Giant Voice System Upgrade Contractor Questions and Answers - Amendment 2.pdf

PDF 86 KB Posted

Attached to
Giant Voice (GV) System Upgrade Federal contract opportunity
Solicitation number
FA670322R0003
Issued by
Department of the Air Force Reserve Command

About this file

This document contains questions and answers regarding a solicitation for the upgrade of an existing Giant Voice notification system. Key details include:

  • The solicitation is for a turnkey upgrade to replace outdated components and add new speakers, strobes, and a seventh outdoor siren location. The contractor will be responsible for engineering, designing, furnishing, installing, and testing the upgraded system.

  • Existing infrastructure such as poles, brackets and mounts can be reused where possible. The existing indoor speakers and modems located in control stations will also be reused. The contractor must supply new speakers, strobes and amplification units as detailed in Table 2 of the statement of work, and procure additional modems for the new controller and seventh siren locations.

  • The upgrade requires reusing the existing DATA CONNECT ENTERPRISE IG96HFP-LV modems and APX4500 radios, with the contractor providing 18 radios total. Temporary construction power at a new 120/220VAC source must be available within 10 feet of the final pole location for the seventh siren.

  • Clarification was provided that the existing Giant Voice system is independent of the legacy Monaco fire alarm panels, and specifications on outdoor siren mounting locations. The solicitation number for this upgrade opportunity through the Department of the Air Force Reserve Command is FA670322R0003.

View the file

Other files for this federal contract opportunity

Other files attached to Giant Voice (GV) System Upgrade, newest first.
File Type Posted
Combined Synopsis Solicitation Amendment 4.pdf PDF
Attachment 14 - Giant Voice System Upgrade Questions and Answers 20220909.pdf PDF
Attachment 1 - SOW Dobbins GV Upgrade_rev 081222_94CS_FINAL - Amendment 1.pdf PDF
Attachment 14 - Giant Voice System Upgrade Contractor Questions and Answers - Amendment 2.pdf PDF
Combined Synopsis Solicitation Amendment 3.pdf PDF
SOW Dobbins GV Upgrade_rev 081222_94CS_FINAL - Amendment 1.pdf PDF
BNJ_Giant Voice_Redacted_1.pdf PDF
Attachment 10 - A004 Meeting Minutes.pdf PDF
Attachment 6 - DARB 4 Access Request Form.pdf PDF
Combined Synopsis Solicitation Final.pdf PDF
Attachment 13 - A007 Training Plan.pdf PDF
Attachment 11 - A005 Installation Test Report.pdf PDF
Attachment 7 - A001 CSIR.pdf PDF
Attachment 4 - Offeror Representations and Certifications--Commercial Items (2022-2).docx DOCX document
Attachment 9 - A003 Status Report.pdf PDF
Attachment 8 - A002 Work Schedule.pdf PDF
Attachment 5 - Price Schedule FA670322R0003.docx DOCX document
Attachment 1 - SOW.pdf PDF
Attachment 12 - A006 Test Plan.pdf PDF
Attachment 3 - Wage Determination No 2015-4471 Rev 23.pdf PDF
Attachment 2 - Drawings.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Giant Voice System Upgrade Contractor Questions

Questions (Amendment 2)

1. Are strobes to be supplied for each of the existing speakers and with each of the new speakers requested?

No strobes for existing speakers. See Table 2 of the SOW for strobe requirements on new contractor furnished speakers.

2. Are the existing speakers to be reused with the new ICU equipment within each building?

Yes. All existing indoor speakers are to be used in addition to new contractor furnished per Table 2.

3. Can you provide details regarding the GFE modems to be reused for each SCU and ICU with the copper cable including the manufacturer, make and model?

DATA CONNECT ENTERPRISE IG96HFP-LV 100-0101d

4. How many local control units are required with each ICU?

The contractor is responsible to Engineer, design, furnish, install and test a turnkey GianVoice system per the SOW.

5. Just to confirm we can use as much of the existing installation infrastructure (i.e. wood Poles, Conduit, Brackets, pole mounting brackets, etc.)

Existing Infrastructure can be used, Brackets, mounts, screws etc. are NOT considered infrastructure.

6. Just to confirm we are to re-use the existing ACE3600 modems at the following existing locations:

a. (8) Indoor ISU

b. (2) Existing Control Stations

c. (6) Outdoor Siren location

See 1.0.4 of SOW.

7. Who is responsible for procuring the additional (2) New ACE3600’s modems; (1) for the Controller and (1) for the Seventh New Outdoor Siren location?

The contractor is responsible to Engineer, design, furnish, install and test a turnkey GiantVoice system per the SOW.

8. The request mentions providing (15) APX4500 Radios, to confirm can we add (3) more radios, one for each Central Control Unit (CCU)? For a Grand Total of (18) APX 4500 radios.

All required equipment should be provided based on the contractor design. This is a turnkey solution.

See 1.0 of SOW.

9. Who is responsible for bringing the copper infrastructure to the New Seventh Siren location?

N/A. No copper to the contractor installed seventh siren location.

10. For the new Siren location will 120/ 220 VAC be provided within 10’ of the Final Pole location?

See 3.1.6.4 of SOW.

11. For the new Indoor Speakers and Speakers w/ Strobes listed through-out the site are they to be directly wired into the existing Wheelock Safepath? Or is it acceptable to wire the new speakers into a new amplification unit?

The contractor is responsible to Engineer, design, furnish, install and test a turnkey GianVoice system per the SOW.

12. Are the Wheelock Safepath Panels configured as Mass Notification Systems (MNS) panels or as Fire Alarm Panels (FAP)? Considering that the SOW mentions the existence of Monaco FAP’s.

Current Legacy Giant Voice system is entirely independent of Monaco FAP.

13. Can it be confirmed whether all of the outdoor siren locations are pole mounted or if there are any outdoor sirens that are mounted on buildings?

Five current existing pole outdoor sirens; one current existing wall-mounted on building siren and one new outdoor siren location which is stated to be contractor engineer, design, furnish, install and test. See 3.1.6.1 - 3.1.6.4 in SOW new outdoor siren location requirements.

14. Section 3.2.5.2 of the SOW states "Aforementioned C2 bldgs. shall have new audible appliances installed, i.e., new ceiling speakers, strobes, and horns, IAW Table 2 of this SOW." yet states "Tables in this SOW serve as a guide only and shall not be used quantitatively for installation (i.e., ordering).".

Can clarification be provided to confirm if the new speaker quantities in Table 2 shall be used to quantify the number of new sirens? If not, what requirement shall be met to determine new speaker quantities?

The highlighted statement has been removed from the initial SOW; therefore, a revised version of the SOW has been uploaded to Sam.gov.

15. What Mfg is the current GV System?

The current system is a multivendor system.