This document provides questions and answers related to a solicitation for a fall arrest protection solution at Dobbins Air Reserve Base. The solicitation seeks a turnkey contractor to provide structural analysis, design, fabrication, installation, and load testing of fall arrest systems for four aircraft hangars to ensure safety compliance for maintenance technicians working on C-130H aircraft. The contractor must design solutions certified to safely arrest falls from any elevated work surface or position on the aircraft. Training for government operation of the equipment is also required. The contractor has 180 days from award to complete all work, which must meet standards outlined in the 18 April 2022 Statement of Work. Commercial warranties must be provided. Structural analysis will be the contractor's responsibility to ensure hangar structures can support added loads.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS, ALL ARREST PROTECTION SYSTEM
FA670322Q0006
1. QUESTION 1. When adding anchor points to an existing building and/or Aircraft Hanger.
Have you spoken and/or had a structural engineer sign off on this project? Many of these hangers/building are old and number one issue is Structural Integrity.
ANSWER: 94 CES Engineers did not determine the load capacity of the buildings. In accordance with the paragraph 3.12.1, Structural Analysis it is up to the contractor’s Structural
Engineer to perform a 100% load analysis as required to determine the excess load capacity of the existing structural components within Buildings 731, 746, 838, and 904 to support future
FAS loads.
2. QUESTION 2. Regarding paragraph 2.2.1 and 2.2.2 and in general references to the Fall
Protection PE and Structural PE in the Scope of Work document, it states that the PE shall be licensed in the state of Georgia, will PEs licensed in other states be an acceptable alternative to the GA PE?
ANSWER: Yes, the PE may be licensed in other states.
3. QUESTION 3. The PowerPoint shows the same photo for 731 & 746, which is not accurate.
ANSWER: See Attachment 25, Bldg 746
4. QUESTION 4. The structure in 731 is not laid out to be able to take the proposed system as shown on PowerPoint, what is Dobbins thoughts on next steps and where we go from here?
ANSWER: This is part of the Design Phase. It is up to the offeror to provide a preliminary, critical and final design for review and approval by the Government prior to proceeding with delivery and installation of each FAS.