SOW Addendum.docx
DOCX document 14 KB Posted
- Attached to
- installation of an electrical panel and receptacles Federal contract opportunity
- Solicitation number
- FA671224Q0025
About this file
This document is a Statement of Work (SOW) Addendum for a federal contract opportunity. The SOW Addendum provides additional details and changes to the original SOW, including requirements for cable size, installation of emergency shut off switches, and wiring installation in conduit.
The related federal contract opportunity is for the installation of an electrical panel and receptacles at the Pittsburgh ARS, PA. This is a small business set-aside solicitation with a Lowest Price Technically Acceptable evaluation criteria. Key details include a site visit on June 20, 2024, with a registration deadline of June 18, 2024, and a quote due date of June 26, 2024. The contract has a 10-day period of performance from date of award. Offerors must provide information on their technical capability and proposed start date, which are more important than price in the evaluation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Future B405 Server_Switch Rooms.pdf | ||
| Outlet mount.jpg | JPG image | |
| Ups drawing.jpg | JPG image | |
| UPS.jpg | JPG image | |
| QUOTE TEMPLATE-911th AW.xlsx | XLSX spreadsheet | |
| DBA WD PA20240001 Modification 4 dated June 7 2024.pdf | ||
| Pictures.docx | DOCX document | |
| Statement_of_Work.docx | DOCX document | |
| Shop Drawing.docx | DOCX document | |
| (2008)_JLSS 03-0023ABC_Sheet 54 of 58_E5.01_Electrical Riser Diagrams.PDF | ||
| (2008)_JLSS 03-0023ABC_Sheet 58 of 58_E7.01_Electrical Schedules.PDF |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW) FOR
BLDG 405 Power Installation Pittsburgh ARS, PA
ADDENDUM
ADD:
2.6.1 All cable ran to the L6-20 shall be 10-guage.
Cable ran to the L6-20 outlets need to be 10-guage to allow for future changes to L6-30 if needed.
2.8.1 Installation of emergency shut off switches for room 26 is required for power and HVAC units.
Install an emergency shut off switch for power on the outside of the entry door as shown on attached shop drawing.
Install an emergency shut off switch for both HVAC units on the outside of the entry door as shown on attached shop drawing.
Change:
2.7 Install required wiring in conduit.
All associated wiring will be installed in flexible conduit.