Site Visit Slides Vandenberg 7 8.pdf

PDF 73 KB Posted

Attached to
Renovate Vandenberg Hall Phases 7 & 8 Federal contract opportunity
Solicitation number
FA7000-11-R-0021
Issued by
Department of the Air Force Headquarters Air Force Academy

About this file

Site Visit Briefing. Questions are due no later than 30 August 2011.

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Vandenberg Hall Phases 7 & 8, newest first.
File Type Posted
Questions and Responses 9-7-11.pdf PDF
Questions and Responses 9-2-11.2.pdf PDF
Questions and Responses 9-2-11.pdf PDF
FA7000-11-R-0021-0002.pdf PDF
FA7000-R-0021-0001.pdf PDF
Questions and Responses 8-25-11.pdf PDF
Site Visit Attendance Sheets 18 August 2011.pdf PDF
Site Visit Attendance Sheets 11 August 2011.pdf PDF
J A Sole Source Items.pdf PDF
Attachment 5 PAST PERFORMANCE QUESTIONNAIRE.doc DOC document
Attachment 4 Davis Bacon Wage Decision.pdf PDF
FA7000-11-R-0021 Solicitation.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Proposal Site Visit

Renovate Vandenberg Hall

Phases 7 & 8

11 August 2011 and

18 August 2011 This document may contain FOR OFFICIAL USE ONLY (FOUO) information which must be protected under the Privacy Act and AFI 33-332 and does contain Source Selection Sensitive Information – See FAR 2.101 and 3.104.

This document may contain FOR OFFICIAL USE ONLY (FOUO) information which must be protected under the Privacy Act

Pre-Proposal Site Visit

AGENDA

Introductions Rules of Engagement for Site Visit Prospective Offeror Responsibilities Brief Description of Project Cell Phone Usage on the Academy Visit to Vandenberg Hall Questions

This document may contain FOR OFFICIAL USE ONLY (FOUO) information which must be protected under the Privacy Act

Introductions

Contracting Office Personnel James Anderson – Contracting Officer Aaron Vollbracht – Contract Specialist

Civil Engineering -Government Scott Bowshot – Civil Engineer

Civil Engineering CHAS Personnel Chris Simpson – Engineering Programs Manager Henry Medlock– Architect Sandee Miller – Construction Manager Mel Peppers– Construction Inspector

This document may contain FOR OFFICIAL USE ONLY (FOUO) information which must be protected under the Privacy Act

Site Visit Rules of Engagement

Questions Limited to General Nature

Contractors Must Submit Any Questions Relating to Specifications and Drawings In Writing

Contractors Must Stay with Escort During Site Visit

Attendance Sheets will be posted on FedBizOpps

This document may contain FOR OFFICIAL USE ONLY (FOUO) information which must be protected under the Privacy Act

Prospective Offerors Responsibilities

Prospective Offerors Must Submit Any Questions In Writing

Questions Due Not Later than 10 AM MST, 30 August 2011

This document may contain FOR OFFICIAL USE ONLY (FOUO) information which must be protected under the Privacy Act

Cell Phone Usage on USAFA

Cell Phone Usage on the United States Air Force Academy (USAFA) Use of hand held devices is prohibited

If call must be taken or sent, pull over to the side of the road and park Penalties for use include points assessed and a seven-day suspension of driving privileges on USAFA

Hands-free devices can be utilized

This document may contain FOR OFFICIAL USE ONLY (FOUO) information which must be protected under the Privacy Act

Brief Description of Project

Mobilization Demolition Materials testing Curtain Wall Interior finishes HVAC Units Fire suppression system Plumbing systems Demobilization Asbestos abatement Electrical Cat 5 cable wiring Replace exiting curtain wall Interior finishes including floors, walls, and ceilings Replace lavatories in Cadet Rooms, fixtures and cabinetry

New communications cabling and supporting accessories

Install wall mounted HVAC units in selected offices

New fire suppression system, fire detection, and alarm system

New plumbing systems and plumbing fixtures

New and refurbished HVAC systems New electrical power systems and lighting Conduct testing and abate asbestos, lead based paint, CFC and PCB’s Replace MTHW piping/hydronic heating distribution systems Renovate non-cadet rooms

Description of Requirement

Pre-Proposal Site Visit
Pre-Proposal Site Visit
Introductions
Site Visit Rules of Engagement
�Prospective Offerors Responsibilities
�Cell Phone Usage on USAFA
Brief Description of Project�