
RESPONSIBLE FOR RELOCATING ASSOCIATED CABLE AND EQUIPMENT.
5. EXISTING COMMUNICATIONS CAPABILITY TO AFFECTED FACILITIES AND THE FACILITIES' USERS MUST REMAIN OPERATIONAL THROUGHOUT ANY
CONSTRUCTION AND/OR RENOVATION.
6. PER UFC 3-580-01, TELECOMMUNICATIONS DESIGN MUST BE PERFORMED AND STAMPED BY A REGISTERED COMMUNICATIONS DISTRIBUTION DESIGNER
(RCDD) FOR ALL PROJECTS.
FIRE PROTECTION NOTES:
1. ANY WELDING, CUTTING, BRAZING, SOLDERING OR OPEN FLAME MUST HAVE A BURN PERMIT ISSUED FOR THE SPECIFIC WORK AREA WHICH WORK IS TO BE
PERFORMED. CONTACT PERSONNEL AT FIRE STATION NO. 3 719-333-4433.
2. FIRE EXTINGUISHERS MUST BE KEPT ON HAND AROUND HEAT PRODUCING EQUIPMENT AT ALL TIMES.
3. FLAMMABLE AND COMBUSTIBLE MATERIAL MUST BE STORED SAFELY WHEN NOT IN USE AND DURING OPEN FLAME OPERATIONS.
4. WORK SITE MUST BE KEPT NEAT, ALL DEBRIS HAULED AWAY FROM THE SITE ON A DAILY BASIS OR MORE FREQUENTLY AS NEEDED.
5. SMOKING IS NOT ALLOWED IN OR AROUND THE WORK SITE. COORDINATE A DESIGNATED SMOKING AREA AS NECESSARY.
6. ALL EMERGENCY REPORTING ON THE ACADEMY: DIAL 911.
7. CONTACT 719-333-2051 FOR ASSISTANCE.
8. REFERENCE THE USACE ENGINEERING MANUAL, EM-385-1-1 AND NFPA 241 AND MUST CONTAIN THE REQUIREMENT THAT THE USAFA FIRE REGULATIONS BE
FOLLOWED.
9. MINIMIZE, TO THE EXTENT POSSIBLE, ANY IMPAIRMENTS OR DISRUPTIONS TO ACTIVE FIRE PROTECTION FEATURES.
ENVIRONMENTAL NOTES:
1. THE CONTRACTOR SHALL HEED THE USAFA ENVIRONMENTAL STANDARDS. CONTACT 10 CES/CEIEC AT 719.333.6418 FOR THE MOST CURRENT VERSION.
2. GREEN PROCUREMENT - THE CONTRACTOR, 10 DAYS PRIOR TO CONSTRUCTION START, SHALL SUBMIT A GREEN PROCUREMENT PROGRAM (GPP) REPORT TO
THE 10 CES/CEIEC GPP MANAGER AT 719.333.6418. THE CONTRACTOR SHALL COMPLY WITH THE EPA'S COMPREHENSIVE PROCUREMENT GUIDELINES
REGARDING THE PURCHASE OF EPA DESIGNATED PRODUCTS.
3. SOLID WASTE - THE CONTRACTOR, ON A MONTHLY BASIS AND WITHIN 10 DAYS FROM PROJECT COMPLETION, SHALL SUBMIT A SOLID WASTE REPORT TO THE
10 CES/CEIEC SOLID WASTE MANAGER AT 719.333.3852. THE REPORT MUST INCLUDE WEIGHT CONSTRUCTION DEBRIS DISPOSED AND RECYCLED, ITEMIZED.
4. AIR QUALITY - CONTRACTORS SHALL REMAIN IN COMPLIANCE WITH ALL FEDERAL, STATE, LOCAL, DOD AND AIR FORCE AIR QUALITY REQUIREMENTS.
CONTRACTORS SHALL FULLY COMPLY WITH THE CONDITIONS OF ALL APPLICABLE COLORADO AIR POLLUTION PREVENTION AND CONTROL ACT AND
REGULATIONS AS IDENTIFIED IN 5 CCR 1001: REGULATIONS 1-19.
FOR PROJECTS DISTURBING MORE THAN ONE ACRE, BUT LESS THAN 25 ACRES, FOR LESS THAN SIX MONTHS DURATION, CONTRACTORS SHALL SUBMIT A
PERMIT APPLICATION TO EL PASO COUNTY WITH COPIES SUBMITTED TO 10 CES/CEIEC. FOR PROJECTS DISTURBING MORE THAN 25 ACRES, OR DISTURBING
AN AREA OF ANY SIZE FOR A DURATION LONGER THAN SIX MONTHS, THE CONTRACTOR SHALL SUBMIT AN AIR POLLUTION EMISSION NOTICE (APEN) ALONG
WITH ASSOCIATED FEES TO THE STATE. A COPY OF THE APEN WILL BE SUBMITTED TO 10 CES/CEIEC, AIR QUALITY MANAGER AT 719.333.6418.
ANY EQUIPMENT OR ACTIVITY THAT EMITS OR HAS THE POTENTIAL TO EMIT POLLUTANTS OR THAT DISTURBS SOLID OR LIQUID MATERIALS, WHICH CAN
BECOME AIRBORNE, IS A SOURCE OF AIR POLLUTION THAT MAY REQUIRE A PERMIT. ACTIVITIES WITH ANTICIPATED AIR EMISSIONS INCLUDE BUT ARE NOT
LIMITED TO PAINTING, STRIPPING, CLEANING WITH DEGREASERS OR SOLVENTS, MATERIAL HAULING, DEMOLITION, SAND BLASTING, USE OF FUEL-BURNING
EQUIPMENT (OTHER THAN MOTOR VEHICLES), WELDING, USE OF VOLATILE ORGANIC COMPOUNDS OR OZONE-DEPLETING CHEMICALS (ODCS), AND
REMEDIATION ACTIVITIES. CONTRACTORS SHALL OBTAIN APPROVAL FOR USE OF HAZARDOUS MATERIALS AS IDENTIFIED IN ITEM 5 HAZARDOUS MATERIALS.
IF AIR EMISSION ESTIMATES FOR CRITERIA OR HAZARDOUS AIR POLLUTANTS (HAPS) EXCEEDS THRESHOLD LEVELS (AS DEFINED BY 5 CCR 1001-5: REGULATION
NO. 3) THE CONTRACTOR SHALL COMPLETE AN APEN AND/OR CONSTRUCTION PERMIT APPLICATIONS REQUIRED BY CDPHE, AIR POLLUTION CONTROL DIVISION
(APCD). CONTRACTORS SHALL SUBMIT THE COMPLETED APEN(S) AND/OR CONSTRUCTION PERMIT APPLICATION(S) TO CDPHE AND PROVIDE A COPY TO 10
CES/CEIEC, AIR QUALITY MANAGER AT 719.333.6418.
CONTRACTORS SHALL ENSURE ALL COMPANY-OWNED AND EMPLOYEE OWNED GASOLINE AND DIESEL VEHICLES WHICH SHALL BE DRIVEN ON USAFA COMPLY
WITH THE EMISSIONS INSPECTION REQUIREMENTS OF CDPHE 5 CCR 1001-13: REGULATION NO. 11 (MOTOR VEHICLE EMISSIONS INSPECTION PROGRAM) AND 5
CCR 1001-15: REGULATION NO. 12 (REDUCTION OF DIESEL VEHICLE EMISSIONS).
OPEN BURNING ON USAFA IS PROHIBITED.
CONTRACTORS SHALL CREATE NO NOXIOUS ODORS THAT VIOLATE COLORADO'S ODOR EMISSIONS REGULATION (5 CCR 1001-4: REGULATION NO. 2).
CONTRACTORS SHALL ENSURE ANY EQUIPMENT CONTAINING OZONE-DEPLETING COMPOUNDS (ODC) ARE OPERATED AND MAINTAINED IN ACCORDANCE WITH
COLORADO'S CONTROL OF EMISSION OF (ODC) REQUIREMENTS (5 CCR 1001-19: REGULATION NO.15). ALL CONTRACTORS AND SUBCONTRACTOR EMPLOYEES
SERVICING ODC CONTAINING EQUIPMENT SHALL BE TRAINED AND EPA CERTIFIED IN ACCORDANCE WITH CDPHE AIR QUALITY REGULATION NO. 15.
CONTRACTORS MUST SUBMIT COPIES OF TECHNICIAN AND EQUIPMENT CERTIFICATIONS TO 10 CES/CEIEC PRIOR TO START OF WORK AT 719.333.6418. ALL
CLASS I ODC USE IS PROHIBITED. ANY REQUESTS FOR USE OF CLASS II ODC MUST BE SUBMITTED IN WRITING TO THE CO FOR REVIEW AND APPROVAL, OTHERWISE, THE USE OF CLASS II ODS IS PROHIBITED.
CONTRACTORS SHALL TAKE ACTIVE STEPS TO PREVENT EVAPORATION OF ALL SOLID OR LIQUID MATERIALS THAT HAVE POTENTIAL TO BECOME AIRBORNE
INCLUDING BUT NOT LIMITED TO FUELS, SOLVENTS, PAINTS, AND OTHER VOLATILE CHEMICALS UNDER THE CONTRACTOR'S CONTROL. ALL CONTAINERS
HOLDING SOLID OR LIQUID MATERIALS THAT HAVE POTENTIAL TO BECOME AIRBORNE SHALL BE CLOSED AT ALL TIMES.
WHEN A FUGITIVE PARTICULATE CONTROL PLAN IS NOT REQUIRED BY 5 CCR 1001-3: REGULATION NO. 1, CONTRACTORS SHALL PERFORM ALL FUGITIVE
PARTICULATE CONTROL MEASURES NECESSARY TO PREVENT EMISSIONS OF OVER 20 PERCENT OPACITY OR VISIBLE EMISSIONS THAT CROSS USAFA'S
PROPERTY BOUNDARIES. CONTRACTORS SHALL MAINTAIN A DAILY LOG OF FUGITIVE PARTICULATE EMISSIONS THAT EXCEED 20 PERCENT OPACITY OR THAT
CAUSE VISIBLE EMISSIONS. CONTRACTORS SHALL MAINTAIN A COPY OF THIS LOG ON SITE AT ALL TIMES AND SHALL MAKE IT AVAILABLE FOR REVIEW BY 10
CES/CEIEC, AIR QUALITY MANAGER UPON REQUEST.
CONTRACTORS SHALL NOT UTILIZE CUTBACK ASPHALT OR ANY COATING INCLUDED IN THE DEFINITION OF CUTBACK ASPHALT AS DEFINED AT 5 CCR 1001-9:
REGULATION NO. 7 DURING THE MONTHS OF MARCH THROUGH SEPTEMBER UNLESS THE CUTBACK ASPHALT IS USED SOLELY AS A PENETRATING PRIME COAT;
OR IF THE USER CAN DEMONSTRATE TO CDPHE APCD THAT UNDER THE CONDITIONS OF ITS INTENDED USE THAT THERE WILL BE NO EMISSIONS OF VOLATILE
ORGANIC COMPOUNDS TO THE AMBIENT AIR. ALL INFORMATION CONCERNING SUCH WILL BE SENT TO 10 CES/CEIEC, AIR QUALITY MANAGER AT 719.333.6418.
CONTRACTORS SHALL NOT APPLY SAND OR GRAVEL TO USAFA ROADS WITHOUT OBTAINING PRIOR WRITTEN APPROVAL FROM 10 CES/CEIEC, AIR QUALITY
MANAGER 719.333.6418.
CONTRACTORS SHALL PROPERLY RE-VEGETATE ALL DISTURBED LAND TO PREVENT FUGITIVE PARTICULATE EMISSIONS FOLLOWING THE COMPLETION OF
WORK.
5. WATER QUALITY - CONSTRUCTION STORM WATER, IF GREATER THAN OR EQUAL TO ONE (1) ACRE OF LAND DISTURBANCE IS CREATED. A STORM WATER
CONSTRUCTION ELECTRONIC NOTICE OF INTENT (ENOI) IS REQUIRED TO BE FILED BY THE CONTRACTOR. IF AN ENOI IS REQUIRED, THE CONTRACTOR IS
REQUIRED TO PREPARE A STORM WATER POLLUTION PREVENTION PLAN (SWPPP) PRIOR TO SUBMITTING THE ENOI. THE SWPPP SHALL COMPLY WITH ALL
PROVISIONS OF THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) GENERAL PERMIT FOR DISCHARGES FROM CONSTRUCTION ACTIVITIES, GENERAL PERMIT NO. COR12000F. PLEASE REFER TO THE USAFA AND CONTRACTOR STORM WATER PERMITTING GUIDANCE DOCUMENT FOR INSTRUCTION.
THE SWPPP MUST BE APPROVED BY THE 10 CES/CEIEC WATER QUALITY MANAGER PRIOR TO ENOI FILING. THE ENOI REQUIRES INFORMATION PROVIDED BY 10
CES/CEIEC TO THE CONTRACTOR. A COPY OF THE APPROVED, FINAL AND SIGNED SWPPP SHALL BE PROVIDED TO THE 10 CES/CEIEC WATER QUALITY
MANAGER, WHO WILL FILE A CORRESPONDING USAFA ENOI. THE STORM WATER PERMITTING PROCESS IS REQUIRED TO BE COMPLETED PRIOR TO
CONSTRUCTION COMMENCEMENT. THE EPA ENOI APPROVAL PROCESS IS, AT A MINIMUM, A 14-DAY PROCESS AND WORK CANNOT BEGIN UNTIL FINAL
APPROVAL IS RECEIVED. CONTRACTORS ARE URGED TO SUBMIT THE SWPPP TO THE USAFA CONTRACTING OFFICE OR 10 CES/CEIEC 30 DAYS PRIOR TO
GROUND-BREAKING.
IF INITIALLY THE CONTRACTOR DETERMINES THAT LESS THAN ONE (1) ACRE IS PROPOSED TO BE DISTURBED, AND THE DISTURBANCE IS ACTUALLY GREATER
THAN OR EQUAL TO ONE (1) ACRE DURING CONSTRUCTION, THE PROCESS NOTED IN THE ABOVE PARAGRAPH MUST BE COMPLETED IMMEDIATELY. THE
PROJECT MAY BE TEMPORARILY HALTED UNTIL THE CONTRACTOR AND USAFA SECURE THE STORM WATER PERMIT COVERAGE. IF THE CONTRACTOR EQUALS
OR EXCEEDS THE ONE (1) ACRE DISTURBANCE THRESHOLD DURING CONSTRUCTION WITHOUT REGULATORY AUTHORIZATION, THE CONTRACTOR IS
RESPONSIBLE FOR ANY PROJECT DELAY COSTS. UPON PROJECT COMPLETION, AN ELECTRONIC NOTICE OF TERMINATION (ENOT) WITH THE STORM WATER
GENERAL PERMIT IS REQUIRED TO BE FILED. THE ENOT IS REQUIRED TO BE APPROVED BY THE 10 CES/CEIEC WATER QUALITY MANAGER.
LAND DISTURBANCE INCLUDES GRUBBING, CLEARING, EXCAVATION, GRADING, STOCKPILING, MAINTENANCE YARDS, AND OTHER AREAS CREATING GROUND
DISRUPTION IN WHERE VEGETATION IS REMOVED OR SIGNIFICANTLY IMPACTED. IF PROPOSED LAND DISTURBANCE IS LESS THAN ONE (1) ACRE, THE
CONTRACTOR IS REQUIRED TO IMPLEMENT STORM WATER BEST MANAGEMENT PRACTICES (BMPS) WITHOUT FILING AN ENOI AND RELATED SWPPP. REFER TO
THE 10 CES/CEIEC ENVIRONMENTAL STANDARDS FOR MORE GUIDANCE. PLEASE CONTACT THE 10 CES/CEIEC WATER QUALITY MANAGER AT 719-333-6420 TO
DISCUSS STORM WATER PERMITTING REQUIREMENTS.
70% VEGETATIVE COVER IS REQUIRED TO BE ESTABLISHED BEFORE A NOT CAN BE APPROVED BY WATER QUALITY MANAGER.
REFERENCE UNITED STATES AIR FORCE ACADEMY STANDARD SECTION 01351
IF THE PROPOSED ACTIVITIES IMPACT WATERS OF THE US BY FILLING ACTIVITY, NATIONWIDE AUTHORIZATION OR AN INDIVIDUAL PERMIT IS REQUIRED TO BE
APPROVED BY THE US ARMY CORPS OF ENGINEERS (USACE). UPON ADEQUATE PROJECT DESCRIPTION, THE 10 CES/CEIEC WATER QUALITY MANAGER OR
CONTRACTOR WILL PREPARE AND SUBMIT THE APPROPRIATE USACE AUTHORIZATION/PERMITTING APPLICATIONS. THE PERMIT APPLICATION IS REQUIRED
PRIOR TO START OF CONSTRUCTION. ANY QUESTIONS REGARDING WHAT CONSTITUTES “WATERS OF THE US,” SHALL BE DIRECTED TO THE 10 CES/CEIEC
WATER QUALITY MANAGER.
IF WASTE WATER IS GENERATED BY THE PROJECT OR CONSTRUCTION ACTIVITY, THE 10 CES/CEIEC WATER QUALITY MANAGER SHALL BE NOTIFIED PRIOR TO
DISPOSAL OR DISCHARGE. NON-STORM WATER DISCHARGES ARE PROHIBITED FROM BEING DISCHARGED TO THE USAFA STORM WATER SYSTEM.
DISCHARGES TO THE USAFA WASTE WATER TREATMENT PLANT (WWTP) REQUIRE PRE-AUTHORIZATION BY 10 CES/CEIEC AND/OR THE WWTP MANAGER.
PLEASE CONTACT THE 10 CES/CEIEC WATER QUALITY MANAGER IF THE PROJECT GENERATES WASTE WATER.
6. HAZARDOUS WASTE - IF HAZARDOUS WASTES ARE TO BE GENERATED BY CONSTRUCTION, THE 10 CES/CEIEC HAZARDOUS WASTE MANAGER SHALL BE
CONTACTED AT 719.333.3852 PRIOR TO GENERATION.
THE CONTRACTOR SHALL OBTAIN APPROVAL FOR A WRITTEN SPILL PREVENTION RELEASE PLAN (SPRP) PRIOR TO CONSTRUCTION START. PLAN SHALL BE
SUBMITTED TO THE 10 CES/CEIEC HAZARDOUS MATERIAL AND HAZARDOUS WASTE MANAGER AT 719.333.3852.
7. SPILL PREVENTION CONTROLS AND COUNTERMEASURES (SPCC) - ANY CONTRACTOR STORING OIL, AS DEFINED BY 40 CFR 112.2, IN CONTAINERS WITH A
CAPACITY OF 55 GALLONS OR MORE, SHALL SUBMIT AN INVENTORY OF THE CONTAINERS FOR APPROVAL TO THE 10 CES/CEIEC POLS MANAGER AT
719.333.6425. IF A CONTRACTOR'S AGGREGATE OIL STORAGE CAPACITY IS 1,320 GALLONS OR GREATER, AN SPCC PLAN SHALL BE PREPARED ACCORDING TO
THE REQUIREMENTS OF 40 CFR 112 AND A COPY SHALL BE PROVIDED TO THE SPCC COORDINATOR.
8. STORAGE TANKS - NO CONTRACTOR IS AUTHORIZED TO USE OR STORE STORAGE TANKS ON USAFA WITHOUT PERMISSION FROM USAFA. PLEASE CONTACT 10
CES/CEIEC AT 719.333.6418. IF THE PROJECT REQUIRES THE USE OF STORAGE TANKS.
9. PERMITTING - ALL REGULATORY PERMITTING AND AUTHORIZATION ASSUMPTIONS ARE BASED ON DETAILS PROVIDED IN THE DESIGN ANALYSIS DOCUMENTS
AND DRAWINGS SUBMITTED. ANY FIELD CHANGES IN PROJECT SCOPE, DESIGN, OR CONSTRUCTION EXECUTION MAY REQUIRE ADDITIONAL REGULATORY
PERMITTING OR AUTHORIZATIONS. PLEASE CONTACT 10 CES/CEIEC IMMEDIATELY IF CHANGES TO THE PROJECT ARE IMPLEMENTED.
FOR CONSTRUCTION
FINAL SUBMITTAL
AutoCAD SHX Text
AIR FORCE ACADEMY
AutoCAD SHX Text
UNITED STATES
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text Y
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text O
MITCHELL HALL
FACULTY DRIVE
FAIRCHILD HALL
FACULTY DRIVE
V A
N D
E N
B E
R G
I V
E
FAIRCHILD HALL
AERO LAB
F A
I R
C H
I L
I V
E
F A
I R
C H
I
I V
E
V A
N D
E N
B E
G
I V
E
FAIRCHILD DRIVE
CETF
CETF DRIVE
VANDENBERG HALL
VANDENBERG DRIVE
CADET DRIVE
CADET AREA - ROAD CLOSURE SITE PLAN
1" = 100'-0"
GENERAL NOTES
1. SUBMIT TRAFFIC CONTROL PLAN TO 10CES (10TH CIVIL ENGINEER SQUADRON) IN COMPLIANCE WITH
REQUIRED TRAFFIC SAFETY LAWS.
2. CONTRACTOR SHALL OBTAIN AN APPROVED EXCAVATION PERMIT (AF FORM 103) FROM THE 10TH CIVIL
ENGINEER SQUADRON (10CES) PRIOR TO ANY TRENCHING, EXCAVATION, OR EARTHWORK. URGENT
REPAIR EXCAVATION PERMITS MUST BE REQUESTED BEFORE BEGINNING WORK. COORDINATE THE
PERMIT REQUEST THROUGH THE 10CES CONSTRUCTION MANAGER. COORDINATE WITH THE 10CES
CONSTRUCTION MANAGER TO SCHEDULE UTILITY LOCATES PRIOR TO ANY EXCAVATION.
3. THE PROJECT AREA OF WORK IS SHOWN ON THE MECHANICAL PLANS. CONTRACTOR IS TO LIMIT ALL
CONSTRUCTION ACTIVITIES AND DISTURBANCES TO THIS AREA.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING EXACT LOCATIONS AND ELEVATIONS OF ALL
UTILITIES PRIOR TO EXCAVATION BY POTHOLING. THIS APPLIES TO ALL UTILITIES, INCLUDING TELECOMM
CONDUIT AND EQUIPMENT. NOTE UNDERGROUND UTILITY LINES SHOWN ARE BASED INFORMATION
PROVIDED BY USAFA GIS DEPARTMENT. ALL UTILITIES (SHOWN OR UNKNOWN) LOCATED BY POTHOLING
SHALL BE DOCUMENTED ON RED-LINED AS-BUILTS.
5. IN THE EVENT THAT AN EXISTING UTILITY LINE IS DISCOVERED THAT HAS NOT BEEN IDENTIFIED ON THE
CONSTRUCTION DRAWINGS, THE CONTRACTOR SHALL SURVEY THE SAID UTILITY AND NOTIFY THE GIS
DEPARTMENT (719-333-7175) TO BE RECORDED INTO THE USAFA GIS MAPPING SYSTEM.
6. THE PROJECT MANAGER WILL ESTABLISH HAUL ROUTES TO AND FROM THE CONSTRUCTION SITE WHERE
CONSTRUCTION MAY IMPACT BASE OPERATIONS. THE CONTRACTOR SHALL MAINTAIN ALL HAUL ROUTES
CLEAR OF FOREIGN OBJECT DEBRIS (FOD) AT ALL TIMES. EQUIPMENT PARKING AND LAYDOWN AREAS
MUST BE APPROVED BY THE PROJECT MANAGER. INCLUDE USAFA/SE ON TRAFFIC PLAN FOR VEHICLES
UTILIZED DURING DEMOLITION AND CONSTRUCTION AND ADDITIONAL ONGOING CONSTRUCTION IN THE
AREA OUTSIDE DESIGNATED HAUL ROUTE. REFERENCE FRMACC SPECIFICATION SECTION 01 01 00 FOR
TEMPORARY FENCING REQUIREMENTS.
7. ALL DEMOLITION SITES MUST BE PROTECTED FROM UNAUTHORIZED ENTRY. ABATEMENT OF
ASBESTOS/LEAD (IF ANY) MUST COMPLY WITH ALL STATE AND FEDERAL STANDARDS.
8. THE CONTRACTOR MUST SUBMIT A WRITTEN PHASING PLAN TO THE PROJECT MANAGER FOR REVIEW
AND APPROVAL PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITIES. ANY CHANGES TO THE PHASING
PLAN MUST BE APPROVED BY THE PROJECT MANAGER.
9. ALL APPLICABLE 29 CFR 1910, 1926, NFPA, AND APPLICABLE CONSENSUS STANDARDS SHALL BE
ADHERED TO.
10. ALL SITE RESTORATION AND REVEGETATION SHALL BE CONDUCTED IN CONFORMANCE WITH AIR FORCE
ACADEMY SITE RESTORATION, REVEGETATION AND TREE SPECIFICATION. ENSURE THAT THE USAFA
EROSION CONTROL, REVEGETATION, AND TREE CARE STANDARDS ARE USED.
KEYED NOTES
REFERENCE SHEET M-100 FOR AREA OF WORK.
THE CONTRACTOR SHALL INSTALL LOW PROFILE BARRICADES TO MARK CLOSED AREAS AND OPEN
TRENCHES. ALL BARRICADES MUST BE LIT AT NIGHT AND MEET THE REQUIREMENTS OF ETL 04-2 AND
UFC 3-260-01. PROVIDE STEEL DRIVE AND PEDESTRIAN PLATES WHERE REQUIRED. THE 10CES COR MUST
APPROVE BARRICADE DESIGN AND LOCATIONS PRIOR TO IMPLEMENTATION.
Sheet
ID
Sheet
D e s i g n e r
R e v i e w e r
F i l e
N a m e
D r a f t e r
S u b m i t t e r
D r a w i n g
D a t e
A F
A
P r o j e c t
M g r
A o j e c t
M g r
S y m b R e v i s i o n s A d d e n d a
D a t e
A p p r
S c a l e
1OTH CIVIL ENGINEER SQUADRON
U.S. AIR FORCE ACADEMY,
COLORADO
G
S
I T
D
W G
SCHENDT
ENGINEERING
CORPORATION
CONSULTING ENGINEERS
* PH. (719) 637-8850 *
sec@secengr.com
5145 CENTENNIAL BLVD
COLORADO SPRINGS, CO 80919
U S
A F
A
P
R O
J E
X
Q P
Z
R P
R
H
V A
C
E
A S
T
K
I T
C H
E N
M I T
C H
E L
L
H
A L
L
C A
D E
T
A
R E
A
R O
O
S U
S
I T
E
P
L A
N
G-101
B
B
U R
G E
S S
B
B
U R
G E
S S
K
M
E R
O L A
T
H
A R
V E
Y
D
V
L E
K
M
E R
O L A
100' 200'0
FOR CONSTRUCTION
FINAL SUBMITTAL
AutoCAD SHX Text N
AutoCAD SHX Text
AIR FORCE ACADEMY
AutoCAD SHX Text
UNITED STATES
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text Y
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text O
Sheet
D e s i g n e r
R e v i e w e r
F i l e
N a m e
D r a f t e r
S u b m i t t e r
D r a w i n g
D a t e
A F
A
P r o j e c t
M g r
A o j e c t
M g r
S y m b R e v i s i o n s A d d e n d a
D a t e
A p p r
S c a l e
1OTH CIVIL ENGINEER SQUADRON
U.S. AIR FORCE ACADEMY,
COLORADO
M
L E
G D
W G
SCHENDT
ENGINEERING
CORPORATION
CONSULTING ENGINEERS
* PH. (719) 637-8850 *
sec@secengr.com
5145 CENTENNIAL BLVD
COLORADO SPRINGS, CO 80919
U S
A F
A
P
R O
J E
X
Q P
Z
R P
R
H
V A
C
E
A S
T
K
I T
C H
E N
M I T
C H
E L
L
H
A L
L
M E
C H
A N
I C
A L
L E
G E
N D
M-001
B
B
U R
G E
S S
B
B
U R
G E
S S
K
M
E R
O L A
N A
T
H
A R
V E
Y
D
V
L E
K
M
E R
O L A
FFE
Ø
V
W, KW
VTR
TYP.
UNO
T&P
SAN
S.A.
T.A.
R.A
I.E.
N.I.C.
O.A.
M
AD
AD
M
VD
DHW
DN
(E)
E.A.
DCW
BOP
BAS
ADA
AFF
R
20/12
PA
s
ARROWS INDICATE DIRECTION
OF THROW
RETURN/EXHAUST GRILLE:
GRILLE SYMBOL - SEE SCHEDULE
B
12"Ø
(TYP 2)
A
CHWS
EGS
CWS
CWR
WCO
WH
FD
FCO
WF
F
HPS
CD
MPS
LPS
SUPPLY DIFFUSER:
NECK SIZE
DIFFUSER SYMBOL - SEE SCHEDULE
DESIGN AIRFLOW (CFM)
QUANTITY FOR ROOM OR SPACE
FLARED SPIN-IN FITTING
W/ MANUAL VOLUME DAMPER
DUCTWORK
TRANSFER AIR OPENING
OPPOSED BLADE DAMPERS
PARALLEL BLADE DAMPERS
UNIT HEATER (HORIZONTAL)
POWER OR GRAVITY ROOF
VENTILATOR - EXHAUST (ERV)
RECTANGULAR DUCT (1ST FIGURE, SIDE
SHOWN 2ND FIGURE, SIDE NOT SHOWN)
ACOUSTICAL LINING (DUCT
DIMENSIONS FOR NET FREE AREA)
DIRECTION OF FLOW
DUCT SECTION (SUPPLY)
DUCT SECTION (EXHAUST/RETURN)
INCLINED RISE (R) OR DROP (D)
(ARROW IN DIRECTION OF FLOW)
TRANSITIONS
TRANSITION: ROUND TO RECTANGULAR
STANDARD BRANCH FOR RECTANGULAR
SUPPLY OR RETURN DUCT
SPLITTER DAMPER
MANUAL VOLUME DAMPER
MOTOR OPERATED DAMPERS
ACCESS DOOR (AD)
DYNAMIC FIRE DAMPER:
CLASS I SMOKE DAMPER
CLASS I COMBINATION
FIRE/SMOKE DAMPER
RADIANT DAMPER
HEAT STOP, FLOOR/CEILING OR
ROOF/CEILING ASSEMBLY
TURNING VANES
FLEXIBLE CONNECTION
ROUND DUCT SYMBOL
FLAT OVAL DUCT SYMBOL
FLEXIBLE DUCT
REFRIGERANT STRAINER
THERMOSTATIC EXPANSION VALVE
GLOBE VALVE
O, S, & Y GATE VALVE W/SUPERVISORY SWITCH
GATE VALVE
CHECK VALVE
HOSE GATE VALVE
PLUG VALVE OR BALANCING COCK
NEEDLE VALVE
STRAINER
RELIEF VALVE
MOTOR OPERATED CONTROL VALVE (2-WAY)
MOTOR OPERATED CONTROL VALVE (3-WAY)
TEMPERATURE REGULATING VALVE
SOLENOID VALVE
PRESSURE REDUCING VALVE
FLOAT VALVE
BUTTERFLY VALVE
BALL VALVE
BALANCING VALVE
BOILER BLOW DOWN VALVE - SLOW OPENING
BOILER BLOW DOWN VALVE - FAST OPENING
CALIBRATED BRONZE BALANCING VALVE
ANCHOR
EXPANSION JOINT, SLIDING, WITH ANCHOR
EXPANSION JOINT, BELLOWS
PIPE GUIDE
ELBOW
TEE
ELBOW DOWN
ELBOW UP
TEE DOWN
TEE UP
CAP
UNION
PIPE INCREASER OR DECREASER
FLANGE
BLIND FLANGE
AIR VENT
FLOW SWITCH
VENTURI FLOW METER
PRESSURE/TEMPERATURE TAP
PRESSURE GAUGE
WATER HAMMER ARRESTER
AMERICANS WITH DISABILITIES ACT
ABOVE FINISHED FLOOR
BUILDING AUTOMATION SYSTEM
BOTTOM OF PIPE
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOWN
EXISTING
EXHAUST AIR
FINISHED FLOOR ELEVATION
INVERT ELEVATION
NOT IN CONTRACT
OUTSIDE AIR
RETURN AIR
SANITARY
SUPPLY AIR
TRANSFER AIR
TEMPERATURE & PRESSURE
TYPICAL
UNLESS NOTED OTHERWISE
VENT
VENT THROUGH ROOF
WASTE, KITCHEN WASTE
LOW PRESSURE STEAM (0-15 PSI)
MEDIUM PRESSURE STEAM (15-50 PSI)
HIGH PRESSURE STEAM (ABOVE 50 PSI)
CONDENSATE DRAIN
F & T TRAP
THERMODYNAMIC TRAP
BUCKET TRAP
THERMOSTATIC TRAP
FLOAT TRAP
DOMESTIC COLD WATER
DOMESTIC HOT WATER
RECIRCULATING DOMESTIC HOT WATER
SANITARY SEWER
VENT
ACID WASTE
ACID VENT
WALL FAUCET
WALL HYDRANT
CLEAN OUT
FLOOR DRAIN
WALL CLEAN OUT
INSTRUMENTATION PIPING
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
ETHYLENE GLYCOL CHILLED WATER SUPPLY
ETHYLENE GLYCOL CHILLED WATER RETURN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
COMPRESSED AIR
FIRE LINE
SEE TEMPERATURE CONTROL DRAWINGS FOR ADDITIONAL LEGEND
HEATINGVALVES & FITTINGS
F
S
FS
R
1. THESE LEGENDS ARE COMPOSED OF STANDARD SYMBOLS AND ARE PERTINENT TO THE
CONDITIONS ON THIS SET OF DRAWINGS TO THE EXTENT APPLICABLE.
2. ADDITIONAL LEGENDS AND/OR ANOTHER LEGEND SHEET MAY APPEAR IN THIS SET OF
DRAWINGS TO INDICATE SPECIFIC CONDITIONS IN LIEU OF SYMBOLS SHOWN ON THIS
SHEET.
3. EXISTING FACILITIES TO BE REMOVED ARE INDICATED BY USE OF THE FOLLOWING
SYMBOL .
4. NOT ALL SYMBOLS SHOWN ON THIS LEGEND ARE NECESSARILY USED ON THE
FOLLOWING SHEETS.
5. DRAWINGS ARE DIAGRAMMATIC, DO NOT SCALE FOR INSTALLATION. FIELD VERIFY ALL
DIMENSIONS PRIOR TO INSTALLATION.
U
UNDERCUT DOOR
MEDIUM TEMPERATURE HOT WATER SUPPLY
MEDIUM TEMPERATURE HOT WATER RETURN
MAKE-UP WATER
STORM DRAIN PIPING
DEIONIZED WATER
DISTILLED WATER
FUEL OIL SUPPLY
FUEL OIL RETURN
FUEL OIL VENT
HELIUM
HYDROGEN
DE
DW
FOR
FOR
FOV
HE
H
INDUSTRIAL COLD WATER
ICW
INDUSTRIAL HOT WATER RETURN
IHR
INDUSTRIAL HOT WATER SUPPLY
IHW
LIQUID NITROGEN
LN
LIQUID OXYGEN
LOX
LIQUID PETROLEUM GAS
LPG
NITROUS OXIDE
NO
NITROGEN
N
OXYGEN
OX
PNEUMATIC TUBE RUN
PN
VACUUM
VAC
VACUUM PUMP DISCHARGE
VPD
BRINE RETURN
BR
BRINE SUPPLY
RL
RS
REFRIGERANT LIQUID
REFRIGERANT SUCTION
T
PB
T
N
T
S
HEAVY LINE INDICATES NEW
LIGHT LINE INDICATES EXISTING
POINT OF CONNECTION OF NEW TO EXISTING
TEMPERATURE SENSOR
NIGHT SETBACK THERMOSTAT
PUSH BUTTON
MISCELLANEOUS SYMBOLS
TEMPERATURE CONTROLS
MISCELLANEOUS PIPING & UTILITIES
REFRIGERATION
PLUMBING
ABBREVIATIONS
GENERAL NOTES:
HGB
HOT GAS BYPASS
AS
AMMONIA SUCTION
AR
AMMONIA RELIEF
AL
AMMONIA LIQUID
AD
AMMONIA DISCHARGE
RD
REFRIGERANT DISCHARGE
HOSE CONNECTION W/CAP
AUTOMATIC FLOW CONTROL VALVE
DIRECTION OF FLOW ARROW
V F
D
VARIABLE FREQUENCY DRIVE (VFD)
MOTOR STARTER
OCCUPANCY SENSOR
HUMIDITY SENSOR
SUPPLY DIFFUSER
SLOT TYPE
OR
STRAINER W/VALVE, HOSE END & CAP
PC PUMPED CONDENSATE
MPC
LPC
LOW PRESSURE CONDENSATE
MEDIUM PRESSURE CONDENSATE
HPC
HIGH PRESSURE CONDENSATE
MU BOILER FEEDWATER
HTWS
HTWR
HIGH TEMPERATURE HOT WATER SUPPLY
HIGH TEMPERATURE HOT WATER RETURN
MTWS
MTWR
LOW TEMPERATURE HOT WATER SUPPLY
LOW TEMPERATURE HOT WATER RETURN
HWS
HWR
GLYCOL HEATING WATER SUPPLY
GLYCOL HEATING WATER RETURN
GS
GR
DUAL TEMPERATURE WATER SUPPLY
DUAL TEMPERATURE WATER RETURN
H/C S
H/C R
BOILER BLOW-DOWNBBD
HIGH PRESSURE GASHG
MEDIUM PRESSURE GASMG
MEDIUM PRESSURE GASG
DCW
DHW
DHWR
SAN
V
AW
MU
CD CONDENSATE DRAIN
SD
EGR
CHWR
A
BS
TRIPLE OFFSET ROTARY VALVE
GEOTHERMAL WATER SUPPLY
GEOTHERMAL WATER RETURN
GCS
GCS
NON-POTABLE WATER
NPW
HEAT PUMP WATER SUPPLY
HEAT PUMP WATER RETURN
HPWS
HPWR
MH MANHOLE
GS
GLYCOL CHILLED WATER SUPPLY
GLYCOL CHILLED WATER RETURN
GR
DIFFERENTIAL PRESSURE TRANSMITTER
DPT
KITCHEN WASTE
MANHOLE
MH
KW
IRRIGATION LINE
IRRG
ELECTRICAL UNDERGROUND
E
TELECOMMUNICATIONS
COMM
TELEPHONE
T
FOR CONSTRUCTION
FINAL SUBMITTAL
FP
AutoCAD SHX Text
AIR FORCE ACADEMY
AutoCAD SHX Text
UNITED STATES
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text U
AutoCAD SHX Text Y
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text or
AutoCAD SHX Text or
AutoCAD SHX Text S
Sheet
D e s i g n e r
R e v i e w e r
F i l e
N a m e
D r a f t e r
S u b m i t t e r
D r a w i n g
D a t e
A F
A
P r o j e c t
M g r
A o j e c t
M g r
S y m b R e v i s i o n s A d d e n d a
D a t e
A p p r
S c a l e
1OTH CIVIL ENGINEER SQUADRON
U.S. AIR FORCE ACADEMY,
COLORADO
M
N
O T
D
W G
SCHENDT
ENGINEERING
CORPORATION
CONSULTING ENGINEERS
* PH. (719) 637-8850 *
sec@secengr.com
5145 CENTENNIAL BLVD
COLORADO SPRINGS, CO 80919
U S
A F
A
P
R O
J E
X
Q P
Z
R P
R
H
V A
C
E
A S
T
K
I T
C H
E N
M I T
C H
E L
L
H
A L
L
M E
C H
A N
I C
A L
G E
N E
R A
L
P
R O
J E
C T
R E
Q U
I R
E M
E N
T S
M-002
B
B
U R
G E
S S
B
B
U R
G E
S S
K
M
E R
O L A
N A
T
H
A R
V E
Y
D
V
L E
K
M
E R
O L A
GENERAL MECHANICAL REQUIREMENTS
1. PROVIDE ALL REQUIRED PERMITS, INSPECTIONS, AND COORDINATION
WITH GOVERNING AUTHORITIES. THIS SHALL INCLUDE WALKING PROJECT
THROUGH THE BUILDING DEPARTMENT. INSTALLATION SHALL COMPLY
WITH ALL APPLICABLE CODES, TO INCLUDE:
a. 2018 INTERNATIONAL BUILDING CODE (IBC)
b. 2018 INTERNATIONAL MECHANICAL CODE (IMC)
c. 2018 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
d. 2018 INTERNATIONAL FUEL GAS CODE (IFGC)
e. 2018 INTERNATIONAL PLUMBING CODE (IPC)
f. 2018 INTERNATIONAL FIRE CODE (IFC)
g. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
h. NFPA 70- NATIONAL ELECTRICAL CODE (NEC) 2020
i. ASHRAE 90.1 LATEST VERSION
j. ASHRAE 62.1 LATEST VERSION
k. UFC 1-200-01 DOD BUILDING CODE (GENERAL REQUIREMENTS)
l. UFC 3-410-01 HEATING, VENTILATING, AND AIR CONDITIONING SYSTEMS
m. UFC 3-420-01 PLUMBING SYSTEMS
n. UFC 3-600-01 FIRE PROTECTION ENGINEERING FOR FACILITIES
o. COLORADO DEPARTMENT OF HEALTH AND PUBLIC SAFETY (CDHPS)
2. WHERE CONFLICTS ARISE BETWEEN THE DRAWINGS, USAFA FRMMAC
SPECIFICATIONS, SCHEDULES, NOTES OR OTHER ITEMS IN THE CONTRACT
DOCUMENTS, THE MOST STRINGENT OF THE CONDITIONS SHALL APPLY.
3. NOT ALL UTILITIES, DUCTWORK, PIPING, AND ACCESSORIES ARE
NECESSARILY SHOWN, BUT WHAT WAS DEEMED NECESSARY TO SHOW
INTENT OF WORK INVOLVED IN THIS PROJECT. REFER TO ALL OTHER
PLANS, SECTIONS, DETAILS, SCHEDULES AND SPECIFICATIONS FOR
COMPLETE SYSTEM REQUIREMENTS.
4. UNLESS OTHERWISE NOTED, THE WORK DESCRIBED ON THE PLANS AND
SPECIFICATIONS SHALL INCLUDE THE FURNISHING AND INSTALLATION OF
ALL LABOR AND MATERIALS NECESSARY FOR COMPLETE AND
OPERATIONAL SYSTEMS. CONTRACTOR SHALL FURNISH THESE EVEN IF
ALL ITEMS REQUIRED (I.E. OFFSETS, ISOLATION AND BALANCING DEVICES,
MAINTENANCE CLEARANCES, ETC.) ARE NOT SPECIFICALLY SHOWN.
5. DATA GIVEN ON THE DRAWINGS IS AS ACCURATE AS COULD BE SECURED.
ABSOLUTE ACCURACY IS NOT GUARANTEED; THE CONTRACTOR SHALL
OBTAIN AND VERIFY EXACT LOCATIONS, MEASUREMENTS, SPACE
REQUIREMENTS, POTENTIAL CONFLICTS WITH OTHER TRADES, ETC. AT
THE SITE AND SHALL SATISFACTORILY ADAPT HIS WORK TO ACTUAL
CONDITIONS AT THE PROJECT SITE. THE DRAWINGS ARE DIAGRAMMATIC IN
NATURE AND SHALL NOT BE SCALED. THIS DOES NOT RELIEVE ANY
SUB-CONTRACTOR FROM COORDINATING WORK WITH ALL OTHER TRADES
AND FROM ADJUSTING HIS WORK AS REQUIRED BY THE ACTUAL
CONDITIONS OF THE PROJECT. THE CONTRACTOR SHALL VISIT THE SITE
BEFORE SUBMITTING A BID TO BECOME THOROUGHLY FAMILIAR WITH THE
ACTUAL CONDITIONS OF THE PROJECT. NO EXTRAS WILL BE ALLOWED DUE
TO LACK OF KNOWLEDGE OF EXISTING CONDITIONS.
6. THE CONTRACTOR SHALL TAKE FIELD MEASUREMENTS AND VERIFY FIELD
CONDITIONS AND SHALL CAREFULLY COMPARE SUCH FIELD
MEASUREMENTS AND CONDITIONS AND OTHER INFORMATION KNOWN TO
THE CONTRACTOR WITH THE CONTRACT DOCUMENTS BEFORE
COMMENCING ANY ACTIVITIES AFFECTED THEREBY.
7. SUBMIT RFI (REQUEST FOR INFORMATION) IF QUESTIONS OR CONCERNS
ARISE. ALL RFI'S SHALL HAVE A PROPOSED SOLUTION.
8. VERIFY THE ELECTRICAL SERVICE PROVIDED BY THE ELECTRICAL
CONTRACTOR BEFORE ORDERING ANY EQUIPMENT REQUIRING
ELECTRICAL CONNECTIONS.
9. INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS. PROVIDE MANUFACTURER'S
RECOMMENDED SERVICE CLEARANCE AROUND ALL EQUIPMENT.
COMPLETE MANUFACTURER'S START-UP REPORTS AND SUBMIT TO
ENGINEER WITH O&M MANUALS UPON COMPLETION.
10. CONTRACTOR SHALL SECURE ALL EQUIPMENT AND TANKS TO CONCRETE
HOUSEKEEPING PADS IN ACCORDANCE THE 2018 INTERNATIONAL
MECHANICAL CODE SECTION 1004.4.
11. GUARANTEE ALL MATERIALS, LABOR, WORKMANSHIP AND THE PROPER
OPERATION OF ALL EQUIPMENT INSTALLED FOR A PERIOD OF ONE YEAR
FROM THE DATE OF FINAL ACCEPTANCE. REPAIR OR REPLACE, AT NO
EXPENSE TO THE OWNER, ALL DEFECTS WHICH MAY ARISE DURING THIS
TIME DUE TO INFERIOR OR DEFECTIVE MATERIALS, EQUIPMENT OR
WORKMANSHIP.
12. DEFINITIONS:
a. (N) INDICATES "NEW" EQUIPMENT TO BE PROVIDED UNDER THIS
CONTRACT.
b. (E) INDICATES "EXISTING" EQUIPMENT ON SITE WHICH MAY OR MAY NOT
NEED TO BE RELOCATED AS A PART OF THIS WORK.
c. (D) INDICATES EXISTING EQUIPMENT SCHEDULED FOR “DEMOLITION”.
d. "FURNISH" MEANS TO "SUPPLY" AND USUALLY REFERS TO AN ITEM OF
EQUIPMENT.
e. "INSTALL" MEANS TO "SET IN PLACE, CONNECT AND PLACE INTO FULL
OPERATIONAL ORDER".
f. "PROVIDE" MEANS TO “FURNISH AND INSTALL".
13. KEEP DEMOLITION & CUTTING TO MINIMUM REQUIRED FOR PROPER
EXECUTION OF WORK. NO CUTTING (NOT SHOWN ON THE CONTRACT
DOCUMENTS) SHALL BE DONE WITHOUT THE APPROVAL OF THE
ARCHITECT, ENGINEER, OR OWNER AS TO LOCATIONS, METHOD AND
EXTENT OF THE CUTTING.
14. WHERE DEMOLITION WORK IS NOTED, REMOVE ALL ASSOCIATED
APPURTENANCES, HANGERS, FASTENERS, DUCT, PIPING, CONTROLS, ETC.
THIS SHALL ALSO INCLUDE ANY ABANDONED EQUIPMENT,
APPURTENANCES, HANGERS, FASTENERS, DUCT, PIPING, CONTROLS, ETC.
NOT REQUIRED FOR NEW WORK.
15. CONTRACTOR SHALL REMOVE ALL MATERIALS AS REQUIRED AND SHALL
GIVE THE OWNER THE OPPORTUNITY TO INSPECT SUCH MATERIALS FOR
POTENTIAL SALVAGE. CONTRACTOR SHALL REMOVE FROM THE SITE ALL
MATERIALS DEEMED “NON-SALVAGEABLE” BY THE OWNER. CONTRACTOR
SHALL TURN OVER TO THE OWNER ALL MATERIALS DEEMED
“SALVAGEABLE” BY THE OWNER. CONTRACTOR SHALL RECYCLE ALL
MATERIALS DEEMED “RECYCLABLE” BY THE OWNER.
16. COORDINATE ALL PENETRATIONS OF FLOOR, ROOF, WALLS, ETC. WITH
GENERAL CONTRACTOR. ALL PENETRATIONS THROUGH FIRE/SMOKE
RATED CONSTRUCTION SHALL BE SEALED WITH A FIRE RATED CAULK
EQUAL TO OR EXCEEDING THE CONSTRUCTION FIRE RATING.
17. REPAIR ALL ACCIDENTAL OR INTENTIONAL DAMAGE, PLACES WHERE
DEMOLITION HAS OCCURRED, AND WHERE NEW EQUIPMENT HAS BEEN
INSTALLED TO MATCH EXISTING CONSTRUCTION WITH NO NOTICEABLE
DIFFERENCE IN CONTINUITY, APPEARANCE, OR FUNCTION.
18. ALL PRODUCTS SHALL BE NEW AND UNDAMAGED, UNLESS NOTED
OTHERWISE. CONTRACTOR SHALL REPLACE OR REPAIR ALL PRODUCTS
TO NEW CONDITION, FOR EXAMPLE, DENTED CASINGS AND EQUIPMENT
DOORS, DENTED AND BENT GRILLES, REGISTERS, AND DIFFUSERS,
DENTED DUCTWORK, SCRATCHED PAINT, ETC.
19. WHEN BASIS OF DESIGN PRODUCTS ARE SPECIFIED BY MANUFACTURER
AND MODEL NUMBER, EQUIVALENT PRODUCTS BY OTHER
MANUFACTURERS LISTED MAY BE PROVIDED. PRODUCT EQUIVALENCY
SHALL BE DETERMINED BY ENGINEER. CONTRACTOR IS RESPONSIBLE FOR
COORDINATION AND DESIGN OF SUBSTITUTED EQUIPMENT; THIS SHALL
INCLUDE ADDITIONAL WEIGHT, PROPER FIT, AND ALL OTHER ASPECTS.
20. FIRE STOPPING REQUIREMENT. PENETRATIONS THRU RATED WALLS AND
FLOORS SHALL BE SEALED WITH A MATERIAL CAPABLE OF PREVENTING
THE PASSAGE OF FLAMES AND HOT GASSES WHEN SUBJECTED TO THE
REQUIREMENTS OF THE TEST STANDARD SPECIFIC FOR FIRE STOPS
ASTM-E-814. ACCEPTANCE MATERIALS INCLUDE: DOW CORNING RTV FIRE
STOP FOAM FOR BARE PIPE, METAL CONDUIT, AND ELECTRICAL CABLE; 3M
FIRE DAM 150 CAULK FOR BARE PIPE, METAL CONDUIT, AND BUILDING
CONSTRUCTION GAPS; 3M FS-195 INTUMESCENT STRIPS FOR INSULATED
PIPES, PLASTIC PIPE OR CONDUIT, AND ELECTRICAL CABLE.
21. ALL MATERIALS IN THE RETURN AIR PLENUM SHALL HAVE A MAXIMUM
FLAME SPREAD RATING OF 25 AND A MAXIMUM SMOKE DEVELOPED RATING
OF 50 IN ACCORDANCE WITH SECTION 602.2.1 OF THE INTERNATIONAL
MECHANICAL CODE, 2018 EDITION.
22. NOTIFY ENGINEER ONE WEEK IN ADVANCE WHEN WORK ABOVE CEILING IS
COMPLETE AND READY FOR ABOVE CEILING OBSERVATION. CONTRACTOR
SHALL REMOVE CEILING AS REQUIRED FOR ENGINEER'S OBSERVATION.
23. SUBMIT MECHANICAL AND PLUMBING EQUIPMENT, MATERIALS, AND
CONTROLS SUBMITTALS TO ARCHITECT/ENGINEER FOR REVIEW PRIOR TO
ORDERING EQUIPMENT.
24. MAINTAIN A MARK-UP SET OF DRAWINGS WHICH INDICATE VARIATIONS IN
THE ACTUAL INSTALLATION FROM THE ORIGINAL DESIGN. SUBMIT
“AS-BUILT” DRAWINGS TO THE ARCHITECT/ENGINEER FOR REVIEW PRIOR
TO FINAL PAY APPLICATION. DEVIATIONS SHALL BE APPROVED PRIOR TO
SUBMITTING AS-BUILTS.
25. SUBMIT ELECTRONIC PDF OF OPERATION AND MAINTENANCE MANUALS
AND WARRANTIES. UNLESS SPECIFIED OTHERWISE, SUBMIT TWO (2) HARD
COPIES OF ALL OPERATION AND MAINTENANCE MANUALS AND
WARRANTIES IN TABBED 3-RING BINDERS TO CONTRACTING OFFICER. O&M
MANUALS SHALL BE PREPARED IN FULL COMPLIANCE WITH THE 2018 IECC
408.2.5.2 “MANUALS”. O&M MANUALS SHALL CONTAIN ALL TEAM CONTACTS,
EMERGENCY CONTACTS, WARRANTY PROCEDURES, COMPREHENSIVE LIST
OF EXTENDED WARRANTIES, COMPREHENSIVE FILTER SCHEDULE
INDICATING SIZE AND TYPE OF FILTER FOR EACH PIECE OF EQUIPMENT,
COMPREHENSIVE BELT SCHEDULE INDICATING SIZE AND TYPE OF BELTS
FOR EACH PIECE OF EQUIPMENT, APPROVED SUBMITTALS,
MANUFACTURERS' STARTUP REPORTS, TAB REPORT, CONTROLS, AND
MANUFACTURERS' OPERATING MANUALS.
26. PROVIDE TRAINING FOR ALL SYSTEMS. APPROVED O&M'S SHALL BE USED
FOR TRAINING. PROVIDE TRAINING AGENDA'S WITH NAME OF QUALIFIED
TRAINER FOR ALL SYSTEMS. SUBMIT TRAINING ATTENDANCE SHEET FOR
ALL TRAINING SESSIONS.
27. PROVIDE EMT CONDUIT FOR ALL EXPOSED LOW VOLTAGE AND CONTROL
CABLING.
28. PAINT ALL EXPOSED CONDUIT, PIPING, AND DUCTWORK.
29. ISOLATE ALL PRESSURIZED PIPE (WATER, ETC.) AT EACH RISER, BRANCH,
PIECE OF EQUIPMENT, AND AREA SERVED.
30. ALL COMMUNICATIONS CABLES NEED TO BE IDENTIFIED AND PROTECTED
THROUGHOUT THE PROJECT. SPECIAL CARE MUST BE TAKEN WHEN ANY
WORK IS BEING DONE NEAR ANY OF THE TELECOMM ROOMS.
METERS AND GAUGES:
1. THERMOMETERS: LIGHT POWERED DIGITAL IMMERSION WELL. TRERICE
SX9 OR EQUIVALENT. PROVIDE WHERE DEPICTED ON DRAWINGS AND
ADJACENT TO TEMPERATURE SENSORS. PROVIDE P/T PORT ADJACENT TO
THERMOMETER.
2. PRESSURE GAUGES: TRERICE 700, LIQUID DIAL, 4” DIAL, LAMINATED GLASS,
+/-1%. PROVIDE WHERE DEPICTED ON DRAWINGS AND ADJACENT TO
PRESSURE SENSORS. PROVIDE P/T PORT ADJACENT TO GAUGE.
3. PROVIDE SPECIFIED METERS AND GAUGES ON EQUIPMENT REGARDLESS
OF METERS AND GAUGES PROVIDED WITH OR INTEGRAL TO EQUIPMENT.
MECHANICAL HANGERS AND SUPPORTS:
1. PIPING 1.5” AND SMALLER: GALVANIZED CLEVIS OR TRAPEZE HANGERS.
INSULATED PIPING SHALL HAVE SHEET METAL SHIELDS. PIPING SHALL BE
FASTENED TO TRAPEZE HANGERS WITH CLAMP.
2. PIPING 1.5” AND LARGER: GALVANIZED CLEVIS OR TRAPEZE HANGERS.
INSULATED PIPING ON CLEVIS HANGERS SHALL HAVE 180 DEGREE
CALCIUM SILICATE INSERTS WITH SHEET METAL SHIELDS. INSULATED
PIPING ON TRAPEZE HANGERS SHALL HAVE 360 DEGREE CALCIUM SILICATE
INSERTS WITH SHEET METAL SHIELDS. PIPING SHALL BE FASTENED TO
TRAPEZE HANGERS WITH CLAMP OVER INSERT.
3. CHILLED WATER PIPING ALL SIZES: CHWS/R PIPING SHALL HAVE
CONTINUOUS INSULATION WITH CALCIUM SILICATE SUPPORTS.
4. INSULATED PIPING: HANGERS MAY NOT PENETRATE INSULATION, EXCEPT
AT VERTICAL SUPPORTS AND AT SADDLES.
5. HANGERS AND SUPPORTS SHALL BE DESIGNED BY THE CONTRACTOR.
6. SUSPEND EACH TRADE'S WORK SEPARATELY FROM THE STRUCTURE.
7. MAXIMIZE ACCESS TO ALL EQUIPMENT AND OFFSET DUCTWORK AND
PIPING AS REQUIRED.
8. PIPING AND DUCTWORK SHALL BE HELD TIGHT TO STRUCTURE EXCEPT
WHERE NOTED OTHERWISE. DUCT SHALL BE SUPPORTED IN
ACCORDANCE WITH SMACNA STANDARDS. UPPER SUPPORT FASTENERS
ATTACHING TO METAL DECKING SHALL BE HORIZONTAL IN SHEAR, NOT
VERTICAL.
9. NO EQUIPMENT OR PIPING IS PERMITTED TO BE SUPPORTED FROM THE
BOTTOM CHORD OF STRUCTURAL MEMBERS, UNLESS PERMITTED BY
STRUCTURAL ENGINEER.
IDENTIFICATION FOR HVAC PIPING, DUCTWORK, AND EQUIPMENT
1. LABEL ALL EQUIPMENT WITH EQUIPMENT TAG FROM CONTRACT
DOCUMENTS AND AS TO AREA SERVED. LABELS SHALL BE MELAMINE ON
VINYL WITH 1” TALL LETTERS.
2. LABEL PIPING, AND ACCESS PANELS AS INDICATED ON DRAWINGS WITH
ADHESIVE LABELS WITH 1.5” TALL LETTERS AND WITH FLOW ARROWS.
PIPING AND DUCT LABELS SHALL BE ATTACHED EVERY 20 FEET. LABELS
AND LETTERING COLOR SHALL CONFORM TO ANSI/ASME A13.1.
3. LABEL FIRE RATE WALLS WITH STENCILS EVERY 20 FEET ABOVE CEILING.
4. LABEL ALL CONTROL DEVICES WITH DEVICE NAME AND EQUIPMENT
CONTROLLED. WITH 0.5” TALL CLEAR LABELS WITH BLACK LETTERS.
5. PROVIDE VALVE TAGS ON ALL VALVES ON HYDRONIC PIPING.
TESTING, ADJUSTING AND BALANCING (TAB)
1. PROVIDE COMPLETED HVAC BALANCING REPORT AT FINAL INSPECTION TO
THE AUTHORITY HAVING JURISDICTION AND TO THE ENGINEER PRIOR TO
PUNCH LIST.
2. TAB CONTRACTOR SHALL BE NEBB, AABC, OR TABB CERTIFIED.
3. SETPOINTS REQUIRED TO BE DETERMINED BY TAB CONTRACTOR SHALL BE
INDICATED ON THE REPORT. I.E., DUCT STATIC PRESSURE SETPOINT,
PUMP STATIC PRESSURE SETPOINT, AND MINIMUM OA DAMPER POSITION.
4. ALL DEVICES SHALL BE BALANCED WITHIN 0.0 TO + 10%.
5. PROVIDE 11X17 DRAWINGS WITH INLETS AND OUTLETS IDENTIFIED.
6. PROVIDE SKETCH OF AHU WITH PRESSURE DROP THROUGH EACH
COMPONENT. PROVIDE TWO SKETCHES FOR UNIT WITH ECONOMIZERS,
ONE AT MINIMUM OA AND ONE AT FULL ECONOMIZER.
7. PUMPS 1-HP AND LARGER SHALL BE MEASURED AND PLOTTED ON PUMP
CURVE.
8. AFTER SUBMITTING TAB REPORT, TAB CONTRACTOR SHALL DEMONSTRATE
10% OF REPORT TO OWNER/ENGINEER UPON REQUEST. IF WORK IS
DETERMINED TO BE OUT OF COMPLIANCE, THEN CONTRACTOR WILL BE
REQUIRED TO CORRECT AND DEMONSTRATE UNTIL WITHIN COMPLIANCE.
9. MARK BALANCED SETTING ON ALL BALANCING VALVE HANDLES WITH
PERMANENT MARKER.
HVAC PIPE INSULATION
1. REFER TO THE “MECHANICAL INSULATION SCHEDULE” ON THE DRAWINGS
FOR INSULATION TYPE, THICKNESS AND JACKETING REQUIREMENTS.
2. INSULATE CHILLED WATER VALVE BODIES, STRAINERS, AIR SEPARATORS
AND PUMP VOLUTES.
3. PROVIDE STUCCO EMBOSSED ALUMINUM JACKETING ON ALL PIPING
OUTDOORS.
4. PROVIDE PVC JACKETING ON ALL EXPOSED PIPING BELOW 8 FEET
INDOORS AND IN MECHANICAL ROOMS.
5. PROVIDE STUCCO EMBOSSED ALUMINUM JACKETING ON ALL PIPING
OUTDOORS.
6. INSULATION SHALL BE CONTINUOUS THROUGH WALLS AND HANGERS.
7. INSULATION SHALL BE CONTINUOUS OVER VALVES, PUMPS, STRAINERS,
AIR SEPARATORS, CHECK VALVES THAT ARE OVER 1” PER 2018 IECC
C404.4. UNIONS AND STRAINERS SHALL HAVE REMOVABLE COVERS.
HEATING HOT WATER STRAINERS, CONTROL VALVES, BALANCING VALVES,
AND UNIONS 1” AND SMALLER ARE NOT REQUIRED TO BE INSULATED.
8. EXISTING INSULATION THAT IS DAMAGED DURING CONSTRUCTION SHALL
BE REPAIRED WITH INSULATION OF TYPE AND THICKNESS TO MATCH
EXISTING.
INSTRUMENTATION AND CONTROL FOR HVAC
1. PROVIDE BLUE EMT CONDUIT FOR ALL LOW VOLTAGE AND CONTROL
CABLING. CONDUIT SHALL BE COLOR CODED AND LABELED. CONDUIT
SHALL BE ROUTED TO EQUIPMENT, ADJACENT TO ELECTRICAL OR
MECHANICAL CURBS OR PENETRATIONS.
2. ALL THERMOSTATS AND TEMPERATURE SENSORS SHALL BE LOW VOLTAGE
(24V) AND COMPLY WITH REQUIREMENTS OF CURRENT IECC AND ASHRAE
90.1.
3. PROVIDE COMPLETE GRAPHICS FOR ALL CONTROLLED SYSTEMS. PROVIDE
UNITS FOR ALL DATA, SUCH AS CFM, PSI, °F, % SPEED, HZ, % OPEN, %
CLOSED, NORMAL/ALARM, ON/OFF, START/STOP.
4. PROVIDE OPERATING SCHEDULES FOR ALL CONTROLLED EQUIPMENT.
VERIFY EXACT OPERATING SCHEDULE WITH USER OR CONTACT ENGINEER.
5. SETUP TRENDS FOR ALL MOTOR STATUSES, DISCHARGE AIR
TEMPERATURES, OA DAMPERS, AND CONTROL VALVES.
6. IN ADDITION TO SEQUENCES OF OPERATIONS, PROVIDE ALL ASHRAE 90.1
REQUIRED…