Questions Two

View the file

Other files for this federal contract opportunity

Other files attached to Renovate B320, Supply, newest first.
File Type Posted
XX_AF-411-10-11_17_19_E-1_WAREHOUSE BUILDING BLDG. 320_ELECTRICAL PLAN &....pdf PDF
XX_AF-411-10-11_18_19_E-2_WAREHOUSE BUILDING BLDG. 320_SCHEDULES_1984OCT....pdf PDF
XX_AF-411-10-11_14_19_PS-1_WAREHOUSE BUILDING BLDG. 320_PLUMBING SITE PL....pdf PDF
XX_AF-411-10-11_16_19_P-2_WAREHOUSE BUILDING BLDG. 320_DETAILS DIAGRAMS ....pdf PDF
XX_AF-411-10-11_15_19_P-1_WAREHOUSE BUILDING BLDG. 320_PLUMBING FLOOR PL....pdf PDF
A15_Amendment_One.pdf PDF
AMRS_Meter_Specifications_dated_28_January_2016_(002).docx DOCX document
A16_Site_Visit_Sign_In_Sheet.pdf PDF
A16_Questions_One.docx DOCX document
SOW Att 17 - 01 81 30a green procurement reporting form apendx.docx DOCX document
SOW Att 12 - 01 50 00 temporary facilities and controls.docx DOCX document
SOW Att 13 - 01 59 50 safety requirements.docx DOCX document
SOW Att 9 - 01 34 00 submittal procedures.docx DOCX document
SOW Att 5 - Pittsburgh ES Plan Final 2014.docx DOCX document
SOW Att 16 - 01 81 30 green procurement requirements.docx DOCX document
SOW Att 6 - 01 14 00 work restrictions.docx DOCX document
Bid_Schedule.doc DOC document
SOW Att 11 - 01 41 00 Environmental Protection 2016.doc DOC document
SOW Att 18 - 01 87 30 - Project Record Documents.doc DOC document
SOW Att 7 - 01 31 00 - Project Management and Coordination.doc DOC document
SOW Att 3 - Building 320 Existing and Proposed Layout 11-9-17.pdf PDF
A15_Solicitation.docx DOCX document
SOW Att 15 - 01 73 89 cutting and patching.docx DOCX document
SOW Att 4 - Pittsburgh IAP ARS Design Guidelines 120817 v4.pdf PDF
SOW Att 19 - 02 41 19 fl - selective demolition.docx DOCX document
SOW Att 8 - 01 32 00 Constr Progr —
PR_Att_8-_General_Decision_Number_PA170001_20_OCT_2017_PA1.pdf PDF
SOW Att 14 - 01 73 00 closeout procedures.docx DOCX document
SOW Att 10 - 01 40 00 quality requirements.docx DOCX document
PR_Att_1-_Statement_of_Work-JLSS_17-0009.docx DOCX document
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Does the new underground plumbing for the toilet in the men's room need to be cast iron or can it be PVC? PVC is acceptable.

2. Are we to only include the cost of the hazardous survey in our bid amount since there is no specific quantities listed for remediation? YES.

3. Would any hazards found as a result of the survey be treated as a change of condition? YES.

4. Will all of the items identified during the site visit as being moved be relocated to the trailer? YES.

5. Will the contractor be required to move the items in the small security cage which will be demolished? NO.

6. Is the demolished security cage to be turned back to the government or disposed of? DISPOSED.

7. What is the floor capacity of the rolling bins that we will be required to pass over during the moving of the charging station?

Contractor should not be close to the rolling bin floor section. Contractor is to use the designated section that is used by the forklift throughout the warehouse. (around the rolling bins)

8. Is the specific capacity required for the drainless eyewash system? Is it required to be heated? 15 minute continuous flow, no on the heat

9. Will a photometric survey be required as part of our design efforts? NO.

10. Is the tile system in the bathrooms to be of like sizes or are there specific sizes that are to be used? 12"x12" Tile.

11. Are we only putting tile back on the walls that currently have tile in the bathrooms?

The 911th would like to have tile up to 4' high and the rest finished with dry-wall.

12. Is there a preferred material for the toilet partitions? HDPE (Gov will select color)

13. Where the CMU wall is demolished what is the preferred method for covering the existing wall tie areas? Match existing wall and paint.

14. Are there existing drawings for the plumbing and electrical systems? YES. Attached.

15. Is the existing air conditioner and the electric conduits on the end of the TMO wall to be removed/relocated? YES.

16. What is the disposition for the removed vault door? Will the contractor be required to set the combination to a standard transit combination? No, GOV is responsible.