Dobbins_BOS_PWS_Cover_Section_Rev_2 _15_May_14.docx
DOCX document 22 KB Posted
- Attached to
- Dobbins ARB, Base Operations Services Federal contract opportunity
- Solicitation number
- FA6703-14-R-0001
About this file
PWS Rev 2 Cover Section
View the file
Other files for this federal contract opportunity
Show all 50
Dobbins ARB, Base Operations Services has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION C
PERFORMANCE WORK STATEMENT
FOR
SUPPLY, VEHICLE OPERATIONS AND MAINTENANCE,
TRAFFIC MANAGEMENT, TRANSIENT AIRCRAFT,
REAL PROPERTY MAINTENANCE,
FUELS MANAGEMENT AND AIRFIELD MANAGEMENT
BASE OPERATIONS SUPPORT (BOS)
AT
DOBBINS ARB, GEORGIA
REVISION 2
28 APRIL 2014
TABLE OF CONTENTS
| Functional Area | Title |
| Tab A | General Description of Services |
| Tab B | Supply |
| Tab C | Vehicle Operations and Maintenance |
| Tab D | Traffic Management |
| Tab E | Transient Aircraft |
| Tab F | Real Property Management |
| Tab G | Fuels Management |
| Tab H | Airfield Management |
Index
SUMMARY OF CHANGES
Original Document: 1 March 2014
Revision 1
Tab A
A-TE-4c - GFE-Office Equipment, Note added that the equipment is provided in as in condition.
Tab B
B1.3 - Added sentence regarding PM function.
B-TE-2 – Receive Material Inserted at #10, previous items 10 – 33 renumbered to 11 – 34.
B-TE-4c - GFE-Office Equipment, Note added that the equipment is provided in as in condition.
Tab C
C1.2.1 - Added sentence regarding PM function.
C-TE-2b – Added Deliver Material and Pick Up Material lines.
C-TE-4c - GFE-Office Equipment, Note added that the equipment is provided in as in condition.
Tab D
D1.2 - Added sentence regarding PM function.
D2.2.3 – Reference changed from DOD 4500.9R, Part III to DTR 4500.9R, Part III.
D2.2.3.1 Inspection of Baggage, hazardous, or Prohibited Items – Paragraph added.
D2.2.3.2 Passenger Identity Screening (TSA eSecure Flight System) – Paragraphah added.
D3.1.4. – Replaced AFI 23-110 with AFI 23-101 D3.2.2.1. - Replaced AFI 23-110 with AFI 23-101 D15.1 – Inserted space and removed comma, changed AFMAN and AFI reference to AFI 23-101 D15.3 – Removed /Turn-In Processing for title; Replaced AFJI with AFJMAN and AFMAN 23-110 with AFI 23-101; Added Processing Receipts Information; SDS References Corrected D15.4 – Removed Processing Receipts/Turn-Ins Information and moved to D15.3Turn-in D15.5 – Replaced AFMAN 23-110 with AFI 23-101 D-TE-1 – SDSD09 Performance Objective: Replaced “Ensure Syncada billing transactions validated, certified and provided to servicing DFAS”; with “Ensure Syncada billing transactions validated.” Performance Threshold: Replaced, “Billing transactions are processed NLT 72 hrs after Account Statement is posted on Syncada web site. Not more than one of 2 submissions to DFAS annually exceed this threshold”; with “Ensure billing transactions are validated within five workdays of statement date.”; Added SDSD11 and SDSD12;
D-TE-2 – Cargo Movements added Receipts Processed line and Offload Commercial/Government Carriers section.
D-TE-4b – Revised to add 1 Ea Magnetometer.
D-TE-4c - GFE-Office Equipment, Note added that the equipment is provided in as in condition.
Tab E
D1.2 - Added sentence regarding PM function.
E1.2 – capitalized Exceptional Releases E3.8 – added to sentence: The Ktr shall connect, operate, support and maintain equipment….
E-TE-4-c - GFE-Office Furnishings, Note added that the equipment is provided in as in condition.
Tab F
F-TE-1 – SDSF24 Performance Objective: replaced “Maintain AAS in fully operational condition”; with “Reserved” F-TE-3 – removed addressee #5 from “submit to” in all items except for F01 F-TE-3 – changed address #3 from Bioenvironmental to CEV F-TE-6 – changed MAS #8 water distribution quantity to 48,977 LF F-TE-7 – added Communications Manholes drawing F-TE-4-c - GFE-Office and Shop Fixtures, Note added that the equipment is provided in as in condition.
Tab G
G2.1- Added sentence regarding PM function.
G-TE-4-c - GFE-Office Equipment, Note added that the equipment is provided in as in condition.
Tab H
H-TE-4-c - GFE-Office Equipment, Note added that the equipment is provided in as in condition.
Revision 2
Tab B
F-TE-4b – Added VAMPS Machine to list.
Tab C
C-TE-2b – Table revised, Average In-Service Time Column Added, Revised Total Miles Column
Tab F
F5.25.3 – Added verbiage for comm manholes and handholds F7.6.15 – Corrected reference from F-TE-2e to F-TE-2j F-TE-6 – MAS #1 Index – Split into Sections a & b to address electric and manual doors F-TE-6 – MAS #7 Index - Deleted Facility 2035 Precision Approach Radar F-TE-6 – MAS #8 Index – Increased Quantity of Linear Feet F-TE-6 – MAS #12 Index – Removed DHW for header, changed ref to F5.17.4, removed DHWs from equipment list, updated size and PSI information F-TE-6 – MAS #12a – Deleted reference to DHW boilers, item 20 Summary of Changes SOC 2
File details come from the government source that posted it. Updated .