Dobbins_BOS_Tab_A_PWS_Rev_2 _15_May_14.docx

DOCX document 120 KB Posted

Attached to
Dobbins ARB, Base Operations Services Federal contract opportunity
Solicitation number
FA6703-14-R-0001
Issued by
Department of the Air Force Reserve Command

About this file

PWS Rev 2 Tab A

View the file

Other files for this federal contract opportunity

Other files attached to Dobbins ARB, Base Operations Services, newest first.
File Type Posted
Dobbins_BOS_Tab_H_PWS_Rev_2 _15_May_14.docx DOCX document
Dobbins_Entomology.xlsx XLSX spreadsheet
Dobbins_BOS_Tab_E_PWS_Rev_2 _15_May_14.docx DOCX document
Dobbins_BOS_Tab_C_PWS_Rev_2 _15_May_14.docx DOCX document
Dobbins_ARB_Forestry_Road_Map.pdf PDF
Dobbins_BOS_Tab_F_PWS_Rev_2 _15_May_14.docx DOCX document
FA6703-14-R-0001-0002_CONFORMED_COPY.doc DOC document
Dobbins_BOS_Tab_D_PWS_Rev_2 _15_May_14.docx DOCX document
FA6703-14-R-0001_Q A_3.doc DOC document
Dobbins_BOS_Tab_B_PWS_Rev_2 _15_May_14.docx DOCX document
FA6703-14-R-0001_Q A_2.doc DOC document
Dobbins_BOS_Tab_D_PWS_Rev _1_18_Apr_14.docx DOCX document
Dobbins_BOS_Tab_H_PWS_Rev_1 _18_Apr_14.docx DOCX document
Attachment_12_Pricing_Matrix_Rev_1.xlsx XLSX spreadsheet
Dobbins_BOS_Tab_B_PWS_Rev_1 _18_Apr_14.docx DOCX document
Dobbins_BOS_Tab_E_PWS_Rev_1 _18_Apr_14.docx DOCX document
Attachment_7_CBA_2014-6619.pdf PDF
FA6703-14-R-0001-0001.doc DOC document
Dobbins_BOS_Tab_A_PWS_Rev_1 _18_Apr_14.docx DOCX document
DARB_PPC_Brief_3_Apr_14.pptx PPTX presentation
PPC_Attendance_Roster.pdf PDF
G.7_Liquid_Fuel_System.pdf PDF
Gas_Sheet_2_F-TE-7-H.pdf PDF
Gas_Sheet_4_F-TE-7-H.pdf PDF
Comm_Manholes_F-TE-7-F-1.pdf PDF
Gas_Sheet_3_F-TE-7-H.pdf PDF
Storm_Drainage_Sheet_4_F-TE-7-E-3.pdf PDF
Sewer_Sheet_3_F-TE-7-E-2.pdf PDF
Water_Map_Sht2_2011_F-TE-7-1.pdf PDF
Water_Map_Sht3_2011_F-TE-7-1.pdf PDF
Electrical_Distribution_Plan_Sht2__F-TE-7-D-1.pdf PDF
Electrical_Distribution_Plan_Sht4_F-TE-7-D-1.pdf PDF
Grounds_Maintenace_Map_DMS_2_20110322.pdf PDF
Electrical_Distribution_Plan_Sht1__F-TE-7-D-1.pdf PDF
AIRFIELD_DIAGRAM_(MARKINGS).pdf PDF
Electrical_Distribution_Plan__Sht3_F-TE-7-D-1.pdf PDF
Dobbins_BOS_Tab_H_PWS_Final_1_Mar_14.docx DOCX document
Attch_9_Service_Contract_Act_Rates.docx DOCX document
Dobbins_BOS_Tab_B_PWS_Final_1_Mar_14.docx DOCX document
Attch_10_Davis_Bacon_Act_Rates.docx DOCX document
Attch_13_DARB5_security-2.pdf PDF
Dobbins_BOS_Tab_C_PWS_Final_1_Mar_14.docx DOCX document
Dobbins_BOS_Tab_A_PWS_Final_1_Mar_14.docx DOCX document
Attch_6.pdf PDF
Dobbins_BOS_Tab_G_PWS_Final_1_Mar_14.docx DOCX document
Dobbins_BOS_Tab_E_PWS_Final_1_Mar_14.docx DOCX document
Attach_8 _Statement_of_Equivalent_Rates.xls XLS spreadsheet
Attch_4GD_GA140003.pdf PDF
Attch_3_WD2005-2134_Rev_13.pdf PDF
Dobbins_BOS_Tab_D_PWS_Final_1_Mar_14.docx DOCX document
Show all 50

Dobbins ARB, Base Operations Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TAB A

GENERAL

TABLE OF CONTENTS

TAB TITLE PARA PAGE

A-1GENERALA-1
OverviewA1A-1
Contractor PersonnelA2A-2
Quality Assurance/ControlA3A-3
SecurityA4A-4
Hours of OperationA5A-6
Emergency or Special Situation ServicesA6A-6
Conservation of UtilitiesA7A-8
Government ObservationsA8A-8
Labor RelationsA9A-9
SafetyA10A-9
Phase In and Phase Out PeriodsA11A-10
Reserve TrainingA12A-10
Vehicle Operator RequirementsA13A-11
Environmental ControlsA14A-11
Operations Plans (OPLANs) & Support AgreementsA15A-12
A-2GOVERNMENT-FURNISHED PROPERTY AND SERVICESA-13
GeneralA16A-13
Government-Furnished PropertyA17A-13
Government-Furnished ServicesA18A-15
Calibration ServicesA19A-17

TECHNICAL EXHIBITS PAGE

A-TE-1Service Delivery SummarySee C-(B-H)-TE-1
A-TE-2Workload EstimatesSee C-(B-H)-TE-2
A-TE-3Data DeliveriesA-18
A-TE-4Government-Furnished PropertyA-20
A-TE-4aGovernment Furnished FacilitiesA-20
A-TE-4bGovernment Furnished Equipment (Vehicles)A-20
A-TE-4b.1Government Furnished Vehicles Contractor Operator Workload EstimateA-22
A-TE-4cGovernment Furnished Equipment – Office EquipmentA-22
A-TE-4dGovernment Furnished ADPEA-23
A-TE-4eGovernment Furnished TelephonesA-23
A-TE-5General Acronyms/Abbreviations and DefinitionsA-24
A-TE-6Plans and Support AgreementsA-28
Dobbins ARB Base Operations SupportA - 22

Performance Work Statement, Tab A

GENERAL

DESCRIPTION OF SERVICES

A1 Description of Services. The Contractor (Ktr) shall provide all personnel, supervision, equipment, tools, materials, supplies, test equipment, and other items and services necessary to accomplish Supply, Vehicle Operations and Maintenance, Traffic Management, Transient Aircraft Maintenance, Real Property Maintenance, Fuels Management, and Airfield Management at Dobbins Air Reserve Base (ARB), GA as defined in this Performance Work Statement (PWS), except as specified in Section A-2, Government-Furnished Property and Services. All services, labor, supplies, materials, and parts are included in the Firm Fixed Price unless otherwise specified in the contract. All days are in calendar days unless otherwise specified.

A1.1. Inherently Governmental Activity. Specific categories of PWS tasks, processes, and responsibilities, have been identified and partially restricted to performance by government employees. In general the Ktr is prohibited from committing or obligating the government and may not establish policy. Only government employees may perform and provide services or activities as related to the public interest that require either exercise of discretion in applying government authority or the making of value judgment in making decisions for the government. More specifically, government employees are responsible for performing overall functional management, administrative and managerial oversight for all PWS areas. While the Ktr shall provide supervision of Ktr employees, PWS performance and results; participate in specific activities; prepare reports and analyses; provide input, technical advice, education and training; and work with government representatives in all the functional areas listed above, it is only the totality of the tasks that are Ktr limited. Ktr performance and responsibilities must cease short of any point that could be reasonably construed as: Management oversight of the PWS functions; committing or obligating the government; validating results, and approval or direction of government activities.

A1.2 Compliance with Domestic Violence Amendment (hereinafter, “Lautenberg Amendment”) to the Gun Control Act of 1968 (18 U.S.C. 922). The Lautenberg Amendment prohibits an individual who has a misdemeanor conviction for a crime of domestic violence from shipping, transporting, possessing or receiving firearms or ammunition, and prohibits sales or any other transfers of firearms and ammunition to such individuals, as described further in 18 U.S.C. 922. DoD policy extends this prohibition to individuals who have felony convictions for crimes of domestic violence.

The Ktr shall not permit individuals who have a misdemeanor or felony conviction for a crime of domestic violence to perform any work under the instant contract which would require them to perform activities in contravention of 18 U.S.C. 922 or DoD policy (e.g., which would permit or require such individuals to ship, transport, possess, or receive firearms or ammunition in the course of performing their duties under the contract).

Upon becoming aware that an employee has a conviction for a felony or misdemeanor crime of domestic violence (hereinafter “qualifying conviction”), or upon having reasonable cause to believe that an employee has a qualifying conviction, the Ktr shall immediately deny such employee access to firearms and ammunition in the course of the employee’s performance of duties under the contract. The Ktr shall also immediately retrieve any Government-owned or Government-controlled firearms or ammunition in the employee’s possession and return same to the Government. The Ktr shall immediately contact the local Contracting Officer (CO) for further guidance as to required actions. If any Ktr employee is prohibited pursuant to 18 U.S.C. 922 or DoD policy from performing the duties of his or her position, the Ktr is responsible for substituting an acceptable employee in the vacated position. The Government also reserves the right to disallow a Ktr employee from performing his or her Ktr-assigned duties if the Government becomes aware of information from any source that any Ktr employee is prohibited from performing his or her duties due to the prohibitions of 18 U.S.C. 922 or DoD policy. In such a case, the Ktr and CO shall meet to determine an acceptable course of action, to include the substitution of an acceptable employee as appropriate. The Ktr is solely responsible for any delays, contract performance disruption or increased costs attributable to the substitutions required by this provision.

The Ktr shall require any employee proposed by the Ktr to be placed in and perform the duties of any covered position to certify in writing that he/she does not have a qualifying conviction, prior to that Ktr employee assuming the duties of the Covered Positions as defined in Technical Exhibit A-TE-5. Re-certification shall be accomplished by employees occupying covered positions annually or whenever events change the accuracy of a previous certification. These certifications shall be maintained by the Ktr for review by the Government upon request.

A2 Personnel. This PWS sets forth minimum qualifications for certain positions. The contractor shall employ only personnel who meet or exceed any such minimum qualifications. The resume and any additional documentation (certifications, diplomas, etc) for the person proposed to fill the contract manager, functional area manager and all other positions requiring minimum qualifications shall be provided in accordance with A-TE-3, A01. Documentation shall also be provided during contract performance when changes are made in the personnel occupying these positions. HQ AFRC/A7K shall provide written confirmation of all personnel proposed to fill a position where minimum qualifications are specified. Proposed personnel shall not report to work until confirmation is received from HQ AFRC/A7K.

A2.1 Certifications and Licenses. Prior to beginning work, the Ktr shall ensure employees performing work under this PWS have and maintain certifications and licenses acceptable in the commercial market and required by federal, state, and local laws. The Ktr shall maintain certifications on site and make available for government review. Certifications and licenses shall be at the expense of the Ktr.

A2.1.1 Project Manager (PM). The Ktr shall provide a full-time PM who shall be physically on-site during normal work hours, and be responsible for performance of all work. The name of this person and an alternate or alternates who shall act for the Ktr when the manager is absent, shall be designated in writing to the CO. The PM and alternate shall have full authority to contractually bind the Ktr for prompt action on matters pertaining to execution of the Contract. The PM shall possess a minimum of three years experience within the last six years simultaneously managing three or more functions of base operating support services, or the commercial equivalent, of similar magnitude and scope as the total requirement of this PWS. (See A-TE-3, A01)

A2.1.2 Language Requirements. Any Ktr employee who will interface with government representatives shall be able to read, write, speak, and understand the English language to the extent necessary in the performance of this PWS.

A2.1.3. Ktr Employees. The Ktr shall not employ individuals identified to the Ktr by the CO as potential threats to the health, safety, security, or general well being of the population, installation, or operational mission. The Ktr’s employees shall not pose an actual or potential threat or risk to the security or mission of the AFRC or its supported activities, or the health and safety of the AFRC workforce. The government has an inherent right under law, practice, and regulation to restrict and control access to its facilities, including those that are the subject of this PWS. The government’s exercise of its right to grant and revoke access to particular individuals to its facilities shall not constitute a breach or change to this PWS, regardless of whether said individuals are employed by the Ktr. The Ktr shall also comply with the Department of Defense (DoD) smoking policy, AFI 40-102, Tobacco Use in the Air Force, and Air Force Reserve Command (AFRC) smoking policies within DoD facilities.

A2.1.3.1 The Ktr personnel shall present a neat appearance, and be easily recognizable as Ktr employees. The Ktr shall provide all Ktr employees with an identifying badge, which shall include as a minimum, the person's name, picture, and the Ktr’s name. While on the installation, the Ktr employees shall wear this picture identification at all times in a clearly visible manner. The Ktr shall obtain restricted or controlled area badges from the 94 SFSI in order to gain access to certain restricted areas. Wear of badges shall not present a foreign object damage/debris (FOD) potential.

A2.1.3.2. Employee Rosters. The Ktr shall provide an employee roster in accordance with A-TE-3, A02.

A2.1.3.3. The Ktr shall maintain procedures for the immediate removal of employees for misconduct or other causes prejudicial to the maintenance of health, welfare, morale or security of the facilities, populace, and computer system information. The Ktr shall exercise these provisions when notified by the CO that action is necessary.

A2.1.3.4 Contractor Full-Time Equivalent Reporting. The Ktr shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil.

Report Period: Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October * of each calendar year. Contractors may direct questions to the CMRA help desk.

Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contractor number associated with the data.

User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.

A2.2 Employment:

A2.2.1 Current Government Employees. All current government employees hiring shall be IAW DoD 5500.7-R, Joint Ethics Regulation, and AFI 64-106, Air Force Industrial Labor Relations Activities.

A2.2.2 Off-Duty Active Duty Military. The Ktr is cautioned that off-duty active military personnel hired may be subject to permanent change of station, change in duty hours, or deployment. Military Reservists and National Guard members may be subject to recall to active duty. The abrupt absence of these personnel could adversely affect the Ktr’s ability to perform; however, their absence at any time shall not constitute an excuse for non-performance under this contract.

A2.2.3 Employee Training. The Ktr is responsible for providing fully-trained and qualified journeyman or craftsman level workforce, if specified, IAW the clauses included in the contract. Therefore, except as otherwise indicated, the Ktr shall provide at its expense any required employee training, including the cost of instruction, per diem, travel, salaries, and benefits. If the Ktr-identified training is available only from government sources, requests for such training shall be submitted to the CO IAW AFCAT 36-2223, USAF Formal Schools, and the Ktr shall reimburse the government for all costs associated with the training.

A2.2.3.1 Employee Training Records. Training and qualification must be documented.

A3 Quality Assurance/Control.

A3.1 Quality Assurance (QA). In accordance with the Inspection of Services clause (“Inspection of Services - Fixed Price”) incorporated by reference in Contract Section E, the Government will evaluate the Ktr’s performance under this contract. For those tasks listed on the Service Delivery Summary (SDS) (Technical Exhibit 1, Tabs B thru H), the Contracting Officer Representative (COR) will follow the methods of surveillance specified for this contract in the Quality Assurance Surveillance Plan (QASP). Government personnel will record all surveillance observations. When an observation indicates defective performance, the COR will require the Ktr at the site to initial the observation to acknowledge that the Ktr has been made aware of the defective performance. Government surveillance of tasks not listed in the SDS or by methods other than those listed in the SDS may occur during the performance period of this contract. Such surveillance will be done according to standard inspection procedures or other contract provisions. Any action taken by the CO as a result of surveillance will be according to the terms of this contract.

A3.2 Quality Control Plan (QCP). A final QCP shall be submitted IAW A-TE-3, A03. The records of inspections shall be kept and made available to the CO and COR electronically for immediate access throughout the contract performance period and for the period after contract completion until final settlement of any claims under this contract.

A3.2.1 The QCP shall contain a Customer Satisfaction Measurement Plan. The plan shall demonstrate the Ktr’s ability to measure customer satisfaction using Point of Service Surveys and Statistically Valid Random Sampling for each performance objective specified in Technical Exhibit-1, Service Delivery Summary, Tabs B-H.

A3.2.2 In the plan, the Ktr shall clearly articulate how the Ktr proposes to address, services that will be surveyed in a general population customer survey; services that will be administered under a point of service survey; survey tools and process (e-mail, paper, telephone or other); random sampling methodology; sample size determination; survey distribution methods; definition of survey scale and “acceptable” performance threshold; and methods of preparation, coordination, reviewing, distribution, and retention of reports.

A3.3. Performance Management.

A3.3.1 The Ktr shall meet as with the Multi-Functional Team (MFT) when convened to review the government and Ktr’s performance data. The MFT will evaluate and discuss with the Ktr the results of performance measurement data for possible action. The Ktr shall be responsible for making the required changes in processes and practices to ensure performance is managed effectively. The Ktr shall formulate tactical as well as long-term courses of action jointly with the MFT. A member of the MFT will record meeting minutes and the CO will sign the minutes. Any disagreements with the minutes shall be identified in writing to the CO within 10 calendar days following receipt of the minutes.

A3.4 Customer Complaints. The Ktr shall ensure that a customer complaint process is established and advertised. The Ktr shall track, report, and inform the MFT of the resolution of customer complaints.

A4 Security

A4.1. Overview. The Contractor shall comply with all security regulations and directives identified herein and other security requirements as shown elsewhere in this contract.

A4.2 Unclassified Information Security. The Contractor shall handle and safeguard Controlled Unclassified Information in accordance with DoD Manual 5200.1-M, Volume 4 entitled, DoD Information Security Program: Controlled Unclassified Information (CUI). The Contractor shall participate in the host installation’s Information Protection Program (IPP). See paragraph 8.8 for classified information security.

A4.3 Physical Security - Resource Protection and Integrated Defense. The Contractor shall safeguard all government property in accordance with AFI 31-101, Integrated Defense, and any forms provided for Contractor use. The Contractor shall immediately report all thefts, vandalism, or destruction of property and equipment (Government or Contractor owned) to the Contracting Officer Representative (COR) of this contract.

A4.3.1 Key Control. The Ktr shall establish and implement methods of making sure all keys issued by the government to the Ktr for Ktr employee use are not lost or misplaced and are not used by unauthorized persons IAW 94 AWI32-9001. The Ktr shall develop procedures covering key control that shall be included in the QCP. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Ktr shall immediately report to the COR any occurrences of loss, unauthorized use, or unauthorized duplication of keys. The Ktr shall control access to all government provided lock combinations to preclude unauthorized entry.

A4.3.2 Corrective Actions. In the event keys, other than master keys, are lost or duplicated, the Ktr may be required, upon written direction of the CO, to re-key or replace the affected lock or locks without cost to the government. In the event a master key is lost or duplicated; the Ktr at no cost to the government will replace all locks and keys for that system.

A4.3.3 Lock Combinations. The Ktr shall establish and implement methods of ensuring that lock combinations are not revealed to unauthorized persons. These procedures shall be included in the Ktr’s QCP.

A4.4 Privacy Act of 1974. The Contractor personnel shall have access to Privacy Act information that requires adherence with the Privacy Act of 1974, Title 5 of the U.S. Code, Section 552a, AFI 33-332, Air Force Privacy Act Program, and other applicable agency rules and regulations.

A4.5 Network Access.

A4.5.1 Overview. Network access is a privilege extended to Contractor personnel. Network access will be granted by the Government after all criteria have been met and may be suspended for cause as defined in AFI 33-115V2, Section 5.6. Network access will be approved by the Government in accordance with AFI 31-501, AFI 31-601, AFI 33-115V2 and V3, AFI 33-200, DoDI 8510.01, and DoDM 5220.22-M and its supplement. Pursuant to AFI 33-115V2, “every individual who has access to the Air Force (AF) network (af.mil) domain, specialized systems and mission systems is an AF network user. Before becoming an AF network user, the Contractor personnel shall be trained and licensed. This process of training and licensing ensures every AF network user is trained and aware of the basic principles of network security and their role in Information Assurance (IA).

A4.5.2 Foreign Nationals. All Contractor personnel that are Foreign Nationals shall meet the requirements of AFI 31-501 prior to network access. The Contractor shall ensure the request for network access for Foreign Nationals in their employ are processed and approved by the Foreign Disclosure Office (FDO) in accordance with Air Force Security Systems Instruction (AFSSI) 8522 entitled, Access to Information Systems, paragraphs 3.2.1 and 3.2.3.

A4.5.3 Information Technology (IT) Level and Investigation Required. Contractor personnel shall possess a National Agency Check with Inquiries (NACI) for IT Level III as mandated by DoD Regulation 5200.2-R entitled, Personnel Security Program, paragraph C3.6.15 and DoD Instruction 8500.2 entitled, Information Assurance Implementation, Table ET.1. Contractor personnel shall possess a current and favorable Investigation for designated level III prior to contract performance. Contractor personnel without a current investigation shall follow the procedures established by the 94th AW/IP.

4.6 Background Investigation Requirements.

A4.6.1 Processing. The 94 AW/IP Personnel Security section will process and forward requests for Contractor investigations using the Electronic Questionnaires for Investigations Processing (e-QIP) system. The Personnel Security section will fingerprint the contractor employees on a FD Form 258, Fingerprint Card.

A4.6.2 Contractor Notification. The Contractor is notified by the 94 AW/IP Personnel Security section of the results of the NACI Investigations. The Personnel Security section is the repository for the record of investigations conducted on Contractor personnel for access to sensitive information, automated information systems and access to restricted areas.

A4.6.3 COR Notification. The 94 AW/IP Personnel Security section will notify the COR with the results of the NACI investigations when they are returned from the Air Force Central Adjudicative Facility with an eligibility of “No Determination Made”. The Contractor personnel shall not have access to sensitive information, automated information systems or restricted areas until a final determination is made. The 94 AW/IP Personnel Security section notifies the COR with the final determination.

A4.6.4 Terminations. If a Contractor employee is terminated before the Government completes the NACI investigation, the Contractor shall immediately forward written notice to the 94 AW/IP Personnel Security section.

A4.6.5 The requirement for NACI investigations does not equate to a mandate for a security clearance, if applicable.

A4.7 Installation Perimeter Access Control. The requirements for installation perimeter access are detailed in Air Force Federal Acquisition Regulation Supplement (AFFARS) clause 5352.242-9000 entitled, Contractor Access to Air Force Installations, in Section I, Contract Clauses, of the basic contract.

A4.8 Classified Information Security and Clearance Level. The Contractor shall require access to classified information at the security clearance level of SECRET in performance of this contract. The Contractor shall conform to the provisions of DOD 5220.22M, National Industrial Security Program Operating Manual (NISPOM), DoD 5220.22-R, Department of Defense Industrial Security Program, DoDM 5200.01 V2 and V3, Department of Defense Information Security Program and AFI 31-401, Air Force Information Security Program, and AFI 31-601, Industrial Security Program Management.

A4.8.1 Access Requirements. The Contractor personnel who require access to classified information or materials shall: (A) Possess a valid and appropriate security clearance, (B) Execute a SF 312 (Non-Disclosure Agreement), and (C) Have a valid need for access to the information to perform a lawful and authorized Government function. The Contractor personnel shall possess appropriate clearances prior to commencing work that requires access to classified information, facilities or materials.

A4.8.2 DD Form 254. The Contractor shall comply with the DD254, DoD Contract Security Classification, attached to Section J of this contract.

A4.8.3 Visitor Group Security Agreement (VGSA). The Contractor shall enter into a VGSA with HQ AFRC. The VGSA shall comply with the provisions of all applicable AF and AFRC instructions. Coordination of the VGSA shall be accomplished by the signatures of personnel identified on the coordination page.

A4.8.4 Facility Clearance. The Contractor shall comply with AFFARS 5352.215-9000, Facility Clearance (MAY 1996) in Section I of this contract.

A4.9 RESERVED

A4.10 Tool and Equipment Control Accountability Program. The Ktr shall submit a Tool Control and Accountability Plan IAW A-TE-3, A15. All functions within the responsibility of the Ktr shall comply with the Ktr's approved tool and equipment control and accountability program.

A5 Hours Of Operation. The Ktr core hours of operations shall be 0730 to 1630 hours, Monday through Friday, excluding holidays, unless otherwise specified in Tabs B thru H. All times in this PWS are specified in Local (L) time on a 24 hour clock. The Ktr shall ensure that service to customers is not interrupted during break and lunch periods. Variances in operating hours, other than that specified herein, must be approved by the CO. The government retains the right to change normal duty hours at any time. Ktr support required during UTAs shall be provided as specified in Tabs B thru I. Except that work described in Tab F, the government will not pay any overtime or over and above for Ktr support specified in the PWS as being required during normal hours on UTAs. Unless otherwise specified in Tabs B thru H, the Ktr will not be required to perform services on the following recognized holidays or when the base is officially closed by direction of the Base Commander:

New Year’s Day1 JanuaryLabor Day1st Monday in Sep
Martin Luther King’s Birthday3rd Monday in JanColumbus Day2nd Monday in Oct
President’s Day3rd Monday in FebVeterans Day11 Nov
Memorial DayLast Monday in MayThanksgiving Day4th Thursday in Nov
Independence Day4 JulyChristmas Day25 Dec

A5.1 Call-out and After-Hours Services Under Routine Operations. The Ktr shall provide fully qualified personnel, accessible by phone, on a 24-hour a day, 7 days a week basis, to perform unscheduled mission or emergency requirements. For unscheduled mission requirements, Ktr personnel shall respond within 15 minutes of the initial notification and be on-site within one hour after the initial response in order to perform services and satisfy unscheduled mission requirements.

A5.2 Reservist Support and Access. The Ktr shall provide support and access to reservists on UTAs as specified in Tabs B thru H. Dobbins ARB conducts one (1) primary and (1) alternate UTAs each month. Except that work described in Tab F, the government will not pay any overtime or over and above for Ktr support specified in the PWS as being required during normal hours on UTAs. Ktr support shall be in the manner of granting access to reservists, providing training, and documentation of training. The Ktr shall grant access to reservists for training use of any and all Government Furnished Property (GFP) listed in B thru H, Technical Exhibits TE-4.

A6 Emergency Or Special Situation Services. Services may be required to support an activation or exercise of contingency plans or emergency services. Emergency and disaster situations (including, but not limited to: accident and rescue operations, civil disturbances, natural disasters and military peacetime/wartime contingency operations and exercises) may necessitate an increase in Ktr effort. This effort will be ordered by the CO under the Over and Above (O & A) Work Contract Line Item, with the exception of effort performed under Tab-F, which will be ordered under the fixed hourly rate Labor for Service Call CLIN of the contract.

A6.1 Upon notification by the CO, the Ktr shall provide services to support base, local or national commitments, up to and including a declared war that would require emergency or contingency support. These services may be required 24 hours a day, 7 days a week for the duration of the emergency. Requirements beyond the capability of the Ktr may be augmented by the Government, at its option, when it perceives that mission accomplishment is endangered. Any such augmentation will be subject to the provision H-4, AFRC Rights of Government to Perform Functions With Its Own Personnel. The CO may advise the Ktr of the required level of effort verbally and follow up immediately with written direction.

A6.2 When multiple contingency plans generate conflicting support requirements, the installation Crisis Action Team (CAT) will establish the priority for the events as they occur. The Ktr project manager will be notified by either the CAT or the CO of those priorities.

A6.3 Performance of Services During Crisis Declared by the Secretary of Defense or Overseas Combatant Commander (OCC). All services identified in this PWS are considered critical services during a crisis. The Ktr shall continue providing services to Dobbins ARB 24 hours a day until the crisis is over. The Ktr shall ensure enough skilled personnel are available during a crisis for any operational emergency. A crisis management plan shall be submitted IAW A-TE-3, A04. The Ktr will be notified by the CO should a crisis be declared affecting needed Ktr support.

A6.4 Full Spectrum Threat Response (FSTR). The Ktr shall support and participate in the Dobbins ARB FSTR program and appoint FSTR representatives as needed for program coverage IAW AFMAN 32-4004, Emergency Response Operations.

A6.4.1 Unit Control Center (UCC). Establish UCCs to monitor unit resources, mission capability and coordinate unit activities during disaster or contingency operations such as accidents, natural disasters, mobility and recovery requirements and during all planned exercises.

A6.4.1.1 Specialized Team. The Ktr shall appoint specialized FSTR team members (Disaster Control Group (DCG), Contamination Control Teams (CCT), Shelter Management teams (SMT) and support teams) to support local response and contingency plans. The Ktr shall perform functions necessary to minimize the loss of personnel, resources, and operational capability caused by accidents, natural disasters and contingencies.

A6.4.1.2 Response Procedures. The Ktr shall develop and implement response procedures and checklists to support Dobbins ARB Plan 32-1, Disaster Preparedness Operations Plan, other local response plans, as well as war and contingency planning documents. Checklists shall be drafted and forwarded for approval prior to use. The Ktr shall review checklists annually to ensure accuracy and coverage. (See A-TE-3, A09).

A6.4.2 FSTR Equipment. The Ktr shall obtain, maintain and store equipment and supplies needed for response and recovery operations for members of their team. This includes all elements of the Disaster Response Force (DRF), including UCCs, DCG members, CCTs, shelters, SMTs and support teams.

A6.4.3 Base Shelter Program. Support and Participate in the Base Shelter Program. Shelters as identified in Dobbins ARB Plan 32-1 will be maintained as such for use during contingency situations, natural disasters, and exercises by the owners and users of the shelter.

A6.5 Hazmat Spill Notification And Response Procedure. This procedure applies when the Ktr causes or discovers a spill, release or leakage of any HAZMAT substance, which includes but is not limited to: Petroleum, Oil, Lubricant (POL) fuel, waste oil, hazardous material, hazardous waste, Aqueous Film Forming Foam (AFFF) liquid, sewage, toxic gases or vapors, which could potentially damage or endanger the environment, or threaten public health or personnel safety. Specific non-POL chemicals are listed on the Hazardous Substance list in 40 CFR 302.4 and on the Extremely Hazardous Substance list in 40 CFR 355.40. Reporting and response for all hazardous material releases shall be IAW the Hazardous Material Emergency Planning and Response Plan for Dobbins ARB and notification to the Base Fire Department. Additional requirements are as follows:

A6.5.1 If the Ktr causes a spill, then financial liability for all spill related costs shall rest solely with the Ktr. In the case of pre-existing environmental contamination within a spill area, the Ktr is only liable for costs related to a spill which they caused. Such liability shall include, but is not limited to: spill response costs, spill area cleanup and remediation costs, spill waste disposal costs, and any penalties that may be assessed by regulatory agencies as a result of the spill.

A6.5.1.1 If the Ktr discovers a spill, which is not caused by the Ktr, then financial liability for all spill related costs shall not rest with the Ktr, unless determined otherwise by a fair and reasonable investigation of the spill.

A6.5.1.2 Regardless of whether the Ktr causes or discovers a spill, the Ktr shall comply with the procedure that was developed from the base HAZMAT Emergency Planning & Response Plan for Dobbins ARB.

A6.5.1.3 When cleaning up a spill, use proper absorbent media for the Hazmat. Granular clean up material such as kitty litter or speedy dry is prohibited for use on Dobbins ARB. Absorbents contaminated with organics are recycled on Dobbins ARB.

A6.5.2 If the spill can be contained and controlled by the Ktr, without undue risk of injury to personnel, and without assistance from the base Fire Dept or other HAZMAT response team, then the Ktr shall perform the following:

A6.5.2.1 Immediately upon recognizing a spill, use materials from any available spill kit or other equipment as required, to contain and control the spill.

A6.5.2.2 Upon observation of a spill, the Ktr shall notify the base Fire Department and provide (1) the name of person reporting spill; (2) the exact location of spill; (3) any personnel injuries; (4) the substance spilled; (5) an estimate of amount spilled; (6) the date and time of spill; (7) the status of spill containment and control; (8) and the status of spill clean up. The Ktr shall provide a courtesy notification concerning the spill to CEV, COR and CO.

A6.5.2.3 If the spill can be cleaned up by the Ktr, and there is no environmental (soil or water) contamination, and no excavation is required, then perform the following:

A6.5.2.3.1 Use absorbent materials from any available spill kit or other equipment as required, to collect and clean up spilled substances as much as possible.

A6.5.2.3.2 Do not hose down spilled substances into floor drains or storm drains.

A6.5.2.3.3 Properly package and dispose of spilled substances and waste materials generated during the spill response or clean up, IAW the Hazardous Material Emergency Planning and Response Plan and the Dobbins ARB Waste Management Plan.

A6.5.2.4 If the spill cannot be cleaned up by the Ktr, or there is environmental contamination, or excavation is required, then notify the base CEV office for technical assistance. CEV will determine which organization, other than the Ktr, is going to perform the spill cleanup, and will ensure that the cleanup methods used are in compliance with applicable environmental regulations.

A6.5.3 If the spill cannot be contained and controlled by the Ktr, or involves undue risk of injury to personnel, or requires assistance from the base Fire Dept or other HAZMAT response team, then the Ktr shall perform the following:

A6.5.3.1 Immediately upon recognizing a spill, notify the base Fire Department and provide the same information as listed in Para A6.5.2.2 above.

A6.5.3.2 Stop the source of a spill in progress, if possible without undue risk of injury to personnel, using materials from any available spill kit or other equipment as required.

A6.5.3.3 Ensure that all employees in spill area, shut down their work operations and secure their equipment as required. Restrict all sources of ignition.

A6.5.3.4 Make the spill area “Off Limits” to unauthorized personnel. Evacuate to an area upwind of the spill, if appropriate for the type of substance spilled.

A6.5.3.5 Report all known spill information to the On Scene Commander, Incident Commander, or Senior Fire Official on duty, as appropriate when they arrive at the area.

A6.5.3.6 If the spill resulted in environmental (soil or water) contamination, or excavation is required for clean up, then notify the base CEV office for technical assistance. CEV will determine which organization, other than the Ktr, is going to perform the spill cleanup, and will ensure that the cleanup methods used are in compliance with applicable environmental regulations.

A7 Conservation Of Utilities. The Ktr shall ensure employees practice utility conservation. The Ktr shall operate under conditions that prevent the waste of utilities.

A8 Government Observations. As approved by the CO, government personnel other than COs and COR may from time to time observe Ktr operations. However, these personnel will not interfere with Ktr performance.

A8.1 Regulatory Observation. Outside regulatory agencies such as Department of Environmental Protection (DEP), Environmental Protection Agency (EPA), local conservation commissions may inspect the installation unannounced. Ktr shall cooperate fully with these agencies. In the event the Ktr receives a deficiency report or other derogatory finding, upon CO direction, the Ktr shall take immediate action to correct the deficiency. Any cost associated with the finding due to Ktr’s negligence shall be at the Ktr’s expense.

A8.2 Records Management. All data created for Government use and delivered to, or falling under the legal control of the Government are Federal records and shall be managed IAW objectives and policies of the DoD, AF directives and the records management legislation as codified at 44 U.S.C., chapters 21, 29, 31, and 33, the Freedom of Information Act (5 U.S.C. 552), and the Privacy Act (5 U.S.C. 552a), and shall be scheduled for disposition IAW 36 CFR part 1228. When data deliverable includes electronic records, the Ktr must provide and deliver sufficient technical documentation to permit Government agencies to use the data. If requested by the government, the Ktr shall provide the original record, or a reproducible copy of any such record within 5 working days of receipt of the request.

A8.3 The Privacy Act. The Ktr shall comply with the Privacy Act of 1974 (Public Law 93-529), including AFI 33-332, Air Force Privacy Act Program, as needed to ensure the personal information collected and maintained on government employees is protected from unauthorized disclosure. . If records are requested by the government, the Ktr shall provide the original record, or a reproducible copy of any such record within 5 work days of receipt of the request.

A8.4 Special Requirements. The Ktr shall receive, review, coordinate, implement and initiate corrective action as directed by the CO on all AF special subject and special interest items submitted by higher headquarters to the Ktr IAW AFI 90-201, Inspector General Activities. Prepare correspondence for signature of government official IAW AFMAN 33-326, Preparing Official Communications, and evaluate for recommended suggestions for areas of Ktr responsibility when requested by the CO.

A8.5 Coordination With Other Contractors. The government may award other contracts for additional work not prescribed in this contract. The Ktr shall fully cooperate with such other Ktrs, being careful to fit the Ktr’s own work to such additional work as may be directed by the CO. The Ktr shall not commit or permit any act, which will interfere with the performance of work by any other Ktr.

A9 Labor Relations

A9.1 Performance During Labor Strikes. In the case of government takeover of performance because of labor strikes, the government shall be entitled to a pro-rata contract price reduction for the period of time for which services are not performed by Ktr personnel. The Ktr shall be equitably compensated for government use of any Ktr-furnished property.

A9.2 Strike Plan. If unionized, the Ktr shall establish and maintain a current Strike Plan IAW A-TE-3, A05.

A10 Safety. The Ktr shall comply with all safety requirements contained in Occupational Safety and Health Act (OSHA) and National Fire Protection Association (NFPA) Standards; TOs: 00-25-172, Ground Servicing of Aircraft and Static Grounding/Bonding; 37A-1-101, General Instruction-Fuel, Water, and Lubricant Dispensing Equipment; and 42B5-1-2, Gas Cylinder (Storage Type) Use, Handling, and Maintenance; AFIs: 13-204 Vol 3Airfield Operations Procedures and Programs; 23-201, Fuels Management; 91-203, Air Force Consolidated Occupational Safety Information; 29 CFR 1910, Occupational Safety and Health Standards; and 1926, Safety and Health Regulations For Construction; as specified in this contract. The Ktr shall submit a Safety Plan IAW A-TE-3, A06. The Ktr shall comply during the life of this contract with the approved Safety Plan. The Ktr shall comply with the specific safety requirements and directives referenced in the PWS at all times. The Ktr shall maintain their assigned work areas and facilities in a neat, clean, and orderly condition. (See A-TE-3, A06)

A10.1 Inspections. The Ktr shall provide access for to all facilities and equipment to the government safety inspection authorities (SEG and CEF) to conduct annual, semi-annual, high interest, and spot inspections. The representative from the base (SEG/CEF) will notify the CO prior to all safety inspections and issue a report of discrepancies to the CO.

A10.1.1 Except for spot inspections, the CO will provide the Ktr at least five work days advance notice of safety inspections. A copy of the base (SEG/CEF) inspection reports will be provided to the Ktr by the CO.

A10.1.2 The Ktr shall correct discrepancies as directed by the CO. Any discrepancies which result from violating any of the terms of this contract or which result from violating any OSHA or AFOSH standards, shall be corrected immediately by the Ktr at no cost to the government.

A11 Phase In And Phase Out Periods

A11.1 Phase-In Period. The Ktr shall develop comprehensive procedures for phasing in Ktr performance to the level prescribed and within the time allowed under the terms of this contract. The Ktr shall submit a completed Phase-In Plan IAW A-TE-3, A07.

A11.1.1 During the phase-in period, the Ktr shall prepare to assume full responsibility for all areas of operation IAW the terms and conditions of this contract. The Ktr shall take all actions necessary for a smooth transition of the contracted operations. The Government will make all facilities and equipment accessible to the Ktr. During this period the Ktr’s management personnel will be permitted to observe functions on a non-interference basis, as approved by the CO.

A11.1.2 The Ktr shall establish the Project Management Office; recruit and hire necessary personnel; obtain all required certifications and clearances, including personnel security clearances; participate in joint inventories and sign for Government-furnished Property (GFP); develop and submit any required deliverables; attend post-award meetings as required; and accomplish any necessary training to support the requirement of this contract.

A11.2 Phase-Out Period. Sixty calendar days prior to the completion of this contract (to include option periods), an observation period shall occur, at which time management personnel of the incoming workforce may observe operations and performance methods of the incumbent Ktr. This will allow for orderly turnover of facilities, equipment, and records and will help to ensure continuity of service. The Ktr shall not defer any requirements for the purpose of avoiding responsibility or of transferring such responsibility to the succeeding Ktr. The Ktr shall fully cooperate with the succeeding Ktr and the Government.

A11.3 Phase-Out Plan. The Ktr shall establish and implement a plan for the smooth and orderly transfer of contract responsibility to a successor IAW A-TE-3, A08. The Ktr’s phase-out procedures shall not disrupt or adversely impact the day-to-day conduct of Government business.

A12 Reserve Training

A12.1 Trainers and Certifiers. The Ktr shall appoint a trainer and certifier for each Reserve career field identified in Tabs B-H contact the Wing Training Manager to schedule the appointees to attend and complete the AF Trainer’s Course IAW AFI 36-2201, Developing, Managing, and Conducting Training, Volume 3, and shall maintain current lesson plans. The Ktr shall provide specific Air Force Specialty Code (AFSC) training requirements IAW Career Field Education and Training Plan (CFETP) and wartime skill requirements as determined by Unit Type Codes (UTCs) for reservists. The Ktr shall request to attend a “Train the Trainer” course from the CO. The Ktr shall adhere to all specific training requirements addressed in a specific Tab of this PWS. (See Tabs B thru H, TE-2, for estimated Reserve training workload for each functional area).

A12.2 Training Augmentees. The Ktr shall make facilities, GFE tools, and equipment available and perform training of Air Force Reserve members. Certification of training shall be IAW AFI 36-2201, and AFIND 8 (AF Index), Index of Command Job Qualification Standards (CJQS), Qualification Training Packages (QTP), and Instructional Programs. The Ktr shall allow qualified Air Force Reserve members to train and certify other reserve members for a given training requirement within the Ktr designated facility.

A12.3 Training and Work Performance. The Ktr shall conduct and monitor the reserve members training activities within the assigned career field. When approved by the Reserve Unit Training Manger, the assigned reserve members may be used to perform work required under this contract during the conduct of training. Ktr shall make facilities available a minimum of two-day shift weekends per month on the reserve member's normally scheduled UTA and during any dayshift weekday throughout the year or as directed by the CO. The Ktr shall provide secure storage area for reserve member-owned tools and equipment within or adjacent to the training facility.

A12.4 Written Evaluations. The Ktr, in coordination with trainees' reserve unit of assignment, shall provide a brief written narrative describing the trainees' training and an evaluation of the trainees' performance during the period of training, in addition to basic information necessary for completing AF Form 623, On-the-Job Training Record. The Ktr shall document training provided to reservists in trainer block of the CFETP and the Government will certify the task on the CFETP.

A12.5 Trainees. A training request specifying dates, times, names, and required access will be provided by the CO to the Ktr at least 5 workdays in advance of required access to government-furnished facilities, equipment, and vehicles or requirements for hands-on training, familiarization, qualification, and On-the-Job-Training (OJT) training and at least 10 workdays in advance of scheduled classroom training.

A12.6 The Ktr shall take appropriate precautions to safeguard any materials made available to Government personnel during these training periods.

A13 Vehicle Operator Requirements.

A13.1 Operator Licensing and Operation. All Ktr personnel operating privately owned, Government, or Ktr-owned vehicles or material handling equipment, shall possess a current and valid state driver’s license and CDL license IAW AFI 24-301, Vehicle Operations, for operation of that vehicle IAW federal, state and local laws. All Ktr personnel shall abide by installation rules and regulations as to safety, speed, parking and seasonal hazards.

A13.2. Flight line Operations. Ktr personnel operating motor vehicles on the flight-line shall possess a valid state driver’s license and Airfield Competency Card, AF 483, IAW AFI 13-213, Airfield Driving, and 94 AWI 13-213. Work within 100 feet of the edges of all-active runways and runway overruns and within 50 feet of all taxiways, should be done when there are no flying activities. Personnel working around runways, overruns, taxiways, and aprons shall have operable radios and be in contact with Airfield Management and the airfield control tower. They shall ensure all of their airfield equipment is working and that they are operating a rotating yellow beacon light or flashing yellow lights. Personnel shall immediately remove themselves from the airfield when notified by Airfield Management or the control tower that an emergency situation is in progress. Airfield Management will approve resumption of work after termination of the emergency.

A13.3 Driver Safety Training. The Ktr shall provide a vehicle driver safety orientation to Ktr personnel who operate Government-furnished vehicles and equipment. The orientation shall include refresher training on traffic rules, safe driving procedures, seasonal hazards, and operator care and maintenance. The Ktr shall conduct the initial orientation prior to operation of Government-furnished vehicles and equipment by Ktr employees and shall conduct refresher training annually. The Ktr shall notify the CO within ten calendar days after completion of the training.

A14 Environmental Controls.

A14.1. Compliance with Laws and Regulations. The Ktr shall comply with all applicable, federal, state, and local laws in the performance of this PWS. The Ktr shall comply with AF instruction, regulation and requirements cited in Tabs A thru H in the performance of this PWS. Ktr shall ensure policies and procedures are established that protect the health and safety of employees and the community to minimize or eliminate the risk of environmental pollution.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .