Solicitation_Amendment_FA670319RA0040001_SF_30.pdf
PDF 527 KB Posted
- Solicitation number
- FA670319RA004
About this file
The Purpose of This Amendment Is: 1) Post answers to questions resulting from the solicitation and site visit on 21 Aug 2019 to include sign in sheet. 2) Revise the solicitation in Section B to read Atlanta City Cost Index vice Dobbins ARB. 3) Revise attachments JA-1 SABER SOW CH 1 and JA-14 SABER Seed SOO CH 1. 4) Provide two (2) drawings for sewer associated with Bldg 401 seed project.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The Purpose of This Amendment Is: 1) Post answers to questions resulting from the solicitation and site visit on 21 Aug 2019 to include sign in sheet.
2) Revise the solicitation in Section B to read Atlanta City Cost Index vice Dobbins ARB.
3) Revise attachments JA-1 SABER SOW CH 1 and JA-14 SABER Seed SOO CH 1.
4) Provide two (2) drawings for sewer associated with Bldg 401 seed project.
Section B - Supplies or Services & Prices or Costs
Miscellaneous text in this section has been modified to:
B-001 COEFFICIENTS PRICING SCHEDULE
A. The purpose of applying the coefficients to direct costs, national average bare costs as obtained from the Unit Price Book, and/or negotiated bare costs of non-Unit Price Book (non-prepriced) items, is to compensate the Contractor for all indirect costs and profit for performance.
B. The offeror's/contractor's coefficients (in percentage format, no more than 3 decimal places) shall contain any/all applicable profit and burden costs such as, but not limited to, bond premiums;
insurance; computer system, software and support costs; compliance with environmental and safety laws/regulations, taxes, overhead, general and administrative expense and any/all other associated indirect costs required to perform the work. SABER unit prices are for materials in place (FOB Destination) and, unless otherwise specified, include materials, labor and equipment.
C. Task order prices will be based on negotiated quantities times the total of the current established prices in the R.S. Means database bare cost column (which means no markup for overhead and profit (O&P)) times the current City Cost Index (weighted average percentage) for Atlanta, GA. After the City Index has been applied, this amount will then be multiplied by the co-efficient proposed for the applicable category. Any non-priced items will then be added on to the total to arrive at the total task price for a unit of work. Example : Pricing will be determined at the task order level as follows:
Total amount of RS Means items x City index x Coefficient
+ any non-priced items
= total task order price.
D The R.S. Means data is updated annually. Except as otherwise authorized herein, the R.S. Means annual update shall provide the only economic price adjustment under the contract. The pricing coefficients are not subject to economic price adjustment and shall remain unchanged for the existing terms and conditions of the contract.
E. The categories of pricing coefficients in this contract are based on a combination of standard and nonstandard work hours and size of project. If a task order includes work that has more than one pricing coefficient category, the work will be prorated and the applicable coefficient applied to its portion of the direct costs.
F. Coefficients are to remain unchanged throughout the life of the contract, including the base period of performance and any option periods exercised by the Government.
G. The Offeror must include a coefficient cost for work to be performed in restricted and unrestricted areas, during standard and non-standard working hours; the appropriate coefficient will be applied to each task order issued under the contract.
H. Please enter coefficients below.
See Diagram I in Attachment JA_16 COEFFICIENTS PRICING SCHEDULE
FA670319RA0040001
NOTE: Failure to propose appropriate coefficients or include costs for all items required to be included within the coefficient is the fault of the Contractor; adjustments to the coefficients will NOT be made. Please thoroughly review SABER Statement of Work prior to proposing.
I. Please transfer coefficients from the table above into the table below and calculate the estimated annual price for each coefficient, ending with the Total Evaluated Price (TEP).
See Diagram II in Attachment JA_16 COEFFICIENTS PRICING SCHEDULE
NOTE: Please reference Attachment JA-16 for a sample showing how to complete the table and calculate the TEP.
2. Work in Restricted Areas in select government facilities are areas that have been designated "controlled" areas, for security purposes, requiring special procedures for entering, exiting, or operating within these areas. Any such areas wit in the scope of a task order issued against this contract will be clearly identified in the government scope of work.
3. All work inside controlled areas is inherently subject to delays due to security processing, as well as interruptions to the normal work schedule to protect mission essential operation. Reasonable delays/interruptions are considered a standard element of work, and shall be factored into the coefficients for work in select security facilities/areas. All work in controlled areas will require total-time escorts at all times by either Government personnel or Government, Contracting Officer approved contractor personnel. No contractor personnel shall be out of line of sight of the escort at any time the contractor or subcontractor(s) are within a controlled area. There are no exceptions to this policy and this shall be the contractor's policy under the terms of the contract.
4. CONTRACT PRICING MINIMUMS AND MAXIMUMS
A. The guaranteed minimum amount to be ordered for this contract, to include any exercised options, is $50,000.00.
B. The maximum amount to be ordered for this contract for the base, and all option periods, if exercised by the Government, is $6,000,000.00. If the maximum aggregate amount of $6,000,000.00 is reached prior to the end date of the final period of performance, no further task orders will be issued on the contract.
No prices/coefficients are required for this section. The CLINS shown simply represent option CLINS and will contain no funding. You must complete Diagrams I and II on Attachment JA-16 and submit completed Attachment JA-16 with your proposal.
Section J - List of Attachments
The following attachments were added:
JA_1 SABER SOW 28 Aug 2019 CH 1
JA_14 Seed Project Bldg 401 SOW CH 1
Sign in sheet BLDG 401 21 Aug 2019
FA670319RA004 Questions
SEWER LINE PROFILE AND TYPICAL CONSTRUCTION DETAILS B401 (002)
WATER AND SANITARY SEWER FACILITY 401 (002)
The following attachments were deleted:
JA_1 SABER SOW 13 Feb 2019
JA_14 Seed Project Bldg 401 SOW
Miscellaneous text in this section has been modified to:
Made modifications to JA-1 SABER SOW and JA-14 Seed SOO, Provided Questions and Answers in Repsonse to Site visit, Posted drawings in response to sewer questions, and Posted Site Visit Sign-in sheet
FA670319RA0040001
| IDCode: |
| Page: 1 |
| Pages: 3 |
| AmendNo: 0001 |
| EffDate: 8/29/2019 |
| ReqNo: A003208 |
| ProjNo: N/A |
| IssCode: FA6703 |
| AdmCode: |
| IssuedBy: FA6703 94 LG LGC |
ADMINISTRATIVE ONLY NO REQUISITIONS
1538 ATLANTIC AVE
DOBBINS AFB, GA 30069-4824
United States Warren Deeds, Email: warren.deeds@us.af.mil Telephone: 6786555276
| AdminBy: |
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA670319RA004 |
| SolDate: 8/8/2019 |
| AwardChg: |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G |
| ChgeOrd: |
| ChgeOrder: |
| Modify: |
| SuppAgre: |
| SuppAuth: |
| ModOthr: |
| OthrSpec: |
| NoReq: 1 |
| Require: |
| Copies: |
| Descript: |
SEE CONTINUATION PAGE
| ContNameTitle: |
| CoNameTitle: Patrina Sheffield |
Email: patrina.sheffield@us.af.mil Telephone: 6786555778
| ContDate: |
| CODate: |
File details come from the government source that posted it.