11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of amendment 0001 is the following:Block 14 (Description of Amendment/Modification):
To remove the "F35 Sunshade - Statement of Work and Specifications" attachment and replace with "F35 Sunshade - Statement of Work and Specifications Revision 1". The revision of this document clarifies that all materials are to be provided and installed by the contractor. Language that conflicts with this statement has been removed.
To further clarify the evaluation factors on contractor project management in sections L and M of this solicitation.
Section J - List of Attachments
The following attachments were added:
F35 Sunshade - Statement of Work and Specifications Revision 1
The following attachments were deleted:
F35 Sunshade - Statement of Work and Specifications
Section L - Instructions, Conditions, & Notices to Offerors or Quoters
Miscellaneous text in this section has been modified to:
L-1 PROPOSAL PREPARATION
General Instructions, Conditions, and Notices to Offerors
To ensure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. Offeror shall submit original and one
(1) hard copy of the Price Proposal. Hard copies of the Offeror's proposal shall be submitted in a tabbed, three-ring binder or portfolio folder. The Offeror shall also submit one (1) complete proposal on a CD.
A. The offeror's proposal must include all data and information requested by this Instruction to Offerors (ITO) and must be submitted in accordance with these instructions. The offer shall be compliant with the requirements in the Drawings, Specifications and addendum(s). Non-conformance with the instructions provided in this ITO may result in an unfavorable proposal evaluation.
B. The response shall consist of two (2) Volumes: Price, and Technical. Hard copies of the proposal volumes shall be submitted in separate, tabbed, three-ring binder or folder. Each volume shall be clearly marked as to its content, i.e., project title, price proposal, technical, solicitation number, name and address of the offeror, and the time specified for receipt. Information within each volume shall be organized sequentially under the specified tabs to facilitate evaluation.
C. All solicitations and amendments must be acknowledged in accordance with FAR 52.215-1, Instructions to Offerors- Competitive Acquisition.
D. In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain all unsuccessful proposals. The Government will retain all submitted proposals.
E. The Contracting Officer (CO) has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the contracting officer will review this determination and if, in the contracting officer's opinion, adequate price competition exists no additional cost information will be requested and certification under FAR 15.406-2 will not be required. However, if at any time during this competition the contracting officer determines that adequate price competition no longer exists, offerors may be required to submit cost data to the extent necessary for the contracting officer to determine the reasonableness and affordability of the price.
F. General Information
1. Point of Contact
The Contract Specialist (CS) / Contracting Officer (CO) is the sole point of contact for this acquisition. Address any questions or concerns you may have to the Contract Specialist or Contracting Officer. Written requests for clarification may be sent to the Contract Specialist at the address located in Section A of the solicitation.
2. Debriefings
FA667523R00010001
The CO will promptly notify offerors of any decision to exclude them from the competitive range, whereupon they may request and receive a debriefing in accordance with FAR 15.505.
3. Discrepancies
If an offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the offeror shall immediately notify the CO in writing with supporting rationale as well as the remedies the offeror is asking the CO to consider as related to the omission or error.
The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal as received, without discussion.
4. Communications
Exchanges of source selection information between Government and offerors will be controlled by the CO. Email may be used to transit such information to offerors only if the e-mail can be sent and received encrypted and includes "Source Selection Information - See FAR 2.101 & 3.104" in the Subject line.
Volume I - Cost/ Price Proposal
The Price volume shall consist of the following documents. Offerors shall furnish only one original of the price proposal for Volume I - Cost / Price Proposal. Submit an original and one (1) copy.
a) Complete blocks 14 through 20C Standard Form 1442-Solicitation, Offer and Award. In doing so the offeror consents to the contract terms and conditions as written. An official having the authority to contractually bind the company must sign the SF 1442 in accordance with FAR 4.102.
b) Section B: Insert the proposed total price in Section B for Contract Line Item Number (CLIN) 0001.
c) Any amendments to the solicitation shall be acknowledged in Block 19 of the SF 1442 and by returning a signed copy of the amendment(s) - Standard Form 30, with the proposal.
d) Complete the necessary fill-ins and certifications in Sections I through K. The offeror shall submit only those pages that require a fill in or document completion.
e) Bid Bond: See FAR Clause 52.228-1 Bid Guarantee.
f) Financial Resources: Offerors shall submit a completed financial capability letter from their financial institution. In addition, Offerors shall submit a letter from the bonding company confirming bonding capacity and maximum dollar threshold. The letter will be used in the Contracting Officer's determination of responsibility.
Volume II - Technical
Submit an original plus one (1) complete copy. Technical Factor length: Limited to 20 pages in length. A page is defined as one face of a sheet of paper containing information. A page printed on both sides will be counted as two pages. Font shall be a minimum of 12 pt. Pages exceeding the page limitations set forth in this Section L will not be read or evaluated, and will be removed from the proposal. The Technical Volume shall be specific and complete. Legibility, clarity, and coherence are very important. Your responses will be evaluated against the Technical sub factors defined in Section M, Evaluation Factors. Using the instructions provided below, provide as specifically as possible the actual methodology you would use for accomplishing or satisfying these sub factors. All the requirements specified in the solicitation are mandatory. By your proposal submission, you are representing that your firm will perform all the requirements specified in the solicitation. Do not merely reiterate the objectives or reformulate the requirements specified in the solicitation.
The specific sub factors to be addressed in Part I are as follows:
SUB FACTOR 1: Project Management
Offeror shall provide an approach that demonstrates their ability to execute all critical aspects of the construction within the performance period of the contract. The plan shall consist of the anticipated phases of construction from pre-mobilization/site occupancy, site preparation, quality control testing, punch list completion to project closeout. Describe how communications with the government shall be addressed, focusing in particular on problem avoidance/resolution.
Offeror may use a critical path or other method of his/her choice; however, schedules shall be graphically represented. The length of the schedule must match the proposed contract duration.
NOTE: The summary schedule will, after contract award, be replaced with a final schedule as required by FAR Clause 52.236-15, Schedules for Construction Contracts. The schedules shall be task oriented, indicating the number of calendar days, after notice to proceed, by which milestones are to be achieved.
Provide a graphical organizational chart that identifies positions and names of key personnel that will be performing on this project. This organizational chart should denote whether the position is in the field or at the home office. Key personnel include the Project Manager, Quality Control Managers, On Site Project Superintendents, Safety Managers and Office Administrator. Contractor must provide resumes demonstrating qualifications and experience of proposed key personnel identified above.
SUB FACTOR 2: Company Experience
Offeror shall provide a capability statement identifying experience of the company as outlined in the following:
At least two (2) recent projects (within past 5 years) of similar scope and size involving metal structure construction or of similar design >$5M from award through project completion. Offerors that demonstrate sufficient proficiency in engineering, construction, or design of metal structures may also be considered for this sub factor. The list shall have Point of Contact Information to include; name of organization, names of the primary AND alternate POCs, telephone numbers, dollar value, period of performance and description of each project.
L-2 GENERAL INFORMATION
NOTE TO OFFERORS: Proposals will be accepted via mail (i.e. USPS, FedEx, UPS, DHL, etc.) or hand delivered. FAXED OR E-MAILED PROPOSALS WILL NOT BE ACCEPTED. The sealed envelope/package used to submit your proposal must show the solicitation number and name and address of offeror.
MAILING ADDRESS:
Attn: Nicholas Fyffe
FA6675-23-R-0001 Proposal
301 CONF/PK
1660 Lyons Drive
NAS Fort Worth JRB, TX 76127
HAND DELIVERED: Proposals may be hand delivered to:
301 CONF/PK
1660 Lyons Drive
NAS Fort Worth JRB, TX 76127
Visitor Center hours are 6:30 AM to 2:30 PM Monday thru Friday.
Contact Robert Walz at robert.walz.1@us.af.mil and Nicholas Fyffe at nicholas.fyffe.4@us.af.mil three days before arrival to request and submit base access pass information. Note, a background screen is required for access to NAS Fort Worth JRB.
L-3 CONTRACTOR QUALIFICATION
In accordance with FAR 9.104-1, prior to award, the lowest priced offeror must be determined to be responsible by the Contracting Officer. In order to do so, that offeror may be requested to submit additional documentation for review. Information includes, but is not limited to:
a. Financial ability to perform the contract, including the availability of necessary working capital and credit. Offeror shall furnish a copy of its current financial statement and obtain statements from its bank or banks and/or lending institutions with whom it does business as to its credit and other data deemed pertinent regarding its ability to perform the work.
b. Business and financial reputation and integrity. Offeror shall furnish Points of Contact, phone numbers, company names and addresses of four or more commercial firms for whom work has been performed recently or is under construction. A brief description of the projects and dollar value of same shall also be furnished. Data on work performed which is similar to the proposed work is preferred.
This information is necessary for determining your responsibility and will not be released outside the Government or made available for inspection by individuals, firms or trade organizations. Prior to determination of responsibility, such data may be discussed with you as deemed necessary prior to award.
L-4. SITE VISITS
NOTICE OF PRE-PROPOSAL CONFERENCE/SITE VISIT
A. A pre-proposal conference/site visit will be conducted on at 10 January 2023 10:00 a.m. central standard time (CST).
B. Submit the names of all attendees to Mr. Robert Walz and Mr. Nicholas Fyffe via email at robert.walz.1@us.af.mil and nicholas.fyffe.4@us.af.mil no later than 4:30 p.m. CST on 8 Jan 2023. Limit is one (1) representative per contractor. This information must be provided in advance, in order to ensure access to the conference site and adequate space for the conference attendees. Upon receipt of names and attendees, details will be provided on the meeting location and how to gain access.
C. Information provided at this conference shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgement and receipt of solicitation amendments shall apply.
L-5. REQUESTS FOR INFORMATION
Requests for Information (RFIs) or other questions pertaining to this requirement must be submitted no later than 17 January 2023 at 10:00 a.m.
central standard time (CST). RFIs or other questions submitted after Month/Date/Year> at 10:00 a.m. central standard time (CST) may or may not be answered if the Contracting Officer determines it to be in the Government's best interest.
Section M - Evaluation Factors for Award
Miscellaneous text in this section has been modified to:
M-1 EVALUATION BASIS FOR AWARD
Introduction: This is a Lowest Price Technically Acceptable (LPTA) source selection conducted in accordance with Federal Acquisition Regulation (FAR) 15, Contracting by Negotiation, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), the Air Force Federal Acquisition Regulation Supplement (AFFARS), DOD Source Selection Procedures 5315.3, 27 January 2017. These regulations are available electronically at https://www.acquisition.gov/.
The Government will select the proposal with the lowest evaluated price from those meeting the acceptability standards for non-price factors. Award will be made to the offeror deemed responsible in accordance with FAR Part 9.1, as supplemented, whose proposal conforms to the solicitation's requirements (to include all stated terms, conditions, representations, certifications, and all other information required by Section L of this solicitation) and is based on the evaluation factors and sub factors, and have the lowest total evaluated price.
The Government intends to award one FFP contract, without discussions with respective offerors. However, the Government reserves the right to conduct discussions if deemed in its best interest. If so, discussions will be conducted in accordance with FAR 15.306. Proposals should be submitted initially on the most favorable terms from a price and technical standpoint. Offerors should not assume they will be contacted or afforded an opportunity to clarify, discuss or revise their proposals. The Government reserves the right to reject any or all offers if such action is in the Government's best interests.
M-2 EVALUATION FACTORS
Evaluation Factors and Sub factors the evaluation process is as follows:
A. First, the Government will determine if the proposal conforms to the RFP requirements. Only conforming proposals will be eligible for award.
B. Second, the Government shall perform a price analysis on all conforming proposals, ranking them from lowest to highest evaluated price.
C. Third, the Government shall then determine if responsive proposals are technically acceptable or unacceptable in accordance with the evaluation criteria (factors/sub factors.) If responsive proposals are found to be technically acceptable and price is determined to be reasonable, award will be made to the offeror with the lowest price without further consideration of any other proposals. If the lowest price proposal is not found to be technically acceptable, the process will continue and award will be made to the lowest offeror with a technically acceptable proposal. At the Contracting Officer's discretion, the government may conduct a realism analysis of contractor proposals.
Factor 1 - Price
Factor 2 - Technical
Sub-factor 1: Project Management
Sub-factor 2: Company Experience
Proposals which do not address all evaluation factors and sub factors, or that are found to be unacceptable in any factor/sub factor, will be determined unacceptable proposals and will receive no further consideration for award.
A. Factor 1: Price: The offeror's Price proposal will be evaluated for reasonableness, total evaluated price and financial resources. These will be evaluated in accordance with paragraphs 1, 2, 3 and 4.
1. Reasonableness: The offeror's Price proposal will be evaluated to ensure it is fair and reasonable pursuant to FAR 15.404-1. The existence of adequate price competition is expected to support a determination of reasonableness. Price analysis techniques may be used to further validate price reasonableness. If adequate price competition is not obtained or if price reasonableness cannot be determined using price analysis of Government obtained information, additional information in accordance with FAR 15.4 may be required to support the proposed price.
2. Total Evaluated Price (TEP): The TEP will be the total proposed price for CLIN 0001 in Schedule B of the SF 1442.
The offeror's TEP will be evaluated to ensure it is fair and reasonable, pursuant to FAR 15.404. For additional information see FAR 31.201-3. The otherwise technically acceptable, lowest-priced offeror may be required to confirm its price on a total price basis, and/or provide additional information in support of their price, prior to contract award. Offerors whose price is determined to be unreasonable or unaffordable may not be considered for award.
3. Financial Resources: The financial capability letter will be evaluated to determine financial capacity to meet this requirement. The letter from the bonding company will be evaluated to determine bonding capacity and maximum dollar threshold.
B. Factor 2: Technical: The Government's technical evaluation team will evaluate the technical proposals on an acceptable or unacceptable basis, assigning one of the ratings described below for each sub factor. Any sub factor evaluated as "unacceptable" will render the entire proposal unacceptable and, therefore, unawardable. Only those proposals determined to be technically acceptable, either initially or as a result of discussions, will be considered for award. However, the offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion.
Table 1 - TECHNICAL RATINGS
Rating Description
Acceptable Proposal clearly meets minimum requirements Unacceptable Proposal does not clearly meet minimum requirements.
The proposals shall be evaluated against the following technical sub factors:
1. Sub factor 1: Project Management
Description: This sub factor evaluates the Project Management elements submitted in response to those outlined in Section L.
Measure of Merit: This sub factor is met when the offeror demonstrates a Project Management Plan that clearly demonstrates their ability to execute all critical aspects of the construction within the performance period of the contract. The plan shall clearly identify the anticipated phases of construction from pre-mobilization/site occupancy, site preparation, quality control testing, punch list completion to project closeout. Describe how communications with the government shall be addressed, focusing in particular on problem avoidance/resolution.
2. Sub factor 2: Company Experience
Description: This sub factor evaluates the relevant company experience on recent projects with similar size and scope of this requirement.
Measure of Merit: This requirement is met when the offeror's capability statements clearly define experience as shown in Section L.
C. Other/Conformance to RFP Requirements: The Government will determine if the proposal conforms to the RFP requirements; only conforming proposals will be eligible for award. Proposals will be determined to conform based on the following:
Offer is submitted by a Small Business;
Offeror registration is current in System for Award Management (SAM) and offeror is not debarred/ineligible;
Offer must provide evidence of sufficient bid guarantee, as required in FAR 52.228-1, Bid Guarantee. (include in volume I of proposal under section f);
Offeror has the financial and bonding capability and is determined responsible in accordance with FAR 9. (include in volume I of proposal under section g).
| IDCode: |
| Page: 1 |
| Pages: 6 |
| AmendNo: 0001 |
| EffDate: 12 Jan 2023 |
| ReqNo: |
| ProjNo: F5A6CE2223AW01 |
| IssCode: FA6675 |
| AdmCode: |
| IssuedBy: FA6675 301 LRS LGC |
1637 CARSWELL AVE
CP 817 782 7556
NAS JRB, TX 76127-6200
UNITED STATES
Nicholas Fyffe, Email: nicholas.fyffe.4@us.af.mil Telephone: 817-782-6194
| AdminBy: |
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA667523R0001 |
| SolDate: 12 Dec 2022 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: Robert J. Walz |
| ContDate: |
| CODate: 12 Jan 2023 |