MAF-R_MX_PWS_(201806020)_Final.pdf

PDF 356 KB Posted

Attached to
AFGSC Missile Alert Facilities - Refueler Maintenance Services Federal contract opportunity
Solicitation number
FA6800-18-R-0001
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

MAF-R Performance Work Statement

View the file

Other files for this federal contract opportunity

Other files attached to AFGSC Missile Alert Facilities - Refueler Maintenance Services, newest first.
File Type Posted
MAF_Questions.xlsx XLSX spreadsheet
A4_MAF-R_Combined_Synopsis-Solicitation_0002.pdf PDF
Atch_5_Missile_Alert_Facility-Refueler_Schematics.pdf PDF
MAF-R_MX_PWS_(20180829)_Final.pdf PDF
Atch_6_Questions_and_Answers.pdf PDF
FA6800-18-R-0001_0001.pdf PDF
Atch_2_-_FE_Warren_(Laramie_County)_2015-5405_WD.pdf PDF
Atch_4_-_Minot_(Ward_County)_2015-5383_WD.pdf PDF
Atch_3_-_Malmstrom_(Cascade_Coonty)_2015-5391_WD.pdf PDF
A4_MAF-R_Combined_Synopsis-Solicitation(1).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1

FA6800-18-Q-S028

PERFORMANCE WORK STATEMENT (PWS)

MISSILE FACILITY REFUELER (MAF-R) MAINTENANCE

BARKSDALE AFB, LOUISIANA

Date: 20 June 2018

TABLE OF CONTENTS

SCOPE OF WORK

SECTION I

1. DESCRIPTION OF SERVICES

1.1. MAINTENANCE SERVICE

1.2. PREVENTIVE MAINTENANCE AND INSPECTION PROGRAM (PMI)

1.3. MAINTENANCE LOGS/INSPECTION CHECKLIST

1.4. REPAIRS

1.5. COORDINATION

1.6. SERVICE CALLS

1.7. SERVICE REQUEST

1.8. CALL BACKS

1.9. COMMUNICATION AND RESPONSE TIME

1.10. PARTS AND MATERIALS

1.11. ORIGINAL EQUIPMENT MANFACTURER (OEM) REPLACEMENT PARTS

1.12. INITIAL REFUELER ASSESSMENT REPORT

1.13. INVOICING

1.14. AUTHORIZED PERSONNEL

SECTION II

2. SERVICES SUMMARY

2.1. OVERVIEW

2.2. PERFORMANCE EVALUATION

SECTION III

3. GOVERNMENT-FURNISHED PROPERTY AND SERVICES

3.1. UTILITIES

3.2. TECHNICAL DATA

3.3 ACCOUNTABILITY

SECTION IV

4. GENERAL INFORMATION

4.1. PERSONNEL

4.2. EMPLOYEES

4.3. IDENTIFICATION

4.4. ATTIRE

4.5. QUALIFICATIONS

4.6. QUALITY CONTROL PLAN

4.7. QUALITY ASSURANCE

4.8. HOURS OF OPERATION/HOLIDAYS

4.9. SAFETY AND HEALTH STANDARDS

4.10. SAFETY DATA SHEET

4.11. ENVIRONMENTAL COMPLIANCE/HAZARDOUS MATERIALS

4.12. CONTRACTOR FURNISHED ITEMS AND SERVICES

4.13 VEHICLES

SECTION V

5. SECURITY REQUIREMENTS

5.1. SECURITY

5.2. PASS AND IDENTIFICATION ITEMS

5.3. RETRIEVING IDENTIFICATION MEDIA

5.4. TRAFFIC REGULATIONS

5.5. RANDOM PERSONNEL AND VEHICLE SEARCHES

5.6. WEAPONS, FIREARMS, AND AMMUNITION

5.7. REPORTING REQUIREMENTS

5.8. PHYSICAL SECURITY

5.9. KEY CONTROL

5.10 WORK AREA

APPENDICES

A. DEFINITIONS

B. ACRONYMS

C. WORK LOCATIONS

D. WORKLOAD ESTIMATES

E. MAF-R INSPECTION CHECKLIST

F. SPARES AND SUPPORT EQUIPMENT – GFE/GFM

G. CONTRACTOR PROCURED BENCHSTOCK

SCOPE OF WORK

The Contractor shall provide all personnel, labor, equipment, supplies, tools, materials and other items necessary to perform regular periodic inspection and maintenance, and emergency repair for 16 Missile Field Refuelers (MAF-Rs) at and within the vicinity of Malmstrom Air Force Base (AFB), F.E. Warren AFB, and Minot AFB as listed in Appendix C herein. Work shall comply with commercial standards for maintenance and repair of these units as well as all commercial, federal, state, and local requirements that may apply.

SECTION I

DESCRIPTION OF SERVICES

1.1. MAINTENANCE SERVICE: Contract personnel will perform full preventive maintenance inspection (FPMI) and repair in accordance with equipment manufacturer’s specifications/recommendations, industry standards, and Air Force Technical Orders. Contractor shall respond to service calls 7 days each week and will respond to emergency calls as needed. Contractor will perform periodic inspections, and be responsible for repair and replacement of all worn or failed components and parts. Replacement parts and interface shall be fully compatible with existing systems.

1.2. PREVENTIVE MAINTENANCE AND INSPECTION PROGRAM (PMI): The contractor shall establish and perform PMI IAW IAW T.O. 37A-1-101 and local manufacturers guidance to ensure reliable and continuous safe operation. Contractor shall also ensure fuel systems meet manufacturer maintenance performance specifications. Contractor shall provide trained mechanics and inspectors for all fuel systems maintenance. A certified inspection report and checklist shall be provided to the Contracting Officer’s Representative (COR) within 10 days of inspection.

1.3. MAINTENANCE LOGS/INSPECTION CHECKLIST: Fuel systems Maintenance Logs i.e.

AF Form 4427, Operator’s Inspection Guide and Trouble Report (Fuels Support Equipment) will be updated and maintained by the contractor IAW Air Force Manual 33-363, Management of Records, and disposed of IAW Air Force Records Information Management Systems, Records Disposition Schedule. The maintenance log shall include a complete history of maintenance and repairs, indicating dates and name of technician who performed the work.

1.4. REPAIRS: During any scheduled FPMI, the contractor shall immediately service any system that is not operating properly. If the inoperable systems cannot be repaired during the inspection, the contractor shall notify the COR and Fuels Service Center (FSC) within one (1) hour of determining the irreparable status of the refueler. Additionally, contractor shall provide the COR and FSC with the refueler expected time in commission (ETIC) date.

1.5. COORDINATION: The contractor shall coordinate all inspections with the COR, FSC and missile facility personnel so inspections are conducted during the hours of operation.

1.6. SERVICE CALLS: Service calls are unscheduled maintenance requests pertaining to situations that hinder normal operational efficiency or serviceability of the fuel systems. Service call repairs may be in the form of either routine, urgent or emergency calls. The COR will identify calls as routine, urgent or emergency before notifying the contractor. The COR and/or FSC will initiate/authorize all service calls.

1.7. SERVICE REQUEST: A service request is a request that is outside of the reoccurring/scheduled maintenance taskers. A service request may be called in by either the COR or the FSC.

1.7.1. ROUTINE SERVICE CALLS: A Routine service call is used when a MAF-R requires unscheduled repairs, but the unit can still be utilized until the repairs are fixed. Some examples include minor fuel seeps/weeps/drips and hoses that indicate a replacement is warranted. A routine service call requires the Contractor to be on location within 72 hours. In the event the Contractor is unable to correct any deficiencies while on location, the COR shall be notified with current status report which will include required repairs, parts cost estimate and ETIC. Parts required over $500.00 will be routed through the COR to the Contracting Officer for approval.

1.7.2. URGENT SERVICE CALLS: An Urgent service call is used when one MAF-R becomes nonoperational, such as Differential Pressures that indicate the Filter Elements need to be replaced. An Urgent service call requires the Contractor to be on location within 24 hours. In the event the Contractor is unable to correct any deficiencies while on location, the COR shall be notified with current status report which will include required repairs, parts cost estimate and ETIC. Parts required over $2,000.00 will be routed through the COR to the Contracting Officer for approval.

1.7.3 EMERGENCY SERVICE CALLS: An Emergency service call is used when two or more MAF- R’s becomes nonoperational at the same Missile Wing. The contractor shall be at one of the locations within 8 hours to initiate repairs to a point of safe utilization. In the event the Contractor is unable to correct any deficiencies while on location, the COR shall be notified with current status report which will include required repairs, parts cost estimate and ETIC. Parts required over $3,000.00 will be routed through the COR to the Contracting Officer for approval.

1.8. CALLBACKS: Defective repairs will be re-accomplished within service call time frames listed above at no additional cost to the government.

1.9. COMMUNICATION AND RESPONSE TIME: The contractor will provide the COR(s) and FSC’s with at least one primary and one alternate emergency contact phone number to initiate service response (business phone/cell phone). The contractor shall have an answering service that will notify the contractor when personnel are not available to receive service calls. The contractor must respond to service call requests within the time frames listed in 1.7.1, 1.7.2 and 1.7.3.

1.10. PARTS AND MATERIALS: The Contractor shall have a bench stock of parts within 45 days of Contract start. The bench stock shall consist of (1) ea. replaceable item for rapid repair of MAF-R identified in Appendix G. The Contractor shall have a bench stock located in each Wing’s area of responsibility to expedite repairs. Additional items may be placed in bench stock with the approval of the Contracting Officer. The initial bench stock invoice shall be sent to the COR(s) within 15 days of the start of contract performance. The Contractor shall be responsible for all reoccurring/preventative maintenance parts cost. All items will be reimbursed by the Gov’t via an invoice in accordance with paragraph 1.13. The Contractor shall respond to initial service calls with sufficient parts and tools to repair equipment.

1.10.1 There is a possibility the government may take on the responsibility to purchase all MAF-R parts in the future. If this occurs the contractor will not be responsible to purchase replacement parts, but will be responsible for notifying the Government which parts will be needed to make repairs if not currently available. The contractor may assist with the location of parts and the location of sources for replacment parts. The Government will take receipt all leftover bench stock if contract is terminated or expires.

1.11. OEM REPLACEMENT PARTS: The contractor shall use OEM, or equal parts and materials when repairs are needed. All parts shall be Underwriters Laboratories approved/listed. Only new standard parts will be used in completed repairs. All parts obtained by the contractor will be invoiced at contractor’s cost. Additional cost/mark-up on materials of work performed by sub-contractor will not be accepted. If applicable, contractors will abide by any existing active mechanical warranties.

1.12. INITIAL REFULER ASSESSMENT REPORT: The contractor shall prepare and submit a written report, including the Inspection Checklist, to the COR within 10 days of the first FPMI performed.

The report will include identification of each refueler, location, maintenance and repair performed (if applicable), additional repairs needed, date of inspection, inspector, and overall condition of the equipment.

The Contractor shall submit one report, sectioned with tabs according to fuel system location, to the designated COR.

1.13. INVOICING: The contractor shall invoice for Special Maintenance Projects, parts and materials after work is completed and accepted by the COR. Contractors shall use Wide Area Work Flow (https://wawf.eb.mil) to submit payment requests in electronic form. Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests, prescribes policies and procedures for submitting and processing payment requests in electronic form to comply with 10 U.S.C. 2227. Vendors are encouraged to access Uhttp://farsite.hill.af.mil/vfdfara.htm U, and read DFARS

252.232.7003 in full text. Each SMP, parts and materials invoice shall be submitted on company letterhead, and shall include:

a. Project number (sequentially numbered)

b. Date of proposal

c. Refueler number/location, and original call number (if any)

d. Scope of repair work

e. Breakdown of materials and labor for repair

f. Indicate if refueler failed or was damaged

g. Estimate time to accomplish repair (include delivery of materials or parts)

h. Name, signature and telephone number of individual preparing the proposal

i. A copy of receipt reflecting price paid for part(s)

1.13.1. This information shall be submitted to the COR for review/approval.

1.14. AUTHORIZED PERSONNEL: The Contracting Officer (CO) will provide the contractor a list of COR and FSC, who are authorized to request/accept services for the government. The contractor will only accept work from designated CORs.

http://farsite.hill.af.mil/vfdfara.htm

SECTION II

SERVICES SUMMARY

2.1 This Services Summary (SS) identifies critical success factors for the contract. It identifies both the performance objectives for those factors and the performance threshold required for each performance objective. The Government reserves the right to survey all services called for in the contract to determine whether or not the performance objectives and goals were met. This Services Summary (SS) lists the performance objectives performance objectives for services the Government shall survey.

2.1.1 The absence of any contract requirement from the SS shall not detract from its enforceability, nor limit the rights or remedies of the Government under any clause of the contract.

2.1.2 The SS will be used as the baseline to develop a Quality Assurance Surveillance Plan (QASP). The QASP will be developed by the Air Force Petroleum Office. The QASP will identify the surveillance methods the Government will use to evaluate the contractor’s performance.

2.1.3 Surveillance methods may include: customer complaints, phone calls or e-mails, and periodic inspections by the COR.

2.1.4 Methods of surveillance can change after contract award based on, but not limited to:

a. Acceptance of a contractor QC plan

b. Contractor performance.

2.2. PERFORMANCE EVALUATION: Performance of a service will be evaluated to determine whether or not it meets the performance threshold. Preferred method of correcting unacceptable performance is to recomplete necessary performance to evaluated standards.

Table 2.2.1. Performance Objectives

Performance Objective Para Performance Threshold Perform Preventative Maintenance. Maintenance performed according to submitted timeline.

1.1 95% of preventative maintenance completed

Perform Inspections. Inspections performed and an accurate report is delivered within 10 days of inspections.

1.2 95% of all reports and supporting documents must be received within

Perform Routine Service Call Repairs. Respond to and repair system within specified time frame.

1.7.1 95% of routine service calls are responded to within specified time frame

Perform Urgent Service Call Repairs. Respond to and repair system within specified time frame.

1.7.2 98% of emergency service calls are responded to specified time frame

Perform Emergency Service Call Repairs. Respond to and repair system within specified time frame.

1.7.3 100% of emergency service calls are responded to within specified time frame

Special Maintenance Projects Repairs completed within negotiated time frame

APDX-A 95% of special maintenance projects completed within negotiated time frame

SECTION III

GOVERNMENT-FURNISHED PROPERTY AND SERVICES

3.1. UTILITIES. The government will furnish, where available, water, natural gas, sewage service, and electricity at no cost to the contractor for the sole purpose of accomplishing the requirements of this contract. Any temporary connection of electrical lines that may be required shall be installed, maintained, and removed by the contractor at its own expense.

3.2. TECHNICAL DATA. The Contractor shall contact AFGSC/A4RE if fuel system (and associated equipment) Plans and Specifications are required.

3.3. ACCOUNTABILITY. All parts purchased by the Government will remain the property of the Government. The Contractor shall maintain a listing of all Government furnished property valued at or above $10.00 and shall ensure 100% accountability of the items. The CORs will conduct annual of accountable GFP.

SECTION IV

GENERAL INFORMATION

4.1. PERSONNEL: The contractor shall be responsible for obtaining all necessary identification cards, passes, badges, and decals to perform the requirements of this PWS. The Contractor shall contact the appropriate base Pass & ID offices for access to secured locations.

4.2. EMPLOYEES: The contractor shall not employ any person who has been identified by the contracting officer as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population. All employees and potential employees are subject to a local background investigation. Investigation results will be provided to the CO and COR for all employees prior to start of contract. The contractor shall submit an organizational structure and a list of personnel designated to perform work under this contract to the contracting officer within 30 calendar days following notification of contract award. The contractor shall notify the administrative contracting office, in writing, of any additions, deletions, or changes in personnel within one duty day of any change.

4.2.1. The contractor shall provide the Government a 24/7 contact number. The contractors shall be able to read, write, speak, and understand the English language.

4.3. IDENTIFICATION: The contractor shall obtain a Base Identification Card for all contractors.

While in restricted access areas (i.e. Flight-line Area, Missile Alert Facilities) an appropriate government official with access authorization must escort contract employees. The contractor shall turn in all forms of Government issued identification items of employees who are terminated or willfully leave the contracted company within 48 hours. Long-term contractor passes and are issued at Pass and Registration via Security Forces Squadron identification shall be obtained and remain in the contractor’s possession at all times while on the installation.

4.4. ATTIRE: The Contractor shall provide uniforms that a represent a professional appearance that are clean, free of rips/tears, displays the company logo and provide a professional appearance. The Contractor shall also provide any Personal Protective Equipment required.

4.5. QUALIFICATIONS: Contractor shall have a minimum of five years of experience in performing fuels maintenance on various types of fuel systems to include gas station dispensing systems, bulk fuel facilities, hydrant fuel systems, or mobile refueling vehicle pumping systems.

4.6. QUALITY CONTROL PLAN: The contractor shall develop and maintain a quality control program to ensure inspection, maintenance, and repair services are performed in accordance with applicable standards, manufacturer instructions. The contractor shall develop and implement procedures to identify and prevent defective services from occurring and reoccurring. As a minimum, the contractor shall develop quality control procedures that address the areas identified in Section II, Services Summary. The Quality Control Plan (QCP) shall be provided to the CO as part of their initial proposal. Although a QCP may have been deemed technically acceptable during the evaluation for contract award, minor modifications may be required after contract award. The contractor shall make these modifications, if necessary, within 10 calendar days following notification from the CO.

4.7. QUALITY ASSURANCE: The Government will evaluate the contractor’s performance in accordance with the QASP. The contractor shall submit a schedule to the COR of all inspections, prior to start of work. The COR shall evaluate the contractor’s performance through 100% inspection of service call repairs, periodic inspections of routine FPMIs, and 100% inspection of SMPs.

4.8. HOURS OF OPERATION/HOLIDAYS: Maintenance shall be performed during the duty hours identified below:

4.8.1. SCHEDULED MAINTENANCE/ROUTINE SERVICE CALLS: Monday through Friday between 7:30 a.m. and 4:30 p.m., excluding recognized federal holidays as defined by the Service Contract Act Wage Determination.

4.8.2. URGENT/EMERGENCY SERVICE CALLS: The COR/FSC will coordinate with Facility Managers to ensure an escort is available. Any hour restrictions will be provided to the Contractor prior to the Contractor departing for the service call.

4.9. SAFETY AND HEALTH STANDARDS: Contractor personnel shall comply with all applicable laws and safety regulations. Compliance with Occupational Safety and Health Administration (OSHA) and other applicable laws and regulations for the protection of employees is exclusively the obligation of the contractor, and the Government will assume no liability or responsibility for the contractor’s compliance or non-compliance with such responsibilities.

4.10. SAFETY DATA SHEET (SDS): The contractor will be provide a copy of an SDS for each product(s) used.

4.11. ENVIRONMENTAL COMPLIANCE/HAZARDOUS MATERIALS: Oil cans, oil residue and any oil soaked material (e.g., rags and/or paper towels, granulated materials and sand) shall be disposed IAW base directives. The contractor shall transport and dispose of all waste in accordance with Federal, State and local laws and regulations. The contractor shall adhere to written procedures for hazardous material spill clean-up and prevention according to Environmental Protection Agency regulations.

4.12. CONTRACTOR FURNISHED ITEMS AND SERVICES: Except for those items referred to as government furnished in Section III, the contractor shall furnish everything needed to perform the services identified in this contract.

4.13. VEHICLES: The Contractor shall provide vehicle(s) for transport to locations identified in Appendix C. Vehicle(s) shall be maintained in a clean and serviceable condition. The Contractor is required to travel in all types of weather conditions and is recommended that 4-wheel drive vehicle(s) is/are provided. Government parking space shall not be used for parking privately owned vehicles, trailers, snowmobiles, all-terrain vehicles or other conveyances. All vehicles shall be in operable condition and meet all local, state, and federal safety requirements. Each vehicle shall have the contractor name neatly exhibited on each side of the cab.

SECTION V

SECURITY REQUIREMENTS

5.1. SECURITY: The Contractor shall safeguard all materials and parts removed, as well as replacement parts. The Contractor shall secure the fuel areas at the end of each work period, fueling systems shall be secured. The contractor shall immediately notify the COR, FSC and the base SFS when damage to government property, such as accidental abuse or misuse is discovered. The contractor shall annotate the damage on the inspection report.

5.2. PASS AND IDENTIFICATION ITEMS: The contractor shall ensure that pass and identification items required for contract performance are obtained for contactor employees and non- Government owned Vehicles.

5.3. RETRIEVING IDENTIFICATION MEDIA: The owning MAF-R unit shall retrieve all identification media, including vehicle passes from employees who depart for any reason before the contract expires; e.g. terminated for cause, retirement, etc., and turn them in to the issuing office.

5.4. TRAFFIC REGULATIONS: Contractor employees shall comply with all base traffic regulations, and are subject to random vehicle speed control checks. Contractor personnel cited for speeding on the installation may suffer loss of base driving privileges, debarment from the base, or other administrative action. The use of cell phones, except hands-free phones, are prohibited while driving on military bases/property.

5.5. RANDOM PERSONNEL AND VEHICLE SEARCHES: Contractor personnel are subject to random personnel and vehicle searches. If contractor personnel refuse to be searched, they will be denied entry to the base, and may result in loss of base driving privileges, debarment from the base, or other administrative action.

5.6. WEAPONS, FIREARMS, AND AMMUNITION: Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within government-owned vehicles or privately owned vehicles while on military bases.

5.7. REPORTING REQUIREMENTS: Contractor personnel shall immediately report any information or circumstances of which they are aware may pose a threat to the security of Department of Defense personnel, contractor personnel, resources, and classified or unclassified defense information to an appropriate Government authority

5.8. PHYSICAL SECURITY: Contractor employees are responsible for safeguarding all Government property and controlled forms provided for the contractor’s use. At the end of each work period, all Government facilities, equipment, and materials shall be secured.

5.9. KEY CONTROL: The contractor shall establish a key control process that ensures Government issued keys are not misplaced or used by unauthorized personnel. The Contractor shall not duplicate any keys issued by the Government.

5.9.1. The contractor shall immediately report any occurrences of lost or duplicated keys to the COR.

5.9.2. In the event keys, other than master keys, are lost or duplicated, the contractor may be required, upon written direction from the CO, to re-key or replace the affected lock or locks. The Government may, however, at its option, replace the affected lock or locks or perform rekeying and replace any affected lock or locks or perform rekeying and deduct the cost of such from the monthly payment due the contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the contractor.

5.9.3. Only authorized contractor personnel will receive cipher lock combinations and approval to use Government issued keys.

5.10. WORK AREA. The contractor shall at all times, keep work areas free from any accumulation of debris, waste material, rubbish, tools, scaffolding, equipment, and materials. Upon completion of the job, or when away from the work site, the contractor shall leave the work area and its premises in a clean, neat, safe and workmanlike condition.

APPENDIX A

DEFINITIONS

Authorized Personnel: Individuals authorized to place "calls" to the contractor for response to a service call or any other maintenance action or service covered in the Performance Work Statement.

Damage to Government Property: Damage or abnormal deterioration caused by physical abuse or negligence.

Defective Service: A service/part that does not fix the initial maintenance work order.

Escort: One or more persons accompanying the contractor in high security areas on a military base.

Inspection: Detailed visual examination of MAF-R and its components.

Proposal: To submit in writing an offer listing discrepancies identified during inspection of barriers.

Quality Assurance Surveillance Plan (QASP): An organized written document used for quality assurance surveillance. The document contains specific methods to perform surveillance of the contractor.

Quality Control (QC): A contractor program of action to effectively and efficiently manage the quality of performance objectives relating to standards of performance and inspections necessary to assure that the service satisfy the requirements from concept through validation.

Service Call: Service calls are defined as additional visits and service requested at any time other than scheduled/reoccurring maintenance.

Services Summary (SS): Identifies the key service outputs of the contract that will be evaluated by the government to assure contract performance.

Special Maintenance Projects (SMP): Work requirements within the general scope of this contract work but not elsewhere defined or priced

APPENDIX B

ACRONYMS

AFB Air Force Base

AFPET Air Force Petroleum Office

EPA Environmental Protection Agency

CDRL Contract Data Requirement List

CLIN Contract Line Item Number

CO Contracting Officer

COR Contracting Officer’s Representative

FAR Federal Acquisition Regulation

FPMI Full Preventative Maintenance Inspection

FSC Fuels Support Center

IAW In Accordance With

SDS Safety Data Sheet

OSHA Occupational Safety and Health Administration

POC Point of Contact

QASP Quality Assurance Surveillance Plan

QC Quality Control

QCP Quality Control Plan

SMP Special Maintenance Projects

SS Service Summary

APPENDIX C

Work Locations

FE Warren Air Force Base Malmstrom Air Force Base 90th LRS/Fuels 341st LRS/Fuels 7310 Post Rd bldg. 1274 6710 Trainer Dr. Bldg 1469 FE Warren AFB, WY 82005 Malmstrom AFB, MT 59402

Delta One Bravo One 5083 State Rd 21 7046 Sourdough Rd Kimball, NE 69145 Geyser, MT 59447

Golf One Charlie One 3025 State Rd 101 24 Mountain View Rd Sidney, NE 69162 Stanford, MT 59479

Lima One Echo One 63159 State Rd 71 4250 Echo Dr Stoneham, CO 80754 Hilger, MT 59451

Golf One Minot Air Force Base 9958 MT HWY 200 5th LRS/LGRF Agusta, MT 59410 781 Bomber Blvd Minot AFB, ND 58705 Hotel One

579 2ND LN NE

Charlie One Fairfield, MT 59436 1 County Road 6 Benedict, ND 58716 Lima One

1940 US HWY 191 N

Gulf One Judith Gap, MT 59453 1 County Road 3 Plaza, ND 58771 November One

102906 US HWY 87

Mike One Lewistown, MT 59457 3 County Road 2 Tolley, ND 58787

APPENDIX D

WORKLOAD ESTIMATES

AFGSC Missile Facility Refueler (MAF-R) Maintenance

Installation Level of Service Available Hours Number of visits

Minot Air Force Base, North Dakota TBD UFC M-F 7:30 am – 4:30 pm TBD Malmstrom Air Force Base, Montana TBD UFC M-F 7:30 am – 4:30 pm TBD FE Warren Air Force Base, Wyoming TBD UFC M-F 7:30 am – 4:30 pm TBD Minot Air Force Base, North Dakota Routine N/A 6 per month Malmstrom Air Force Base, Montana Routine N/A 14 per month FE Warren Air Force Base, Wyoming Routine N/A 6 per month Minot Air Force Base, North Dakota Urgent N/A 3 per month Malmstrom Air Force Base, Montana Urgent N/A 7 per month FE Warren Air Force Base, Wyoming Urgent N/A 3 per month Minot Air Force Base, North Dakota Emergency N/A 1 per month Malmstrom Air Force Base, Montana Emergency N/A 2 per month FE Warren Air Force Base, Wyoming Emergency N/A 1 per month

APPENDIX E

MAF-R INSPECTION CHECKLIST

AF Form 4427, Operator’s Inspection Guide and Trouble Report

APPENDIX F

Spares and Support Equipment – GFE/GFM

Government Furnished Equipment.

Government Furnished Equipment (GFE) will be determined and documented in the maintenance plan as system spares or support equipment. The contractor shall be responsible for the security of all GFE in which they have operational control. All GFE will be maintained in a secure environment.

DESCRIPTION IDENTIFICATION No. DATE MANUFACTURED LOCATION Bryant Fuels Systems Missile Field Refueler

753-04 06-2015 90th LRS/Fuels 7310 Post Rd bldg.

FE Warren AFB, WY 82005

Bryant Fuels Systems Missile Field Refueler

753-02 06-2015 Delta One 5083 State Rd 21 Kimball, NE 69145

Bryant Fuels Systems Missile Field Refueler

753-01 06-2015 Golf One 3025 State Rd 101 Sidney, NE 69162

Bryant Fuels Systems Missile Field Refueler

753-03 06-2015 Lima One 63159 State Rd 71 Stoneham, CO 80754

Bryant Fuels Systems Missile Field Refueler

753-08 09-2015

5th LRS/LGRF 781 Bomber Blvd Minot AFB, ND 58705

Bryant Fuels Systems Missile Field Refueler

753-05 09-2015 Charlie One 1 County Road 6 Benedict, ND 58716

Bryant Fuels Systems Missile Field Refueler

753-07 09-2015 Gulf One 1 County Road 3 Plaza, ND 58771

Bryant Fuels Systems Missile Field Refueler

753-06 09-2015 Mike One 3 County Road 2 Tolley, ND 58787

Bryant Fuels Systems Missile Field Refueler

753-10 09-2015 Malmstrom Air Force Base 341st LRS/Fuels 6710 Trainer Dr. Bldg 1469 Malmstrom AFB, MT 59402

Bryant Fuels Systems Missile Field Refueler

753-12 09-2015 Bravo One 7046 Sourdough Rd Geyser, MT 59447

Bryant Fuels Systems Missile Field Refueler

753-09 09-2015 Charlie One 24 Mountain View Rd Stanford, MT 59479

Bryant Fuels Systems Missile Field Refueler

753-14 09-2015 Echo One 4250 Echo Dr Hilger, MT 59451

Bryant Fuels Systems Missile Field Refueler

753-11 09-2015 Golf One

9958 MT HWY 200

Agusta, MT 59410

Bryant Fuels Systems Missile Field Refueler

753-13 09-2015 Hotel One

579 2ND LN NE

Fairfield, MT 59436

Bryant Fuels Systems Missile Field Refueler

753-15 09-2015 Lima One

1940 US HWY 191 N

Judith Gap, MT 59453

Bryant Fuels Systems Missile Field Refueler

753-16 09-2015 November One

102906 US HWY 87

Lewistown, MT 59457

APPENDIX G

Contractor Procured Bench stock

F.E. WARREN AFB, WY

Description Manufacturer Part No. Qty Required Aircraft Nozzle OPW 295SAJ 4 each

Deadman Switches “Pistol

Grip”

Western Technology

1003-CR-25 4 each

Static Grounding Reels

Hannay Reels GR 75 4 each

Filter Separator Elements

Parker Velcon I-622MMTB 4 each

Pump Seals Blackmer 701914, 702242, 701947

4 each

MINOT AFB, ND

Aircraft Nozzle OPW 295SAJ 4 each Deadman

Switches “Pistol Grip”

Western Technology

1003-CR-25 4 each

Static Grounding Reels

Hannay Reels GR 75 4 each

Filter Separator Elements

Parker Velcon I-622MMTB 4 each

Pump Seals Blackmer GX2B 701914, 702242, 4 each

MALMSTROM AFB, MT

Aircraft Nozzle OPW 295SAJ 8 each

Deadman Switches “Pistol Grip”

Western Technology 1003-CR-25 8 each

Static Grounding Reels

Hannay Reels GR 75 8 each

Filter Separator Elements

Parker Velcon I-622MMTB 8 each

Pump Seals Blackmer 701914, 702242, 8 each

PERFORMANCE WORK STATEMENT (PWS)
4. GENERAL INFORMATION
SECTION I
DESCRIPTION OF SERVICES
SECTION II
SERVICES SUMMARY
SECTION III
SECTION IV
GENERAL INFORMATION
SECTION V
APPENDIX A
DEFINITIONS
APPENDIX B ACRONYMS

File details come from the government source that posted it.